  • 8/19/2019 Offshore structures surface treatment

    1/11

    HEMPEL ACADEMY

    Off-shore structures

    Surface treatment

    SPJ/HO  – Revision 0 / Jan-2010

    Søren Pii JohannessenHempel Academy - Paint Technology & Inspection

    Manager 

  • 8/19/2019 Offshore structures surface treatment

    2/11

    HEMPEL ACADEMY

    Off-shore structuresTypical structures

    FPSO, FLNG

    Rigs

    Wind-mills

  • 8/19/2019 Offshore structures surface treatment

    3/11

    HEMPEL ACADEMY

    Off-shore structuresSurface treatment

    Surface preparation of steel

     Application of protective system

  • 8/19/2019 Offshore structures surface treatment

    4/11

    HEMPEL ACADEMY

    Off-shore structuresRequirements

    Long lifetime

    • Structural

    • Protective system

    25 to 50 years

    15 to 25 years

    - In extreme aggressive environment

  • 8/19/2019 Offshore structures surface treatment

    5/11

    HEMPEL ACADEMY

    Off-shore structuresRequirements - Specification

    Protective system

    Surface preparation

     Application

    Inspection

    Dry film thickness

    Steelwork, cleanliness, roughness

    Dry film thickness, intervals

    Control, reporting

    - Each to be documented / certified

  • 8/19/2019 Offshore structures surface treatment

    6/11

    HEMPEL ACADEMY

    Off-shore structuresRequirements - Standards

    NORSOK

    ISO 12944

    ISO 20340

  • 8/19/2019 Offshore structures surface treatment

    7/11

    HEMPEL ACADEMY

    Off-shore structuresUnder-water areas

    Cleanliness

    Roughness

    Paint system

    Sa 2½, max. 20 mg/sqm soluble salts

    Medium (G), BN 10b

    Epoxy: 2 x 400 micron

    (+ cathodic protection)Fouling protection ?

  • 8/19/2019 Offshore structures surface treatment

    8/11

    HEMPEL ACADEMY

    Off-shore structuresAtmospheric exposed areas - 1

    Cleanliness

    Roughness

    Paint system

    Sa 2½, max. 20 mg/sqm soluble salts

    Medium (G), BN 10b

    Zinc-(epoxy/silicate): 1 x 60 micron

    Epoxy : 2 x 125 micronPolyurethane : 1 x 50 micron

  • 8/19/2019 Offshore structures surface treatment

    9/11

    HEMPEL ACADEMY

    Off-shore structuresAtmospheric exposed areas - 2

    Cleanliness

    Roughness

    System

    Sa 3, max. 20 mg/sqm soluble salts

    Coarse(G), BN 11b

    Zinc-(metallizing) : 1 x 60 micron

    Epoxy : 2 x 100 micronPolyurethane : 1 x 50 micron

  • 8/19/2019 Offshore structures surface treatment

    10/11

    HEMPEL ACADEMY

    Off-shore structuresVarious tanks

    Cleanliness

    Roughness

    System

    Sa 2½, max. 20 mg/sqm soluble salts

    Medium(G), BN 10b

    Epoxy phenolic : 3 x 100 micron

    Epoxy phenolic : 2 x 150 micron

    or 

  • 8/19/2019 Offshore structures surface treatment

    11/11

    HEMPEL ACADEMY

    End