Minutes of the 11 th Meeting of River Rejuvenation Committee (RRC) held on 09 th May 2019 The eleventh meeting to the River Re juvenation Committee (RRC) was held on 09/05/2019 in the conf erence hall of the Secretariat under the Chairmanship of Secretar y Environment. The following members were present for the meeting:- 1. Mr. Govind Jaiswal, Secretary Environment, Secretariat, Alto- Porvorim 2. Mr. Pramod Badami, Superitending Engineer (S.E.), Water Resources Dept. (\1/RD) 3. Mr. Ra jan Satardekar , Director, Directorate of Panchayat, Panaji 4. Dr. Anand Palekar, Dy. Director, Directorate of Health Services. 5. Mr . Pr ashant Kamai. Functional Manager, Directorate of lndustr i . .. : >s, Trade and Commerce. 6 Dr. Tariq T homas, l/\S. Director f or \1unicipal Adminisn - ation. DM.,\ 7. I \1r. l. Thas Ker kar, S.J-. \. Public \ Vorks Depa r tment 8. i \lr. "\ ;. P. Par sckar , LI"]], Public \Vorks Depl. 9. \Ir. P. Jl. Shcldarkar. M. D SIDCGL

Upload: others

Post on 27-Oct-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: New Minutes of the 11th Meeting of River Rejuvenation Committee …goaspcb.gov.in/Media/Default/RCC/MOM_11th RRC.pdf · 2019. 7. 25. · Minutes of the 11th Meeting of River Rejuvenation

Minutes of the 11th Meeting of River Rejuvenation Committee (RRC)

held on 09th May 2019

The eleventh meeting to the River Rejuvenation Committee (RRC) was

held on 09/05/2019 in the conference hall of the Secretariat under the

• Chairmanship of Secretary Environment. The following members were present

for the meeting:-

1. Mr. Govind Jaiswal, Secretary Environment, Secretariat, Alto-

Porvorim

2. Mr. Pramod Badami, Superitending Engineer (S.E.), Water Resources

Dept. (\1/RD)

• 3. Mr. Rajan Satardekar, Director, Directorate of Panchayat, Panaji

4. Dr. Anand Palekar, Dy. Director, Directorate of Health Services.

5. Mr. Prashant Kamai. Functional Manager, Directorate of lndustri. .. :>s,

Trade and Commerce.

6 Dr. Tariq Thomas, l/\S. Director for \1unicipal Adminisn-ation. DM.,\

7. I\1r. l.Thas Kerkar, S.J-. \. Public \Vorks Department

8. i\lr. "\;. P. Parsckar, LI"]], Public \Vorks Depl.

9. \Ir. P. Jl. Shcldarkar. M. D SIDCGL

Page 2: New Minutes of the 11th Meeting of River Rejuvenation Committee …goaspcb.gov.in/Media/Default/RCC/MOM_11th RRC.pdf · 2019. 7. 25. · Minutes of the 11th Meeting of River Rejuvenation

l 0. Mr. Dee lip Dhavalikar, CGM. Sewerage Infrastructure Development

Corporation Goa Limited (SIDCGL)

I I .Mr. Subhash Kelekar, Asst. Director of Tourism

12.Mr. Chandrakant Velip, Dy. Director of Fisheries

13.Ms. Megha Kerkar, Superitendent of Fisheries

14.Capt. Premlal Sirsaiker, Captain of Ports

15.Mr. Ankush Gaunkar, Exe. Engr, WRD

16.Mr. Deepak Mayenkar, Asst. Geologist, Directorate of Mines &

Geology

The Member Secretary welcomed the Chairman and other Members of

the Committee. The status of the action plan as submitted to the NGT for River

Rejuvenation of the I I polluted stretches of the rivers were taken up:

Sr.

No.

• I Action Strategy River

Stretch

T------­ ! Agency Time

Frame

Present Status

Sal river - Priority- III (From Mobor to Kharehand Madgaon)

I. ~1-~~;~~;ral I • j Phvtoric

·-;~eatment (·s1J3·r:.;1· Khareba~<.j- TSJD(:GL Beds) will be I to Mobor

installed immediately in

eighteen months along the

banks in order to avoid the pollution

18 months SIUC(il.

identified

has

'J

nallahs and -vatcr

' samples h,n ,·

been collected

I

I

l

I i1\ 1\' recommend

tcchnolouv tu h'-'

Page 3: New Minutes of the 11th Meeting of River Rejuvenation Committee …goaspcb.gov.in/Media/Default/RCC/MOM_11th RRC.pdf · 2019. 7. 25. · Minutes of the 11th Meeting of River Rejuvenation

I Sr. --- -I Action Strategy ~()~, River

Stretch

Agency Time

Frame

Present Status

implemented.

They al so rcq urrc

the flood levels

from \VRD.

The Managing

Director,

SIDCGL brought

to the notice that

most of the waste

1s getting into

river Sal from

I upstream area and ' ' this source has to be taken care of

which includes

discharge coming

from the SGPD/\

market and the

whole sale

market

The Sccrctnrv

Envi n iumcn t

directed the

Pollution Comro!

Board to 1s-;11t'

SC '¾J /I Jirect i( ms,

Ill SUPD.-\ \\ itf

Municipal

Page 4: New Minutes of the 11th Meeting of River Rejuvenation Committee …goaspcb.gov.in/Media/Default/RCC/MOM_11th RRC.pdf · 2019. 7. 25. · Minutes of the 11th Meeting of River Rejuvenation

I Sr .. r Action Str~~~g)' i

Agent)

f-------------- -···-· ----1 Administration

No.

River

Stretch

(DMA). r--r----------+------j-----+----+--··--·· 2. I Improvement and up I Khareband

gradation of the existing I to Mobor

Solid Waste Management

Facility including collection

system, composting

facilities and erection of ! • ;

1 material recovery facilities / i

' I ! I storage shed for non-

biodegradable waste at

Sonsoddo Margaon

--

! Time

Frame

' I L _

9 months

Present Status,

The

informed that cl

Joint Survey is

being carried out

with Directorate

of Health

Services (DHS)

and Directorate of

Panchayat (DoP)

and will

completed bv

27/05/2019 w

identify those

notices

discharging

sewage and

disposrng

(DMAJ

be

solid

waste J Tl \\ at er

bodies. Notices

will be issued

subsequently.

Prcscmlv 1 )I l\

notices

households

d:1\ -"

Page 5: New Minutes of the 11th Meeting of River Rejuvenation Committee …goaspcb.gov.in/Media/Default/RCC/MOM_11th RRC.pdf · 2019. 7. 25. · Minutes of the 11th Meeting of River Rejuvenation

, Sr. l Action Strategy River Agency 1 No. Stretch

- ··- - --- -- ----------------------- - - . ---- ·-· -- ····-~--

i

3. De weeding Khareband WRD

to Mobor

' I ' ' I t------- --

4. Recycling and Reuse of Khareband SIDCGL

treated sewage from the to Mobor

Sewage treatment plant at

Navclim for flushing and

i maintaining E-11ow during

: dry season. ·- _______ ,. 5. Installation of DO control Khare band WRD

measures to Mobor

l

. ---'------------------ - --- L - --

I ;::~e - _ j i;;cse~;S.:.tus I (D2D) collection

I b · · d · 1s emg came

out and they have

issued directions

to bulk waste

generators.

18 months I Survey and

quantification 1s I

under process and I tender issued I shortly

18 months Proposal is under ! way

18 months I WR I) may

i I furnish the report I

L f111 the next RRl

meeung - - - - -

Talpona River- Priority- IV (from Talpona to Gokarna Math I

Poinginium) S­ i I i

i) Ckar the solid \\ilsteT:.\lun:; th~·ectun.11 ' dumped along the hank i Canacona ! c of

ii) l'rcv en! further sulid

\\ c1sk dumping along the

],;:11k of the River.

<l) l alpona

bl Poingini

um

6 months

! that this muller h

' I taken up

:-;ul1d

Ill the

Page 6: New Minutes of the 11th Meeting of River Rejuvenation Committee …goaspcb.gov.in/Media/Default/RCC/MOM_11th RRC.pdf · 2019. 7. 25. · Minutes of the 11th Meeting of River Rejuvenation

Sr.

No .

Action Strategy

• [ 2· I improvement to c-ollccti~~ a) Talpona ----t--------

system, and erection of I b) Poingini I Village

material recovery facilities /

storage shed for non­

biodegradable waste in the

River

Stretch

1 Agency

village Panchayat areas

along the hanks of Talpona

River.

urn

r T-i~~---- --- ... TP~esent~~-tatus ·Frame~

·----- ---------

606/2018 mutter

I Further he stated

I that priority will

I be given to ' Villages along the polluted River

Stretches and

model villages.

He also stated that

wire meshes will

be installed 111

Respective I 12 months

Panchayat

and

Dircctorat I

of I

storm wat er

drains so as to

avoid any solid !

waste entering

into the mam

nver.

C

Panchayat

Dcpnrtme

Ill of

6 months

DoP

Action

informed

that this matter is

taken up in the

Solid

Pbn

submitted 1n 1h._,,

606/2018 matter

Page 7: New Minutes of the 11th Meeting of River Rejuvenation Committee …goaspcb.gov.in/Media/Default/RCC/MOM_11th RRC.pdf · 2019. 7. 25. · Minutes of the 11th Meeting of River Rejuvenation

I - -,---- ------ ------~

Sr. I Action Strategy I River

r"· f I

I 4 .

j Agency

i : --------t----··

Stretch

Time

Frame

I Prcs;~t Status

-+------ ---­ Env. directed that

the work should

be completed by (>

moths

Proposed SWM facility at

Curchorem having 100 TPD

and the estimated cost the

work is 190.00 Cr. This

facility will be operational

in next J 8 months .

• i

__ l _ Mandovi Rivcr > Priority- JV -(from Panjim to Volvot)

I Disconnection

' discharges or of direct Panjim

domestic : Volnii

to

Goa

Waste

Managern

ent

Corporatio

n

- "

River/storrn water drains/

r Disconnection of the

( 'andola

h) I\J::n'lTa1

Directorat

C of

Panchayat,

Dircctorat

18 months ! Letter issued to

concessionaires to

' l kalth

of

Services:

6 months

submit

proposal

final

with

regards to expert

committees

recommendations

on 03/05/2019.

And

conccssionancs

I submitted final ' ! proposal on

09/05/2019. Same

JS

to

The

send

management

consultant.

informed 1h;11

for

technical sanction

project

])\I. \

Joint SL!lvn 1:--.

being carried out

\\ ith Dcp; ,,r l k';illh und I)\ lp

and \\ il-1 h~ ' " C

Page 8: New Minutes of the 11th Meeting of River Rejuvenation Committee …goaspcb.gov.in/Media/Default/RCC/MOM_11th RRC.pdf · 2019. 7. 25. · Minutes of the 11th Meeting of River Rejuvenation

Sr.

No .

Action Strategy [ River

· Stretch

rtver or through storm I c) Amona

water drain/ Nallah.

tank and soak pits by

d) Navelim

Y Construction of septic I e) Cando la,

Volvoi

residential houses and I f) Panchaya monitoring the frequent

cleaning the septic tanks

m order to avoid I g) Se-old untreated domestic

t St.

Estevam

Goa.

sewage discharge in to I h) Salvador-

the natural drains.

Y Initiating action under

the Water act including I i) Penha de

levying of fines for

commercial

establishment under

Do­

Mundo

France

.i) Reis Magos

Pollutant pay principal. ! k) Panchaya

(within I month)

1-c;- - --

1 ! Li ) 1 m pn1 \ -cmcm

l Nerul

to ! <1} Bctqui-

Agc~~~-°iime·- - -1-pr;~en~ S~-~tus • Frame

----- I - ----- completed h\

1 month

27/05/2019

identify

notices

discharging

sewage

disposing

! to I

I those

waste m water

bodies. Notices

will be issued

subsequently.

Presentlv

notices

households

1 GSPCB

or

I hU\L'

I PL'lwity ;

I I

R~~~p,0cli\·c 1·-(; months -!)::!JJ ,• . _j

puid

and

solid i

DHS

has issued 218

comply within 60 ·

days.

issued notices tu

28 commercial

establishments

which were round

to be discharg:in[.'

m the· river. Out

which

; establishments

to

to

Page 9: New Minutes of the 11th Meeting of River Rejuvenation Committee …goaspcb.gov.in/Media/Default/RCC/MOM_11th RRC.pdf · 2019. 7. 25. · Minutes of the 11th Meeting of River Rejuvenation

I Sr. - ,Action St;ate~ ----·-·- -j Rive~ - - ·1 Agency

~-~--~

1

collection -system, -a~Jtretch I

, ensuring collection of I b J I, segregated waste. I 'I 1v1

Candola I

· • 1arcem -

'em-

Orgao

c) Amona

d) Navelim

e) Candela,

Volvoi

f) Panchaya

t St

Estevam

g) Se-old

Goa.

b) Installation

Management

Corporation.

of Bio- i h) Salvador- digester having capacity

100 TPD at Bainguinim

Do­ Mundo

bv the Goa Waste I i) Penha-

De-

France

i) Reis Magos

k) Panchaya

e

r1~ime I Frame

--··1------ Present Status

Directorat

of

Panchayat

being carried out

and thev have

issued directions

to bulk waste

generators.

DoP

that this matter is

taken up in the

Solid Waste

Action

submitted in the

606/2018 matter

MD,

informed

smce the draft

EIA report has

been

informed

Plan'

GWMC

that

received

from NLLRl thcv

have proposed for

putting upt the

I integrated Solid

\Vaste

Management

Facility ell

submitted to l '"

L --.--

Page 10: New Minutes of the 11th Meeting of River Rejuvenation Committee …goaspcb.gov.in/Media/Default/RCC/MOM_11th RRC.pdf · 2019. 7. 25. · Minutes of the 11th Meeting of River Rejuvenation

Sr.

No.--~-

Tu ·-----r- --~ I River Agency i Time

· Stretch I Frame -+------+-----+- --

,---- i Present Status ' _L

3. I Pro,;iding toilet facility and a) !FF! _ Captain of 1

12 -~0;1ths

sanitation facility for fishing b) Volvoi P011 &

'Jetty at IFFI, Volvoi & c) Marcel SIDCGL

Marccm

--·---

1 TOR. --- '

j COP has already I

! fitted Bio toilets I

at Adpai and is

proposed to I

install 2 at Vashi. 1

Permanent toiletrs

have mbccn

constructed at

Volvoi, Ribander

and Saramanus

Ramp.

4. Existing 8 toilets, 7 13ath I a) Fishing Dept. of I 12 months I Work

rooms, 7 urinals at the

fisheries complex Malim

Betim, Goa managed bv

Sulabh International Social i

S . o . . I : ervice rgaruzauon

Porvorim Goa. The 20

seated toilet block 1s

I proposed along the waste 1 vvatcr treatment plant of 40

Kl I). The -vork is been

carried out through Goa

State lnfrustructurc

i 1,

I Jcvclopmcnt Corporation.

Jetty at

Malim

JlLu<t ill J\11,_i1m 1,.; under Panjirn.

Fisheries

handed

over to GSIDC

and work will he

completed ' 3]/05/2019.

- --------- _,__ - --· -i--- - Jhc up gradation oJ'Sn\·at'.e STP :n P\\'D, Cioa i 18 months I The plan! vill h(·

operational

n-.. 2020.

1-'

Page 11: New Minutes of the 11th Meeting of River Rejuvenation Committee …goaspcb.gov.in/Media/Default/RCC/MOM_11th RRC.pdf · 2019. 7. 25. · Minutes of the 11th Meeting of River Rejuvenation

[ Sr.l Action Strategy [ River j Agen91ime I Present Status ·f No. I Stretch l Frame I

. - -~-- ------------- -- -- - -- -- - <-

' , expected to be completed in _Ll I one year. • --~

Chapora River - Priority V - (from Alorna Fort , Pernem Taluka to

Morjim) __ I · ~· · ' ----·-- '.__ u,n.,-~ I. Disconnection of direct I Alorna fort I Directorat I 6 months

discharges of domestic I to Morjim

sewage into the Chapora

River/storm water drains/

Nallah.

> Disconnection of the

direct discharge into the

river/storm water

drain/Nallah.

~ lt:stallatio~ of Bio toilet_s I

r Construction of septic I tank and soak pits by .

residential houses. s I

I

I

e of

Panchayat

and

Directorat

C of

Health

The

informed that a

Joint Survey

being carried

with Dept

Health and Dop

and will

completed

27/05/2019

identify

notices

discharging

sewage

disposing

JS •

out !

I. I O I

I has

be

b, I . ' ' to

those

and

solid

waste rn water

bodies.

will be issued

subsequently.

I Present!', Ul h '

nut ices

household-

, complv within (!U

I

f l mprovcmem tu collection

crccuon 01

a1 /'.ll)rn;i j Respective ! 12 months

h) Casavct l Villag'-' _l_ -- ----- --

UuP uuormo.l

that th» maucr 1"

.L

Page 12: New Minutes of the 11th Meeting of River Rejuvenation Committee …goaspcb.gov.in/Media/Default/RCC/MOM_11th RRC.pdf · 2019. 7. 25. · Minutes of the 11th Meeting of River Rejuvenation

I - T-------- Sr. , Action Strategy

· No. I

- ~--- ---~~~-c+-- 1 material recovery facilities / e

' storage shed for non- c) 0. ---

biodegradable waste in the

village Panchayat areas

along the banks of Chapora

River

Directorat

e of

Panchayat

Frame

taken up in the

Solid Waste

Action Plan

submitted in the

606/2018 matter

- -

River

Stretch

n

zorim

d) Dhargal

rm

e) Tuem

I) Parcem

g) Agarwa

da

h) Chopde

m

i) Morjim

j) Mcnecu

nm

k) Pima

I) Nadora

m) Rivera

n) Colvale

o) Camurli

m

I r) Oxcl

j q) Siolim

j r) Assagao j

1- -- -- +'l__!'njuna . · Expansion of Salieao Waste 1 + '1 1· -·1- 1· I 11 anagcmenr ucr 11\' rom 1

l 2~ tnns per day to 250 -

20'>o UO(J tons per day}.

Project coxt i.c. 82 er. (_l(}_/()5.-·'201 lJ. Sumc

1s -vn! j()j"

l

final

Ull

Page 13: New Minutes of the 11th Meeting of River Rejuvenation Committee …goaspcb.gov.in/Media/Default/RCC/MOM_11th RRC.pdf · 2019. 7. 25. · Minutes of the 11th Meeting of River Rejuvenation

&I l\o. ,

Action Strategy

C----

! Agency - I Time ---1 Present Status Frame

---c---·------+--- management

consultant

(GSIDC) on

09/05/2019 itself I --- '

-4_ I Providing toilet facilities at Departme 6 months The Dep~rtmen;: '

Chapora fishing jetty nt of has proposed to 1

1

provide a toilet I

block of 2 sealers ! ! I

through PWD.·-~

'

Fisheries

I Tcrekhol River- Priority - V:

I Disconnection of direct Along

discharges of domestic Tcrekhol

sewage into the T erekhol River

River/storm water drains/ I a) Tambosa I and Nnllahs.

r Disconnection of the

direct discharge into the i

• ri vcr/storm

drains/Nallahs.

water

da

c) Bhalkhuj

an

Directorat I 6 months

e of

Panchayat

b) Nanerwa I Dircctorut

e

Health

of

The DMA

r Installation or Rio- ' I toilet.

r Construction of septic

tank and soak pits b)

residential houses.

d) Qucrim - I Tirncn1 ·

I

I

informed that a

Joint Survey 1s

being carried out ·

with Dept ur

1 ! lca!th and Uop

and will

completed

27/05/2019 1 identiJ)

notices

discharging

SC\\ age

subsequcntlv

Pn::.,1:'Illl\

I U

disposing solid

waste Ill water

bodies. l"<r)l ic~·o,

vvill h1.· i -;-;11c•d

])] l'<

Page 14: New Minutes of the 11th Meeting of River Rejuvenation Committee …goaspcb.gov.in/Media/Default/RCC/MOM_11th RRC.pdf · 2019. 7. 25. · Minutes of the 11th Meeting of River Rejuvenation

Sr.

No.

Action Strategy

---t------ ····--

2 .

• ]

Agenc): · 1 Time

Stretch _ _ Fra~c -+-~- River Present Status

. notices ! households to ·

comply within 60

days.

Improvement and up I a) Querim- I Respective I 12 months I DoP gradation of the existing Tiracol Village

Solid Waste Management b) Paliyem Panchayat

Facility including collection I c) Corgao and

system and erection of I d) Pernem I Directorat material recovery facilities/

storage shed for non­

biodegradable waste in the

murucrp I e

al

council

village panchayat areas e) Casne - ' ! along the banks of Terekhol Ambere

River. m

porosca

dem

f) Tamhox

cm­

Mopa­

Uguem

g) Torxcm

of

Panchayat

Expansion of Saligao Waste

Management facility from

125 tons per day 10 250 +

20°/() noo tons per day). Project cost i.~·. ~2 er.

i

- -to-1

that this matter is

taken up in the

Solid

Action

informed

submitted in the

606/2018 matter

I

' I

9 months tLe;~er _issu~·d lo

conccssmnanv tu I i JSSUC final

proposal on

: 09/05 .. ":ZO 19 San»,

lS sent

10

Waste

Plan

I management __ l _

Page 15: New Minutes of the 11th Meeting of River Rejuvenation Committee …goaspcb.gov.in/Media/Default/RCC/MOM_11th RRC.pdf · 2019. 7. 25. · Minutes of the 11th Meeting of River Rejuvenation

--T ------ - Sr. ! Action Strategy

' ~1--- 1 I

River

Stretch

Agency ,----- ; Time

Frame --1--

Zuari River- Priority - V - (from Curchorem to Madkai)

1·· Presen-~-s;atus

--iconsultant-- ,

(GSIDC)

09/05/2019 itself.

-------1 '

I.

direct

Disconnection

discharges

river/storm

drains/N allahs.

of Cure

of I horem to

domestic sewage into the I Madkai

Zuari River/storm water

drains/ Nallahs.

r Disconnection of the

direct discharge into the

water

r Installation of Bio-toilet.

r Construction of septic

tank and soak pits by

residential houses.

Dir 6

ectorate of I months Panchayat

and

Direotorat

e of

Health

on

The

informed that al Joint Survey

I IS ,

being carried out

with Dept of

Health and Dop

and will be

completed

DMA

by

27 /05/20 I 9 to

identify those

notices

discharging

I L

sewage and

disposing solid

\.\'HSlC 111 water

bodies. Notices

wil I he issued

subsequently.

Presently DHS

has issued

notice- lo

households h'

-- _J

Page 16: New Minutes of the 11th Meeting of River Rejuvenation Committee …goaspcb.gov.in/Media/Default/RCC/MOM_11th RRC.pdf · 2019. 7. 25. · Minutes of the 11th Meeting of River Rejuvenation

Gg;n~y T.im;---iP~ese~-~-·s;;tus ! Frame

Ice--,--------+-~·-· 1- - - 2. 1 a) Savordc · ·

Sr.

No .

, Action Strategy

Improvement and up

gradation of the existing

Solid Waste Management

Facility including collection I c) Shiroda I Panchayat

system and erection of

material recovery facilities/ storage shed for non­

biodegradable waste in the

village panchayat areas

along the banks of Zuari

River.

Establishment of

toilets at Fishing Jetty at

Cortalim in one vcar.

Establishment of S\\'\1

f:xility m Curchorcm of 100

tpd capacirv within 18

·1 his \vil! cater 10

Stretch

Ill

b) Panchw I spectivc aJi

d) Borim

e) Wadi -

m

i) Neura

j) St.

Lawrenc

c(Agasa

im)

k) St.

Andre (

Vclha)

1) Siridao

- pale

m)

Curchor

cm­

kakora

n1 Macaso na

(1) Cunori

111

p) Rachol

Re

Village

and

Directorat talaulim e of

f) Durbhat Panchayat

g) Bandora

h) Marcai

months

, D2D collection

12 I being carried out

and they have

issued directions

to bulk waste

generators.

DoP

that this matter is

taken up in the

Solid

Action

1:--

informed

Dept

proposed

Waste I

Plan

submitted in the

606/2018 matter

has

toilet

i block of 2 seater

i and treatment

plant.

I .cucr is:,ucd 111

concessrorunre-, to

submit

with

Page 17: New Minutes of the 11th Meeting of River Rejuvenation Committee …goaspcb.gov.in/Media/Default/RCC/MOM_11th RRC.pdf · 2019. 7. 25. · Minutes of the 11th Meeting of River Rejuvenation

i River

r

I ~,r. I Action Strategy

~ ; Stretch

, : Olrnrhandora Taluka. I - Lotoliu i I .

Agency Time - r _

Present Status

Frame

• Ponda

m

q) Cortali

Quelosi

m

r) Sancoal

recommendations

on

And

03/0512019,

concessionancs

submitted

proposal

IS send

final

on

09/05/2019_ Same

for

technical sanction

to project

management

consultant.

Toilets facility for

! Fishing Jetty at Cortalim

h 1

4 I

! The underground se,ycragc

scheme 111 progress for

municipal

including Curti. Bandora.

Kavclcm. Undir ,:nd area

close to Kaplcshxvari na]Jah

which furtherjoins the Zuan

proposed at Cuni. Kavelcm

De partmcnt

of

Fisheries

SIDCGL

6

months

12 months

Dept

proposed

matter

has

toilet

block of 2 seater

and treatment

plant.

Ponda-Curti S 1 P

IS

subjudicc.

Bandera plant 1s

given in rm our (lj

\\ ork has to h,·

Page 18: New Minutes of the 11th Meeting of River Rejuvenation Committee …goaspcb.gov.in/Media/Default/RCC/MOM_11th RRC.pdf · 2019. 7. 25. · Minutes of the 11th Meeting of River Rejuvenation

,---- - --- ---

Pt' Sr Action Strategy

.

1

I nd Bandora of capacity

8MLD. 15MLD and

15MLD respectively. At

present sewerage

network is laid and 15MLD

STP at Kavelem 1s m

progress. Sewerage scheme

with IMLD STP

commissioned for Durbhat

village which is on the bank

on River Zuari. This STP

was

70%

commissioned

River

Stretch

-·-!A;cncy 1-:-l,i~e Frame

IS

m

September 2017 and 1s

running successfully. The

total cost of all the projects

mentioned above is 536 er. ' -------~------ C

) Present Status

-- . _J .,_ ----------· ----- . completed.

• Khandepar - Priority V- (from Opa Ponda & Codli- u/s of Opa

-~Yater works)

1-- -; Disconnection or direct Codli lo U/s -Di;;,ct~r,;1- ·16 months I The IJM;\

. I discharges of domestic of Opa e of'

, sewage into the Khandcpar. water works Panchayat.

River/storm water drains/ a) Khandep Directorat

nallah ur

r Disconnection or the I b) Uspao

direct discharge into the

river/storm vvater drnin

Nall ah.

,. Construction or septic

tank and soak pits bJ

C

Health

of

Services:

informed that " Joint Sunn 1,

being curried nut

with Dept of I 1 Health and Dop

nnd will bl

completed h\

2 7/05/10 I q lil

notices

discharuiuv

Page 19: New Minutes of the 11th Meeting of River Rejuvenation Committee …goaspcb.gov.in/Media/Default/RCC/MOM_11th RRC.pdf · 2019. 7. 25. · Minutes of the 11th Meeting of River Rejuvenation

,---------

: Sr.

I No. /-----

Action Strategy

cleaning the septic tanks

ll1 order

untreated

to avoid

domestic

sewage discharge in to

the natural drains.

1 Present St~t~~­ ~ge

j disposmg

waste m water

bodies.

will be issued

subsequently.

Presently

has

Notices

issued

notices

households

' and

solid

OHS

comply within 60

days.

Assonora - Priority -V - from Assonora to Sirsaim C----~-------------~-~---- 1. ~· Disconnection of direct I Assonora to I Directorat

discharges of domestic I U/s

sewage into the Assonora. I Sirsaim

River /storm water drains/

nallah.

i ',- Disconnection of the

direct discharge into the

river/storm

drnin/Nallah

water

,- installation of Bio toilets

along the river stretch

for residential areas.

,- Construction of septic

tank and soak pits by

rcsidenual houses and

monnormg the frequent

of I c

a) Assonora

b)Sirsaim

of.

Panchayat.

Directorat

C

Health

of i

Services;

6 months

to

10

1 The D-MA~

that a informed

Joint Survey 1s

being carried out

with Dept of

Health and Dop

and will be

completed b\

27/05/2019 tn

identif those

notices

dischargint'

disposing solid

wa-ac 1Jl \\(ik"I

Page 20: New Minutes of the 11th Meeting of River Rejuvenation Committee …goaspcb.gov.in/Media/Default/RCC/MOM_11th RRC.pdf · 2019. 7. 25. · Minutes of the 11th Meeting of River Rejuvenation

rr· 1 Action Strateg)- - - ,-II River -TAgency I Time - ·-r;;csent Status t"· Stretch I j_F"rame

f i-m - order to avoid I ---i I !subscquentlv untreated domestic l sewage discharge in to I

the natural drains. ·-----+-----+--- [ I 2. I Improvement to collection a) Assonora Respective 12 monthsiDc;-P--i-nformed I

system, and erection of bj Sirsaim Village I that this matter is·

material recovery facilities / Panchayat

storage shed for non- and

biodegradable waste in the

village Panchayat areas

along the banks of Assonora

f~~ver. , .

j 3· I ~~pansion of Saligao Waste 9 months I Letter issued to I

· Management facility from I I concessionaire to I

125 tons per dav to 250 + _ issue final · • I 20% (300 tons per day).

Project cost i.e. 82 er.

Directorat

e of Panchayat

taken up in the

Solid

Action

Waste

Plan

submitted in the

606/2018 matter

• i ' J__

proposal

09/05/2019 nn

1s sent

Same, . I Jor I

Yalvanti Rinr- Priority - V- from Poriem to Sanquelim-Bicholim l j __

technical sanction

to project

management

consultant

Oil

_J I. j Disconnection

discharges of

·, of direct I Poricm to

domestic J Sanquelim <.:('\\ <1gc into . !

the Vulvauti. I a) Poricm

water drains" I b) Honda

C of

Pane ha vat.

Dircctorat

«isnx: _ J 09.'0~~~-('. J 9 itscl I'

River/storm

C nJ'

+ · The

informed

])\ 1 \

that :I

.lurnt Survc- iS

bviug carried om \\'ith Dept ()j

Page 21: New Minutes of the 11th Meeting of River Rejuvenation Committee …goaspcb.gov.in/Media/Default/RCC/MOM_11th RRC.pdf · 2019. 7. 25. · Minutes of the 11th Meeting of River Rejuvenation

,I Sr./A.ction.Strategy -]iver - I Agency I Time

j No. / Stretch ! Frame L --------- __ _j__ -·-- I j nallah. . c) Karapur I ~eal~h · j > Disconnection of the / & / Services;

' Sarvona direct discharge into the

river/storm water

drain/Nall ah.

> Installation of Bio toilets

> Construction of septic

tank and soak pits by

residential houses.

Present Status

I

I I I L+-------- 12. . a) Improvement to a) Poricm

j_ - Respective

collection system, and I b) Honda Villane

erection o;. material / c) Karapur Panc~ayat

rccovcrv facilities / 11 & I and

storage shed fur non- Sarvonu ! Directorat

Health and Dop

and will be !

completed by

27/05/2019 to I identify those

notices

discharging

sewage and

disposing solid

waste in water

1 bodies. Notices .

will be issued j

subsequently.

Presently OHS

biodegradable waste m

the village l'unchayat

areas along the hanks or Vulvanu RiYLT,

! h) lmprovcmcm and l'p

eradution of the cxistina .

., W;1s1:.1 _l_ __ /_

I e of

· I'anchayat

) notices

I households I comply within 60

days. --1' ----- -- 12 months DoP informed

!

has issued 7

to i

10

I' that this matter 1s

taken up in till' ' Solid

Action

Waste

Pl::in

submitted in tln-

606/:!0l 8 1rnllk1

Page 22: New Minutes of the 11th Meeting of River Rejuvenation Committee …goaspcb.gov.in/Media/Default/RCC/MOM_11th RRC.pdf · 2019. 7. 25. · Minutes of the 11th Meeting of River Rejuvenation

I Sr. r Action Strategy j'Rh·~·- Agency I Ti.;.e ·- ]Present Status

f No. f Stretch +---- [ Frame l 1- ,-Man~gerne-mT3CilitY~f ------- -- , - - -- and the) hen e

f I Sanqudim Mu~icipal I I issued directions · Council; installation of I j to bulk waste

biogas plant of 3 tons

I per day and construction I I I I I ~~~- --~ I ') I ~ "--" •. , ~\ n _

generators.

Expansion or oaugao waste

Management facility from

125 tons per day to 250 + 20% (300 tons per day).

Project cost i.e. 82 er.

a) Pemem

b) Bardez

c) Bicholi

m&

d) Sattari

talukas

in North

Goa

District.

I .

I I r I r icommissioning of existi,;;;-Jaj Sa~queli

j I sewerage network and STP I m

. / UY . MLIJ capacity. i hJ 3 wards /

1

(C ovenug S wards)

9 months Letter issued to

concessionaire to

issue

proposal

09/05/2019. Same

IS sent

final

on

for

technical sanction

to project

management

J.C.

Bandhar

-vada.

Muslim

\\'ad:1

Muzar

wada &

( l.-1k ubv

' [ consultant

, j (GSJDC) on

j 1· 09/05/20]9 itself -·-··t-·- - ···- ·-· - _j STDCGL 12 months ! Total network

I length is 290(Jm.

Tested network

length i:-; 1980m

Network balance

to be tested 92Un1.

during tcsunu th.n

.L adi

~- ()f 200m

Page 23: New Minutes of the 11th Meeting of River Rejuvenation Committee …goaspcb.gov.in/Media/Default/RCC/MOM_11th RRC.pdf · 2019. 7. 25. · Minutes of the 11th Meeting of River Rejuvenation

~-' -- ··-------· ---· =t, ----

I SL I Action Strategy River Present Status ! No. Stretch Frame 1-1- r -·-----··

time required for

rectification of '

manholes, I

replacement of . I' I main sewer me j

within 8 month~

Bicholim River- Priority- V - from Bicholim to Curchirem I

- I. Disconnection of direct Curchirern Dircctorat 6 months The DMA

discharges of domestic to Bicholim e of informed that a

sewage into the Bicholim. a) Curchirc Panchayat Joint Survey IS !

I River/stonn water drains/ m and being carried out nallah. b) Bicholi Directorat with Dept of

I Y Disconnection of the m e of Health and Dop '

direct discharge into the Municip Health, and will be

river/storm water 1 al ULB. completed by !

I drain/Nallah. Council 27/05/2019 lo

',,..-- Installation of Bio toilets c) Ona- identify those

I Construction of septic Mauling notices

tank and soak pits by uem discharging

residential houses and d) Karapur sewage and '

monitoring the frequent -Sarvan disposing solid

cleaning Ihe septic tanks c) Amona waste 111 water

Ill order to avoid l) Pilgao I bodies. :'Juticc'S ' !

I will be issued untreated domestic

I subsequently. sewage discharge in 1!._1 ' ' ! Presently DI l\ the natural drains. I

' has issued l ii !

noucc« l\l

comply within ()fl

Page 24: New Minutes of the 11th Meeting of River Rejuvenation Committee …goaspcb.gov.in/Media/Default/RCC/MOM_11th RRC.pdf · 2019. 7. 25. · Minutes of the 11th Meeting of River Rejuvenation

.. Sr~-rA~tio;Strateg):- --- - -,--- Ri~·er___ A-g-en--q,- - -T-im_e --TPr~sent Status

No, ! Stretch Frame / --+-----,-------------+-----+-- - -Tdavs-:- - - -

I - ------,- ------ - a)lmnrr,vPmAn-t ~~ --11-~~, - ~ ·-L --~ I r>- I 12 rnonrhc I l)"p !:-:.t:..::·:::~;:

, I I system, and erection of that this matter is

taken up in the

2,

material recovery

facilities / storage shed for

non-biodegradable waste

in the Municipal Council,

village Panchayat areas

along the banks of I c) Ona- ft I I I3icholim River.

b) Improvement and up

aJ Curchire , rvespecuve m ULB &

b) Bicholi Village m Panchayat Municip and al Directorat Council e of

Mauling

uem gradation of the existing I d) Karapur Solid Waste Management -Sarvan facility of Bicholim c) Amona

jj Muni~1pal Council . f) Pilgao

- --- ------l--~-+- 3 Expansion ofSaligao Waste I a) Curchirc

, C 'j' j' ' J11 Management racr ny rom I

12\t _ ib)Bicholi _ ons

per day to 250 + 20% m

Municip

al

Council

c) Ona-

Mauling

uem

d) Karapur

-Sarv :in

e) Amona

n Pilgno -" - - ··-- ----- ·-·-

Panchayat

6 months

Solid

Action

Waste

Plan

submitted in the

606/2018 matter

D2D collection is

being carried out I [ and they have ' issued directions

to bulk waste

J' generators -·~··· -- --

9 months I l .cuer _issu~d 10

I concessronarrc to

I issue final

' proposal on

09/05/2019. Same

sent

technical sanction

to project

! ruanagemcm

1 consultant ! - (CiSIDC)

Page 25: New Minutes of the 11th Meeting of River Rejuvenation Committee …goaspcb.gov.in/Media/Default/RCC/MOM_11th RRC.pdf · 2019. 7. 25. · Minutes of the 11th Meeting of River Rejuvenation

I Sr. I[ Action Strategy jRi,er J:gency J Time lPrescnt Status I No. Stretch Frame

l _ _l_ --- ---- - Sinquerim River- Priority- V- from Candolim to Ganesh Temple, Nerul

r-]_ -.--

I

I

Disconnection

discharges of

of direct I Candolim

domestic Bridge

sewage into the Sinquerim. I Ganpati River/storm

nallah.

water drains/ Temple

(Nerul)

m order to avoid

untreated domestic

sewage discharge in to

the natural drains.

Oirectorat

to I e of

Panchayat,

Directorat

e of

,,, Disconnection of the ] d) Pileme- I Health Services; direct discharge into the I Marra

river or through storm I e) Candoli water drain/ Nallah. m

>" Installation of Bio toilets !) Reis-

along the river stretch. Magos

> Construction of septic g) Nerul

tank and soak pits by

residential houses and

monitoring the frequent

cleaning the septic tanks

6 months The

----- -- -

7 I a) Improvement to a) Pileme-

collection svstcm. and Marra

ensuring collection of bl Cnndoli

scgrcgai. . .-J \\ astc m

b) lmp1p, cmcut and Up CI Reis- -----

I I -----1 I Respective i omonths Village

Pane ha-, at i •

1

and

Dircctorut

informed

Joint

with

DMAI

that a i

Survev

Dept

ts

being carried out

of

Health and Dop

and will be

completed by

27/05/2019 to

identify those I

notices I discharging I

sewage and ii

disposing solid

waste 111 water

bodies. Notices !

will be issued !

subsequently.

I Prescnt'.y DHS

; has issued _1

notices tu 1

households 1(1

comply within (1()

days -1-

])oP inJmrnLd

that this matter t-;

taken up in th,·

Solid \\ ,1-;h_'

Action PL111 J

Page 26: New Minutes of the 11th Meeting of River Rejuvenation Committee …goaspcb.gov.in/Media/Default/RCC/MOM_11th RRC.pdf · 2019. 7. 25. · Minutes of the 11th Meeting of River Rejuvenation

Status

C - I.·--­ ! Sr. I Action Strategy

I No. I -]- · gradation o{--

1

Solid

Manaacment I -

d in the

matter

3. . Providing toilet

I sanitation fac

fishing trawlers

-

River I AgencY I Time ! Present

Stretch Frame -- -·-- ---

existing Magos e of submitt

Waste d) Nerul Panchayat 606/20

D2D c

being

and

issued

to b

genera -

Departme 6 months The

nt of has f

Fisheries proVJC

toilet

Nerul ·-·--L-- -· . I

I ' L-.·--

ection 1s

rried out

y have I

directions )

waste I

' __ j partment I posed to

2 seater

eility

mp.

at I !

Meeting ended with thanks to the Chair

• ~ (Dr. Shamila Monteiro)

Member Secretary