Work codes for consentrating project: Area Sub area 1 Column 1 Walkways 1 Daily Time Sheet -Operational Employee/Crew 2 Cleaning structural steel 2 Department / Crew : Supervisor : 3 Cleaning columns 3 Date : Superintendent : 4 Painting columns 4 5 Painting Structural Steel 5 No Id Number Name Position Status Time in Time out Mile Point Area Sub Area Activity 6 Cut off existing pipe 6 7 Replace and modify existing 7 1 80002407 RIYANTO Store Assistant column to be composit column 8 8 Cleaning up pipe and cable 9 2 9 New staircase to Basement 10 10 Change steel grating of Walkway 11 3 to be Fiberglass grating 12 13 4 2 Laydown 1 Gabion wall behind office 14 2 Re-arrange laydown yard 15 5 3 Temporary fabrication facility 16 4 Laydown pad concrete 17 6 5 Temporary power supply 18 19 7 3 Main line 1 Install scaffold 20 2 Clean pipe line 8 3 Identify defects 21 4 Repair defects 22 9 23 4 All area 10 24 25 11 26 27 12 28 29 13 30 31 14 32 33 15 34 16 35 36 17 37 38 18 39 19 40 20 41 42 Prepared by, Rechecked and Confirm by, Approved by, Acknowledge and Confirm by, 43 44 45 46 47 Foreman Dept. SPV/SUPT Dept. Head/MGR HR MGR/SUPT 48 BU3 Form - People

Upload: anonymous-iinjei4e2

Post on 13-Apr-2016

220 views

Category:

Documents


0 download

DESCRIPTION

time

TRANSCRIPT

Page 1: Non Staff Timesheet Concentrator Rev1

Work codes for consentrating project:

Area Sub area Activity

1 Column 1 Walkways 1

Daily Time Sheet -Operational Employee/Crew 2 Cleaning structural steel 2

Department / Crew : Supervisor : 3 Cleaning columns 3

Date : Superintendent : 4 Painting columns 4

5 Painting Structural Steel 5

No Id Number Name Position Status Time in Time out Mile Point Area Sub Area Activity6 Cut off existing pipe 6

7 Replace and modify existing 7

1 80002407 RIYANTO Store Assistant column to be composit column 8

8 Cleaning up pipe and cable 9

2 9 New staircase to Basement 10

10 Change steel grating of Walkway 11

3 to be Fiberglass grating 12

13

4 2 Laydown 1 Gabion wall behind office 14

2 Re-arrange laydown yard 15

5 3 Temporary fabrication facility 16

4 Laydown pad concrete 17

6 5 Temporary power supply 18

19

7 3 Main line 1 Install scaffold 20

2 Clean pipe line

8 3 Identify defects 21

4 Repair defects 22

9 23

4 All area

10 24

25

11 26

27

12 28

29

13 30

31

14 32

33

15

34

16 35

36

17 37

38

18

39

19 40

20 41

42

Prepared by, Rechecked and Confirm by, Approved by, Acknowledge and Confirm by, 43

44

45

46

47

Foreman Dept. SPV/SUPT Dept. Head/MGR HR MGR/SUPT 48

BU3 Form - People

Page 2: Non Staff Timesheet Concentrator Rev1

Name Name Name Name 49

Page 3: Non Staff Timesheet Concentrator Rev1

Activity

Fabricate steel structure 50 QA Field

Erect steel structure 51 QA Office

Demolish steel structure, grating etc. 52 Handover Document

Erect scaffolding 53 Project Control/ Planner/ Scheduler

Demolish scaffolding 54 Document Control

Cleaning steel structure 55 Drafting

Cleaning tank 56 Electrical demolish

Cleaning pipe 57 Install cable ladder / tray

Painting steel structure 58 Install support / bracket

Painting tank 59 Fabricate ladder / tray

Painting pipe 60 Install conduit

Excavation 61 Install cable

Levelling and compacting 62 Install field device

Demolish existing concrete 63 Install panel / DB

Formwork and rebar 64 Cable termination

Pouring concrete 65 Pre-commissioning

Install gabion basket 66 Commissioning

Put rock in gabion basket 67 Internal Report (LCI)

Install wall, ceiling and roof 68 External Report (PTFI)

Install floor tile, wall tile, ablution, 69 Internal Meeting (LCI)

skirting, vinyl 70 External Meeting (PTFI)

Install door and window 71 Input data of plant & equipment

Painting wall, ceiling, door and window 72 Equipment control

Demolish& relocation existing roof, 73 Machinary maintenance

wall, door, window, etc. 74 Input data for administration

Install furniture 75 Accounting

Delivery material 76 Maintenance of power supply

Lifting material and temporary lighting

Issue material 77

Issued and return tools

stock control

Survey Topografhy

Survey Traverse

Calculation of Survey Data

Staking out coordinate position of

Site Plan ,Grid Line

Setting Bow Plank

Marking for position of Foundation

Monitoring for excavation

Setting and Levelling Ancor Bolt

Levelling Top Concrete ( checking

before pouring concrete)

Survey Plumbnes

Marking elevation of top Floor

and centre of grid line

Marking position of room, window,

door,celling ,ect

marking monitoring

Surveying for as built Drawing data

Safety induction and training

Supervising and monitoring

Input data for safety

Site inspection and testing

Field and documentation audit

Page 4: Non Staff Timesheet Concentrator Rev1

Prepare permit and 5.4.3 document

Page 5: Non Staff Timesheet Concentrator Rev1

Work codes for consentrating project:

Area Sub area Activity

1 Column 1 Walkways 1

Daily Time Sheet -Operational Employee/Crew 2 Cleaning structural steel 2

Department / Crew : Supervisor : 3 Cleaning columns 3

Date : Superintendent : 4 Painting columns 4

5 Painting Structural Steel 5

No Id Number Name Position Status Time in Time out Mile Point Area Sub Area Activity6 Cut off existing pipe 6

7 Replace and modify existing 7

1 80004404 SUTISNA BIN MARNA Steel Erection FM column to be composit column 8

8 Cleaning up pipe and cable 9

2 V99179 TARSIM Steel Erection L/H 9 New staircase to Basement 10

10 Change steel grating of Walkway 11

3 80002350 BUSRIYONO Welder to be Fiberglass grating 12

13

4 V85586 SADAM Welder 2 Laydown 1 Gabion wall behind office 14

2 Re-arrange laydown yard 15

5 80003338 SLAMET RIYADI Welder 3 Temporary fabrication facility 16

4 Laydown pad concrete 17

6 80002355 ASEP SUNARYA Steel Erection 5 Temporary power supply 18

19

7 80003102 USMADI Steel Erection 3 Main line 1 Install scaffold 20

2 Clean pipe line

8 V120461 ASEP SAEPUDIN Steel Erection 3 Identify defects 21

4 Repair defects 22

9 V120802 ADE FATULAH APRIANSYAH Steel Erection 23

4 All area

10 24

25

11 26

27

12 28

29

13 30

31

14 32

33

15

34

16 35

36

17 37

38

18

39

19 40

20 41

42

Prepared by, Rechecked and Confirm by, Approved by, Acknowledge and Confirm by, 43

44

45

46

47

Foreman Dept. SPV/SUPT Dept. Head/MGR HR MGR/SUPT 48

BU3 Form - People

Page 6: Non Staff Timesheet Concentrator Rev1

Name Name Name Name 49

Page 7: Non Staff Timesheet Concentrator Rev1

Activity

Fabricate steel structure 50 QA Field

Erect steel structure 51 QA Office

Demolish steel structure, grating etc. 52 Handover Document

Erect scaffolding 53 Project Control/ Planner/ Scheduler

Demolish scaffolding 54 Document Control

Cleaning steel structure 55 Drafting

Cleaning tank 56 Electrical demolish

Cleaning pipe 57 Install cable ladder / tray

Painting steel structure 58 Install support / bracket

Painting tank 59 Fabricate ladder / tray

Painting pipe 60 Install conduit

Excavation 61 Install cable

Levelling and compacting 62 Install field device

Demolish existing concrete 63 Install panel / DB

Formwork and rebar 64 Cable termination

Pouring concrete 65 Pre-commissioning

Install gabion basket 66 Commissioning

Put rock in gabion basket 67 Internal Report (LCI)

Install wall, ceiling and roof 68 External Report (PTFI)

Install floor tile, wall tile, ablution, 69 Internal Meeting (LCI)

skirting, vinyl 70 External Meeting (PTFI)

Install door and window 71 Input data of plant & equipment

Painting wall, ceiling, door and window 72 Equipment control

Demolish& relocation existing roof, 73 Machinary maintenance

wall, door, window, etc. 74 Input data for administration

Install furniture 75 Accounting

Delivery material 76 Maintenance of power supply

Lifting material and temporary lighting

Issue material

Issued and return tools

stock control

Survey Topografhy

Survey Traverse

Calculation of Survey Data

Staking out coordinate position of

Site Plan ,Grid Line

Setting Bow Plank

Marking for position of Foundation

Monitoring for excavation

Setting and Levelling Ancor Bolt

Levelling Top Concrete ( checking

before pouring concrete)

Survey Plumbnes

Marking elevation of top Floor

and centre of grid line

Marking position of room, window,

door,celling ,ect

marking monitoring

Surveying for as built Drawing data

Safety induction and training

Supervising and monitoring

Input data for safety

Site inspection and testing

Field and documentation audit

Page 8: Non Staff Timesheet Concentrator Rev1

Prepare permit and 5.4.3 document

Page 9: Non Staff Timesheet Concentrator Rev1

Work codes for consentrating project:

Area Sub area Activity

1 Column 1 Walkways 1

Daily Time Sheet -Operational Employee/Crew 2 Cleaning structural steel 2

Department / Crew : Supervisor : 3 Cleaning columns 3

Date : Superintendent : 4 Painting columns 4

5 Painting Structural Steel 5

No Id Number Name Position Status Time in Time out Mile Point Area Sub Area Activity6 Cut off existing pipe 6

7 Replace and modify existing 7

1 80002440 HERU GUNAWAN HSE Assistant column to be composit column 8

8 Cleaning up pipe and cable 9

2 80002445 SAMINO HSE Assistant 9 New staircase to Basement 10

10 Change steel grating of Walkway 11

3 to be Fiberglass grating 12

13

4 2 Laydown 1 Gabion wall behind office 14

2 Re-arrange laydown yard 15

5 3 Temporary fabrication facility 16

4 Laydown pad concrete 17

6 5 Temporary power supply 18

19

7 3 Main line 1 Install scaffold 20

2 Clean pipe line

8 3 Identify defects 21

4 Repair defects 22

9 23

4 All area

10 24

25

11 26

27

12 28

29

13 30

31

14 32

33

15

34

16 35

36

17 37

38

18

39

19 40

20 41

42

Prepared by, Rechecked and Confirm by, Approved by, Acknowledge and Confirm by, 43

44

45

46

47

Foreman Dept. SPV/SUPT Dept. Head/MGR HR MGR/SUPT 48

BU3 Form - People

Page 10: Non Staff Timesheet Concentrator Rev1

Name Name Name Name 49

Page 11: Non Staff Timesheet Concentrator Rev1

Activity

Fabricate steel structure 50 QA Field

Erect steel structure 51 QA Office

Demolish steel structure, grating etc. 52 Handover Document

Erect scaffolding 53 Project Control/ Planner/ Scheduler

Demolish scaffolding 54 Document Control

Cleaning steel structure 55 Drafting

Cleaning tank 56 Electrical demolish

Cleaning pipe 57 Install cable ladder / tray

Painting steel structure 58 Install support / bracket

Painting tank 59 Fabricate ladder / tray

Painting pipe 60 Install conduit

Excavation 61 Install cable

Levelling and compacting 62 Install field device

Demolish existing concrete 63 Install panel / DB

Formwork and rebar 64 Cable termination

Pouring concrete 65 Pre-commissioning

Install gabion basket 66 Commissioning

Put rock in gabion basket 67 Internal Report (LCI)

Install wall, ceiling and roof 68 External Report (PTFI)

Install floor tile, wall tile, ablution, 69 Internal Meeting (LCI)

skirting, vinyl 70 External Meeting (PTFI)

Install door and window 71 Input data of plant & equipment

Painting wall, ceiling, door and window 72 Equipment control

Demolish& relocation existing roof, 73 Machinary maintenance

wall, door, window, etc. 74 Input data for administration

Install furniture 75 Accounting

Delivery material 76 Maintenance of power supply

Lifting material and temporary lighting

Issue material

Issued and return tools

stock control

Survey Topografhy

Survey Traverse

Calculation of Survey Data

Staking out coordinate position of

Site Plan ,Grid Line

Setting Bow Plank

Marking for position of Foundation

Monitoring for excavation

Setting and Levelling Ancor Bolt

Levelling Top Concrete ( checking

before pouring concrete)

Survey Plumbnes

Marking elevation of top Floor

and centre of grid line

Marking position of room, window,

door,celling ,ect

marking monitoring

Surveying for as built Drawing data

Safety induction and training

Supervising and monitoring

Input data for safety

Site inspection and testing

Field and documentation audit

Page 12: Non Staff Timesheet Concentrator Rev1

Prepare permit and 5.4.3 document

Page 13: Non Staff Timesheet Concentrator Rev1

Work codes for consentrating project:

Area Sub area Activity

1 Column 1 Walkways 1

Daily Time Sheet -Operational Employee/Crew 2 Cleaning structural steel 2

Department / Crew : Supervisor : 3 Cleaning columns 3

Date : Superintendent : 4 Painting columns 4

5 Painting Structural Steel 5

No Id Number Name Position Status Time in Time out Mile Point Area Sub Area Activity6 Cut off existing pipe 6

7 Replace and modify existing 7

1 80002831 FITRA KUSUMA Scaffolder L/H column to be composit column 8

8 Cleaning up pipe and cable 9

2 80002522 AGUS SUBHAN MAULANA Scaffolder 9 New staircase to Basement 10

10 Change steel grating of Walkway 11

3 80005263 HENDRIK PAJAN Scaffolder to be Fiberglass grating 12

13

4 80004463 HARIYONO Scaffolder 2 Laydown 1 Gabion wall behind office 14

2 Re-arrange laydown yard 15

5 3 Temporary fabrication facility 16

4 Laydown pad concrete 17

6 5 Temporary power supply 18

19

7 3 Main line 1 Install scaffold 20

2 Clean pipe line

8 3 Identify defects 21

4 Repair defects 22

9 23

4 All area

10 24

25

11 26

27

12 28

29

13 30

31

14 32

33

15

34

16 35

36

17 37

38

18

39

19 40

20 41

42

Prepared by, Rechecked and Confirm by, Approved by, Acknowledge and Confirm by, 43

44

45

46

47

Foreman Dept. SPV/SUPT Dept. Head/MGR HR MGR/SUPT 48

BU3 Form - People

Page 14: Non Staff Timesheet Concentrator Rev1

Name Name Name Name 49

Page 15: Non Staff Timesheet Concentrator Rev1

Activity

Fabricate steel structure 50 QA Field

Erect steel structure 51 QA Office

Demolish steel structure, grating etc. 52 Handover Document

Erect scaffolding 53 Project Control/ Planner/ Scheduler

Demolish scaffolding 54 Document Control

Cleaning steel structure 55 Drafting

Cleaning tank 56 Electrical demolish

Cleaning pipe 57 Install cable ladder / tray

Painting steel structure 58 Install support / bracket

Painting tank 59 Fabricate ladder / tray

Painting pipe 60 Install conduit

Excavation 61 Install cable

Levelling and compacting 62 Install field device

Demolish existing concrete 63 Install panel / DB

Formwork and rebar 64 Cable termination

Pouring concrete 65 Pre-commissioning

Install gabion basket 66 Commissioning

Put rock in gabion basket 67 Internal Report (LCI)

Install wall, ceiling and roof 68 External Report (PTFI)

Install floor tile, wall tile, ablution, 69 Internal Meeting (LCI)

skirting, vinyl 70 External Meeting (PTFI)

Install door and window 71 Input data of plant & equipment

Painting wall, ceiling, door and window 72 Equipment control

Demolish& relocation existing roof, 73 Machinary maintenance

wall, door, window, etc. 74 Input data for administration

Install furniture 75 Accounting

Delivery material 76 Maintenance of power supply

Lifting material and temporary lighting

Issue material

Issued and return tools

stock control

Survey Topografhy

Survey Traverse

Calculation of Survey Data

Staking out coordinate position of

Site Plan ,Grid Line

Setting Bow Plank

Marking for position of Foundation

Monitoring for excavation

Setting and Levelling Ancor Bolt

Levelling Top Concrete ( checking

before pouring concrete)

Survey Plumbnes

Marking elevation of top Floor

and centre of grid line

Marking position of room, window,

door,celling ,ect

marking monitoring

Surveying for as built Drawing data

Safety induction and training

Supervising and monitoring

Input data for safety

Site inspection and testing

Field and documentation audit

Page 16: Non Staff Timesheet Concentrator Rev1

Prepare permit and 5.4.3 document

Page 17: Non Staff Timesheet Concentrator Rev1

Work codes for consentrating project:

Area Sub area Activity

1 Column 1 Walkways 1

Daily Time Sheet -Operational Employee/Crew 2 Cleaning structural steel 2

Department / Crew : Supervisor : 3 Cleaning columns 3

Date : Superintendent : 4 Painting columns 4

5 Painting Structural Steel 5

No Id Number Name Position Status Time in Time out Mile Point Area Sub Area Activity6 Cut off existing pipe 6

7 Replace and modify existing 7

1 80002886 NANA TARYANA Mason L/H column to be composit column 8

8 Cleaning up pipe and cable 9

2 80002614 AHMAD JEJEN Mason 9 New staircase to Basement 10

10 Change steel grating of Walkway 11

3 80003086 WAWAN ERNAWAN Mason to be Fiberglass grating 12

13

4 2 Laydown 1 Gabion wall behind office 14

2 Re-arrange laydown yard 15

5 3 Temporary fabrication facility 16

4 Laydown pad concrete 17

6 5 Temporary power supply 18

19

7 3 Main line 1 Install scaffold 20

2 Clean pipe line

8 3 Identify defects 21

4 Repair defects 22

9 23

4 All area

10 24

25

11 26

27

12 28

29

13 30

31

14 32

33

15

34

16 35

36

17 37

38

18

39

19 40

20 41

42

Prepared by, Rechecked and Confirm by, Approved by, Acknowledge and Confirm by, 43

44

45

46

47

Foreman Dept. SPV/SUPT Dept. Head/MGR HR MGR/SUPT 48

BU3 Form - People

Page 18: Non Staff Timesheet Concentrator Rev1

Name Name Name Name 49

Page 19: Non Staff Timesheet Concentrator Rev1

Activity

Fabricate steel structure 50 QA Field

Erect steel structure 51 QA Office

Demolish steel structure, grating etc. 52 Handover Document

Erect scaffolding 53 Project Control/ Planner/ Scheduler

Demolish scaffolding 54 Document Control

Cleaning steel structure 55 Drafting

Cleaning tank 56 Electrical demolish

Cleaning pipe 57 Install cable ladder / tray

Painting steel structure 58 Install support / bracket

Painting tank 59 Fabricate ladder / tray

Painting pipe 60 Install conduit

Excavation 61 Install cable

Levelling and compacting 62 Install field device

Demolish existing concrete 63 Install panel / DB

Formwork and rebar 64 Cable termination

Pouring concrete 65 Pre-commissioning

Install gabion basket 66 Commissioning

Put rock in gabion basket 67 Internal Report (LCI)

Install wall, ceiling and roof 68 External Report (PTFI)

Install floor tile, wall tile, ablution, 69 Internal Meeting (LCI)

skirting, vinyl 70 External Meeting (PTFI)

Install door and window 71 Input data of plant & equipment

Painting wall, ceiling, door and window 72 Equipment control

Demolish& relocation existing roof, 73 Machinary maintenance

wall, door, window, etc. 74 Input data for administration

Install furniture 75 Accounting

Delivery material 76 Maintenance of power supply

Lifting material and temporary lighting

Issue material

Issued and return tools

stock control

Survey Topografhy

Survey Traverse

Calculation of Survey Data

Staking out coordinate position of

Site Plan ,Grid Line

Setting Bow Plank

Marking for position of Foundation

Monitoring for excavation

Setting and Levelling Ancor Bolt

Levelling Top Concrete ( checking

before pouring concrete)

Survey Plumbnes

Marking elevation of top Floor

and centre of grid line

Marking position of room, window,

door,celling ,ect

marking monitoring

Surveying for as built Drawing data

Safety induction and training

Supervising and monitoring

Input data for safety

Site inspection and testing

Field and documentation audit

Page 20: Non Staff Timesheet Concentrator Rev1

Prepare permit and 5.4.3 document

Page 21: Non Staff Timesheet Concentrator Rev1

Work codes for consentrating project:

Area Sub area Activity

1 Column 1 Walkways 1

Daily Time Sheet -Operational Employee/Crew 2 Cleaning structural steel 2

Department / Crew : Supervisor : 3 Cleaning columns 3

Date : Superintendent : 4 Painting columns 4

5 Painting Structural Steel 5

No Id Number Name Position Status Time in Time out Mile Point Area Sub Area Activity6 Cut off existing pipe 6

7 Replace and modify existing 7

1 80002446 SAMAN B KARMAN Mason column to be composit column 8

8 Cleaning up pipe and cable 9

2 80002453 TABRONI Mason 9 New staircase to Basement 10

10 Change steel grating of Walkway 11

3 to be Fiberglass grating 12

13

4 2 Laydown 1 Gabion wall behind office 14

2 Re-arrange laydown yard 15

5 3 Temporary fabrication facility 16

4 Laydown pad concrete 17

6 5 Temporary power supply 18

19

7 3 Main line 1 Install scaffold 20

2 Clean pipe line

8 3 Identify defects 21

4 Repair defects 22

9 23

4 All area

10 24

25

11 26

27

12 28

29

13 30

31

14 32

33

15

34

16 35

36

17 37

38

18

39

19 40

20 41

42

Prepared by, Rechecked and Confirm by, Approved by, Acknowledge and Confirm by, 43

44

45

46

47

Foreman Dept. SPV/SUPT Dept. Head/MGR HR MGR/SUPT 48

BU3 Form - People

Page 22: Non Staff Timesheet Concentrator Rev1

Name Name Name Name 49

Page 23: Non Staff Timesheet Concentrator Rev1

Activity

Fabricate steel structure 50 QA Field

Erect steel structure 51 QA Office

Demolish steel structure, grating etc. 52 Handover Document

Erect scaffolding 53 Project Control/ Planner/ Scheduler

Demolish scaffolding 54 Document Control

Cleaning steel structure 55 Drafting

Cleaning tank 56 Electrical demolish

Cleaning pipe 57 Install cable ladder / tray

Painting steel structure 58 Install support / bracket

Painting tank 59 Fabricate ladder / tray

Painting pipe 60 Install conduit

Excavation 61 Install cable

Levelling and compacting 62 Install field device

Demolish existing concrete 63 Install panel / DB

Formwork and rebar 64 Cable termination

Pouring concrete 65 Pre-commissioning

Install gabion basket 66 Commissioning

Put rock in gabion basket 67 Internal Report (LCI)

Install wall, ceiling and roof 68 External Report (PTFI)

Install floor tile, wall tile, ablution, 69 Internal Meeting (LCI)

skirting, vinyl 70 External Meeting (PTFI)

Install door and window 71 Input data of plant & equipment

Painting wall, ceiling, door and window 72 Equipment control

Demolish& relocation existing roof, 73 Machinary maintenance

wall, door, window, etc. 74 Input data for administration

Install furniture 75 Accounting

Delivery material 76 Maintenance of power supply

Lifting material and temporary lighting

Issue material

Issued and return tools

stock control

Survey Topografhy

Survey Traverse

Calculation of Survey Data

Staking out coordinate position of

Site Plan ,Grid Line

Setting Bow Plank

Marking for position of Foundation

Monitoring for excavation

Setting and Levelling Ancor Bolt

Levelling Top Concrete ( checking

before pouring concrete)

Survey Plumbnes

Marking elevation of top Floor

and centre of grid line

Marking position of room, window,

door,celling ,ect

marking monitoring

Surveying for as built Drawing data

Safety induction and training

Supervising and monitoring

Input data for safety

Site inspection and testing

Field and documentation audit

Page 24: Non Staff Timesheet Concentrator Rev1

Prepare permit and 5.4.3 document

Page 25: Non Staff Timesheet Concentrator Rev1

Work codes for consentrating project:

Area Sub area Activity

1 Column 1 Walkways 1

Daily Time Sheet -Operational Employee/Crew 2 Cleaning structural steel 2

Department / Crew : Supervisor : 3 Cleaning columns 3

Date : Superintendent : 4 Painting columns 4

5 Painting Structural Steel 5

No Id Number Name Position Status Time in Time out Mile Point Area Sub Area Activity6 Cut off existing pipe 6

7 Replace and modify existing 7

1 80002990 DADAN KUSWARA Electrician L/H column to be composit column 8

8 Cleaning up pipe and cable 9

2 80002905 SAHRONI LCI Electrician 9 New staircase to Basement 10

10 Change steel grating of Walkway 11

3 to be Fiberglass grating 12

13

4 2 Laydown 1 Gabion wall behind office 14

2 Re-arrange laydown yard 15

5 3 Temporary fabrication facility 16

4 Laydown pad concrete 17

6 5 Temporary power supply 18

19

7 3 Main line 1 Install scaffold 20

2 Clean pipe line

8 3 Identify defects 21

4 Repair defects 22

9 23

4 All area

10 24

25

11 26

27

12 28

29

13 30

31

14 32

33

15

34

16 35

36

17 37

38

18

39

19 40

20 41

42

Prepared by, Rechecked and Confirm by, Approved by, Acknowledge and Confirm by, 43

44

45

46

47

Foreman Dept. SPV/SUPT Dept. Head/MGR HR MGR/SUPT 48

BU3 Form - People

Page 26: Non Staff Timesheet Concentrator Rev1

Name Name Name Name 49

Page 27: Non Staff Timesheet Concentrator Rev1

Activity

Fabricate steel structure 50 QA Field

Erect steel structure 51 QA Office

Demolish steel structure, grating etc. 52 Handover Document

Erect scaffolding 53 Project Control/ Planner/ Scheduler

Demolish scaffolding 54 Document Control

Cleaning steel structure 55 Drafting

Cleaning tank 56 Electrical demolish

Cleaning pipe 57 Install cable ladder / tray

Painting steel structure 58 Install support / bracket

Painting tank 59 Fabricate ladder / tray

Painting pipe 60 Install conduit

Excavation 61 Install cable

Levelling and compacting 62 Install field device

Demolish existing concrete 63 Install panel / DB

Formwork and rebar 64 Cable termination

Pouring concrete 65 Pre-commissioning

Install gabion basket 66 Commissioning

Put rock in gabion basket 67 Internal Report (LCI)

Install wall, ceiling and roof 68 External Report (PTFI)

Install floor tile, wall tile, ablution, 69 Internal Meeting (LCI)

skirting, vinyl 70 External Meeting (PTFI)

Install door and window 71 Input data of plant & equipment

Painting wall, ceiling, door and window 72 Equipment control

Demolish& relocation existing roof, 73 Machinary maintenance

wall, door, window, etc. 74 Input data for administration

Install furniture 75 Accounting

Delivery material 76 Maintenance of power supply

Lifting material and temporary lighting

Issue material

Issued and return tools

stock control

Survey Topografhy

Survey Traverse

Calculation of Survey Data

Staking out coordinate position of

Site Plan ,Grid Line

Setting Bow Plank

Marking for position of Foundation

Monitoring for excavation

Setting and Levelling Ancor Bolt

Levelling Top Concrete ( checking

before pouring concrete)

Survey Plumbnes

Marking elevation of top Floor

and centre of grid line

Marking position of room, window,

door,celling ,ect

marking monitoring

Surveying for as built Drawing data

Safety induction and training

Supervising and monitoring

Input data for safety

Site inspection and testing

Field and documentation audit

Page 28: Non Staff Timesheet Concentrator Rev1

Prepare permit and 5.4.3 document