october 12, 2012

13
1 October 12, 2012 December 5, 2012

Upload: becky

Post on 23-Feb-2016

45 views

Category:

Documents


0 download

DESCRIPTION

October 12, 2012. December 5, 2012. Light Rail Efficiency Projects. Board Adopted LRT Improvement Plan May 2010 Speed up system, open new markets, improve cost recovery Improve connectivity to BART and other regional services, increase ridership - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: October 12, 2012

1

October 12, 2012December 5, 2012

Page 2: October 12, 2012

Light Rail Efficiency Projects• Board Adopted LRT Improvement Plan May 2010• Speed up system, open new markets, improve cost recovery• Improve connectivity to BART and other regional

services, increase ridership• Anticipate employment and population growth• Support new 49ers Stadium

2

Page 3: October 12, 2012

VTA Light Rail System

6.3.C 3

32,716 weekday ridership

42.2 miles, 62 stations

Page 4: October 12, 2012

4

• Project began in September 2008, Board adopted mid 2010

• LRT is Phase 2 of the Comprehensive Operations Analysis

• Comprehensive evaluation of the existing light rail system -- focus on making the system as effective and efficient as possible

• Operations and capital improvements analyzed and tested

• Evaluation of the LRT system to handle projected passenger growth to the year 2018 and 2035

LRT Systems Analysis Background

Page 5: October 12, 2012

5

2010 Study Goals

• Increase Ridership• Calculate changes in ridership vs. No Build

• Speed up the System• Compute differences in average operating speed

• Spend Money Wisely• Check whether proposed scenarios lead to improved farebox recovery

ratio

• Be More Relevant to the Needs of the Valley• Review how specific ridership gains compare to Market Analysis

opportunities

Page 6: October 12, 2012

6

Downtown Transit Mall

Single Track

Merge Points

Light Rail System: Constraints

At-gradeIntersections Future Transit

ConnectionsExisting Transit

Connections

Single Track

Page 7: October 12, 2012

7

Market Analysis: Transit Competitive Factor & Core Network Area

< 2525 - 5050 - 100100 - 200> 200

DestinationOrigin Both

Page 8: October 12, 2012

8

Peer Comparison – Boardings and Route Miles

VTA Salt Lake City Sacramento Denver Portland San Francisco0

20,000

40,000

60,000

80,000

100,000

120,000

140,000

160,000

180,000

200,000

-

10

20

30

40

50

60

70

80

90

100

Average Weekday Boardings LRT Route Miles

Ave

rage

Wee

kday

Rid

ersh

ip

LRT

Rou

te M

iles

1,0101,420 800 1,160Boardings per Mile 460460

Page 9: October 12, 2012
Page 10: October 12, 2012
Page 11: October 12, 2012

Double Track Mountain View to Whisman

Run-Around Track in Downtown Vicinity

Storage near 49ers Stadium

N. First Street and Transit Mall Speed

Improvements

System-wide Transit Signal Priority Improvements

11

Page 12: October 12, 2012

New 49ers Stadium Accelerates Need to Deliver Planned Improvements

Source: 49ers Stadium EIR, 2009/ AECOM, 2012

August 2014

126.3.C

Page 13: October 12, 2012

2014 Stadium Access Improvements

13

• New eastbound platform at Great America Station for stadium event service

• Queuing areas for departing stadium attendees on closed eastbound lanes of Tasman Drive

• Fencing of LRT Right-of-Way• Improve stadium access from ACE/Capitol Corridor

Great America Station• Temporary pedestrian at-grade crossing of LRT tracks

on Tasman Drive at Great America Station• New pedestrian bridge over San Tomas Aquino Creek