Transcript
Page 1: NEW FAIRFIELD FREE PUBLIC LIBRARY

1

NEW FAIRFIELD FREE PUBLIC LIBRARY

Renovation Project2012 1

Page 2: NEW FAIRFIELD FREE PUBLIC LIBRARY

Renovations

• Elevator• Doors• Bathrooms• Lighting• Air Conditioner• Program Room• Community Room

2

Page 3: NEW FAIRFIELD FREE PUBLIC LIBRARY

Proposed Alterations Main Level

3

Page 4: NEW FAIRFIELD FREE PUBLIC LIBRARY

Proposed AlterationsLower Level

4

Page 5: NEW FAIRFIELD FREE PUBLIC LIBRARY

5

Improve AccessTo Meet ADA Compliance

• Easy Open Electronic Doors

• Elevator For Access To Both Floors

• Wider Staircases

• Updated Bathrooms

• 5

Page 6: NEW FAIRFIELD FREE PUBLIC LIBRARY

6

Difficult Door AccessInterior & Exterior

6

Page 7: NEW FAIRFIELD FREE PUBLIC LIBRARY

7

c CurrentNarrow

Staircase• Width-33” (Fire

code- min 36”)

• Railing HT-33” (ADA 34-38”)

• Railings required on both sides of staircase

7

Page 8: NEW FAIRFIELD FREE PUBLIC LIBRARY

Current Bathroom

8

Page 9: NEW FAIRFIELD FREE PUBLIC LIBRARY

Air Conditioning

• Bring system up to code

• Replace system for energy efficiency

9

Page 10: NEW FAIRFIELD FREE PUBLIC LIBRARY

10

Air Conditioner/ Chiller

36 Years Old

10

Page 11: NEW FAIRFIELD FREE PUBLIC LIBRARY

11

Inadequate Lighting Conditions

11

Page 12: NEW FAIRFIELD FREE PUBLIC LIBRARY

Renovate Program Room

• Provide storage for chairs & tables • Remove or enclose furnace unit• Install cabinets to house program

resources & supplies• Install sink for easier access & clean-up• Replace secondary door with window• Add additional outlets for equipment

12

Page 13: NEW FAIRFIELD FREE PUBLIC LIBRARY

Current Storage for Supplies

13

Page 14: NEW FAIRFIELD FREE PUBLIC LIBRARY

Storage Shelves

14

Page 15: NEW FAIRFIELD FREE PUBLIC LIBRARY

Program Room

15

Page 16: NEW FAIRFIELD FREE PUBLIC LIBRARY

Furnace in Program Room

16

Page 17: NEW FAIRFIELD FREE PUBLIC LIBRARY

Replace Slider in Children’s Room with Windows

17

Page 18: NEW FAIRFIELD FREE PUBLIC LIBRARY

Upgrade Electrical & Computer Wiring

18

Page 19: NEW FAIRFIELD FREE PUBLIC LIBRARY

Install Energy Efficient Windows in Community Room

19

Page 20: NEW FAIRFIELD FREE PUBLIC LIBRARY

Other Renovations

• Add suspended ceiling to office & workroom on main level

• Improve insulation levels in workroom & Community Room

20

Page 21: NEW FAIRFIELD FREE PUBLIC LIBRARY

Estimated Costs

Phase 1$565,000

Phase 2$390,00

21

Page 22: NEW FAIRFIELD FREE PUBLIC LIBRARY

Suggested Funding

• Library Funds $390,000• Funds from town capital fund• Possible grants• Donations

22