Objective ATC 16

ESSIP Plan 2013

Luca DELL’ORTODSS/EIPR

13.09.2013

Page 2: Objective ATC 16 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR 13.09.2013

2

Comprehensive Explanation 1/2

Traffic alert and Collision Avoidance System (TCAS) is an a/c (= airborne – based) system to reduce the incidence of mid-air collisions between aircraft.

This objective concerns the upgrade of existing ACAS/ TCAS. Currently Airborne (ACAS II) is based on TCAS II (SW) version 7.

An enhanced TCAS compliant with the changes TCAS II Change 7.1 would further reduce the risk of a mid-air collision in European airspace by a factor of 4.

Note: this OBJ is applicable to all flights performed by a/c of a given category, regardless of State of Registry: with MTOW > 5700 kg, or authorised to carry more than 19 passengers; or any other a/c equipped with ACAS II.

ESSIP Plan 2013 / Objective ATC16

Page 3: Objective ATC 16 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR 13.09.2013

3

Comprehensive Explanation 2/2

Applicable legislation: Commission Regulation (EU) No 1332/2011 on common airspace usage requirements and operating procedures for airborne collision avoidance

Applicable ICAO Annexes: ICAO Annex 10 – Amendment 85 of )ctober 2010

Note: the 12/2015 FOC date is for retrofit; For new aircraft (forward-fit) the applicable date is March 2012. Implementation is on a voluntary basis for the MIL transport type a/c,

unless specified differently at National level.

ESSIP Plan 2013 / Objective ATC16

Page 4: Objective ATC 16 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR 13.09.2013

4

What is new or has changed for ESSIP Plan ed 2013

No change

ESSIP Plan 2013 / Objective ATC16

Page 5: Objective ATC 16 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR 13.09.2013

5

Link to European ATM Master Plan and/or Interim Deployment Programme (IDP)

Eur. ATM Master Plan:Linked to OI step CM-0803 via Enabler [CTE-S11a] - Upgrades to TCAS, TAWS etc.

IDP:None

ESSIP Plan 2013 / Objective ATC16

Page 6: Objective ATC 16 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR 13.09.2013

6

Most important SLoA(s)

Most SLoAs (REG01 – 03; MIL01 – 02; USE01 – 02) concern approval of i.e. airworthiness of (CIV/MIL) a/c and the implementation by airspace users.

ASP SLoAs: ASP01 – Train controllers

ASP02 - Establish ACAS II (TCAS II change 7.1) performance monitoring: This SLoA has to be understood as the requirement to perform ACAS

monitoring as prescribed in ICAO PANS-ATM. Such monitoring should be performed by means of reporting (incident reports from airlines and ANSPs).

It would be useful to contribute ACAS monitoring data/reports to the EUROCONTROL Voluntary ATM Incident Reporting System (EVAIR). 

ESSIP Plan 2013 / Objective ATC16

Page 7: Objective ATC 16 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR 13.09.2013

7

Finalisation Criteria and Closed Questions

REG/MIL/USE: A/c airworthiness certification, equipage and operational approval of ACAS II (TCAS II version 7.1) equipped a/c;

ASP: Implementation of a performance monitoring system; ASP: training of controllers

ESSIP Plan 2013 / Objective ATC16

Page 8: Objective ATC 16 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR 13.09.2013

8

Supporting Material

Various – check ESSIP Plan 2013 – ATC16 List of supporting material in individual SLoAs

ESSIP Plan 2013 / Objective ATC16

Page 9: Objective ATC 16 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR 13.09.2013

9

ESSIP Report 2012

Objective included in the ESSIP Plan as from 2011. 5 States have already it completed, 10 have partially completed the

SLoAs. 22 States plan to implement within the FOC date (12/2015). The objective does not require changes to ATM system: the 2 ASP

SLoAs cover ATCO training (ASP01) and incident reporting (ASP02).

ESSIP Plan 2013 / Objective ATC16

Page 10: Objective ATC 16 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR 13.09.2013

10

Links and contacts

Objective Coordinator: Dell’Orto Luca, +32 2 729 3325

[email protected]

EUROCONTROL Objective Expert:

Stanislaw Drozdowski +32 2 729 3760 stanislaw.drozdowski @eurocontrol.int

ESSIP Plan 2013 / Objective ATC16