NECEPT Plant Technician Proficiency Certification
• NECEPT Bituminous Plant Technician Proficiency Certification requires that all candidates successfully complete both the NECEPT written and performance examinations
• This Proficiency Certification will be required in addition to the current NECEPT Bituminous Level 1 and 2 Plant Technician Certification Program
• NECEPT Bituminous Plant Technician Proficiency Certification provides recognition of your skills to conduct sampling and testing of asphalt mixtures
![Page 2: NECEPT Plant Technician Proficiency Certification · • Included Standards • (7) PTM 715 - Determination of Bulk Specific Gravity of Compacted Bituminous Mixtures • (8) PTM 716](https://reader033.vdocuments.us/reader033/viewer/2022050410/5f86e725fe96370ae3358611/html5/thumbnails/2.jpg)
• Why is this needed?• Asphalt mixtures tested by Certified Technicians improves
the reliability of test results • This aids in assuring that the test results are truly
representing the asphalt mixture being placed. Proper testing therefore assures accurate identification of good quality asphalt mixtures and sub-standard mixes
• Records of these test results by a Certified Technician are essential for payment purposes and any potential disputes
• Proficiency in the required sampling and test methods becomes extremely important as PennDOT Projects migrate towards Local Acceptance (LA) and Hands-on Local Acceptance (HOLA) specifications where acceptance testing is performed at the producer’s lab and not at PennDOT’sLaboratory Testing Section (LTS)
NECEPT Plant Technician Proficiency Certification
![Page 3: NECEPT Plant Technician Proficiency Certification · • Included Standards • (7) PTM 715 - Determination of Bulk Specific Gravity of Compacted Bituminous Mixtures • (8) PTM 716](https://reader033.vdocuments.us/reader033/viewer/2022050410/5f86e725fe96370ae3358611/html5/thumbnails/3.jpg)
NYSDOT Plant Technician Proficiency Program
• Held at Alfred State College – Alfred, NY• Also (1) at Advance Testing – Campbell Hall, NY
• Class is 1 ½ days • Day 1 – Hands on proficiency / oral exam
• 3 stations in AM• 3 stations in PM
• Day 2 – Written exam (open book)
• 12 students per class• Staff - 1 professor and 2 consultants• 100-200 students per year• No experience required
![Page 4: NECEPT Plant Technician Proficiency Certification · • Included Standards • (7) PTM 715 - Determination of Bulk Specific Gravity of Compacted Bituminous Mixtures • (8) PTM 716](https://reader033.vdocuments.us/reader033/viewer/2022050410/5f86e725fe96370ae3358611/html5/thumbnails/4.jpg)
NYSDOT Plant Technician Proficiency Program
• Day 1 – AM• Demonstrate proficiency and understanding of
procedures/test methods• Three stations – 20 minutes each
• Sampling and splitting • Sieve analysis• Gmb
• Day 1 – PM• Demonstrate proficiency and understanding of
procedures/test methods• Three stations – 20 minutes each
• Gyratory compaction• Gmm• NYSDOT Forms (calculating sample point and QAF)
![Page 5: NECEPT Plant Technician Proficiency Certification · • Included Standards • (7) PTM 715 - Determination of Bulk Specific Gravity of Compacted Bituminous Mixtures • (8) PTM 716](https://reader033.vdocuments.us/reader033/viewer/2022050410/5f86e725fe96370ae3358611/html5/thumbnails/5.jpg)
![Page 6: NECEPT Plant Technician Proficiency Certification · • Included Standards • (7) PTM 715 - Determination of Bulk Specific Gravity of Compacted Bituminous Mixtures • (8) PTM 716](https://reader033.vdocuments.us/reader033/viewer/2022050410/5f86e725fe96370ae3358611/html5/thumbnails/6.jpg)
![Page 7: NECEPT Plant Technician Proficiency Certification · • Included Standards • (7) PTM 715 - Determination of Bulk Specific Gravity of Compacted Bituminous Mixtures • (8) PTM 716](https://reader033.vdocuments.us/reader033/viewer/2022050410/5f86e725fe96370ae3358611/html5/thumbnails/7.jpg)
![Page 8: NECEPT Plant Technician Proficiency Certification · • Included Standards • (7) PTM 715 - Determination of Bulk Specific Gravity of Compacted Bituminous Mixtures • (8) PTM 716](https://reader033.vdocuments.us/reader033/viewer/2022050410/5f86e725fe96370ae3358611/html5/thumbnails/8.jpg)
![Page 9: NECEPT Plant Technician Proficiency Certification · • Included Standards • (7) PTM 715 - Determination of Bulk Specific Gravity of Compacted Bituminous Mixtures • (8) PTM 716](https://reader033.vdocuments.us/reader033/viewer/2022050410/5f86e725fe96370ae3358611/html5/thumbnails/9.jpg)
![Page 10: NECEPT Plant Technician Proficiency Certification · • Included Standards • (7) PTM 715 - Determination of Bulk Specific Gravity of Compacted Bituminous Mixtures • (8) PTM 716](https://reader033.vdocuments.us/reader033/viewer/2022050410/5f86e725fe96370ae3358611/html5/thumbnails/10.jpg)
• Day 2 – AM• Written exam• Open book• Re-test is possible
NYSDOT Plant Technician Proficiency Program
![Page 11: NECEPT Plant Technician Proficiency Certification · • Included Standards • (7) PTM 715 - Determination of Bulk Specific Gravity of Compacted Bituminous Mixtures • (8) PTM 716](https://reader033.vdocuments.us/reader033/viewer/2022050410/5f86e725fe96370ae3358611/html5/thumbnails/11.jpg)
NYSDOT Plant Technician Proficiency Program
• Upon successful completion of both proficiency and written exam
• Certification is good for 5 years• Re-certification is required – two methods
• Successfully complete the entire 1 ½ day course againOR
• IAST tests • Two in the past five years with at least one within 24 months of re-
certification date AND• Successfully pass the written exam
• Cost• Full course - $625 NYCMA members ($925 non-members)• Written exam only - $395• http://www.nymaterials.com/Resources/Documents/CMA%202
015%20Brochure.pdf
![Page 12: NECEPT Plant Technician Proficiency Certification · • Included Standards • (7) PTM 715 - Determination of Bulk Specific Gravity of Compacted Bituminous Mixtures • (8) PTM 716](https://reader033.vdocuments.us/reader033/viewer/2022050410/5f86e725fe96370ae3358611/html5/thumbnails/12.jpg)
• Put on by WVDOT• IAS engineer• Lab technician
• ½ day• Hands-on proficiency
• Sampling / Splitting • Gradation• Marshall compaction• Gyratory compaction• Gmb / Gmm• Marshall stability / flow• Ignition oven
• Written exam?
WVDOT Plant Technician Proficiency Program
![Page 13: NECEPT Plant Technician Proficiency Certification · • Included Standards • (7) PTM 715 - Determination of Bulk Specific Gravity of Compacted Bituminous Mixtures • (8) PTM 716](https://reader033.vdocuments.us/reader033/viewer/2022050410/5f86e725fe96370ae3358611/html5/thumbnails/13.jpg)
• Currently a one-time requirement• However FHWA pressure going to 5-year renewal• Also developing a proficiency program for those
certified with sample throughout the year (similar to AMRL)
WVDOT Plant Technician Proficiency Program
![Page 14: NECEPT Plant Technician Proficiency Certification · • Included Standards • (7) PTM 715 - Determination of Bulk Specific Gravity of Compacted Bituminous Mixtures • (8) PTM 716](https://reader033.vdocuments.us/reader033/viewer/2022050410/5f86e725fe96370ae3358611/html5/thumbnails/14.jpg)
NECEPT Plant Technician Proficiency Certification
• Manual - Table of Contents• Purpose and Importance• Overview• Administration• Definitions• Technician Manual• Written Examination• Performance Examination• Re-examination• Appeals• Certification• Recertification• Decertification
![Page 15: NECEPT Plant Technician Proficiency Certification · • Included Standards • (7) PTM 715 - Determination of Bulk Specific Gravity of Compacted Bituminous Mixtures • (8) PTM 716](https://reader033.vdocuments.us/reader033/viewer/2022050410/5f86e725fe96370ae3358611/html5/thumbnails/15.jpg)
NECEPT Plant Technician Proficiency Certification
• Study Guide - Each section contains:• Brief description of how to conduct the procedure• Reprint of the AASHTO or PennDOT Standard• Performance Checklist
• Attachment• Question/Answer Study Guide (not to be used on the
written examination)
![Page 16: NECEPT Plant Technician Proficiency Certification · • Included Standards • (7) PTM 715 - Determination of Bulk Specific Gravity of Compacted Bituminous Mixtures • (8) PTM 716](https://reader033.vdocuments.us/reader033/viewer/2022050410/5f86e725fe96370ae3358611/html5/thumbnails/16.jpg)
NECEPT Plant Technician Proficiency Certification
• Included Standards• (1) AASHTO R 47 – Standard Practice for Reducing Samples
of Hot Mix Asphalt (HMA) to Testing Size• (2) PTM 702 - Quantitative Extraction of Bitumen From
Bituminous Paving Mixtures• (3) PTM 739 - Sieve Analysis of Extracted Aggregate (on
written test only)• (4) PTM 757 - Determination of Asphalt Content and
Gradation of Bituminous Mixtures By The Ignition Method• (5) AASHTO T 30 - Standard Method of Test for Mechanical
Analysis of Extracted Aggregate• (6) PTM 703 – Method of Calibration For Volumeter (on
written test only)
![Page 17: NECEPT Plant Technician Proficiency Certification · • Included Standards • (7) PTM 715 - Determination of Bulk Specific Gravity of Compacted Bituminous Mixtures • (8) PTM 716](https://reader033.vdocuments.us/reader033/viewer/2022050410/5f86e725fe96370ae3358611/html5/thumbnails/17.jpg)
NECEPT Plant Technician Proficiency Certification
• Included Standards• (7) PTM 715 - Determination of Bulk Specific Gravity of
Compacted Bituminous Mixtures• (8) PTM 716 - Determination of Bulk Specific Gravity of
Compacted Bituminous Mixtures That Absorb More Than 3.0 Percent Water By Volume (on written test only)
• (9) AASHTO T 209 - Theoretical Maximum Specific Gravity (Gmm) and Density of Hot Mix Asphalt (HMA)
• (10) AASHTO T 312 - Standard Method of Test for Preparing and Determining the Density of Asphalt Mixture Specimens by Means of the Superpave Gyratory Compactor
![Page 18: NECEPT Plant Technician Proficiency Certification · • Included Standards • (7) PTM 715 - Determination of Bulk Specific Gravity of Compacted Bituminous Mixtures • (8) PTM 716](https://reader033.vdocuments.us/reader033/viewer/2022050410/5f86e725fe96370ae3358611/html5/thumbnails/18.jpg)
NECEPT Plant Technician Proficiency Certification
• To be held at various locations across the state
• TBD• Class is 1 ½ days
• Day 1 – Hands on proficiency / oral exam
• 3 stations in AM• 3 stations in PM
• Day 2 – Written exam (open book)• 12 students per class ???• Staff - 1 lead examiner and 2
assistant examiners• 100-200 students per year ???• Approved experience required
![Page 19: NECEPT Plant Technician Proficiency Certification · • Included Standards • (7) PTM 715 - Determination of Bulk Specific Gravity of Compacted Bituminous Mixtures • (8) PTM 716](https://reader033.vdocuments.us/reader033/viewer/2022050410/5f86e725fe96370ae3358611/html5/thumbnails/19.jpg)
NECEPT Plant Technician Proficiency Certification
• Day 1 – AM• Demonstrate proficiency and understanding of
procedures/test methods• Three stations – 20 minutes each
• Reducing HMA to Testing Size (AASHTO R 47)• Determination of Asphalt Content (PTM 702 or 757)• Sieve Analysis (AASHTO T 30)
• Day 1 – PM• Demonstrate proficiency and understanding of
procedures/test methods• Three stations – 20 minutes each
• Gmb Determination (PTM 715)• Gmm and HMA Density Determination (AASHTO T 209)• Gyratory Compaction (AASHTO T 312)
![Page 20: NECEPT Plant Technician Proficiency Certification · • Included Standards • (7) PTM 715 - Determination of Bulk Specific Gravity of Compacted Bituminous Mixtures • (8) PTM 716](https://reader033.vdocuments.us/reader033/viewer/2022050410/5f86e725fe96370ae3358611/html5/thumbnails/20.jpg)
NECEPT Plant Technician Proficiency Certification
• Day 2 – AM• Written exam ???• Open book ???• Re-test is possible ???
![Page 21: NECEPT Plant Technician Proficiency Certification · • Included Standards • (7) PTM 715 - Determination of Bulk Specific Gravity of Compacted Bituminous Mixtures • (8) PTM 716](https://reader033.vdocuments.us/reader033/viewer/2022050410/5f86e725fe96370ae3358611/html5/thumbnails/21.jpg)
What’s Next?
• Completion of manual/class structure• Identification of examiners and locations• Secure equipment / materials• Pilot in 2017• Implementation beginning in 2018????• Phased in approach???
![Page 22: NECEPT Plant Technician Proficiency Certification · • Included Standards • (7) PTM 715 - Determination of Bulk Specific Gravity of Compacted Bituminous Mixtures • (8) PTM 716](https://reader033.vdocuments.us/reader033/viewer/2022050410/5f86e725fe96370ae3358611/html5/thumbnails/22.jpg)
Questions?
Gregory A. Harder, P.E.Asphalt InstituteRegional Engineer5791 Route 80Tully, NY 13159