nimbus status report
DESCRIPTION
NIMBUS Status Report. Ryan Rasmussen Caleb Fangmeier Maggie Krause Brett Mahnke Jiajun Yang. Milestones. Complete Quadcopter assembly 11/2/2012 Requirements Document 11/2/2012 Test Quadcopter hardware 11/9/2012. Current Progress. Nearly completed assembly - PowerPoint PPT PresentationTRANSCRIPT
NIMBUS Status Report
Ryan RasmussenCaleb FangmeierMaggie KrauseBrett Mahnke
Jiajun Yang
Milestones
• Complete Quadcopter assembly– 11/2/2012
• Requirements Document– 11/2/2012
• Test Quadcopter hardware– 11/9/2012
Current Progress
• Nearly completed assembly– Missing parts, RC receiver
Current Progress
• Place order for missing parts
• Early configuration and testing of APM
Current Progress
• Researching communication options for direct connection between drone and Android/Iphone– Radio • Good range, requires addition to phone
– Bluetooth• Easiest to work with, very short range
– WiFi• Acceptable range, no extra attachments for phone
Plans for next week
• Continue researching communication options
• Learn more about APM software
• Complete assembly if needed parts arrive
• Draft requirements document and meet with sponsors for feedback
Issues/Risks
• Time to ship needed parts
• Highly likely that props or other components break while testing
• Unforeseen technical problems– Soldering– If programmed/assembled incorrectly, drone could
fly away and never be seen again
Problems
• One motor spinning wrong direction– Calibration issue?
• Missing parts
• Vague instructions
• Team schedule