new fairfield free public library
DESCRIPTION
NEW FAIRFIELD FREE PUBLIC LIBRARY. Renovation Project 2012. 1. Renovations. Elevator Doors Bathrooms Lighting Air Conditioner Program Room Community Room. Proposed Alterations Main Level. Proposed Alterations Lower Level. Improve Access To Meet ADA Compliance. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: NEW FAIRFIELD FREE PUBLIC LIBRARY](https://reader035.vdocuments.us/reader035/viewer/2022062810/56815ce7550346895dcaecce/html5/thumbnails/1.jpg)
1
NEW FAIRFIELD FREE PUBLIC LIBRARY
Renovation Project2012 1
![Page 2: NEW FAIRFIELD FREE PUBLIC LIBRARY](https://reader035.vdocuments.us/reader035/viewer/2022062810/56815ce7550346895dcaecce/html5/thumbnails/2.jpg)
Renovations
• Elevator• Doors• Bathrooms• Lighting• Air Conditioner• Program Room• Community Room
2
![Page 3: NEW FAIRFIELD FREE PUBLIC LIBRARY](https://reader035.vdocuments.us/reader035/viewer/2022062810/56815ce7550346895dcaecce/html5/thumbnails/3.jpg)
Proposed Alterations Main Level
3
![Page 4: NEW FAIRFIELD FREE PUBLIC LIBRARY](https://reader035.vdocuments.us/reader035/viewer/2022062810/56815ce7550346895dcaecce/html5/thumbnails/4.jpg)
Proposed AlterationsLower Level
4
![Page 5: NEW FAIRFIELD FREE PUBLIC LIBRARY](https://reader035.vdocuments.us/reader035/viewer/2022062810/56815ce7550346895dcaecce/html5/thumbnails/5.jpg)
5
Improve AccessTo Meet ADA Compliance
• Easy Open Electronic Doors
• Elevator For Access To Both Floors
• Wider Staircases
• Updated Bathrooms
• 5
![Page 6: NEW FAIRFIELD FREE PUBLIC LIBRARY](https://reader035.vdocuments.us/reader035/viewer/2022062810/56815ce7550346895dcaecce/html5/thumbnails/6.jpg)
6
Difficult Door AccessInterior & Exterior
6
![Page 7: NEW FAIRFIELD FREE PUBLIC LIBRARY](https://reader035.vdocuments.us/reader035/viewer/2022062810/56815ce7550346895dcaecce/html5/thumbnails/7.jpg)
7
c CurrentNarrow
Staircase• Width-33” (Fire
code- min 36”)
• Railing HT-33” (ADA 34-38”)
• Railings required on both sides of staircase
7
![Page 8: NEW FAIRFIELD FREE PUBLIC LIBRARY](https://reader035.vdocuments.us/reader035/viewer/2022062810/56815ce7550346895dcaecce/html5/thumbnails/8.jpg)
Current Bathroom
8
![Page 9: NEW FAIRFIELD FREE PUBLIC LIBRARY](https://reader035.vdocuments.us/reader035/viewer/2022062810/56815ce7550346895dcaecce/html5/thumbnails/9.jpg)
Air Conditioning
• Bring system up to code
• Replace system for energy efficiency
9
![Page 10: NEW FAIRFIELD FREE PUBLIC LIBRARY](https://reader035.vdocuments.us/reader035/viewer/2022062810/56815ce7550346895dcaecce/html5/thumbnails/10.jpg)
10
Air Conditioner/ Chiller
36 Years Old
10
![Page 11: NEW FAIRFIELD FREE PUBLIC LIBRARY](https://reader035.vdocuments.us/reader035/viewer/2022062810/56815ce7550346895dcaecce/html5/thumbnails/11.jpg)
11
Inadequate Lighting Conditions
11
![Page 12: NEW FAIRFIELD FREE PUBLIC LIBRARY](https://reader035.vdocuments.us/reader035/viewer/2022062810/56815ce7550346895dcaecce/html5/thumbnails/12.jpg)
Renovate Program Room
• Provide storage for chairs & tables • Remove or enclose furnace unit• Install cabinets to house program
resources & supplies• Install sink for easier access & clean-up• Replace secondary door with window• Add additional outlets for equipment
12
![Page 13: NEW FAIRFIELD FREE PUBLIC LIBRARY](https://reader035.vdocuments.us/reader035/viewer/2022062810/56815ce7550346895dcaecce/html5/thumbnails/13.jpg)
Current Storage for Supplies
13
![Page 14: NEW FAIRFIELD FREE PUBLIC LIBRARY](https://reader035.vdocuments.us/reader035/viewer/2022062810/56815ce7550346895dcaecce/html5/thumbnails/14.jpg)
Storage Shelves
14
![Page 15: NEW FAIRFIELD FREE PUBLIC LIBRARY](https://reader035.vdocuments.us/reader035/viewer/2022062810/56815ce7550346895dcaecce/html5/thumbnails/15.jpg)
Program Room
15
![Page 16: NEW FAIRFIELD FREE PUBLIC LIBRARY](https://reader035.vdocuments.us/reader035/viewer/2022062810/56815ce7550346895dcaecce/html5/thumbnails/16.jpg)
Furnace in Program Room
16
![Page 17: NEW FAIRFIELD FREE PUBLIC LIBRARY](https://reader035.vdocuments.us/reader035/viewer/2022062810/56815ce7550346895dcaecce/html5/thumbnails/17.jpg)
Replace Slider in Children’s Room with Windows
17
![Page 18: NEW FAIRFIELD FREE PUBLIC LIBRARY](https://reader035.vdocuments.us/reader035/viewer/2022062810/56815ce7550346895dcaecce/html5/thumbnails/18.jpg)
Upgrade Electrical & Computer Wiring
18
![Page 19: NEW FAIRFIELD FREE PUBLIC LIBRARY](https://reader035.vdocuments.us/reader035/viewer/2022062810/56815ce7550346895dcaecce/html5/thumbnails/19.jpg)
Install Energy Efficient Windows in Community Room
19
![Page 20: NEW FAIRFIELD FREE PUBLIC LIBRARY](https://reader035.vdocuments.us/reader035/viewer/2022062810/56815ce7550346895dcaecce/html5/thumbnails/20.jpg)
Other Renovations
• Add suspended ceiling to office & workroom on main level
• Improve insulation levels in workroom & Community Room
20
![Page 21: NEW FAIRFIELD FREE PUBLIC LIBRARY](https://reader035.vdocuments.us/reader035/viewer/2022062810/56815ce7550346895dcaecce/html5/thumbnails/21.jpg)
Estimated Costs
Phase 1$565,000
Phase 2$390,00
21
![Page 22: NEW FAIRFIELD FREE PUBLIC LIBRARY](https://reader035.vdocuments.us/reader035/viewer/2022062810/56815ce7550346895dcaecce/html5/thumbnails/22.jpg)
Suggested Funding
• Library Funds $390,000• Funds from town capital fund• Possible grants• Donations