nov/dec 2009 exploring for our next gold mine funding a top tier nb/ta mine

27
NOV NOV / / DEC 2009 DEC 2009 EXPLORING FOR OUR NEXT GOLD MINE FUNDING A TOP TIER Nb/Ta mine

Upload: lawrence-mcbride

Post on 23-Dec-2015

216 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: NOV/DEC 2009 EXPLORING FOR OUR NEXT GOLD MINE FUNDING A TOP TIER Nb/Ta mine

NO

VN

OV

// DEC

2009

DEC

2009

NO

VN

OV

// DEC

2009

DEC

2009

EXPLORING FOR OUR NEXT GOLD MINE FUNDING A TOP TIER Nb/Ta mine

Page 2: NOV/DEC 2009 EXPLORING FOR OUR NEXT GOLD MINE FUNDING A TOP TIER Nb/Ta mine

2 TSX: MDN

Cautionary StatementCautionary StatementCautionary StatementCautionary Statement

This presentation contains certain “forward-looking statements”, including, but not limited to, the statements regarding the Company’s strategic plans, its anticipated benefits and the use of proceeds resulting thereof, in particular, future financial results, production targets and timetables, the evolution of mineral reserves and resources, mine operating costs, capital expenditures, work programs, development plans, exploration programs, objectives and budgets, the possible determination of additional reserves, and the Company's eventual success to execute its strategy to focus on building its portfolio of properties. Forward looking statements express, at this date, the Company’s plans, estimates, forecasts, projections, expectations or beliefs as to future events and results. Forward-looking statements involve a number of risks and uncertainties, and there can be no assurance that such statements will prove to be accurate. Therefore, actual results and future events could differ materially from those anticipated in such statements. Risks and uncertainties that could cause results or future events to differ materially from current expectations expressed or implied by the forward-looking statements include, but are not limited to, factors associated with fluctuations in the market price of metals, mining industry risks, exploration risks, risks associated with foreign operations, environmental risks and hazards, uncertainty as to calculation of mineral reserves, requirement of additional financing or additional permits, authorizations or licenses, risks of delays in construction and production and other risks referred to in the Company’s Annual Information Form.

Page 3: NOV/DEC 2009 EXPLORING FOR OUR NEXT GOLD MINE FUNDING A TOP TIER Nb/Ta mine

3 TSX: MDN

MDN at a glanceMDN at a glanceMDN at a glanceMDN at a glance

A Canadian exploration and development company based in Montreal, listed on the TSX under MDN

Gold producer since 2005 in Tanzania (MDN 30%, Barrick 70%)− 2009 cash flows from Tulawaka gold mine should be about

C$10 million (MDN’s share)

Working capital of C$25 million, profitable and no debt

Actively exploring for gold in Tanzanian world-class district and in Quebec

− 621 sq km in Tanzania around several world class gold mines

Technical exploration and management expertise in financing and building mines with partners

Page 4: NOV/DEC 2009 EXPLORING FOR OUR NEXT GOLD MINE FUNDING A TOP TIER Nb/Ta mine

4 TSX: MDN

Strong Financial Position - 2009 ResultsStrong Financial Position - 2009 ResultsStrong Financial Position - 2009 ResultsStrong Financial Position - 2009 Results

Nine-month periodending September 30, 2009

Revenue $7,555,170

Net income $2,685,193

Book value per share $0.49

Cash and cash equivalents $20,412,805

Production (oz)

Tulawaka Production nine-month period (U/G)

74,543

MDN’s 30% share (oz) 22,363

U/G Average grade (g/t) 15.3

Recovery rate 94%

Cash costs/oz US $383

Page 5: NOV/DEC 2009 EXPLORING FOR OUR NEXT GOLD MINE FUNDING A TOP TIER Nb/Ta mine

5 TSX: MDN

Recent DevelopmentsRecent DevelopmentsRecent DevelopmentsRecent Developments

Over 728,910 oz of gold produced at Tulawaka gold mine since 2005; going toward 1 Million oz over next few years

Drilling program ongoing in Tanzania since July and until the end of 2009 – preliminary results published on 100% owned Isambara and Ikungu high grade project is currently being drilled

Acquired 28.75 % interest in Anita, a large niobium (Nb) and tantalum (Ta) resource in Quebec

− Right to acquire control interest of up to 75% over next 3 years

− Scoping study started in June 2009 and drilling campaign of 5,500m was initiated

Page 6: NOV/DEC 2009 EXPLORING FOR OUR NEXT GOLD MINE FUNDING A TOP TIER Nb/Ta mine

6 TSX: MDN

The Anita projectThe Anita projectGenerate additional near term cash flows Generate additional near term cash flows

from Rare & Strategic Metalsfrom Rare & Strategic Metals

Page 7: NOV/DEC 2009 EXPLORING FOR OUR NEXT GOLD MINE FUNDING A TOP TIER Nb/Ta mine

7 TSX: MDN

ANITAPROJECT

Location of Niobium and Tantalum ResourceLocation of Niobium and Tantalum ResourceLocation of Niobium and Tantalum ResourceLocation of Niobium and Tantalum Resource

Page 8: NOV/DEC 2009 EXPLORING FOR OUR NEXT GOLD MINE FUNDING A TOP TIER Nb/Ta mine

8 TSX: MDN

A 25.75 million metric tonne resource

Open pit operation currently under study for at least 18 years

More exploration will be on the deposit’s southern and northern extensions to expand the resource

Proposed annual targeted output of the mine is:

− 1.2 million kg of Niobium oxide (Nb2O5) at US$ 45 per kg

− 115,000 kg of Tantalum oxide / K-salt (Ta2O5/TaK2F7) at US$ 150 per kg

Investment HighlightsInvestment Highlights

Resources Depth M tonnes Ta2O5 g/t Nb2O5 g/t Ta2O5 Kg Nb2O5 Kg

Indicated* 0-250 m 25.75 199 1,860 5,124,250 47,895,000

Inferred* 250-350 m 16.88 204 1,620 3,443,520 27,345,600

*Cut-off grade of 1,000 g/t Nb included as reported by SGS Geostat – April 6th 2009

Page 9: NOV/DEC 2009 EXPLORING FOR OUR NEXT GOLD MINE FUNDING A TOP TIER Nb/Ta mine

9 TSX: MDN

The Demand for Niobium & TantalumThe Demand for Niobium & TantalumThe Demand for Niobium & TantalumThe Demand for Niobium & Tantalum

The unique properties of these rare and strategic metals are very useful in superalloys (Nb) and tantalum condensers (Ta)

Industrial applications include: − Aerospace− Aeronautics− Steel manufacturing− Nuclear plant processing − Equipment manufacturing such as turbine blades, engines etc.

Page 10: NOV/DEC 2009 EXPLORING FOR OUR NEXT GOLD MINE FUNDING A TOP TIER Nb/Ta mine

10 TSX: MDN

The current shareholders

28.75% MDN Inc

37.5% IAMGOLD Inc

33.75% private investors

The asset

100% of Nb-Ta deposit

No Royalty

Very good location in Québec, Canada

Road, water, power, and labour access

The funding: a total of $13.5 million over the next few years

− to develop the feasibility study of the resource and to give MDN rights to acquire up to 75% of equity in the project

Corporate Profile of AnitaCorporate Profile of AnitaCorporate Profile of AnitaCorporate Profile of Anita

Page 11: NOV/DEC 2009 EXPLORING FOR OUR NEXT GOLD MINE FUNDING A TOP TIER Nb/Ta mine

11 TSX: MDN

We have the team in place to complete the feasibility of the project

− Feasibility and technical studies underway with a completion target of 2011

− Roskill confirms advantages of the project and the high probability of success

We have an off-take agreement with IAMGOLD, the 3rd largest producer of ferro-niobium in the world

− All of our niobium oxide production could be, if needed, purchased by IAMGOLD for the life of the mine, for the production of ferro-niobium

Anita – The next Nb / Ta ProducerAnita – The next Nb / Ta Producer

Page 12: NOV/DEC 2009 EXPLORING FOR OUR NEXT GOLD MINE FUNDING A TOP TIER Nb/Ta mine

12 TSX: MDN

MDNMDN in Tanzaniain Tanzania

Page 13: NOV/DEC 2009 EXPLORING FOR OUR NEXT GOLD MINE FUNDING A TOP TIER Nb/Ta mine

13 TSX: MDN

Tanzania is Africa’s 3rd largest gold producer Tanzania is Africa’s 3rd largest gold producer hosting World-Class Gold Depositshosting World-Class Gold DepositsTanzania is Africa’s 3rd largest gold producer Tanzania is Africa’s 3rd largest gold producer hosting World-Class Gold Depositshosting World-Class Gold Deposits

Tanzania produced more than one million ounces from Geita, Bulyanhulu & other mines in 2008

In May 2009 Barrick started the Buzwagi Mine (3.3 million ounces reserves)

Geita Mine>10 M oz Au

Bulyanhulu Mine> 10 M oz Au

Tulawaka Mine> 0.7M oz Au

Buzwagi Mine3.3 M oz Au reserves

Page 14: NOV/DEC 2009 EXPLORING FOR OUR NEXT GOLD MINE FUNDING A TOP TIER Nb/Ta mine

14 TSX: MDN

MDN controls 621 km2 area around the MDN controls 621 km2 area around the Tulawaka Gold Mine Tulawaka Gold Mine MDN controls 621 km2 area around the MDN controls 621 km2 area around the Tulawaka Gold Mine Tulawaka Gold Mine

Geita Mine>10 M oz. Au

Bulyanhulu > 10 M oz Au

Tulawaka> 0.7M oz Au

Page 15: NOV/DEC 2009 EXPLORING FOR OUR NEXT GOLD MINE FUNDING A TOP TIER Nb/Ta mine

15 TSX: MDN

Tulawaka Longitudinal MapTulawaka Longitudinal Map

Page 16: NOV/DEC 2009 EXPLORING FOR OUR NEXT GOLD MINE FUNDING A TOP TIER Nb/Ta mine

16 TSX: MDN

Focusing in Tulawaka Gold Mine districtFocusing in Tulawaka Gold Mine districtAn area barely explored due to sand coverAn area barely explored due to sand coverFocusing in Tulawaka Gold Mine districtFocusing in Tulawaka Gold Mine districtAn area barely explored due to sand coverAn area barely explored due to sand cover

Tulawaka Mine> 0.7 M oz Au

Buck Reef1.8 M oz Au

Geita Mine> 10 M oz Au

Bulyanhulu mine>10 M oz Au

Isambara

50 km

Viyonza

Mnekezi

Msasa

Isozibi

Lake Victoria GeologyBarth 1990Volcanics Granites

Bukoban Sediments& sand cover

Gold Showings

Page 17: NOV/DEC 2009 EXPLORING FOR OUR NEXT GOLD MINE FUNDING A TOP TIER Nb/Ta mine

17 TSX: MDN

Exploring western extension of 2 volcanic belts Exploring western extension of 2 volcanic belts hosting World-Class Gold Mineshosting World-Class Gold MinesExploring western extension of 2 volcanic belts Exploring western extension of 2 volcanic belts hosting World-Class Gold Mineshosting World-Class Gold Mines

Isambara

Viyonza

Mnekezi

Isozibi

Tulawaka Mine> 0.7M oz Au

Buck Reef1.8 M oz Au

Geita Mine> 10 M oz Au

Msasa

Bulyanhulu Mine>10 M oz Au

Lake Victoria GeologyBarth 1990

Airborne Calculated Resistivity (2004)

High Resistivity

Low Resistivity

Granite

Volcanics

Page 18: NOV/DEC 2009 EXPLORING FOR OUR NEXT GOLD MINE FUNDING A TOP TIER Nb/Ta mine

18 TSX: MDN

Isambara 5 km strike length gold soil anomalyIsambara 5 km strike length gold soil anomaly70 km west of Geita Mine (>10 M ounces gold)70 km west of Geita Mine (>10 M ounces gold)Isambara 5 km strike length gold soil anomalyIsambara 5 km strike length gold soil anomaly70 km west of Geita Mine (>10 M ounces gold)70 km west of Geita Mine (>10 M ounces gold)

North Zone

Central Zone

South Zone

Exploration Program (2009-2010)

1.Drilling Phase 1 testing South zone2.Soil Detail survey over Central & North Zone3.Drilling phase 2 testing Central & North Zone4.Drilling Phase 3 follow-up on best drill results

Soil SurveyPercentile Contour

Gold

>70%

> 90%

Page 19: NOV/DEC 2009 EXPLORING FOR OUR NEXT GOLD MINE FUNDING A TOP TIER Nb/Ta mine

19 TSX: MDN

Isambara - South zoneIsambara - South zonePhase 1 drillingPhase 1 drillingIsambara - South zoneIsambara - South zonePhase 1 drillingPhase 1 drilling

300 m

Drill section

Sect

ion

1015

NW

Page 20: NOV/DEC 2009 EXPLORING FOR OUR NEXT GOLD MINE FUNDING A TOP TIER Nb/Ta mine

20 TSX: MDN

140 m

8.35 g/t Au / 0.5m

9,13 g/t Au / 1.0m

3.85 g/t Au / 1.0m

7.66 g/t Au / 1,0m

1 200m

1 100m

ISSDD 32ISDD 33

ISDD-33: 153 m @ 0,31 g/t AuISDD-32: 84 m @ 0,33 g/t Au

> 5.0 g/t Au

0.2 to 0.5/t Au

0.5 to 2.0 g/t Au

2.0 to 5.0 g/t Au

0.1 to 0.2/t Au

Isambara - Drill section 1015 NWIsambara - Drill section 1015 NWIsambara - Drill section 1015 NWIsambara - Drill section 1015 NW

Page 21: NOV/DEC 2009 EXPLORING FOR OUR NEXT GOLD MINE FUNDING A TOP TIER Nb/Ta mine

21 TSX: MDNRobert et Al. 2007, Exploration 07

Robert et Al. 2007, Exploration 07

Isambara - Proposed ModelIsambara - Proposed ModelIsambara - Proposed ModelIsambara - Proposed Model

Page 22: NOV/DEC 2009 EXPLORING FOR OUR NEXT GOLD MINE FUNDING A TOP TIER Nb/Ta mine

22 TSX: MDN

Ikungu Ikungu Same geo environment as Kiabakari - Same geo environment as Kiabakari - BuhembaBuhemba

Ikungu Ikungu Same geo environment as Kiabakari - Same geo environment as Kiabakari - BuhembaBuhemba

100 km

Au-Cu

Ikungu

Musoma

Mwanza

KiabakariBuhemba

Au - Cu

Page 23: NOV/DEC 2009 EXPLORING FOR OUR NEXT GOLD MINE FUNDING A TOP TIER Nb/Ta mine

23 TSX: MDN

1 km

Background Map 1st derivative Airborne Mag

70.1 g/t Au

56.8 g/t Au

35.9 g/t Au

12.0 g/t Au

Grab Sample Location

High grade gold values confirmed by MDN

Extensions of high grade indicated by gold soil anomalies

2 parallel gold reefs HW & FW at contact of volcanic and sediments

HW

FW

FW

HW

NW

Stru

cture

Drill Phase 1 Testing high grade extensions of 2 Reefs

Drill Phase 2Testing other soil anomalies along NW Structure

Soil Detail of SW structure

Drill Phase 3Drill Follow-up on best zones

Proposed Drill Holes

Ikungu Drilling Program (Q3/Q4 2009 - 2010)Ikungu Drilling Program (Q3/Q4 2009 - 2010)Ikungu Drilling Program (Q3/Q4 2009 - 2010)Ikungu Drilling Program (Q3/Q4 2009 - 2010)

Page 24: NOV/DEC 2009 EXPLORING FOR OUR NEXT GOLD MINE FUNDING A TOP TIER Nb/Ta mine

24 TSX: MDN

Exploration Program in TanzaniaExploration Program in Tanzania$1.5 to 3 million in Q3/Q4 2009$1.5 to 3 million in Q3/Q4 2009Exploration Program in TanzaniaExploration Program in Tanzania$1.5 to 3 million in Q3/Q4 2009$1.5 to 3 million in Q3/Q4 2009

Isambara: A 5 km anomaly on extension of the same volcanic belt as Geita (>10 million oz Au) − Phase 1 drilling of 2,500 m started in July to confirm

grade and thickness of South zone− Soil sampling program extensions on Central and

North zones− News flow from drilling results to be released by

December 2009

Ikungu: Quartz veins with sulphides− Phase I drilling following up on high grade values

obtained from grab samples (35 to 70 g/t Au)

Page 25: NOV/DEC 2009 EXPLORING FOR OUR NEXT GOLD MINE FUNDING A TOP TIER Nb/Ta mine

25 TSX: MDN

Msasa: 2nd largest gold soil anomaly in a 50 km radius around Tulawaka mine− 1.5 km strike length− Project preparation to advance to Phase I drilling in

2010

Viyonza: Part of the volcanic belt hosting Bulyanhulu (>10 million oz Au)− 600 m strike length area where drill results have intervals

with > 10g/t Au− Project preparation to advance to Phase I drilling in 2010

Exploration Program in TanzaniaExploration Program in Tanzania$1.5 to 3 million in Q3/Q4 2009 (cont’d)$1.5 to 3 million in Q3/Q4 2009 (cont’d)Exploration Program in TanzaniaExploration Program in Tanzania$1.5 to 3 million in Q3/Q4 2009 (cont’d)$1.5 to 3 million in Q3/Q4 2009 (cont’d)

Page 26: NOV/DEC 2009 EXPLORING FOR OUR NEXT GOLD MINE FUNDING A TOP TIER Nb/Ta mine

26 TSX: MDN

Key FactsKey FactsKey FactsKey Facts

Shares outstanding (fully diluted) 98.9M

52 week trading range $0.42-0.85

Recent trading price $0.60

Market capitalization $60M

2008 Net income $22.1M

Cash position* $20.4M

*As of September 30, 2009

Page 27: NOV/DEC 2009 EXPLORING FOR OUR NEXT GOLD MINE FUNDING A TOP TIER Nb/Ta mine

27 TSX: MDN

ContactsContacts

Paul-A. Girard, President & CEOPaul-A. Girard, President & [email protected]@mdn-mines.com

Marc Boisvert, VP ExplorationMarc Boisvert, VP [email protected]@mdn-mines.com

Nicole Blanchard, Investor relationsNicole Blanchard, Investor relations450.973.6600 450.973.6600 [email protected]@isuncomm.com

Suite 680 – Place du CanadaSuite 680 – Place du Canada1010 de la Gauchetière West1010 de la Gauchetière WestMontreal, QuebecMontreal, Quebec

(514) 866-6500(514) 866-6500

www.mdn-mines.comwww.mdn-mines.com

Question PeriodQuestion Period Question PeriodQuestion Period