NDCT-2 Activity Scope UOM Racker column Ring beam 1.5m depth -segment 1 Ring beam 1.5m depth -segment 2 Ring beam 1.5m depth -segment 3 Ring beam 1.5m depth -segment 4 Shell 2nd lift EL Shell 3rd lift Shell 4th lift Shell 5th lift Shell 6th lift Jumpform & Platform erection Shell 7th 10 100 lift Completion of shell Jumpform & platform removal Dismantling of tower crane Basin beam & pile head PCC for basin slab RCC for basin slab Grillage column pre-cast Erection of pre cast ( Ext/ Tower crane ) Pre cast yard Pre cast beams casting RCC for Hot Water duct column 1 RCC for Duct beams Misc item stair case etc CW channel RCC for Duct PVC fills erection Distribution pipes erection Nozzles erection Hot water pipe erection and hydro test 90 RMtr Issues PCTL Wooden Planks Supply Expected Nut Bolts availability To reach outside Stairs up to 30 mtrs Will be a Erection of pre cast col / beam in Driveway( Ext/ Tower crane )

Upload: gunasekaran-shan

Post on 18-Dec-2014

44 views

Category:

Documents


5 download

TRANSCRIPT

Page 1: NDCT-2 Schedule - Copy

NDCT-2 Activity Scope UOM Sep-11 Oct-11Racker column Ring beam 1.5m depth -segment 1 Ring beam 1.5m depth -segment 2 Ring beam 1.5m depth -segment 3 Ring beam 1.5m depth -segment 4Shell 2nd lift EL Shell 3rd liftShell 4th liftShell 5th liftShell 6th liftJumpform & Platform erectionShell 7th 10 100 liftCompletion of shellJumpform & platform removalDismantling of tower craneBasin beam & pile headPCC for basin slabRCC for basin slabGrillage column pre-castErection of pre cast ( Ext/ Tower crane )Pre cast yardPre cast beams castingRCC for Hot Water duct column 1RCC for Duct beamsMisc item stair case etcCW channelRCC for Duct

PVC fills erectionDistribution pipes erectionNozzles erectionHot water pipe erection and hydro test

90 RMtr

IssuesPCTLWooden Planks Supply Expected to reach site by 12/11/11Nut Bolts availability To reach site by 12/11/11outside Stairs up to 30 mtrs Will be arranged by L&T parallely along with slipping

Erection of pre cast col / beam in Driveway( Ext/ Tower crane )

Page 2: NDCT-2 Schedule - Copy

Present Slip form assembly manpower= 40 D +15 Night , 8 BB working + 15 BB manpower reached site, balalnce to reach site by 20/11/11Construction Lightning Protection scheme L&T to submit to SEPCOSEPCOPlaster Rebar cutting approval To be sorted out by 13/11/11Central Rebar arrangement To be sorted out by 13/11/11Rebar availability at site SEPCO to revert on 11/11/11Space for keeping Rebar SEPCO to revert on 11/11/12Streaks Drawings To be taken up with SEPCO chinaEarthing drawing SEPCO to send Fianl drawing

Manpower Slip form assembly- 50 Day- 30 nightSlipping- 250, 50 BB, 50- Slipform, 100 US

Page 3: NDCT-2 Schedule - Copy

Nov-11 Dec-11 Jan-12 Feb-12 Mar-12 Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12 Oct-12

Expected to reach site by 12/11/11To reach site by 12/11/11Will be arranged by L&T parallely along with slipping

Page 4: NDCT-2 Schedule - Copy

Present Slip form assembly manpower= 40 D +15 Night , 8 BB working + 15 BB manpower reached site, balalnce to reach site by 20/11/11L&T to submit to SEPCO

To be sorted out by 13/11/11To be sorted out by 13/11/11SEPCO to revert on 11/11/11SEPCO to revert on 11/11/12To be taken up with SEPCO chinaSEPCO to send Fianl drawing

Page 5: NDCT-2 Schedule - Copy

Nov-12 Dec-12 Jan-13 Feb-13 Mar-13 Apr-13

Expected to reach site by 12/11/11To reach site by 12/11/11Will be arranged by L&T parallely along with slipping

Page 6: NDCT-2 Schedule - Copy

Present Slip form assembly manpower= 40 D +15 Night , 8 BB working + 15 BB manpower reached site, balalnce to reach site by 20/11/11L&T to submit to SEPCO

To be sorted out by 13/11/11To be sorted out by 13/11/11SEPCO to revert on 11/11/11SEPCO to revert on 11/11/12To be taken up with SEPCO chinaSEPCO to send Fianl drawing

Page 7: NDCT-2 Schedule - Copy

NDCT-2 Activity Start Finish Sep-11 Oct-11Racker column 20-Nov-11 Ring beam 1.5m depth -segment 1 4-Nov-11 10-Nov-11 Ring beam 1.5m depth -segment 2 11-Nov-11 15-Nov-11 Ring beam 1.5m depth -segment 3 16-Nov-11 20-Nov-11 Ring beam 1.5m depth -segment 4 20-Nov-11 25-Nov-11Shell 2nd lift EL 18-Nov-11 28-Nov-11Shell 3rd lift 29-Nov-11 9-Dec-11Shell 4th lift 10-Dec-11 20-Dec-11Shell 5th lift 21-Dec-11 5-Jan-12Shell 6th lift 6-Jan-12 17-Jan-12Jumpform & Platform erection 20-Jan-12 7-Feb-12Shell 7th 10 100 lift 12-Feb-12 11-Jun-12Completion of shell ( Target 9-March-11) 14-Jun-12 21-Jun-12Jumpform & platform removal 28-Jun-12 13-Jul-12Dismantling of tower crane 18-Jul-12 30-Jul-12Basin beam & pile head 14-Sep-11 28-Nov-11PCC for basin slab 19-Oct-11 13-Dec-11RCC for basin slab 3-Nov-11 18-Dec-11Grillage column pre-cast 17-Nov-11 16-Mar-12Erection of pre cast ( Ext/ Tower crane ) 12-Dec-11 9-Jun-12Pre cast yard 18-Sep-11 18-Oct-11Pre cast beams casting 25-Oct-11 22-May-12RCC for Hot Water duct column 1 6-Nov-11 4-Feb-12RCC for Duct beams 26-Nov-11 24-Feb-12Misc item stair case etc 10-Dec-11 9-Jan-12CW channel 14-Jan-12 8-Feb-12RCC for Duct 19-Feb-12 19-Apr-12

2-Aug-12 17-Aug-12PVC fills erectionDistribution pipes erectionNozzles erectionHot water pipe erection and hydro test

IssuesPCTLWooden Planks Supply Expected to reach site by 12/11/11Nut Bolts availability To reach site by 12/11/11outside Stairs up to 30 mtrs Will be arranged by L&T parallely along with slipping

Present Slip form assembly manpower= 40 D +15 Night , 8 BB working + 15 BB manpower reached site, balalnce to reach site by 20/11/11Construction Lightning Protection scheme L&T to submit to SEPCOSEPCOPlaster Rebar cutting approval To be sorted out by 13/11/11

Erection of pre cast col / beam in Driveway( Ext/ Tower crane )

Manpower Slip form assembly- 50 Day- 30 nightSlipping- 250, 50 BB, 50- Slipform, 100 US

Page 8: NDCT-2 Schedule - Copy

Central Rebar arrangement To be sorted out by 13/11/11Rebar availability at site SEPCO to revert on 11/11/11Space for keeping Rebar SEPCO to revert on 11/11/12Streaks Drawings To be taken up with SEPCO chinaEarthing drawing SEPCO to send Fianl drawing

Page 9: NDCT-2 Schedule - Copy

Nov-11 Dec-11 Jan-12 Feb-12 Mar-12 Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12

Expected to reach site by 12/11/11To reach site by 12/11/11Will be arranged by L&T parallely along with slipping

Present Slip form assembly manpower= 40 D +15 Night , 8 BB working + 15 BB manpower reached site, balalnce to reach site by 20/11/11L&T to submit to SEPCO

To be sorted out by 13/11/11

Page 10: NDCT-2 Schedule - Copy

To be sorted out by 13/11/11SEPCO to revert on 11/11/11SEPCO to revert on 11/11/12To be taken up with SEPCO chinaSEPCO to send Fianl drawing

Page 11: NDCT-2 Schedule - Copy

Oct-12 Nov-12 Dec-12 Jan-13 Feb-13 Mar-13 Apr-13

Expected to reach site by 12/11/11To reach site by 12/11/11Will be arranged by L&T parallely along with slipping

Present Slip form assembly manpower= 40 D +15 Night , 8 BB working + 15 BB manpower reached site, balalnce to reach site by 20/11/11L&T to submit to SEPCO

To be sorted out by 13/11/11

Page 12: NDCT-2 Schedule - Copy

To be sorted out by 13/11/11SEPCO to revert on 11/11/11SEPCO to revert on 11/11/12To be taken up with SEPCO chinaSEPCO to send Fianl drawing

Page 13: NDCT-2 Schedule - Copy

NDCT-2 Activity Start Finish 5-Nov-11Racker column- Single racker column 25-Nov-11 25-Nov-11Racker column- pair 26-Nov-11 26-Nov-11Racker column- pair 27-Nov-11 27-Nov-11Racker column- pair 28-Nov-11 28-Nov-11Racker column- pair 29-Nov-11 29-Nov-11Racker column- Single racler column 30-Nov-11 30-Nov-11Racket beam Bottom Fixing- 1st pour segment 5-Nov-11 8-Nov-11Reinforcement-1st pour segment 9-Nov-11 11-Nov-11Upright fixing-1st pour segment 11-Nov-11 13-Nov-11Shuttering-1st pour segment 14-Nov-11 15-Nov-11Pouring -1st pour segment 16-Nov-11Bottom Fixing- 2nd pour segment 9-Nov-11 12-Nov-11Reinforcement-2nd pour segment 13-Nov-11 15-Nov-11Upright fixing- 2nd pour segment 16-Nov-11 18-Nov-11Shuttering- 2nd pour segment 19-Nov-11 20-Nov-11Pouring- 2nd pour segment 21-Nov-11Bottom Fixing- 3rd pour segment 14-Nov-11 18-Nov-11Reinforcement- 3rd pour segment 19-Nov-11 22-Nov-11Upright fixing- 3rd pour segment 23-Nov-11 25-Nov-11Shuttering- 3rd pour segment 26-Nov-11 27-Nov-11Pouring- 3rd pour segment 28-Nov-11Bottom Fixing-4th pour segment 20-Nov-11 24-Nov-11Reinforcement- 4th pour segment 25-Nov-11 27-Nov-11Upright fixing-4th pour segment 28-Nov-11 30-Nov-11Shuttering- 4th pour segment 1-Dec-11 2-Dec-11Pouring- 4th pour segment ( Racker beam complete) 3-Dec-11Shell 2nd lift EL 18-Nov-11 28-Nov-11Shell 3rd lift 29-Nov-11 9-Dec-11Shell 4th lift 10-Dec-11 20-Dec-11Shell 5th lift 21-Dec-11 5-Jan-12Shell 6th lift 6-Jan-12 17-Jan-12Jumpform & Platform erection 20-Jan-12 7-Feb-12Shell casting start with jump form 12-Feb-12 11-Jun-12Basin beam & pile head 14-Sep-11 28-Nov-11PCC for basin slab 19-Oct-11 13-Dec-11RCC for basin slab 3-Nov-11 18-Dec-11Grillage column pre-cast 17-Nov-11 16-Mar-12Pre cast yard 18-Sep-11 18-Oct-11Pre cast beams casting 25-Oct-11 22-May-12RCC for Hot Water duct column 1 6-Nov-11 4-Feb-12RCC for Duct beams 26-Nov-11 24-Feb-12Misc item stair case etc 10-Dec-11 9-Jan-12

Page 14: NDCT-2 Schedule - Copy

CW channel 14-Jan-12 8-Feb-12RCC for Duct 19-Feb-12 19-Apr-12

2-Aug-12 17-Aug-12PVC fills erectionDistribution pipes erectionNozzles erectionHot water pipe erection and hydro test

IssuesPCTLRacker column completion need to be expedited Column shuttering is idle at siteManpower planning

Construction Lightning Protection scheme To be finalised SEPCO

RING BEAM

Erection of pre cast col / beam in Driveway( Ext/ Tower crane )

Page 15: NDCT-2 Schedule - Copy

6-Nov-11 7-Nov-11 8-Nov-11 9-Nov-11 10-Nov-11 11-Nov-11 12-Nov-11

Page 16: NDCT-2 Schedule - Copy

Column shuttering is idle at site

To be finalised

RING BEAM

Page 17: NDCT-2 Schedule - Copy

13-Nov-11 14-Nov-11 15-Nov-11 16-Nov-11 17-Nov-11 18-Nov-11 19-Nov-11

Page 18: NDCT-2 Schedule - Copy

To be finalised

RING BEAM

Page 19: NDCT-2 Schedule - Copy

20-Nov-11 21-Nov-11 22-Nov-11 23-Nov-11 24-Nov-11 25-Nov-11 26-Nov-11

Page 20: NDCT-2 Schedule - Copy

To be finalised

RING BEAMFinish Date

8-Nov-1111-Nov-1113-Nov-11

11/15/2011

12-Nov-1115-Nov-1118-Nov-1120-Nov-11

18-Nov-1122-Nov-1125-Nov-1127-Nov-11

Page 21: NDCT-2 Schedule - Copy

24-Nov-1127-Nov-1130-Nov-11

2-Dec-11

Page 22: NDCT-2 Schedule - Copy

27-Nov-11 28-Nov-11 29-Nov-11 30-Nov-11 1-Dec-11 2-Dec-11 3-Dec-11 4-Dec-11

Page 23: NDCT-2 Schedule - Copy

To be finalised

Page 24: NDCT-2 Schedule - Copy

5-Dec-11 6-Dec-11 7-Dec-11 8-Dec-11 9-Dec-11 10-Dec-11 11-Dec-11 12-Dec-11

Page 25: NDCT-2 Schedule - Copy

To be finalised

Page 26: NDCT-2 Schedule - Copy

13-Dec-11 14-Dec-11

Page 27: NDCT-2 Schedule - Copy

To be finalised