8 Pipeline News January 2018 • www.pipeline-news.com recently awarded NEWProjects GAS – The Americas U.S. ENERGY TRANSFER PARTNERS — (1/18) Project: Red Bluff Pipeline Type: Project includes pipeline construction Length: 93 miles Diameter: 30 and 42 inches Location: Orla, TX - Waha, TX Capacity: 1.4 Bcf/d Completion: 2Q 2018 Comments: Project will connect the Orla Plant to the Waha Plant to provide residue gas takeaway and has guaranteed fee based long-term commitments Contractor: Pumpco Inc. Type: Project includes pipeline construction KINDER MORGAN INC. – (1/18) Operator: Tennessee Gas Pipeline Co. LLC Project: Abandonment and Capacity Restoration Project (ACR Project) Type: Project includes abandonment of certain natural gas pipeline facilities and modifications of existing pipeline facilities and compressor stations Length: 964 miles (abandonment) Start: 2Q 2018 Completion:2Q 2019 Comments: Kinder Morgan Louisiana Pipeline and Sabine Pass Liquefaction have signed a precedent agreement for the full capacity of the project under a 20-year term MILLENNIUM PIPELINE CO. – (1/18) Project: Eastern System Upgrade Type: Project includes construction of looped pipeline, new compression capabilities and upgrades to existing stations Length: 10 miles Diameter: 36 inches Location: Rockland County, NY Capacity: 200 MDth/d Cost: $275 million Docket: CP16-486 Completion: 4Q 2018 Comments: An economic analysis done by Concentric Energy Advisors estimates that electric consumers in New York will save $495 million over the first 10 years of the Eastern System Upgrade Project NATIONAL FUEL GAS SUPPLY CORP. – (1/18) Project: Line QP Project Type: Project includes construction of pipeline, a regulator station and the abandonment of a storage field and related facilities 14 miles (construction) Diameter: 2 , 16, 30 and 36 inches Location: Natchitoches Parish, LA; Columbiana County, OH; Kentucky Docket: CP15-88 Comments: Project will abandon pipeline facilities from Station 40 in Natchitoches Parish, LA, to Station 216 in Columbiana County, OH, and construct replacement facilities in OH and KY. Construction of the replacement facilities will enable TGP to abandon the lines by sale to UMTP, which plans to convert the lines to non-jurisdictional natural gas liquids transportation as a component of the UMTP Project Operator: Kinder Morgan Louisiana Pipeline LLC Project: Sabine Pass Expansion Project Type: Project includes construction of a tap and lateral; modification of three existing delivery interconnects; construction of additional compression; construction of header pipelines; and the abandonment and replacement of a meter station Length: 1.6 miles Location: Cameron Parish, LA Capacity: 600 MDth/d Cost: $151 million Docket: CP17-22 “SAFETY FIRST - SERVICE ALWAYS” • Pipeline Stringing - 60’ + 80’ pipe • Unloading/Stockpiling Pipe from rail sidings •Ship discharge/Project Pipe • General/Heavy Hauling (Nationwide) •Logistics/Cost Estimates Contact: Jimmy Montgomery Jimmy@mtilogistics Phone: (877) 787-4644, (713) 592-6766 Fax: (713) 592-6769 Website: MTILOGISTICS.COM

Upload: others

Post on 13-Jun-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: NEWProjects - Amazon S3€¦ · Haradh fi eld to the Hawiyah processing plant Contractor: China Petroleum Pipelines Co. Type: Contract includes pipeline construction Project: Safaniya

8 Pipeline News January 2018 • www.pipeline-news.com

recently awardedNEWProjectsGAS – The AmericasU.S.ENERGY TRANSFER PARTNERS — (1/18)Project: Red Bluff PipelineType: Project includes pipeline constructionLength: 93 milesDiameter: 30 and 42 inchesLocation: Orla, TX - Waha, TXCapacity: 1.4 Bcf/dCompletion: 2Q 2018Comments: Project will connect the Orla Plant to

the Waha Plant to provide residue gas takeaway and has guaranteed fee based long-term commitments

Contractor: Pumpco Inc.Type: Project includes pipeline construction

KINDER MORGAN INC. – (1/18)Operator: Tennessee Gas Pipeline Co. LLCProject: Abandonment and Capacity Restoration

Project (ACR Project)Type: Project includes abandonment of

certain natural gas pipeline facilities and modifi cations of existing pipeline facilities and compressor stations

Length: 964 miles (abandonment)

Start: 2Q 2018Completion:2Q 2019Comments: Kinder Morgan Louisiana Pipeline and

Sabine Pass Liquefaction have signed a precedent agreement for the full capacity of the project under a 20-year term

MILLENNIUM PIPELINE CO. – (1/18)Project: Eastern System UpgradeType: Project includes construction of looped

pipeline, new compression capabilities and upgrades to existing stations

Length: 10 milesDiameter: 36 inchesLocation: Rockland County, NYCapacity: 200 MDth/dCost: $275 millionDocket: CP16-486 Completion: 4Q 2018Comments: An economic analysis done by Concentric

Energy Advisors estimates that electric consumers in New York will save $495 million over the fi rst 10 years of the Eastern System Upgrade Project

NATIONAL FUEL GAS SUPPLY CORP. – (1/18)Project: Line QP Project Type: Project includes construction of pipeline,

a regulator station and the abandonment of a storage fi eld and related facilities

14 miles (construction)Diameter: 2 , 16, 30 and 36 inchesLocation: Natchitoches Parish, LA; Columbiana County, OH; KentuckyDocket: CP15-88Comments: Project will abandon pipeline facilities

from Station 40 in Natchitoches Parish, LA, to Station 216 in Columbiana

County, OH, and construct replacement facilities in OH and KY. Construction of the replacement facilities will enable TGP to abandon the lines by sale to UMTP, which plans to convert the lines to non-jurisdictional natural gas liquids transportation as a component of the UMTP Project

Operator: Kinder Morgan Louisiana Pipeline LLC Project: Sabine Pass Expansion ProjectType: Project includes construction of a tap

and lateral; modifi cation of three existing delivery interconnects; construction of additional compression; construction of header pipelines; and the abandonment and replacement of a meter station

Length: 1.6 milesLocation: Cameron Parish, LACapacity: 600 MDth/dCost: $151 millionDocket: CP17-22

“SAFETY FIRST - SERVICE ALWAYS”

• Pipeline Stringing - 60’ + 80’ pipe

• Unloading/Stockpiling Pipe from rail sidings

•Ship discharge/Project Pipe

• General/Heavy Hauling (Nationwide)

•Logistics/Cost Estimates

Contact:Jimmy MontgomeryJimmy@mtilogistics

Phone: (877) 787-4644, (713) 592-6766Fax: (713) 592-6769

Website: MTILOGISTICS.COM

Page 2: NEWProjects - Amazon S3€¦ · Haradh fi eld to the Hawiyah processing plant Contractor: China Petroleum Pipelines Co. Type: Contract includes pipeline construction Project: Safaniya

NEWProjects recently awarded

10 Pipeline News January 2018 • www.pipeline-news.com

Length: 5 milesDiameter: 4 inchesLocation: Forest and Warren counties, PA Docket: CP16-28Comments: Project includes the abandonment of the

Line Q Project and Queen Storage assets

NIOCORP DEVELOPMENTS LTD. – (1/18)Operator: Rockies Express Pipeline LLCProject: Elk Creek PipelineType: Project includes pipeline constructionLength: 28 milesLocation: Marshall County, KS – Elk Creek, NECapacity: 26.8 Mcf/dComments: Pipeline will supply NioCorp’s planned

Elk Creek Superalloy Facility (Elk Creek Facility)

Contractor: Rockies Express Pipeline LLCType: Contract includes the design,

construction, and operation of the pipeline

Cost: $63 million

SEMGROUP CORP. – (1/18)Project: Canton PipelineType: Project includes pipeline constructionLength: 50 milesDiameter: 24 inchesLocation: Woods County, OK - Blaine County, OKCapacity: 200 MMcf/d (initial) 400 MMcf/d (maximum)Cost: $60 millionComments: Project will tie into the Rose Valley

processing facility

NGL – The AmericasU.S.TARGA RESOURCES CORP. – (1/18)Project: Grand Prix PipelineType: Project includes construction of pipelineLength: 75 milesDiameter: 30 inchesLocation: West Texas - Mont Belvieu, TXCapacity: 300 Mbpd (initial) 550 Mbpd (maximum)Cost: $1.3 billionCompletion: 2Q 2019Comments: Targa and EagleClaw Midstream Ventures

LLC, a Blackstone portfolio company, signed a long-term raw product purchase agreement for transportation and fractionation services whereby EagleClaw will dedicate and commit NGLs associated with its gas volumes produced or processed in the Delaware basin

Contractor: WHC Energy Services Inc.Type: Project includes pipeline construction

OIL – InternationalMiddle EastKURDISTAN REGIONAL GOVERNMENT –(1/18)Project: Kirkuk–Ceyhan PipelineType: Project includes the construction of

pipeline and two pumping stationsLength: 217 milesDiameter: 40 inchesLocation: Baiji, Saladin Province - Fish-Khabur

border crossing with TurkeyCapacity: 1 MMbpdComments: The new pipeline section will replace an

old pipeline that suffered severe damage in terror attacks after ISIS took control of Mosul in June 2014

OFFSHORE – InternationalAsia PacificOIL & NATURAL GAS CORP. – (1/18)Project: Pipeline Replacement Project-4 (PRP4)Type: Project includes surveys; residual

design; engineering, procurement and fabrication; anti-corrosion and weight coating; installation of a submarine pipeline, riser and I/J tubes; modifications on existing facilities; and hook-up, testing, pre-commissioning and commissioning of facilities

Length: 54 milesLocation: Arabian SeaComments: Project is part of ONGC’s strategy to

replace some of its well fluid, gas lift and water injection pipelines along with brownfield modification works on existing platforms in the company’s Mumbai High, Neelam, Heera and Bassein and Satellite

Page 3: NEWProjects - Amazon S3€¦ · Haradh fi eld to the Hawiyah processing plant Contractor: China Petroleum Pipelines Co. Type: Contract includes pipeline construction Project: Safaniya

www.pipeline-news.com • January 2018 • Pipeline News 11

214-515-5000 • www.polyguard.com

Innovat ion based. Employee owned. Expect more.

RD-6 Fastest Coatingin the West

Contractors say there is no faster or trouble free girth weld coating system than Polyguard® RD-6®. On a recent project (12” pipe, FBE

mainline coating) a first time crew coated 150 joints on day one after training. On day two, after adding a driver to the 5 man crew, 201 joints were completed. No coating system has less installation problems than

Polyguard® RD-6®. Ask someone who has installed it.

One of thousands of projects using Polyguard RD-6 non-shielding coating. Our first was in 1988.

www.Polyguard.com/pipeline

®

Country

For more information, visit

fi elds in the Western Off shore fi eld in the Arabian Sea on the continental shelf of Western India

Contractor: L&T Hydrocarbon Engineering Ltd.Type: Project includes engineering,

procurement, construction, installation and commissioning activities

Cost: $194 million

Middle EastSAUDI ARAMCO – (1/18)Project: Zuluf Field ExpansionType: Project includes the installation of water

injection and oil wellhead platforms, tie-in platforms, trunk lines and fl owlines along with onshore central processing facilities

Location: off shore Saudi ArabiaCapacity: 600 MbpdCompletion: 1Q 2021Comments: The gas and condensate will be sent to

the new Tanajib gas plant, which is part of the new Marjan Program

Contractor: Jacobs Engineering Group Inc.Type: Contract includes engineering and project

management for the project

Project: Haradh Gas Increment ProgramType: Project includes construction of pipeline

and new gas compression facilitiesLength: 280 milesLocation: off shore Saudi ArabiaCapacity: 290 Mcf/d

Completion: 2Q 2019Comments: Pipeline will transport natural gas from the

Haradh fi eld to the Hawiyah processing plant

Contractor: China Petroleum Pipelines Co.Type: Contract includes pipeline construction

Project: Safaniya Field ExpansionType: Project includes the construction and

installation of a tie in platform to serve as an extra gathering hub for future oil wellhead platforms, along with a trunkline

Length: 16 milesDiameter: 30 inches

Location: off shore Saudi ArabiaComments: Pipeline will run between the new TP-21

and the onshore Safaniya GOSP-1

Contractor: McDermott International Inc.Type: Contract includes the engineering,

procurement, construction and installation of the platform

Contractor: National Petroleum Construction Co.Type: Contract includes the engineering,

procurement, construction and installation of the pipeline