Glasgow CaledonianGlasgow Caledonian

University.University.

Olympic Games.Olympic Games.

2008/2009 Session.2008/2009 Session.

8/8/2019 Olympics games-group 2(corrected)

http://slidepdf.com/reader/full/olympics-games-group-2corrected 2/12

 Theme: Theme:

Planning for ExhibitPlanning for ExhibitDesign andDesign and

Construction forConstruction for

Glasgow ScienceGlasgow ScienceCentre.Centre.

8/8/2019 Olympics games-group 2(corrected)

http://slidepdf.com/reader/full/olympics-games-group-2corrected 3/12

 Topic: Topic:Planning for the Design andPlanning for the Design and

Construction of an InteractiveConstruction of an Interactive

Dynamo.Dynamo.

ByBy A hmadu Dabai Ibrahim(200811790) A hmadu Dabai Ibrahim(200811790)

Ebede Sylvester O.(200812115)Ebede Sylvester O.(200812115)IbnIbn--Mohammed,  Taofeeq(200811248)Mohammed,  Taofeeq(200811248)

Ojukonsin  Tebe Larry(200811261)Ojukonsin  Tebe Larry(200811261)

8/8/2019 Olympics games-group 2(corrected)

http://slidepdf.com/reader/full/olympics-games-group-2corrected 4/12

8/8/2019 Olympics games-group 2(corrected)

http://slidepdf.com/reader/full/olympics-games-group-2corrected 5/12

Item Selection .Item Selection .

Is it interactive?

Is it informative?

Is it entertaining?

Does it reflect principles of 

Engineering and Ph ysical

Sciences?

Is it safe?

Choose Item for Exhibit

Is it Robust?

 Y es

 Y es

 Y es

 Y es

 Y es

No

No

No

No

No

No

Item selected

 Y es

8/8/2019 Olympics games-group 2(corrected)

http://slidepdf.com/reader/full/olympics-games-group-2corrected 6/12

Sequence of Operation.Sequence of Operation.

 Visitor Approaches Exhibit.

 Visitor turns handle.

Exhibit Senses Visitor.

Sound System asks Visitor If Interested in more demonstrations.

Sound System explains the output of the

Dynamo as displayed on the Display Unit and Light Bulb.

Sound system prompts Visitor to turn Dynamo handle.

Human Machine Interface is triggered.

 The visitor is welcomed by the

exhibit and asked if interested

in the demonstration.

Demonstrationends.

 Y es

No

No

8/8/2019 Olympics games-group 2(corrected)

http://slidepdf.com/reader/full/olympics-games-group-2corrected 7/12

System Block Diagram.System Block Diagram.

Human

Machine

Interface

Human

Sensor

Dynamo/Motor

Micro

Controller

Display

Unit

 Voice codec/

Speaker

8/8/2019 Olympics games-group 2(corrected)

http://slidepdf.com/reader/full/olympics-games-group-2corrected 8/12

8/8/2019 Olympics games-group 2(corrected)

http://slidepdf.com/reader/full/olympics-games-group-2corrected 9/12

 Work Breakdown Structure Work Breakdown Structure

Budget

Conception Construction Installation Documentation

Signage guideline

Interactive Dynamo

8/8/2019 Olympics games-group 2(corrected)

http://slidepdf.com/reader/full/olympics-games-group-2corrected 10/12

 Activity Lists Activity Lists

Define Concept.Define Concept.

Develop System Block diagram.Develop System Block diagram.

Detailed Engineering Design.Detailed Engineering Design.

Design Stator, Rotor , CommutatorDesign Stator, Rotor , Commutatorand Brushes.and Brushes.

Design the Sensors, Control unitDesign the Sensors, Control unitand Humanand Human--MachineMachineInterface(HMI)Interface(HMI)

Design display unit and RotatingDesign display unit and Rotatinghandle.handle.

Design of Audio Systems and voiceDesign of Audio Systems and voicecodec.codec.

Write algorithm/pseudo-codes forthe controller.

Select programming lang. write andSelect programming lang. write anddebug program.debug program.

Design Frame  Work/Casing.Design Frame  Work/Casing. Design Low voltage power supplyDesign Low voltage power supply

unit.unit.

Check design deliverables forCheck design deliverables forconformity with various standards.conformity with various standards.

Prepare bill of materials.Prepare bill of materials.

Conception Detail Engineering Design

8/8/2019 Olympics games-group 2(corrected)

http://slidepdf.com/reader/full/olympics-games-group-2corrected 11/12

 Activity Lists cont·d Activity Lists cont·d

Construction of all ElectricalConstruction of all Electricalcomponents and windings tocomponents and windings tospecification.specification.

Construction of all ElectronicConstruction of all Electroniccomponents and control units tocomponents and control units to

specificationspecification Burn program into controller forBurn program into controller for

control and voice messagescontrol and voice messages

Construct all Mechanical partsConstruct all Mechanical partsto Specificationsto Specifications

Construct Framework andConstruct Framework and

supportssupports Finishing/ Quality checksFinishing/ Quality checks

 Assembling/ Integration of  Assembling/ Integration of units/  Testing/Correctionsunits/  Testing/Corrections

Prepare all documentationsPrepare all documentations(electronic/hard copy and back (electronic/hard copy and back--up)up)

Prepare signage guideline.Prepare signage guideline.

Prepare base for gadget exhibition.Prepare base for gadget exhibition. Transport/couple Gadget to base Transport/couple Gadget to base

Display of signage guidelinesDisplay of signage guidelines

Construction. Documentation.

Signage Guidelines

Installation.

8/8/2019 Olympics games-group 2(corrected)

http://slidepdf.com/reader/full/olympics-games-group-2corrected 12/12

Project Planning  Tools:Project Planning  Tools:

 Activity Precedence  Table Activity Precedence  Table

Network DiagramNetwork Diagram

Gantt ChartGantt Chart

Critical Path MethodCritical Path Method

Critical Path DiagramCritical Path Diagram

CrashingCrashing

Cost AnalysisCost Analysis

LevellingLevellingMicrosoft Office

Excel Worksheet