Minutes of the 11th Meeting of River Rejuvenation Committee (RRC)
held on 09th May 2019
The eleventh meeting to the River Rejuvenation Committee (RRC) was
held on 09/05/2019 in the conference hall of the Secretariat under the
• Chairmanship of Secretary Environment. The following members were present
for the meeting:-
1. Mr. Govind Jaiswal, Secretary Environment, Secretariat, Alto-
Porvorim
2. Mr. Pramod Badami, Superitending Engineer (S.E.), Water Resources
Dept. (\1/RD)
• 3. Mr. Rajan Satardekar, Director, Directorate of Panchayat, Panaji
4. Dr. Anand Palekar, Dy. Director, Directorate of Health Services.
5. Mr. Prashant Kamai. Functional Manager, Directorate of lndustri. .. :>s,
Trade and Commerce.
6 Dr. Tariq Thomas, l/\S. Director for \1unicipal Adminisn-ation. DM.,\
7. I\1r. l.Thas Kerkar, S.J-. \. Public \Vorks Department
8. i\lr. "\;. P. Parsckar, LI"]], Public \Vorks Depl.
9. \Ir. P. Jl. Shcldarkar. M. D SIDCGL
l 0. Mr. Dee lip Dhavalikar, CGM. Sewerage Infrastructure Development
Corporation Goa Limited (SIDCGL)
•
I I .Mr. Subhash Kelekar, Asst. Director of Tourism
12.Mr. Chandrakant Velip, Dy. Director of Fisheries
13.Ms. Megha Kerkar, Superitendent of Fisheries
14.Capt. Premlal Sirsaiker, Captain of Ports
15.Mr. Ankush Gaunkar, Exe. Engr, WRD
16.Mr. Deepak Mayenkar, Asst. Geologist, Directorate of Mines &
Geology
The Member Secretary welcomed the Chairman and other Members of
the Committee. The status of the action plan as submitted to the NGT for River
Rejuvenation of the I I polluted stretches of the rivers were taken up:
Sr.
No.
• I Action Strategy River
Stretch
T------ ! Agency Time
Frame
Present Status
Sal river - Priority- III (From Mobor to Kharehand Madgaon)
I. ~1-~~;~~;ral I • j Phvtoric
·-;~eatment (·s1J3·r:.;1· Khareba~<.j- TSJD(:GL Beds) will be I to Mobor
installed immediately in
eighteen months along the
banks in order to avoid the pollution
18 months SIUC(il.
identified
has
'J
nallahs and -vatcr
' samples h,n ,·
been collected
I
I
l
I i1\ 1\' recommend
tcchnolouv tu h'-'
•
•
I Sr. --- -I Action Strategy ~()~, River
Stretch
Agency Time
Frame
Present Status
implemented.
They al so rcq urrc
the flood levels
from \VRD.
The Managing
Director,
SIDCGL brought
to the notice that
most of the waste
1s getting into
river Sal from
I upstream area and ' ' this source has to be taken care of
which includes
discharge coming
from the SGPD/\
market and the
whole sale
market
The Sccrctnrv
Envi n iumcn t
directed the
Pollution Comro!
Board to 1s-;11t'
SC '¾J /I Jirect i( ms,
Ill SUPD.-\ \\ itf
Municipal
•
I Sr .. r Action Str~~~g)' i
Agent)
f-------------- -···-· ----1 Administration
No.
River
Stretch
(DMA). r--r----------+------j-----+----+--··--·· 2. I Improvement and up I Khareband
gradation of the existing I to Mobor
Solid Waste Management
Facility including collection
system, composting
facilities and erection of ! • ;
1 material recovery facilities / i
' I ! I storage shed for non-
biodegradable waste at
Sonsoddo Margaon
--
! Time
Frame
' I L _
9 months
Present Status,
The
informed that cl
Joint Survey is
being carried out
with Directorate
of Health
Services (DHS)
and Directorate of
Panchayat (DoP)
and will
completed bv
27/05/2019 w
identify those
notices
discharging
sewage and
disposrng
(DMAJ
be
solid
waste J Tl \\ at er
bodies. Notices
will be issued
subsequently.
Prcscmlv 1 )I l\
notices
households
d:1\ -"
•
, Sr. l Action Strategy River Agency 1 No. Stretch
- ··- - --- -- ----------------------- - - . ---- ·-· -- ····-~--
i
3. De weeding Khareband WRD
to Mobor
' I ' ' I t------- --
4. Recycling and Reuse of Khareband SIDCGL
treated sewage from the to Mobor
Sewage treatment plant at
Navclim for flushing and
i maintaining E-11ow during
: dry season. ·- _______ ,. 5. Installation of DO control Khare band WRD
measures to Mobor
l
. ---'------------------ - --- L - --
I ;::~e - _ j i;;cse~;S.:.tus I (D2D) collection
I b · · d · 1s emg came
out and they have
issued directions
to bulk waste
generators.
18 months I Survey and
quantification 1s I
under process and I tender issued I shortly
18 months Proposal is under ! way
18 months I WR I) may
i I furnish the report I
L f111 the next RRl
meeung - - - - -
Talpona River- Priority- IV (from Talpona to Gokarna Math I
Poinginium) S i I i
i) Ckar the solid \\ilsteT:.\lun:; th~·ectun.11 ' dumped along the hank i Canacona ! c of
ii) l'rcv en! further sulid
\\ c1sk dumping along the
],;:11k of the River.
<l) l alpona
bl Poingini
um
6 months
! that this muller h
' I taken up
:-;ul1d
Ill the
•
Sr.
No .
Action Strategy
• [ 2· I improvement to c-ollccti~~ a) Talpona ----t--------
system, and erection of I b) Poingini I Village
material recovery facilities /
storage shed for non
biodegradable waste in the
River
Stretch
1 Agency
village Panchayat areas
along the hanks of Talpona
River.
urn
r T-i~~---- --- ... TP~esent~~-tatus ·Frame~
·----- ---------
606/2018 mutter
I Further he stated
I that priority will
I be given to ' Villages along the polluted River
Stretches and
model villages.
He also stated that
wire meshes will
be installed 111
Respective I 12 months
Panchayat
and
Dircctorat I
of I
storm wat er
drains so as to
avoid any solid !
waste entering
into the mam
nver.
C
Panchayat
Dcpnrtme
Ill of
6 months
DoP
Action
informed
that this matter is
taken up in the
Solid
Pbn
submitted 1n 1h._,,
606/2018 matter
I - -,---- ------ ------~
Sr. I Action Strategy I River
r"· f I
I 4 .
•
j Agency
i : --------t----··
Stretch
Time
Frame
I Prcs;~t Status
-+------ --- Env. directed that
the work should
be completed by (>
moths
Proposed SWM facility at
Curchorem having 100 TPD
and the estimated cost the
work is 190.00 Cr. This
facility will be operational
in next J 8 months .
• i
__ l _ Mandovi Rivcr > Priority- JV -(from Panjim to Volvot)
I Disconnection
' discharges or of direct Panjim
domestic : Volnii
to
Goa
Waste
Managern
ent
Corporatio
n
- "
River/storrn water drains/
r Disconnection of the
( 'andola
h) I\J::n'lTa1
Directorat
C of
Panchayat,
Dircctorat
18 months ! Letter issued to
concessionaires to
' l kalth
of
Services:
6 months
submit
proposal
final
with
regards to expert
committees
recommendations
on 03/05/2019.
And
conccssionancs
I submitted final ' ! proposal on
09/05/2019. Same
JS
to
The
send
management
consultant.
informed 1h;11
for
technical sanction
project
])\I. \
Joint SL!lvn 1:--.
being carried out
\\ ith Dcp; ,,r l k';illh und I)\ lp
and \\ il-1 h~ ' " C
Sr.
No .
•
Action Strategy [ River
· Stretch
rtver or through storm I c) Amona
water drain/ Nallah.
tank and soak pits by
d) Navelim
Y Construction of septic I e) Cando la,
Volvoi
residential houses and I f) Panchaya monitoring the frequent
cleaning the septic tanks
m order to avoid I g) Se-old untreated domestic
t St.
Estevam
Goa.
sewage discharge in to I h) Salvador-
the natural drains.
Y Initiating action under
the Water act including I i) Penha de
levying of fines for
commercial
establishment under
Do
Mundo
France
.i) Reis Magos
Pollutant pay principal. ! k) Panchaya
(within I month)
•
1-c;- - --
1 ! Li ) 1 m pn1 \ -cmcm
l Nerul
to ! <1} Bctqui-
Agc~~~-°iime·- - -1-pr;~en~ S~-~tus • Frame
----- I - ----- completed h\
1 month
27/05/2019
identify
notices
discharging
sewage
disposing
! to I
I those
waste m water
bodies. Notices
will be issued
subsequently.
Presentlv
notices
households
1 GSPCB
or
I hU\L'
I PL'lwity ;
I I
R~~~p,0cli\·c 1·-(; months -!)::!JJ ,• . _j
puid
and
solid i
DHS
has issued 218
comply within 60 ·
days.
issued notices tu
28 commercial
establishments
which were round
to be discharg:in[.'
m the· river. Out
which
; establishments
to
to
•
I Sr. - ,Action St;ate~ ----·-·- -j Rive~ - - ·1 Agency
~-~--~
1
collection -system, -a~Jtretch I
, ensuring collection of I b J I, segregated waste. I 'I 1v1
•
Candola I
· • 1arcem -
'em-
Orgao
c) Amona
d) Navelim
e) Candela,
Volvoi
f) Panchaya
t St
Estevam
g) Se-old
Goa.
b) Installation
Management
Corporation.
of Bio- i h) Salvador- digester having capacity
100 TPD at Bainguinim
Do Mundo
bv the Goa Waste I i) Penha-
De-
France
i) Reis Magos
k) Panchaya
e
r1~ime I Frame
--··1------ Present Status
Directorat
of
Panchayat
being carried out
and thev have
issued directions
to bulk waste
generators.
DoP
that this matter is
taken up in the
Solid Waste
Action
submitted in the
606/2018 matter
MD,
informed
smce the draft
EIA report has
been
informed
Plan'
GWMC
that
received
from NLLRl thcv
have proposed for
putting upt the
I integrated Solid
\Vaste
Management
Facility ell
submitted to l '"
L --.--
•
•
Sr.
No.--~-
Tu ·-----r- --~ I River Agency i Time
· Stretch I Frame -+------+-----+- --
,---- i Present Status ' _L
3. I Pro,;iding toilet facility and a) !FF! _ Captain of 1
12 -~0;1ths
sanitation facility for fishing b) Volvoi P011 &
'Jetty at IFFI, Volvoi & c) Marcel SIDCGL
Marccm
--·---
1 TOR. --- '
j COP has already I
! fitted Bio toilets I
at Adpai and is
proposed to I
install 2 at Vashi. 1
Permanent toiletrs
have mbccn
constructed at
Volvoi, Ribander
and Saramanus
Ramp.
4. Existing 8 toilets, 7 13ath I a) Fishing Dept. of I 12 months I Work
rooms, 7 urinals at the
fisheries complex Malim
Betim, Goa managed bv
Sulabh International Social i
S . o . . I : ervice rgaruzauon
Porvorim Goa. The 20
seated toilet block 1s
I proposed along the waste 1 vvatcr treatment plant of 40
Kl I). The -vork is been
carried out through Goa
State lnfrustructurc
i 1,
I Jcvclopmcnt Corporation.
Jetty at
Malim
JlLu<t ill J\11,_i1m 1,.; under Panjirn.
Fisheries
handed
over to GSIDC
and work will he
completed ' 3]/05/2019.
- --------- _,__ - --· -i--- - Jhc up gradation oJ'Sn\·at'.e STP :n P\\'D, Cioa i 18 months I The plan! vill h(·
operational
n-.. 2020.
1-'
[ Sr.l Action Strategy [ River j Agen91ime I Present Status ·f No. I Stretch l Frame I
. - -~-- ------------- -- -- - -- -- - <-
' , expected to be completed in _Ll I one year. • --~
•
Chapora River - Priority V - (from Alorna Fort , Pernem Taluka to
Morjim) __ I · ~· · ' ----·-- '.__ u,n.,-~ I. Disconnection of direct I Alorna fort I Directorat I 6 months
discharges of domestic I to Morjim
sewage into the Chapora
River/storm water drains/
Nallah.
> Disconnection of the
direct discharge into the
river/storm water
•
drain/Nallah.
~ lt:stallatio~ of Bio toilet_s I
r Construction of septic I tank and soak pits by .
residential houses. s I
I
I
e of
Panchayat
and
Directorat
C of
Health
The
informed that a
Joint Survey
being carried
with Dept
Health and Dop
and will
completed
27/05/2019
identify
notices
discharging
sewage
disposing
JS •
out !
I. I O I
I has
be
b, I . ' ' to
those
and
solid
waste rn water
bodies.
will be issued
subsequently.
I Present!', Ul h '
nut ices
household-
, complv within (!U
I
f l mprovcmem tu collection
crccuon 01
a1 /'.ll)rn;i j Respective ! 12 months
h) Casavct l Villag'-' _l_ -- ----- --
UuP uuormo.l
that th» maucr 1"
.L
•
I - T-------- Sr. , Action Strategy
· No. I
- ~--- ---~~~-c+-- 1 material recovery facilities / e
' storage shed for non- c) 0. ---
biodegradable waste in the
village Panchayat areas
along the banks of Chapora
River
Directorat
e of
Panchayat
Frame
taken up in the
Solid Waste
Action Plan
submitted in the
606/2018 matter
•
- -
River
Stretch
n
zorim
d) Dhargal
rm
e) Tuem
I) Parcem
g) Agarwa
da
h) Chopde
m
i) Morjim
j) Mcnecu
nm
k) Pima
I) Nadora
m) Rivera
n) Colvale
o) Camurli
m
I r) Oxcl
j q) Siolim
j r) Assagao j
1- -- -- +'l__!'njuna . · Expansion of Salieao Waste 1 + '1 1· -·1- 1· I 11 anagcmenr ucr 11\' rom 1
l 2~ tnns per day to 250 -
20'>o UO(J tons per day}.
Project coxt i.c. 82 er. (_l(}_/()5.-·'201 lJ. Sumc
1s -vn! j()j"
l
final
Ull
•
&I l\o. ,
Action Strategy
C----
! Agency - I Time ---1 Present Status Frame
---c---·------+--- management
consultant
(GSIDC) on
09/05/2019 itself I --- '
-4_ I Providing toilet facilities at Departme 6 months The Dep~rtmen;: '
Chapora fishing jetty nt of has proposed to 1
1
provide a toilet I
block of 2 sealers ! ! I
through PWD.·-~
'
Fisheries
I Tcrekhol River- Priority - V:
I Disconnection of direct Along
discharges of domestic Tcrekhol
sewage into the T erekhol River
River/storm water drains/ I a) Tambosa I and Nnllahs.
r Disconnection of the
direct discharge into the i
• ri vcr/storm
drains/Nallahs.
water
da
c) Bhalkhuj
an
Directorat I 6 months
e of
Panchayat
b) Nanerwa I Dircctorut
e
Health
of
The DMA
r Installation or Rio- ' I toilet.
r Construction of septic
tank and soak pits b)
residential houses.
d) Qucrim - I Tirncn1 ·
I
I
informed that a
Joint Survey 1s
being carried out ·
with Dept ur
1 ! lca!th and Uop
and will
completed
27/05/2019 1 identiJ)
notices
discharging
SC\\ age
subsequcntlv
Pn::.,1:'Illl\
I U
disposing solid
waste Ill water
bodies. l"<r)l ic~·o,
vvill h1.· i -;-;11c•d
])] l'<
•
Sr.
No.
Action Strategy
---t------ ····--
2 .
• ]
Agenc): · 1 Time
Stretch _ _ Fra~c -+-~- River Present Status
. notices ! households to ·
comply within 60
days.
Improvement and up I a) Querim- I Respective I 12 months I DoP gradation of the existing Tiracol Village
Solid Waste Management b) Paliyem Panchayat
Facility including collection I c) Corgao and
system and erection of I d) Pernem I Directorat material recovery facilities/
storage shed for non
biodegradable waste in the
murucrp I e
al
council
village panchayat areas e) Casne - ' ! along the banks of Terekhol Ambere
River. m
porosca
dem
f) Tamhox
cm
Mopa
Uguem
g) Torxcm
of
Panchayat
Expansion of Saligao Waste
Management facility from
125 tons per day 10 250 +
20°/() noo tons per day). Project cost i.~·. ~2 er.
i
- -to-1
that this matter is
taken up in the
Solid
Action
informed
submitted in the
606/2018 matter
I
' I
9 months tLe;~er _issu~·d lo
conccssmnanv tu I i JSSUC final
proposal on
: 09/05 .. ":ZO 19 San»,
lS sent
10
Waste
Plan
I management __ l _
--T ------ - Sr. ! Action Strategy
' ~1--- 1 I
River
Stretch
Agency ,----- ; Time
Frame --1--
•
•
Zuari River- Priority - V - (from Curchorem to Madkai)
1·· Presen-~-s;atus
--iconsultant-- ,
(GSIDC)
09/05/2019 itself.
-------1 '
I.
direct
Disconnection
discharges
river/storm
drains/N allahs.
of Cure
of I horem to
domestic sewage into the I Madkai
Zuari River/storm water
drains/ Nallahs.
r Disconnection of the
direct discharge into the
water
r Installation of Bio-toilet.
r Construction of septic
tank and soak pits by
residential houses.
Dir 6
ectorate of I months Panchayat
and
Direotorat
e of
Health
on
The
informed that al Joint Survey
I IS ,
being carried out
with Dept of
Health and Dop
and will be
completed
DMA
by
27 /05/20 I 9 to
identify those
notices
discharging
I L
sewage and
disposing solid
\.\'HSlC 111 water
bodies. Notices
wil I he issued
subsequently.
Presently DHS
has issued
notice- lo
households h'
-- _J
Gg;n~y T.im;---iP~ese~-~-·s;;tus ! Frame
Ice--,--------+-~·-· 1- - - 2. 1 a) Savordc · ·
•
Sr.
No .
•
, Action Strategy
Improvement and up
gradation of the existing
Solid Waste Management
Facility including collection I c) Shiroda I Panchayat
system and erection of
material recovery facilities/ storage shed for non
biodegradable waste in the
village panchayat areas
along the banks of Zuari
River.
Establishment of
toilets at Fishing Jetty at
Cortalim in one vcar.
Establishment of S\\'\1
f:xility m Curchorcm of 100
tpd capacirv within 18
·1 his \vil! cater 10
Stretch
Ill
b) Panchw I spectivc aJi
d) Borim
e) Wadi -
m
i) Neura
j) St.
Lawrenc
c(Agasa
im)
k) St.
Andre (
Vclha)
1) Siridao
- pale
m)
Curchor
cm
kakora
n1 Macaso na
(1) Cunori
111
p) Rachol
Re
Village
and
Directorat talaulim e of
f) Durbhat Panchayat
g) Bandora
h) Marcai
months
, D2D collection
12 I being carried out
and they have
issued directions
to bulk waste
generators.
DoP
that this matter is
taken up in the
Solid
Action
1:--
informed
Dept
proposed
Waste I
Plan
submitted in the
606/2018 matter
has
toilet
i block of 2 seater
i and treatment
plant.
I .cucr is:,ucd 111
concessrorunre-, to
submit
with
i River
•
r
I ~,r. I Action Strategy
~ ; Stretch
, : Olrnrhandora Taluka. I - Lotoliu i I .
Agency Time - r _
Present Status
Frame
• Ponda
m
q) Cortali
m
Quelosi
m
r) Sancoal
recommendations
on
And
03/0512019,
concessionancs
submitted
proposal
IS send
final
on
09/05/2019_ Same
for
technical sanction
to project
management
consultant.
Toilets facility for
! Fishing Jetty at Cortalim
h 1
4 I
! The underground se,ycragc
scheme 111 progress for
municipal
including Curti. Bandora.
Kavclcm. Undir ,:nd area
close to Kaplcshxvari na]Jah
which furtherjoins the Zuan
proposed at Cuni. Kavelcm
De partmcnt
of
Fisheries
SIDCGL
6
months
12 months
Dept
proposed
matter
has
toilet
block of 2 seater
and treatment
plant.
Ponda-Curti S 1 P
IS
subjudicc.
Bandera plant 1s
given in rm our (lj
\\ ork has to h,·
•
,---- - --- ---
Pt' Sr Action Strategy
.
1
I nd Bandora of capacity
8MLD. 15MLD and
15MLD respectively. At
present sewerage
network is laid and 15MLD
STP at Kavelem 1s m
progress. Sewerage scheme
with IMLD STP
commissioned for Durbhat
village which is on the bank
on River Zuari. This STP
was
70%
commissioned
River
Stretch
-·-!A;cncy 1-:-l,i~e Frame
IS
m
September 2017 and 1s
running successfully. The
total cost of all the projects
mentioned above is 536 er. ' -------~------ C
) Present Status
-- . _J .,_ ----------· ----- . completed.
• Khandepar - Priority V- (from Opa Ponda & Codli- u/s of Opa
-~Yater works)
1-- -; Disconnection or direct Codli lo U/s -Di;;,ct~r,;1- ·16 months I The IJM;\
. I discharges of domestic of Opa e of'
, sewage into the Khandcpar. water works Panchayat.
River/storm water drains/ a) Khandep Directorat
nallah ur
r Disconnection or the I b) Uspao
direct discharge into the
river/storm vvater drnin
Nall ah.
,. Construction or septic
tank and soak pits bJ
C
Health
of
Services:
informed that " Joint Sunn 1,
being curried nut
with Dept of I 1 Health and Dop
nnd will bl
completed h\
2 7/05/10 I q lil
notices
discharuiuv
•
,---------
: Sr.
I No. /-----
Action Strategy
cleaning the septic tanks
ll1 order
untreated
to avoid
domestic
sewage discharge in to
the natural drains.
1 Present St~t~~ ~ge
j disposmg
•
waste m water
bodies.
will be issued
subsequently.
Presently
has
Notices
issued
notices
households
' and
solid
OHS
comply within 60
days.
Assonora - Priority -V - from Assonora to Sirsaim C----~-------------~-~---- 1. ~· Disconnection of direct I Assonora to I Directorat
discharges of domestic I U/s
sewage into the Assonora. I Sirsaim
River /storm water drains/
nallah.
i ',- Disconnection of the
direct discharge into the
river/storm
drnin/Nallah
water
,- installation of Bio toilets
along the river stretch
for residential areas.
,- Construction of septic
tank and soak pits by
rcsidenual houses and
monnormg the frequent
of I c
a) Assonora
b)Sirsaim
of.
Panchayat.
Directorat
C
Health
of i
Services;
6 months
to
10
1 The D-MA~
that a informed
Joint Survey 1s
being carried out
with Dept of
Health and Dop
and will be
completed b\
27/05/2019 tn
identif those
notices
dischargint'
disposing solid
wa-ac 1Jl \\(ik"I
•
rr· 1 Action Strateg)- - - ,-II River -TAgency I Time - ·-r;;csent Status t"· Stretch I j_F"rame
f i-m - order to avoid I ---i I !subscquentlv untreated domestic l sewage discharge in to I
the natural drains. ·-----+-----+--- [ I 2. I Improvement to collection a) Assonora Respective 12 monthsiDc;-P--i-nformed I
system, and erection of bj Sirsaim Village I that this matter is·
material recovery facilities / Panchayat
storage shed for non- and
biodegradable waste in the
village Panchayat areas
along the banks of Assonora
f~~ver. , .
j 3· I ~~pansion of Saligao Waste 9 months I Letter issued to I
· Management facility from I I concessionaire to I
125 tons per dav to 250 + _ issue final · • I 20% (300 tons per day).
Project cost i.e. 82 er.
Directorat
e of Panchayat
taken up in the
Solid
Action
Waste
Plan
submitted in the
606/2018 matter
• i ' J__
proposal
09/05/2019 nn
1s sent
Same, . I Jor I
Yalvanti Rinr- Priority - V- from Poriem to Sanquelim-Bicholim l j __
technical sanction
to project
management
consultant
Oil
_J I. j Disconnection
discharges of
·, of direct I Poricm to
domestic J Sanquelim <.:('\\ <1gc into . !
the Vulvauti. I a) Poricm
water drains" I b) Honda
C of
Pane ha vat.
Dircctorat
«isnx: _ J 09.'0~~~-('. J 9 itscl I'
River/storm
C nJ'
+ · The
informed
])\ 1 \
that :I
.lurnt Survc- iS
bviug carried om \\'ith Dept ()j
•
,I Sr./A.ction.Strategy -]iver - I Agency I Time
j No. / Stretch ! Frame L --------- __ _j__ -·-- I j nallah. . c) Karapur I ~eal~h · j > Disconnection of the / & / Services;
' Sarvona direct discharge into the
river/storm water
drain/Nall ah.
> Installation of Bio toilets
> Construction of septic
tank and soak pits by
residential houses.
Present Status
•
I
I I I L+-------- 12. . a) Improvement to a) Poricm
j_ - Respective
collection system, and I b) Honda Villane
erection o;. material / c) Karapur Panc~ayat
rccovcrv facilities / 11 & I and
storage shed fur non- Sarvonu ! Directorat
Health and Dop
and will be !
completed by
27/05/2019 to I identify those
notices
discharging
sewage and
disposing solid
waste in water
1 bodies. Notices .
will be issued j
subsequently.
Presently OHS
biodegradable waste m
the village l'unchayat
areas along the hanks or Vulvanu RiYLT,
! h) lmprovcmcm and l'p
eradution of the cxistina .
., W;1s1:.1 _l_ __ /_
I e of
· I'anchayat
) notices
I households I comply within 60
days. --1' ----- -- 12 months DoP informed
!
has issued 7
to i
10
I' that this matter 1s
taken up in till' ' Solid
Action
Waste
Pl::in
submitted in tln-
606/:!0l 8 1rnllk1
•
I Sr. r Action Strategy j'Rh·~·- Agency I Ti.;.e ·- ]Present Status
f No. f Stretch +---- [ Frame l 1- ,-Man~gerne-mT3CilitY~f ------- -- , - - -- and the) hen e
f I Sanqudim Mu~icipal I I issued directions · Council; installation of I j to bulk waste
biogas plant of 3 tons
I per day and construction I I I I I ~~~- --~ I ') I ~ "--" •. , ~\ n _
generators.
Expansion or oaugao waste
Management facility from
125 tons per day to 250 + 20% (300 tons per day).
Project cost i.e. 82 er.
a) Pemem
b) Bardez
c) Bicholi
m&
d) Sattari
talukas
in North
Goa
District.
•
I .
I I r I r icommissioning of existi,;;;-Jaj Sa~queli
j I sewerage network and STP I m
. / UY . MLIJ capacity. i hJ 3 wards /
1
(C ovenug S wards)
9 months Letter issued to
concessionaire to
issue
proposal
09/05/2019. Same
IS sent
final
on
for
technical sanction
to project
management
J.C.
Bandhar
-vada.
Muslim
\\'ad:1
Muzar
wada &
( l.-1k ubv
' [ consultant
, j (GSJDC) on
j 1· 09/05/20]9 itself -·-··t-·- - ···- ·-· - _j STDCGL 12 months ! Total network
I length is 290(Jm.
Tested network
length i:-; 1980m
Network balance
to be tested 92Un1.
during tcsunu th.n
.L adi
~- ()f 200m
•
•
~-' -- ··-------· ---· =t, ----
I SL I Action Strategy River Present Status ! No. Stretch Frame 1-1- r -·-----··
time required for
rectification of '
manholes, I
replacement of . I' I main sewer me j
within 8 month~
Bicholim River- Priority- V - from Bicholim to Curchirem I
- I. Disconnection of direct Curchirern Dircctorat 6 months The DMA
discharges of domestic to Bicholim e of informed that a
sewage into the Bicholim. a) Curchirc Panchayat Joint Survey IS !
I River/stonn water drains/ m and being carried out nallah. b) Bicholi Directorat with Dept of
I Y Disconnection of the m e of Health and Dop '
direct discharge into the Municip Health, and will be
river/storm water 1 al ULB. completed by !
I drain/Nallah. Council 27/05/2019 lo
',,..-- Installation of Bio toilets c) Ona- identify those
I Construction of septic Mauling notices
tank and soak pits by uem discharging
residential houses and d) Karapur sewage and '
monitoring the frequent -Sarvan disposing solid
cleaning Ihe septic tanks c) Amona waste 111 water
Ill order to avoid l) Pilgao I bodies. :'Juticc'S ' !
I will be issued untreated domestic
I subsequently. sewage discharge in 1!._1 ' ' ! Presently DI l\ the natural drains. I
' has issued l ii !
noucc« l\l
comply within ()fl
•
.. Sr~-rA~tio;Strateg):- --- - -,--- Ri~·er___ A-g-en--q,- - -T-im_e --TPr~sent Status
No, ! Stretch Frame / --+-----,-------------+-----+-- - -Tdavs-:- - - -
I - ------,- ------ - a)lmnrr,vPmAn-t ~~ --11-~~, - ~ ·-L --~ I r>- I 12 rnonrhc I l)"p !:-:.t:..::·:::~;:
, I I system, and erection of that this matter is
taken up in the
2,
material recovery
facilities / storage shed for
non-biodegradable waste
in the Municipal Council,
village Panchayat areas
along the banks of I c) Ona- ft I I I3icholim River.
b) Improvement and up
aJ Curchire , rvespecuve m ULB &
b) Bicholi Village m Panchayat Municip and al Directorat Council e of
Mauling
uem gradation of the existing I d) Karapur Solid Waste Management -Sarvan facility of Bicholim c) Amona
jj Muni~1pal Council . f) Pilgao
- --- ------l--~-+- 3 Expansion ofSaligao Waste I a) Curchirc
, C 'j' j' ' J11 Management racr ny rom I
12\t _ ib)Bicholi _ ons
per day to 250 + 20% m
Municip
al
Council
c) Ona-
Mauling
uem
d) Karapur
-Sarv :in
e) Amona
n Pilgno -" - - ··-- ----- ·-·-
Panchayat
6 months
Solid
Action
Waste
Plan
submitted in the
606/2018 matter
D2D collection is
being carried out I [ and they have ' issued directions
to bulk waste
J' generators -·~··· -- --
9 months I l .cuer _issu~d 10
I concessronarrc to
I issue final
' proposal on
09/05/2019. Same
sent
technical sanction
to project
! ruanagemcm
1 consultant ! - (CiSIDC)
I Sr. I[ Action Strategy jRi,er J:gency J Time lPrescnt Status I No. Stretch Frame
l _ _l_ --- ---- - Sinquerim River- Priority- V- from Candolim to Ganesh Temple, Nerul
r-]_ -.--
I
I
•
•
Disconnection
discharges of
of direct I Candolim
domestic Bridge
sewage into the Sinquerim. I Ganpati River/storm
nallah.
water drains/ Temple
(Nerul)
m order to avoid
untreated domestic
sewage discharge in to
the natural drains.
Oirectorat
to I e of
Panchayat,
Directorat
e of
,,, Disconnection of the ] d) Pileme- I Health Services; direct discharge into the I Marra
river or through storm I e) Candoli water drain/ Nallah. m
>" Installation of Bio toilets !) Reis-
along the river stretch. Magos
> Construction of septic g) Nerul
tank and soak pits by
residential houses and
monitoring the frequent
cleaning the septic tanks
6 months The
----- -- -
7 I a) Improvement to a) Pileme-
collection svstcm. and Marra
ensuring collection of bl Cnndoli
scgrcgai. . .-J \\ astc m
b) lmp1p, cmcut and Up CI Reis- -----
I I -----1 I Respective i omonths Village
Pane ha-, at i •
1
and
Dircctorut
informed
Joint
with
DMAI
that a i
Survev
Dept
ts
being carried out
of
Health and Dop
and will be
completed by
27/05/2019 to
identify those I
notices I discharging I
sewage and ii
disposing solid
waste 111 water
bodies. Notices !
will be issued !
subsequently.
I Prescnt'.y DHS
; has issued _1
notices tu 1
households 1(1
comply within (1()
days -1-
])oP inJmrnLd
that this matter t-;
taken up in th,·
Solid \\ ,1-;h_'
Action PL111 J
Status
•
C - I.·-- ! Sr. I Action Strategy
I No. I -]- · gradation o{--
1
Solid
Manaacment I -
d in the
matter
3. . Providing toilet
I sanitation fac
fishing trawlers
-
River I AgencY I Time ! Present
Stretch Frame -- -·-- ---
existing Magos e of submitt
Waste d) Nerul Panchayat 606/20
D2D c
being
and
issued
to b
genera -
Departme 6 months The
nt of has f
Fisheries proVJC
toilet
Nerul ·-·--L-- -· . I
I ' L-.·--
ection 1s
rried out
y have I
directions )
waste I
' __ j partment I posed to
2 seater
eility
mp.
at I !
Meeting ended with thanks to the Chair