netc n7 status update to aim frb roy hoyt, netc n74 jake aplanalp, aim pgm mgr 23 aug 11
TRANSCRIPT
NETC N7 Status Update to AIM FRB
Roy Hoyt, NETC N74Jake Aplanalp, AIM Pgm Mgr
23 Aug 11
OverviewOverview• NAVEDTRA 130B, 131B, 132, 134, 135C, 136, 137• NAVEDTRA drafts – 133, 138, 139• Central Site implementation• AIM/CPM status support of JDTA w/ participating Center
updates• AIM/CPM status support of OCCSTD capture/validation• AIM/CPM integration status w/ Learning Assessment
Systems• FEA/BCA capability plans for CPM• NETC/OPNAV N15 integration of NETC domain/acquisition
community business processes
Promulgated NAVEDTRAsPromulgated NAVEDTRAs
• 130B (task-based learning content)• 131B (PPP-based learning content)• 132 (Assessment)• 134 (Navy instructor manual)• 135C (Schoolhouse Mgmt)• 136 (ILE learning content)• 137 (JDTA)
NAVEDTRA DraftsNAVEDTRA Drafts
• 133 (HPRR)• 138 (course/content modularization)• 139 (FEA)
NAVEDTRA 136 & 137 Impacts on NAVEDTRA 136 & 137 Impacts on CPM / LO Module Rel 5.0CPM / LO Module Rel 5.0
• Re-evaluated and prioritized existing functional requirements based on 136/137 policies
• Re-write has created a need for additional functionality to meet– Design Strategy (IMDP)– Significant copy and link capability in JDTA and Project
tabs and in LO Module
NAVEDTRA 136 (ILE) ImplementationNAVEDTRA 136 (ILE) Implementation• Current status
‒ Promulgated by NETC in Nov 10‒ 136A in work to address user community
feedback and extend/refine ILE learning content business rules
• Transition from NAVEDTRA 130/131 (AIM II/AIM I) to NAVEDTRA 136 (CPM/LO Module)‒ Policy / trigger‒ Pace of migration‒ Continuing support for AIM I/II through ????
AIM Central Site ImplementationAIM Central Site Implementation• Management points of contact:
‒ NETC N74: Leslie Desenburg‒ NETPDTC: Peg David
• Center-by-Center implementation schedule:‒ Initially established by Leslie Desenburg‒ under review based on NETPDTC move to eDMZ
application hosting in early 2012 and related workload for user account re-initialization
• Peg David to brief in more detail
CPM Hosting at NETPDTCCPM Hosting at NETPDTC• NETC N74, N6, NETPDTC, and AIM team in process of
migrating the production version of CPM to NETPDTC by 1 Oct 11‒ Full IA Certification and Accreditation process underway by
NETPDTC/AIM team‒ CPM Rel 5.0 GAT on new NETPDTC server in early Sep
• Benefits Include:‒ Enterprise hosting and support vs. current R&D environment
in Orlando‒ Co-located with rest of NETC enterprise IT applications and off-
site COOP support
OCCSTDS Support in CPMOCCSTDS Support in CPM• How did we get here?:
– Started with NETC N74/NAVMAC discussions– AIM Team provided a CPM “sandbox” for NAVMAC familiarization– NAVMAC developed an OCCSTDS Storybook PPT to describe high-
level functionality– Initial OCCSTDS tab implementation in Rel 5.0 for
creation/management of OCCSTDS data by NAVMAC – crawl functionality
• Working toward business rule definition of:– How OCCSTDS data pulls forward into JDTA tab– Life-cycle impacts of OCCSTDS revisions on JDTA-based learning
content
Date: 12Jul2011_V1/rh/jtw
Revision to an EnlistedOccupational Standard
Revision to an EnlistedOccupational Standard
Establishment orRevision of a NEC
Establishment orRevision of a NEC
Rating MergerRating Merger
OPNAV N1 TrainingRequirement Sources:
External TrainingRequirement Sources:
Course Development / Revision End - to - End Process
PerformFront EndAnalysis
(FEA)
DevelopBusiness Case
Analysis(BCA)
DevelopTraining
Project Plan(TPP)
DevelopNew Courseor Revise
Existing Courseand Pilot
Perform ContentQuality Review for
Content Re-Use or Re-Purpose
PerformJob Duty
Task Analysis(JDTA)
Job Duty Task Analysis(JDTA) User GuideNETCINST 1510.4 24 February 2010
Front End Analysis(FEA) User GuideNETCINST 1500.6
9 March 2010
Business Case Analysis(BCA) Policy
NETCINST 1510.3 20 October 2009
NAVEDTRA 136 ILE Course
Development & Life-CycleMaintenance Manual
November 2010
NAVEDTRA 131B PPP Based Curriculum Development Manual
November 2010
NAVEDTRA 133Human Performance
Requirements ReviewManagement Manual
June 2011
NAVEDTRA 130BTask Based CurriculumDevelopment Manual
August 2009
Naval Education and Training CommandCourse Development & Revision Process
NAVEDTRA 132Navy School
Testing Program Management Manual
March 2011
NAVEDTRA 135C Navy School
Management ManualMarch 2010
NAVEDTRA 134ANavy Instructor Manual
August 2009
Resource Sponsor /Training Support Agent
Commitsto Resource
TrainingRequirement
Training Requirement Identification & Resource
Sponsor Commitment NETCINST 1500.93 December 2010
OPNAV N1 TrainingRequirement Sources
External TrainingRequirement Sources
Course Development andRevision Process
OPNAV N1 TrainingRequirement Sources
Course Development&
Revision Process Color Key:
Requirement Sponsor & Resource Sponsor Actions
External TrainingRequirement Sources
OPNAV N1 TrainingRequirement Sources
NETC Course Developmentand Revision Process
Trigger Initiating Process
NTSP Revision NTSP Revision
FleetPerformanceAssessment
FleetPerformanceAssessment
Operational RiskManagement (ORM)
Assessment
Operational RiskManagement (ORM)
Assessment
Direct FleetInput
Direct FleetInput
Human PerformanceRequirements Review
(HPRR)
Human PerformanceRequirements Review
(HPRR)
Requirement SponsorProvides FormalCorrespondence
IdentifyingTraining
Requirement
EndProcess
DeliverCourse of Instruction
Trigger Initiating Process
NAWCTSD Orlando, FLQuality Evaluation Tool
Technical Report 2005-002June 2005
NETC Course Development / Revision End - to - End Process
AIM/CPM Support of JDTA and AIM/CPM Support of JDTA and Participating Center UpdatesParticipating Center Updates
• CPM Rel 4.1 operational Jan 11 / Rel 5.0 delivered Jul 11 – operational at NETPDTC by 1 Oct 11
• JDTA NETCINST 1510.4 promulgated 24 Feb 10 / NAVEDTRA 137 forthcoming
• Center projects:– CPPD/CSFE: Curriculum Developer– SLC/CSCS: IT Rating– CID: Information Professional– NETC N72/Carley: ‘A’ School re-engineering– PMS 420/NAWCTSD: LCS mission pkg JDTA
AIM/CPM Support of OCCSTD AIM/CPM Support of OCCSTD Capture/ValidationCapture/Validation
• NETC N74 coordination with NAVMAC• CPM OCCSTDS tab added in CPM Rel 5.0• AIM team working with NAVMAC and
NETPDTC on OCCSTDS data interface with NETC enterprise LAS for fleet validation of preliminary OCCSTDS
• Business rules for use of OCCSTDS data in CPM as basis for JDTA in development
AIM Interface with NETC LASAIM Interface with NETC LAS• Support for NETC N51 assessment program as well
as NAVMAC OCCSTDS validation• Working with NETC N5/N6/N7, NAVMAC, and
PMW-240 for implementation via Atlas Pro Assessment Engine and Survey Engine
• Participants:– NAVMAC and NETC N51 as SMEs– NETPDTC/PMW-240 as Navy technical agent for Atlas
Pro suite implementation and support– AIM team on Web service data output from CPM, AIM
I, AIM II, and LO Module
FEA/BCA Capability Plans for CPMFEA/BCA Capability Plans for CPM• FEA – NETCINST 1500.6 (NAVEDTRA 139
draft)• BCA – NETCINST 1510.3• Business processes integrated into
NAVEDTRA 136• AIM team supporting business process
definition‒ Design prototype of CPM support for FEA/BCA in
final development for NETC / community review
Integration of NETC Domain/Acquisition Integration of NETC Domain/Acquisition Community Business ProcessesCommunity Business Processes
• SPAWAR and NAVSSES Philadelphia working JDTA projects in CPM
• NETC N74 working with aviation community (Kelee Plagis of CNAF) on ‘harmonizing’ NAVEDTRA 136-137-138-139 business process with that in Naval Aviation Training System (NATS) Handbook for NETC domain and acquisition community standardization
Questions?
Backup Slides
AIM Interface with NETC LASAIM Interface with NETC LAS
Learning Object [LO]
Module (ILE ILT content
objects)
Content Planning Module (CPM)
Survey Engine
(SE)
1. Standard OCCSTDFleet Survey
2. Level 3 Survey
Test data for Level of Knowledge exams
Proposed Capability
LAS Applications
AIM
Proposed Interface
AIM I/AIM II(Traditional LP/
TG Content)
Learning objectives,
contentoutline, JDTA
Links
OCCSTDS dataLearning Objectives/
COI data
Existing Interface
JDTA Links
Content structure data for Level 3 surveys
ROCCE(ILE self-paced
content objects)
Self-paced authoring tool
Prelim Learning Content Design Data /
Metadata
Final Learning Content Data /
Metadata
Job Duty TaskAnalysis (JDTA) data
Initial OCCSTDS data
for fleet validation
OCCSTDS survey results
Analysis/Validation of Fleet Data
Fleet validated OCCSTDS data
28 Jul 11
Test data for in-course exams[test items plus test design data?]
Assessment Engine
(AE)
1. All ILT and self-paced in-course testing
2. LoK exams
Test data for in-course exams[test items plus test design
data?]
Note: existing capability to
export AIM I/II test items to
CeTARS testing via standard Excel
model
Note: existing capability to
exchange data with LSI
Venus.net and GD/IT
Webtrain CBT authoring
tools
PPP Repository StatusPPP Repository Status
• AIM team supporting NETC N74 (Leslie Desenburg) in operation of the PPP repository hosted on fedsun at NAWCTSD
• Hosting will shift to NETPDTC with integration into CPM Rel 5.0
SLC e-Library Project OverviewSLC e-Library Project Overview
• Goal: Provide site access to electronic library‒ Validated mission, functions, tasks of Librarians‒ Developed business rules for access, inventory control , and
user requests‒ Identified publications available electronically to support
CINs‒ Defined functional requirements for e-library layout‒ Planned for hosting and deployment
• Project lead: Beth Wigfield (SLC N6)