Project Update

November 12th, 2012

Page 2: November 2012 Monthly Presentation

Transportation Enhancement

Projects

Page 3: November 2012 Monthly Presentation

“Transportation activities designed to strengthen the

cultural, aesthetic and environmental aspects of the

transportation system”

• 12 Categories:

– Ped & Bike Facilities

– Scenic/Historic Hwy Program

– Landscaping

– Historic Preservation

– Historic Transportation Buildings

– Abandoned RR corridors for Ped & Bike

TE Program

Page 4: November 2012 Monthly Presentation

Program Rules:

• Planning, design, and acquisition costs are 100% locally

funded

• Federal funds available for construction only

• Construction costs are 20% local match and 80% federal

funds

• 20% local match must be cash, not in-kind

• Funds are on a cost reimbursement basis

• If selected, an AFA with TxDOT must be executed within

one year

• Must advance to construction within four year

TE Program

Page 5: November 2012 Monthly Presentation

Program Schedule:

• August 2012 – TTC authorized $70M for 2012

Call for Projects

• September 14th – Call for Projects opened

• October 19th – Houston TxDOT District TE

Workshop

• November 1st – Draft submittal to H-GAC

• November 16th – TE Nomination Deadline for

Submission to TxDOT

• June/July 2013 – TE Project Selection by TTC

TE Program

Page 6: November 2012 Monthly Presentation

Additional Program Infomation:

• MPOs will select projects up to their pre-

determined funding levels

• Remaining projects will be selected by TxDOT

• Evaluation Criteria:

– Quality

– Scope of Benefits

– Transportation Value

TE Program

Page 7: November 2012 Monthly Presentation

TE Program – Proposed Projects

Page 8: November 2012 Monthly Presentation

Roadway Projects

Page 9: November 2012 Monthly Presentation

• Purpose: Determine a definitive alignment, which is adopted into the Thoroughfare Plan and used for land acquisition and dedication via platting

• Initial layouts consider: • Existing fixed points

• City Limits

• Existing right-of-ways

• Geometrics

• The alignment is refined considering: • Drainage

• Existing structures

• Acquisition factors

• Environmental Issues

• Other agency infrastructure

McHard Road & Max Road

Alignment Study

Page 10: November 2012 Monthly Presentation

McHard Road Alignment

Cullen to Mykawa

• 120’ right-of-way

• 4-lane boulevard with raised median

• 3.5 Miles

• One lane in each direction passable in 100-year storm

• Identify obstructions

• Structures

• Pipelines

• Ditches or creek crossings

• Significant floodplain or floodway issues

• Equalize acquisition from both sides where practical

Page 11: November 2012 Monthly Presentation

McHard Road Alignment

Cullen Pkwy to Stone Road

• 31 Parcels, 1 Structure, Pipeline Corridor to the north

Page 12: November 2012 Monthly Presentation

McHard Road Alignment

Stone Road to Roy Road

• 8 Parcels, 3-5 Structures

Page 13: November 2012 Monthly Presentation

McHard Road Alignment

Roy Road to O’Day Road

• 8 Parcels, 1 Pipeline, 3-5 Structures

Page 14: November 2012 Monthly Presentation

McHard Road Alignment

O’Day Road to Woody Road

• 4 Parcels, 1 Structure (previously acquired by City)

Page 15: November 2012 Monthly Presentation

McHard Road Alignment

Woody Road to Mykawa Road

• 5 Parcels, 1 Structure

Page 16: November 2012 Monthly Presentation

McHard Road Alignment

Cullen Pkwy to Mykawa Road

• Total Estimated Parcels: 56

• Total Estimated Structures: 8-12

• Total Potential Pipeline Relocations: 3

• Major Floodplain Areas: 2 (Hickory Slough & Clear Creek)

Page 17: November 2012 Monthly Presentation

Max Road Alignment

Hughes Ranch Road to BW8

• 120’ right-of-way

• 4-lane boulevard with raised median

• 2.1 Miles

• Traffic Model – More effective aligned with MLK

versus Wayside at BW8

• One lane in each direction passable in 100-year storm

• Identify obstructions

• Structures

• Pipelines

• Ditches or creek crossings

• Significant floodplain or floodway issues

• Equalize acquisition from both sides where practical

Page 18: November 2012 Monthly Presentation

Max Road Alignment

Hughes Ranch Road to BW8

Page 19: November 2012 Monthly Presentation

Max Road Alignment

Hughes Ranch Road to McHard Road

• 21 Parcels

• 0 Structures

Page 20: November 2012 Monthly Presentation

Max Road Alignment

McHard Road Intersection

• Curves allow intersection

to be perpendicular with

McHard

• Curves are a 750’ radius

• 40 mph design speed

• Avoids Brookside Village

City Limits

• Coordinating with

Brookside Village on the

segment north of

intersection

Page 21: November 2012 Monthly Presentation

Max Road Alignment

McHard Road to Brookside Road

• 11-14 Parcels

• 0 Structures

Page 22: November 2012 Monthly Presentation

Max Road Alignment

Brookside Road to BW8

• 21 Parcels

• 1-4 Structures

• 2 Pipelines

• 1 Bridges

Page 23: November 2012 Monthly Presentation

Max Road Alignment

Hughes Ranch Road to BW8

• Total Estimated Parcels: 53-56

• Total Estimated Structures: 1-4

• Total Potential Pipeline Relocations: 2

• Total Bridges: 1

• Major Floodplain Areas: 1 (Clear Creek)

Page 24: November 2012 Monthly Presentation

McHard Road & Max Road

Alignment Study

• Next Steps

• Review Pearland Parkway Alignment Study – Dixie

Farm Road to City Limits

• Review Dixie Farm Road Alignment Study – SH35

to Veterans

• Make final alignment adjustments

• Adopt alignments into the Thoroughfare Plan

Page 25: November 2012 Monthly Presentation

• Jamison Middle School

– Met with PISD & have general agreement on solution

– Working out details

– Solution is similar to Rustic Oaks with PISD, City, and

Brazoria County partnership

– Schedule

• Rustic Oaks Elementary School – Plan in place

– City fulfilled our obligation

– PISD & Brazoria County working out details &

Interlocal for the work

– Schedule

PISD School Issues

Page 26: November 2012 Monthly Presentation

• Carleston Elementary School

– PW working on plan to enclose ditch and provide

additional paving

– Scheduling work for next summer

PISD School Issues

Page 27: November 2012 Monthly Presentation

• TxDOT reviewing Categorical Exclusion (CE)

documents

• Attended 30% Utility Coordination meeting at

TxDOT

• Noise analyses by TxDOT completed

Pearland Parkway

Page 28: November 2012 Monthly Presentation

• Scheduling a ribbon cutting ceremony

• Save the date December 12 at 9:30am

Barry Rose/Hughes Road

Page 29: November 2012 Monthly Presentation

• Opened Bids on October 18th

• Low Bid was $3, 269,202 received from Third

Coast Services, LLC

• Awaiting TxDOT bid approval

• Planned Award Date is November 26th

ITS Project

Page 30: November 2012 Monthly Presentation

• Max Road

– Negotiated scope and fee sent to TxDOT for review and

approval

• Fite Road

– Staff is reviewing the scope and proposal

TIP Projects Update

Page 31: November 2012 Monthly Presentation

• Milling operations began immediately upon the

traffic change over in late September

• Subgrade stabilization was completed

• Remaining portions of the bridge were demolished

in early October making way for the work on the

new bridge to begin

Cullen Parkway – Phase II

Page 32: November 2012 Monthly Presentation

• November 1st – Meeting with West Lea property

owners

• Moving forward with final parcels for acquisition

Bailey Road

Page 33: November 2012 Monthly Presentation

• Held Pre-construction conference on October 15th

• Conducted construction coordination meeting with

the CR 59 contractor

• CPE Gas completed relocation of 6” gas main

• Comcast has completed their facility relocations

• CenterPoint Electric poles are still encroaching ROW

and need relocation; relocation design has been

initiated

Business Center Drive

Page 34: November 2012 Monthly Presentation

• Broadway/Main Street intersection – New signals cannot be turned on until the northbound

lanes have been poured between FM 518 and Jasmine

• Bridge work continuing – Work is about to begin on the final segments of the Town

Ditch and Hickory Slough bridges once drainage outfalls have been completed

• Drainage – Drainage trunks and laterals now complete at Clear Creek

and the subgrade ready for excavation

SH35 – BW8 to FM518

Page 35: November 2012 Monthly Presentation
Page 36: November 2012 Monthly Presentation

• TxDOT Area Office has approved the City’s plans for modifications to the Crossing for the Quiet Zone

• BNSF has agreed to replace and extend the crossing panels on FM 518 at no charge to the City

• Railroad has begun work to replace ties beneath the tracks throughout the Pearland area

Quiet Zone Railroad Crossing

Page 37: November 2012 Monthly Presentation

Drainage Projects

Page 38: November 2012 Monthly Presentation

Diversion Ditch

• Haddock Construction completed Phase I of slope paving

• Clearing & excavation underway between CR100 & CR101

• Bids on slope paving and hauling by BDD4 are higher than previous estimates

• Base on estimates for Phase II & III of slope paving the City’s share per the Interlocal Agreement could exceed budget

Cowart Creek Diversion

Page 39: November 2012 Monthly Presentation

Pump Station

• Wet well completed

• Pond pump down operations completed

• Pilot channel installation completed

• BorTunCo began jack and bore operations for 60” from the wet well to pond

Re-grading of Roadside Ditches

• Consultant submitted 60% plans

• Plan set review will be followed by a meeting with City staff to review the design

Cowart Creek Diversion (cont’d)

Page 40: November 2012 Monthly Presentation
Page 41: November 2012 Monthly Presentation

• Reviewed 60% plans

• Received 90% plans for review

Westchester Sidewalk and Drainage

Page 42: November 2012 Monthly Presentation

• Staff is reviewing 90% PER

• Geotech field work completed

• Reviewing options for implementing a regional plan

Cullen Regional Detention

Page 43: November 2012 Monthly Presentation

Facility Projects

Page 44: November 2012 Monthly Presentation

• Met with Brazoria County Library System staff for final review of project

• Received and distributed the 100% plan set for review and permitting

• Permit issued

• Opening bids November 29th

Westside Library

Page 45: November 2012 Monthly Presentation

• Received and distributed the 100% plan set for review and permitting

• Held TRC with architect, IT, Engineering, and Building Maintenance departments

• Advertised project November 7th

• Opening bids November 29th

Fire & EMS Administration Building

Page 46: November 2012 Monthly Presentation

• Clarifications successfully uploaded online

• Project returned to LEED review team

• Review scheduled to be completed by 11/20

PSB LEED Certification

Page 47: November 2012 Monthly Presentation

Parks

Page 48: November 2012 Monthly Presentation

• Contractor mobilized

• Began clearing and grubbing of pond and fill site

• Staff reviewed 60% plans for the sports complex

• Completed reimbursement requests to BDD4 and

Developer

Hickory Slough Detention at Max Road

& Max Road Sports Complex, Phase I

Page 49: November 2012 Monthly Presentation
Page 50: November 2012 Monthly Presentation

• Name changed to Trails at JHEC in order to

preserve naming rights for future

• Consultant preparing 90% plans

• Boardwalk requires geotechnical investigation

• Requested proposal for soil borings

• Parks Department received notification of possible

grant funds becoming available

Trails at JHEC

Page 51: November 2012 Monthly Presentation

• Southgate decomposed granite trail 95% complete

• Cypress Village concrete trail 98% complete

• Cypress Village decomposed granite trail 95%

complete

• Irrigation permit approved and Southgate

irrigation started

South Gate & Cypress Village Parks

Page 52: November 2012 Monthly Presentation
Page 53: November 2012 Monthly Presentation

• Design contract awarded by Council on

October 8th

• Project kick-off meeting held October 22nd

Shadow Creek Ranch Park

Page 54: November 2012 Monthly Presentation

Utility Projects

Page 55: November 2012 Monthly Presentation

City of Houston Interconnect

Alice Street Water Plant

• Chemical pumps have been completed

• All punch list items are complete

• After two weeks of pumps functioning continuously the GST demolition will begin

Page 56: November 2012 Monthly Presentation

• Completed all critical submittals reviews

• Electrician completed 99% of relocating

conduits at disk filter area and existing pull

box

• Centrifuge building stairs delivered

• Completed thickener’s pipe support footing

Longwood WWTP Rehabilitation

Page 57: November 2012 Monthly Presentation
Page 58: November 2012 Monthly Presentation

• Sluice gate installation 50% complete

• Tie in to clarifier effluent complete

• Disk filters delivered onsite

• Trash chute for headworks delivered and

installed

Barry Rose WWTP Rehabilitation

Page 59: November 2012 Monthly Presentation
Page 60: November 2012 Monthly Presentation

• 90% plans submitted by the Engineer and

reviewed by staff

• Complete tree protection plans based on tree

evaluation report

• Submitted 90% plans to BDD4 for review

• 15 of 16 parcels acquired or closing

• PISD dedication of easement on their Nov. 13

agenda

• Current estimate will exceed budget – reviewing

options to mitigate

Hatfield Basin Trunk Sewer

Page 61: November 2012 Monthly Presentation

• Electrical contractor has continued

installation of electrical components

• Installation of coatings for wet well and

piping have been started.

Twin Creek Regional Lift Station

Page 62: November 2012 Monthly Presentation

Far Northwest Wastewater Treatment

Plant Improvements

• Engineer submitted 90% PS&E package

• Staff reviewing plans

• Preparing to bid the project

Page 63: November 2012 Monthly Presentation

Old Alvin 20” Waterline

• Continued working with the Acquisition Manager

to acquire ROE and/or easements

• 10 of 13 parcels acquired or closing

• Received 100% plans and specifications along

with responses to the 90% review

Page 64: November 2012 Monthly Presentation

BellaVita Waterline Interconnect

• Council awarded construction contract on

October 8th

• Held pre-construction meeting and mobilization

meeting

• Notice to Proceed issued Nov. 1st

Page 65: November 2012 Monthly Presentation
Page 66: November 2012 Monthly Presentation

• Met with TxDOT’s Permit coordinator to discuss easements, and requirements for the installation of the waterline at SH 288 and at Cullen

• Met with Kinder-Morgan Pipeline Co. to discuss the alignment of the waterline and its proximity to the existing pipelines, there are no apparent conflicts

• Geotechnical work has begun

McHard Road 16” Water Line &

Roadway PER

Page 67: November 2012 Monthly Presentation

Project Update

Questions/Comments

November 12th, 2012