NATIONAL HIGHWAYS AUTHORITY OF INDIA
(MINISTRY OF ROAD TRANSPORT & HIGHWAYS)
GOVERNMENT OF INDIA
Four - Laning Of Panvel - Indapur Section
Of NH-17 From Km 0.000 to 84.000 In The State Of Maharashtra
(Package No: NHDP - III/DL4/05)
Monthly Progress Report No - 27
April 2014
Yongma Engineering Co., Ltd.
Feedback Infra Private Limited.
In Association with
Panvel - Indapur MPR No-27 April’14 Page 1
TABLE OF CONTENTS
Page
Executive Summary 03
1.0 THE PROJECT 05
1.1 Project Background 05
1.2 Project Location 05
1.3 Terrain and Alignment 07
1.4 Salient Features 08
1.5 Project Milestones 20
1.6 Location Map 20
2.0 THE ESTABLISHMENT 23
2.1 Project Organisation 23
2.2 Plant & Machinery 27
3.0 PROGRESS OF WORKS 29
3.1 Land Handing Over 29
3.2 Tree Cutting 30
3.3 Utility Shifting 31
3.4 Hindrance due to Utilities/Buildings/Structures 31
3.5 Design Review & Status 32
3.6 Progress of Works 34
3.7 Miscellaneous Works 35
3.8 Overall Physical / Financial Progress 35
4.0 QUALITY CONTROL & QUALITY ASSURANCE 43
4.1 Quality Control & Quality Assurance 43
4.2 Compliance / Non-Compliance 43
4.3 Routine Inspection by Independent Engineer 43
5.0 TRAFFIC & SAFETY 65
5.1 Safety Issues at Site 65
5.2 Accident Data 65
5.3 Traffic Diversion 65
5.4 Maintenance of Existing Highway 65
6.0 CONTRACTUAL ISSUES 67
6.1 Change of Scope 67
6.2 Project Milestone 68
7.0 CRITICAL ISSUES AND RECOMMENDATIONS 71
8.0 PROJECT PHOTOGRAPHS 72
Panvel - Indapur MPR No-27 April’14 Page 2
Appendices Page
A Comments on Concessionaire’s Monthly Progress Report 74
B Weather 75
C Important Visits 76
D Minutes of Progress Review Meeting 77
E Site Inspection Notes by Independent Engineer 78
F Letters from NHAI 86
G Letters from Concessionaire 89
H Letters Issued by Independent Engineer 92
I Accident Data & Observation 97
J Highway - Progress 100
K Structures - Progress 101
L Status Of Vehicular Underpass - Progress 119
M Status Of Pedestrian Underpass - Progress 122
N Slab/Box Culverts - Progress 126
O Hume Pipe Culverts - Progress 129
Panvel - Indapur MPR No-27 April’14 Page 3
Executive Summary
National Highways Authority of India (NHAI) has entrusted the work of design,
construction, development, finance, operation and maintenance of Four-Laning of the
Panvel - Indapur section of NH-17 in the state of Maharashtra under NHDP phase - III on
DBFOT basis (Package No : NHDP-III/DL4/05) to the Concessionaire Supreme Panvel-
Indapur Tollways Pvt. Ltd. (SPITPL). Concessionaire has deployed two EPC Contractors for
the construction of the Project (M/s Mahavir Roads and Infrastructure Pvt. Ltd. and M/s
Supreme Infrastructure India Limited). M/s Yongma Engineering Co., Ltd. in association
with M/s Feedback Infra Private Limited. has been appointed as the Independent Engineer
[IE] for the Project.
The Project stretch runs in plain and short stretch of hilly terrain. The Project includes
6 nos. Major Bridges, 23 nos. Minor Bridges, 2 nos. Flyovers, 3 nos. ROB’s, 7 nos. Vehicular
Underpasses, 14 nos. Pedestrian /Cattle Underpasses, 135+1 nos. Box/Slab Culverts,
208+20 Pipe Culverts and 2 nos. Toll Plaza’s. The length of service road on LHS is 19.79
Km at on RHS is 17.76 Km totaling to 37.55 Km. and mostly located at urban areas of the
Project highway. The Panvel - Indapur section passes through the towns of Pen, Vadkhal,
Nagothane, Kolad and ends at km 84 before the town of Indapur.
Concession Agreement was signed on 21-01-2011 and the Appointed Date was 19-12-2011.
The scheduled date of completion of construction is 16-06-2014 (with 910 days
construction period).
Tree cutting and shifting of electrical poles and lines are in advanced stage. Shifting of MJP
/ISPAT water pipe lines are in progress. The estimate for CIDCO water pipeline shifting is
yet to be approved by NHAI.
The quantities and percentage progress reported by Concessionaire are on higher side.
Also, the lengths of highway works reported are more than actual lengths completed at
site. Independent Engineer approximately estimated the progress details. The cumulative
achieved Physical Progress is 33.56 % as against Scheduled Physical Progress of 99.17 %.
That means, the slip is 65.61 %. The cumulative achieved Financial Progress is Rs. 413.32
Crores (34.28%) as against scheduled Financial Progress of Rs. 1191.45 Crores (98.82 %).
That means, the slip is Rs. 778.13 Crores (64.54%).
Land Acquisition: Total land to be acquired is approximately 504 Ha. Land handed over till
reporting date is approximately 397 Ha. (Approximately 78.77 %). As per the Concession
Agreement, the NHAI shall make best efforts to procure and grant, no later than 90 days
from the Appointed Date, the Right of Way to the Concessionaire in respect of all land
included in the Appendix. NHAI may speed up balance land acquisition process.
Forest Land: Approval of Forest land except Ch. 0+000 to 20+100 issued by NHAI vide
letter No. NHAI/PIU/PANVEL/PI/SPITPL/ Forest/2013/1201 dt.23-08-’13.
Panvel - Indapur MPR No-27 April’14 Page 4
GAD Approval for ROB’s: GAD’s for all ROB’s are already approved by Railways.
RE Wall Works: The progress for RE wall works is very slow. This will become one of the
critical activities of the Project.
State Board for Wild Life (SBWL)’s Approval of Karnala bird Sanctuary Portion: NHAI may
speed up the Approval of Karnala bird sanctuary portion.
Non-Relocation of CIDCO water pipeline: Non-relocation of CIDCO water pipeline is
affecting the works for approximately 5.08 Km length of the Project.
Non-Removal of Encroachments: NHAI has issued notice under section 26 of the Control of
National Highways (Land and Traffic) Act, 2002 to unauthorized occupants. Police support
is sought. The encroachment removal has not yet started.
Slow Progress of Structures: The progress of structures is slow. Concessionaires should
improve the progress of structures.
Decision on Change of Scope Proposed: Concessionaire has submitted 20 nos Change of
Scope proposals. Some of them are still pending with NHAI for decision.
Panvel - Indapur MPR No-27 April’14 Page 5
1.0 THE PROJECT
1.1 Project Background
The National Highway Authority of India (NHAI) has decided to take up the
development of various National Highways Stretches / Corridors under the National
Highways Development Programme (NHDP). NHAI had accordingly invited proposals by
its Notice Request for Qualification No. NHAI/NHDP-III/MAHA/BOT/PI dated 29-01-
2010 (the "Request for Qualification" or "RFQ") for short listing of bidders for
construction, operation and maintenance of the of NH-17 on DBFOT basis and had
shortlisted certain bidders including, the consortium comprising M/s Supreme
Infrastructure India Ltd., M/s China State Construction Engineering (Hong Kong) Ltd.
and M/s Mahavir Roads and Infrastructures Private Ltd. with M/s Supreme
Infrastructure India Ltd. as its Lead Member. Further, NHAI had accepted the bid of
the Consortium and issued its Letter of Award No. NHAI/BOT-I/11012/62/2005/14902
dated 28-10-2010 to the Consortium. On 21-01-2011, NHAI entered into agreement
with Consortium “Supreme Panvel Indapur Tollways Private Limited (SPITPL)” as
Concessionaire, a company incorporated under the provisions of the Companies Act,
1956 and having its registered office at Supreme City, Hiranandani Complex, Powai,
Mumbai - 400076, Maharashtra, India, for execution of the Project on DBFOT basis.
Thus, National Highways Authority of India (NHAI) has entrusted the work of design,
construction, development, finance, operation and maintenance of Four-Laning of the
Panvel - Indapur section of NH-17 in the state of Maharashtra under NHDP phase - III
on DBFOT basis (Package No : NHDP-III/DL4/05) to the Concessionaire M/s Supreme
Panvel-Indapur Tollways Pvt. Ltd. (SPITPL). Concessionaire has deployed two EPC
Contractors for the construction of the Project. M/s Yongma Engineering Co., Ltd. in
association with M/s Feedback Infra Private Limited. has been appointed as the
Independent Engineer [IE] for the Project.
The Project is having 84.6 Km length, located in the state of Maharashtra passing along
and adjacent to the Arabian Sea coast. The Project basically constitute upgradation
involving construction of 4-lanes highway including bridges, widening and rehabilitation
of existing bridges and culverts, elevated structures, ROB’s, wayside amenities,
realignment, bypasses etc. The Project forms part of the National Highway
Development Project (NHDP Phase-III) Programme.
1.2 Project Location The Panvel - Indapur section of NH-17 is located in the district of Raigarh, which in
turn is located in the State of Maharashtra. The State lies in the western part of the
Panvel - Indapur MPR No-27 April’14 Page 6
Indian peninsula and is surrounded by the States of Gujarat, Madhya Pradesh,
Chhattisgarh, Andhra Pradesh and Karnataka.
Maharashtra has an area of 307,690 sq. km with a population of 96,752,247 and
Mumbai is the state capital. The population density per sq. km is 314.44. It has a
literacy rate of 77.3 %, the second highest in the country, against the average Indian
scenario of 65.4 %. More than 900 educational institutions provide 1, 69,000 technical
manpower each year and 30% share of new patents, setting the pace for innovation in
India. There are in all 35 districts in Maharashtra. Raigarh district is situated in the
western part of Maharashtra. Raigarh district is surrounded by Thane district in the
north; Pune district in the east; Ratnagiri district in the south; and the Arabian Sea in
the west. According to 2001 census, the population of Raigarh was 2,205,972 with
population density of 309 persons per Sq Km. The district, being a part of Konkan
region receives heavy rainfall during the monsoon.
The National Highway No-17 is on the west coast linking Panvel (Maharashtra) and
Cochin (Kerala). This section of the National Highway is heavily trafficked by both
passenger vehicles and freight transport vehicles. To meet the need for road safety
and development of the area, Government of India through the National Highways
Authority of India (NHAI) is implementing the Project of strengthening and widening of
the existing two-lane roadway to a four-lane dual carriageway. Apart from the four
laning, flyovers, vehicular underpasses, pedestrian underpasses, service roads,
highway traffic management systems and other road safety measures will be provided
in these sections. The concession period is 21 years including construction period of
910 days (approximately 2.5 years). The implementation of the Project will reduce the
time and cost of travel for traffic plying between Panvel and Indapur in the Raigarh
district of Maharashtra State. It will also add to the development of tourism in the
State.
NH-17 mainly traverses through the west coast of India, sometimes touching shores of
Arabian Sea. This highway touches the Arabian Sea at Maravanthe in Karnataka and
Thalassery in Kerala. It passes through the States of Maharashtra, Goa, Karnataka,
Kerala.
NH-17 start from the junction with NH-4B near Panvel connecting Indapur, Mahad,
Rajapur, Kudal in Maharashtra, Panaji and Margoa in Goa, Karwar, Honavar, Udupi,
Mangalore in Karnataka, Kasaragod, Kannur, Ponnani, Edappalli, Near Cochin at
Junction With NH-47. NH-17 allows for movement of goods by trucks from hinterland
to major sea ports of India. The trade and commerce in the region has increased due
to expansion of markets for agricultural and sea food produced in the region connected
by this highway.
The Project stretch runs in plain and short stretch of hilly terrain. The Project includes
6 nos. Major Bridges, 23 nos. Minor Bridges, 2 nos. Flyovers, 3 nos. ROB’s, 7 nos.
Vehicular Underpasses, 14 nos. Pedestrian / Cattle Underpasses, 135 nos. Box/Slab
Panvel - Indapur MPR No-27 April’14 Page 7
Culverts, 208 Pipe Culverts and 2 nos. Toll Plaza’s. The length of service road on LHS is
19.79 Km at on RHS is 17.76 Km totalling to 37.55 Km. and mostly located at urban
areas of the Project highway. The Panvel - Indapur section passes through the towns
of Pen, Vadkhal, Nagothane, Kolad and ends at Km 84 before Indapur town.
1.3 Terrain and Alignment
The Project passes primarily through plain & rolling terrain except for the two small
Ghat sections (Km 8 to 9 & Km 64 to 66) where the terrain can be classified as hilly.
The alignment is single carriageway comprising two lanes with width ranging from 7 m
to 10 m and earthen shoulder on either side. The alignment is generally straight with
reasonably large radii curves that are generally appropriate for high speeds except for
some sharp curves in the Karnala Bird Sanctuary portion and Sukheli Khind ghat
section. In these hilly stretches the alignment follows a winding path and several sharp
curves with limited sight distance are present. These curves need to be redesigned to
the extent possible within the available ROW and the overall visibility improved. In the
plain / rolling stretch the highway is not having any major cutting and filling whereas in
the Ghat areas some sections involve large to deep cuts. About 80 % of the Project
Highway runs on an embankment of 1.0 to 2.0 m height. However, significant
variations in heights of embankment are observed at low-lying fields and also at bridge
approaches.
The highway passes through rural agricultural areas and villages, such as Pen (Km
26+600 to 30+000), Wadkhal (Km 32+000 to 34+600), Nagothane (Km 53+000 to
56+200) and Kolad (Km 71+500 to 74+000). The adjoining land use is predominantly
barren with patches of agricultural land, forest and built-up locations. The highway
passes through several towns and many villages some of which have settlements in
close proximity of the highway.
The existing highway has a single two-lane carriageway with pavement width varying
from 10 m to 11.0 m and 1.0 m wide soft shoulder on either side till Km 33. Beyond
this, the width is 7.0 m with soft shoulders of 1.5 to 2.0 m, till the end of the Project.
The highway is on an embankment for most of the length except in Ghat areas from
Km 8 to 9 and Km 64 to 66 where it lies in cutting. The embankment height in general
varies between 1.0 to 5.0 m but there are several locations where it is less than 1m.
However, there is no history of submergence or overtopping of the pavement at these
locations. The depth of cutting in Ghat Sections varies between 1.0 to 10.0 m. The
pavement condition is found to be fair to good for the almost the entire length except
for the stretch from Km 20 to 25 and Km 40 to 42 where substantial ravelling and
rutting is observed. The riding quality as such also varies from fair to quite good. Most
of these stretches have been overlaid recently by the Department.
No organised drainage system exists along the Project Highway. However, the highway
level is sufficiently raised and earthen drains have been constructed to drain the
surface water to the nearby culverts. At some locations, lined drains have also been
Panvel - Indapur MPR No-27 April’14 Page 8
constructed adjacent to the shoulders. Local enquiries reveal that there is no history of
overtopping of the road at any location.
1.4 Salient Features
Contract data is given in Table 1.1. Salient features are given in Table 1.2.
Table 1.1 Contract Data
Description Details
Name of Project
Design, Construction, Development, Finance, Operation and Maintenance of Four-Laning of Panvel-Indapur section of NH-17 from Km. 0+000 to 84+000 in the State of Maharashtra under NHDP Phase-III on DBFOT Basis.
Package No. NHDP-III/DL4/05
Source of Funding DBFOT Basis
Total Project Cost Rs. 942.69 Crores less Equity Support
Client/Employer National Highway Authority of India (NHAI), G-5 & 6, Sector 10, Dwaraka, New Delhi. PIN: 110 075
Concessionaire Supreme Panvel Indapur Tollways Private Limited, 9th Floor, (901-905), Millennium Tower B, Opp. IFFCO Chowk, Metro Station, M.G. Road, Gurgaon-122 002, Haryana-India.
Independent Engineer
M/s Yongma Engineering Co., Ltd.
12 F, Woolim Lions Valley 3rd 5445, Sangdeawon-Dong Joongweon-Gu, Seongnam-Si Gyeonagi-Do, 462819, Korea
in association with
M/s Feedback Infra Private Limited.
15th Floor, Tower 9B, DLF Cyber City Phase-III, Gurgaon.
PIN : 122 002
Project Management Consultants
Consulting Engineering Services (I) Pvt. Ltd., India
EPC Contractors
Ch. 0+000 to 42+000: M/s Mahavir Roads and Infrastructure Pvt. Ltd, 5, Basement, Vasant Industrial Estate, Saki-Vihar Road, Sakinaka, Andheri (E), Mumbai.
Ch. 42+000 to 84+000: M/s Supreme Infrastructure India Limited, Supreme House, 94/C, Pratap Gad, Opp. IIT Main Gate, Powai, Mumbai - 400 076
Date Concession Agreement signed
21-01-2011
Development Period 21-01-2011 to 18-12-2011
Appointed Date 19-12-2011
Concession Period 21 years (19-12-2011 to 18-12-2032)
Letter of Acceptance NHAI/BOT-1/11012/62/2005/14902
Scheduled Construction Period
16-06-2014 (910 days construction period)
Panvel - Indapur MPR No-27 April’14 Page 9
Table 1.2 Salient Features
Description Length/ Nos.
Length of the project 84 Km
Major Bridges 6 Nos.
Minor Bridges 23 Nos.
Slab/Box culverts 135+1 Locations
Pipe culverts 208+20 Locations
Flyovers 2 Nos.
ROB’s 3 Nos
Pedestrian Underpasses 14 Nos +2 Nos Additional
Vehicular Underpasses 7 Nos + 2 Nos Additional
Major Intersections 12 Nos
Minor Intersections 94 Nos
Main Line Toll Plaza 2 Nos (At Km 15 & Km 66+275)
Busbays 52 Nos
Truck Layby 4 Nos
Rest Area 1 No. (At Km 60+250 RHS)
Panvel - Indapur MPR No-27 April’14 Page 10
Table 1.3 Details of Major Bridges
Sl. No.
CA Chainage
(Km)
Design Chainage
(Km)
Name of the River
Details of Existing Structures Details of the Proposed Structures
Type of Superstructu
re
No. of Spans x Span Length (m)
Width of bridge
(m)
Remarks Total
Length (m)
Width (m)
Remarks
1 15+480 15+878 Kharpada
RCC Girder (2 span x 27.0 ) +
10.90 To be retained with repair and
rehabilitation.
12.00
(2 lane)
New Construction on
LHS side. Span over railway line to be
finalised in consultation with railway authority.
PSC Girder (5 spans x 42.50 ) +
RCC Girder (10 spans x 27.80 ) +
RCC Girder (1 span x 14.41 ) + 817.755
PSC Girder (1 span x 38.20 ) +
RCC Girder (1 span x 21.987 ) +
RCC Girder (7 spans x 27.80 )
2 20+097 20+144 Balganga RCC Girder & deck slab
(1 span x 16.50 ) + (2 span x 21.50 ) +
( 1 span x 16.50 )
8.450 To be retained with repair and
rehabilitation
76 12.00
(2 lane) New Construction on RHS side.
3 26+152 26+188 Bhogeshwari MS I - Girder & RCC Deck
(10 spans x 12.80 ) 7.850 Dismantling and reconstruction
128 2 x 12.00 (4 lane)
New Construction
4 44+119 44+155 Nigade RCC Girder & deck slab
(1 span x 12.60 ) + (1 span x 12.20 ) +
(1 span x 17.00 ) + (3 spans x 19.50 ) +
(1 span x 12.20 ) + (1 span x 12.60 )
8.100 To be retained with Repair and rehabilitation
125.1 12.00
(2 lane) New Construction on RHS side.
5 58+857 58+857 Amba CR Masonry arch deck
(9 spans x 10.65 ) 6.900 Existing bridge to be abandoned.
95.85 2 x 12.00 (4 lane)
New Construction.
6 72+876 72+936 Kundalika CR Masonry arch deck
(12 spans x 10.50 ) 6.70 To be retained with Widening.
126 12.00
(2 lane) New Construction on RHS side.
Panvel - Indapur MPR No-27 April’14 Page 11
Table 1.4 Details of Minor Bridges
Sl
No
CA
Chainage
(km)
Design
Chainage (Km)
Name of
River
Details of Existing Structure Proposed Structure
Type of
Superstructure
No. of Spans x
Span Length (m)
Width (m) Remarks
Total
Length (m)
Width Of
Bridge (m)
Remarks
1 0+544 0+544 Local Nallah RC Beam & Deck slab 3 spans x 6.70 12.90 Repair, Widening on both
side. 20.10
27.50
(4 lane)
Concentric widening
of existing bridge.
2 9+363 9+363 Local Nallah RCC Solid Slab (40
skew ) 2 spans x 7.10 11.10
Dismantling and New
Construction. 18.00
25.00
(4 lane) New Construction.
3 20+780 20+754
RCC Solid Slab 4 spans x 6.80 13.00 Repair and rehabilitation. 27.20 12.00
(2 lane)
New Construction on
LHS side.
4 29+728 29+728 Vashi Nallah RCC Solid Slab 3 spans x 7.10 12.60 Repair and rehabilitation. 21.30 12.00
(2 lane)
New Construction on
LHS side.
5 30+557 30+557 Uchede
Nallah
RCC Solid Slab (250
skew ) 2 spans x 6.10 12.40
Widening with Repair and
rehabilitation. 12.20
27.50
(4 lane)
Concentric widening
of existing bridge.
6 52+089 52+155 Nidi RCC Solid Slab (16.30
skew ) 4 spans x 8.80 12.05 Repair and rehabilitation. 35.20
12.00
(2 lane)
New Construction on
RHS side.
7 57+926 57+997 Patansai
CR Masonry arch
extended by RCC solid slab on both
side
4 spans x 4.00 12.00 Repair and rehabilitation. 16.00 12.00
(2 lane) New Construction on RHS side.
8 59+335 59+396 Canal
Crossing RCC Solid Slab 1 span x 10.70 8.50
Widening with repair and
rehabilitation. 10.70
12.00 (2
lane)
New Construction on
RHS side.
9 59+797 59+848 Godsai
CR Masonry arch
extended by RCC
solid slab 2 spans x 3.80 12.90 Repair and rehabilitation. 7.60
12.00
(2 lane)
New Construction on
RHS side.
10 62+285 62+133 Local Nallah RCC Solid Slab 2 spans x 4.60 13.00 Repair and rehabilitation. 9.20 12.00
(2 lane)
New Construction on
RHS side.
11 63+233 63+284 Canal
Crossing
CR Masonry arch
extended by RCC solid slab on both
sides
2 spans x 3.70 12.00 Repair and rehabilitation. 7.40 12.00
(2 lane)
New Construction on
LHS side.
12 64+187 64+236 Canal
Crossing RCC Solid Slab 2 spans x 7.25 8.30
Widening with repair and
rehabilitation. 14.50
12.00
(2 lane)
New Construction on
RHS side.
Panvel - Indapur MPR No-27 April’14 Page 12
Sl
No
CA
Chainage
(km)
Design
Chainage
(Km)
Name of
River
Details of Existing Structure Proposed Structure
Type of Superstructure
No. of Spans x
Span Length
(m) Width (m) Remarks
Total
Length
(m)
Width Of
Bridge
(m) Remarks
13 66+683 66+742 Nandavali RCC solid slab 2 spans x 4.70 12.10 Repair and rehabilitation. 9.40 12.00
(2 lane)
New Construction on
RHS side.
14 67+043 67+099 Local Nallah RCC solid slab 2 spans x 4.60 12.05 Repair and rehabilitation. 9.20 12.00
(2 lane)
New Construction on
RHS side.
15 67+820 67+878 Irrigation
Canal
RCC Solid Slab (510
skew )
(1 span x 9.95)
+ (1 span x
8.95) 7.70
Widening with repair and
rehabilitation. 18.90
27.50
(4 lane)
Concentric widening
of existing bridge.
16 68+927 68+988 Local Nallah
CR Masonry arch
extended by RCC solid slab on both
sides
4 spans x 3.20 12.00 Repair and rehabilitation. 12.80 12.00
(2 lane)
New Construction on
LHS side.
17 69+081 69+140 Local Nallah RCC solid slab
widened on both side 3 spans x 3.70 12.50 Repair and rehabilitation. 11.10
12.00
(2 lane)
New Construction on
RHS side.
18 72+196 72+250 Mahisdara
Nallah
RCC I Girder (180
skew ) 3 spans x 18.30 8.00 Repair and rehabilitation. 54.90
12.00
(2 lane)
New Construction on
RHS side.
19 73+290 73+350 Godi Masonry arch & RCC cantilever slab
(1 span x 7.70)
+ (3 spans x 7.00) + (1 span
x 7.70)
13.65 Repair and rehabilitation. 36.40 12.00
(2 lane) New Construction on RHS side.
20 77+744 77+804 Bhuvan
Nallah
CR Masonry arch
extended by RCC
solid slab on both side
5 spans x 3.10 11.90 Repair and rehabilitation. 15.50 12.00
(2 lane)
New Construction on
RHS side.
21 81+606 81+660 Vave Nallah RCC Solid Slab 3 spans x 7.45 12.20 Repair and rehabilitation. 22.35 12.00
(2 lane)
New Construction on
RHS side.
22 83+861 83+920 Canal
Crossing RCC Solid Slab 1 span x 6.40 8.15
Widening with repair and
rehabilitation. 6.40
12.00
(2 lane)
New Construction on
LHS side.
23 84+431 84+488 Indapur RCC Solid Slab 3 spans x 10.45 11.95 Repair and rehabilitation. 31.35 12.00
(2 lane)
New Construction on
RHS side.
Panvel - Indapur MPR No-27 April’14 Page 13
Table 1.5 Details of Flyovers
Sl
No
CA
Chainage (Km)
Design Chainage
(Km Name of structure
Details Of Existing Structure Details Of Proposed Structure
Total Span
Length
Width
(m) Remarks
Total
Length
(m) Width (m) Remarks
1 0+250 0+250 Palaspe Junction Not Applicable 390 12.00
(2 lane) Proposed to be deleted
2 33+670 33+670 Wadkhal Bypass Not Applicable 1092 2 x 12.00
(4 lane)
Span over railway line to be decided in consultation
with railway authorities.
Table 1.6 Details of ROB’s
Sl
No
CA
Chainage
(Km)
Design
Chainage
(Km
Name of
structure
Details Of Existing Structure Details of proposed structures
Type of
Superstructure
Spans x
Length
Width
(m) Remarks
Total
Length
(m) Width Remarks
1 15+480 16+062 Kharpada PSC Girder and RCC deck slab
1 Span x 38.20 m
10.90 To be retained with repair and rehabilitation.
38.20 12.00 m (2 lane)
New Construction on LHS side.
2 28+283 28+283 Pen
MS Built-up ' I '
girder and RCC deck slab
2 Spans x
13.50 m 11.50
To be retained with repair
and rehabilitation. 27.00
12.00 m
(2 lane)
New Construction on
LHS side.
3 33+670 33+877 Wadkhal
Bypass - - -
28.00
2 x 12.0 m
(4 lanes) New Construction
Table 1.7 Details of RUB’s
Sl
No
CA
Chainage (Km)
Design
Chainage (Km
Details of Existing Structure
Name of
Structure
Type of
Superstructure
No. X size of
Openings Remarks
1 33+860 33+877 Wadkhal Steel girders 1 X 24 Abandoned since bypass is proposed - Due to Wadkhal bypass not applicable
2 56+560 56+560 Nagothane Steel girders 1 X 24 Widening not required as opening size is sufficient to accommodate 4 lane highway.
3 73+250 73+250 Kolad PSC girder and
RCC deck slab 3 X 26 Widening not required as opening size is sufficient to accommodate 4 lane highway.
Panvel - Indapur MPR No-27 April’14 Page 14
Table 1.8 Details of Service Road (LHS) - As per Concession Agreement
Sl No From (Km) To (Km) Length (Km) Location
1 0+950 2+260 1.31 Palaspe
2 4+650 5+380 0.73 Chinchwan
3 13+440 14+210 0.77 Tara
4 17+950 18+970 1.02 Jite
5 25+340 26+060 0.72 Pen
6 26+370 28+000 1.63 Pen
7 28+460 29+590 1.13 Pen
8 29+950 30+480 0.54 Uchede
9 31+300 31+680 0.38 Wadkhal
10 37+080 37+800 0.72 Gadab
11 41+350 42+860 1.51 Kasu, Pandapur, Patni
12 44+710 45+810 1.10 Nigade
13 49+000 49+500 0.50 Koleti
14 55+090 56+590 1.50 Nagothane
15 67+910 68+830 0.92 Khamb
16 73+400 75+450 2.05 Kolad
17 75+940 76+500 0.56 Talavali
Total 17.09
Table 1.9 Details of Service Road (RHS) - As per Concession Agreement
Sl No From (Km) To (Km) Length (Km) Location
1 0+920 2+260 1.34 Palaspe
2 4+650 5+380 0.73 Chinchwan
3 13+430 14+210 0.78 Tara
4 17+950 18+970 1.02 Jite
5 26+760 28+000 1.24 Pen
6 28+510 29+600 1.09 Pen
7 29+950 30+470 0.52 Uchede
8 31+300 31+630 0.33 Wadkhal
9 34+100 34+640 0.53 Wadkhal
10 37+080 37+800 0.72 Gadab
11 44+570 45+600 1.03 Nigade
12 49+000 49+500 0.50 Koleti
13 54+840 56+530 1.69 Nagothane
14 67+920 68+830 0.91 Khams
15 73+400 75+450 2.05 Kolad
16 75+940 76+500 0.56 Talavali
Total 15.04
In addition to above, Concession Agreement has provision for providing additional length of 5.40
Km Service Road. However, as per Concessionaire’s design the following are the details of
Service Road:
Panvel - Indapur MPR No-27 April’14 Page 15
Table 1.10 Details of Service Road - LHS - As per Concessionaire’s Design
Sl
No Location
Chainage Length (Km) Status
From To
1 Palaspe 0+950 2+260 1.31 Concurred
2 Chinchwan 4+570 5+340 0.77 Concurred
3 Tara 13+470 14+400 0.93 Not Submitted
4 Jite 18+300 19+330 1.03 Concurred
5 Khopoli 25+330 26+050 0.72 Concurred
6 Pen 26+380 28+020 1.64 Concurred
7 Ramwadi 28+370 29+500 1.13 Concurred
8 Uchede 29+910 30+920 1.01 Concurred
9 Wadkhal 34+220 34+750 0.53 Not Submitted
10 Gadab 37+210 37+930 0.72 Concurred
11 Khapale 39+430 40+040 0.61 Not Submitted
12 Kasu 41+350 42+840 1.49 Concurred
13 Nigade 44+710 45+810 1.10 Concurred
14 Koleti 48+940 49+590 0.65 Concurred
15 Palas 50+490 51+220 0.73 Concurred
16 Nagothane 53+520 56+580 3.06 Concurred
17 Khamb 68+000 68+900 0.90 Concurred
18 Kolad 73+500 75+440 1.94 Concurred
19 Talavali 76+050 76+590 0.54 Concurred
Total (LHS) 20.81
Table 1.11 Details of Service Road - RHS - As per Concessionaire’s Design
Sl
No Location
Chainage Length (Km)
Status From To
1 Palaspe 0+920 2+260 1.34 Concurred
2 Chinchwan 4+570 5+340 0.77 Concurred
3 Tara 13+470 14+400 0.93 Not Submitted
4 Jite 18+300 19+330 1.03 Concurred
5 Pen 26+780 28+020 1.24 Concurred
6 Ramwadi 28+370 29+460 1.09 Concurred
7 Uchede 29+900 30+940 1.04 Concurred
8 Wadkhal 34+300 34+750 0.45 Concurred
9 Gadab 37+210 37+930 0.72 Concurred
10 Nigade 44+570 45+600 1.03 Concurred
11 Koleti 48+940 49+590 0.65 Concurred
12 Palas 50+490 51+220 0.73 Concurred
13 Nagothane 53+520 56+530 3.01 Concurred
14 Khamb 68+000 68+900 0.90 Concurred
15 Kolad 73+500 75+455 1.95 Concurred
16 Talavali 76+050 76+590 0.54 Concurred
Total (RHS) 17.42
Panvel - Indapur MPR No-27 April’14 Page 16
Table 1.12 Details of Vehicular Underpasses as per Concession Agreement
Sl
No Chainage (Km) Opening
Size (m)
Width
(m) Village
Anticipated Type As per CA As per Design
1 4+992 5+000 2 x 12 x 5.5 24.0 Chinchwan RCC Solid slab
2 25+873 25+860 2 x 12 x 5.5 12.0 Khopoli Junction RCC Solid slab
3 28+040 27+760 2 x 12 x 5.5 24.0 Pen RCC Solid slab
4 31+660 30+930 1x 12 x 5.5 24.0 Wadkhal Bypass RCC Solid slab
5 32+465 32+485 1 x 6 x 5.0 24.0 Wadkhal Bypass RCC Solid slab
6 55+968 56+060 2 x 12 x 5.5 24.0 Nagothane RCC Solid slab
7 73+699 73+760 2 x 12 x 5.5 24.0 Kolad RCC Solid slab
Table 1.13 Details of Pedestrian / Cattle Crossing Underpasses as per Concession Agreement
Table 1.14 Details of Busbays as of now
Sl
No
Chainage (Km) Opening Size (m)
Width
(m) Village Anticipated Type
As per CA As per Design
1 1+219 1+230 6.0 x 3.5 24.0 Palaspe Box structure
2 13+796 13+788 6.0 x 3.5 24.0 Tara Box structure
3 18+229 18+700 6.0 x 3.5 24.0 Jite Box structure
4 27+136 27+100 6.0 x 3.5 24.0 Pen Box structure
5 28+550 28+535 6.0 x 3.5 24.0 Pen Box structure
6 30+276 30+270 6.0 x 3.5 24.0 Uchede Box structure
7 37+453 37+529 6.0 x 3.5 24.0 Gadab Box structure
8 42+075 42+155 6.0 x 3.5 24.0 Kasu Box structure
9 45+149 45+225 6.0 x 3.5 24.0 Nigade Box structure
10 49+280 49+280 6.0 x 3.5 24.0 Koleti Box structure
11 55+749 55+840 6.0 x 3.5 24.0 Nagothane Box structure
12 68+248 68+320 6.0 x 3.5 24.0 Khamb Box structure
13 76+250 76+315 6.0 x 3.5 24.0 Talavali Box structure
14 79+080 79+140 6.0 x 3.5 24.0 Ratvad Box structure
Sl No Chainage (Km)
Side Village As per CA As per Design
1 1+058 1+058 RHS Palaspe
2 1+140 1+140 LHS Palaspe
3 2+560 2+435 LHS Turmale
4 2+620 2+435 RHS Girwale
5 4+244 4+244 RHS Shirdon
6 4+415 4+244 LHS Shirdon
7 11+162 11+162 RHS Kolhe
8 11+406 11+406 LHS Kolhe
9 13+700 13+700 RHS Tara
10 13+902 13+902 LHS Tara
Panvel - Indapur MPR No-27 April’14 Page 17
11 14+599 14+599 RHS Kasarbhat
12 14+568 14+568 LHS Kasarbhat
13 16+666 16+512 RHS Kasarbhat
14 16+725 16+512 LHS Kasarbhat
15 18+271 18+550 RHS Kharpada
16 18+349 18+870 LHS Kharpada
17 26+003 25+492 RHS Chinchghar
18 26+003 25+450 LHS Chinchghar
19 28+610 28+610 RHS Pen
20 28+659 28+659 LHS Pen
21 29+495 29+300 RHS Pen
22 29+495 29+300 LHS Pen
23 30+090 30+250 RHS Pen
24 30+096 30+250 LHS Pen
25 37+700 37+700 LHS Gadab
26 37+951 37+700 RHS Gadab
27 39+414 39+617 RHS Gadab
28 39+418 40+133 LHS Gadab
29 42+137 41+845 RHS Kasu
30 42+152 42+245 LHS Kasu
31 44+342 44+354 RHS Salinde
32 44+364 44+402 LHS Salinde
33 45+046 45+092 RHS Nigdi
34 45+064 45+142 LHS Nigdi
35 48+903 48+972 RHS Koleti
36 49+129 49+200 LHS Koleti
37 61+324 61+387 RHS Kansai
38 61+368 61+437 LHS Kansai
39 63+200 63+388 LHS Sukeli
40 68+145 68+315 RHS Kharwali
41 68+265 68+315 LHS Kharwali
42 70+392 70+392 RHS Pugaon
43 70+407 70+407 LHS Pugaon
44 75+320 75+060 LHS Kolad Railway station
45 76+126 76+200 RHS Talavali
46 76+137 76+200 LHS Talavali
47 78+439 78+107 RHS Bhuvan
48 78+468 78+107 LHS Bhuvan
49 79+600 79+707 RHS Ghotwal
50 79+600 79+707 LHS Ghotwal
51 82+570 82+462 RHS Nagroli
52 84+330 84+222 RHS Potner
Panvel - Indapur MPR No-27 April’14 Page 18
Table 1.15 Details of Proposed Vehicular Underpasses as of now
Table 1.16 Details of Proposed Pedestrian / Cattle Crossing Underpasses as of now
Note: PUP’s envisaged as per Concession Agreement at Ch. 27+156 (Design Ch. 27+100) and at
Ch. 28+550 (Design Ch. 28+535) are proposed to be converted to VUP.
Total number of Pipe Culverts: 208 + 20 Nos.
Total number of Slab Culverts: 135 + 1 Nos.
Sl No
Chainage (Km)
Village Remarks As per
CA
As per
Design
1 4+992 5+000 Chinchwan VUP
2 25+873 25+860 Khopoli VUP- Half Portion
3 27+136 27+100 Pen PUP proposed to be converted to VUP
4 28+040 27+760 Pen VUP- Shifted to this Place
5 28+550 28+535 Pen/Ramwadi PUP proposed to be converted to VUP
6 31+660 30+930 Vadkhal VUP
7 32+465 32+485 Vadkhal VUP
8 - 54+450 Nagothane (SH-91) Additional VUP as per CA
9 55+968 56+060 Nagothane VUP
10 73+699 73+760 Roha/Kolad (SH-62) VUP
11 - 74+780 Kolad (SH-60) Additional VUP as per CA
Sl
No
Chainage (Km) Village Remarks
As per CA As per Design
1 1+219 1+230 Palaspe
2 13+796 13+625 Tara
3 18+229 18+700 Jite
4 - 27+420 Pen Change of Scope proposed
5 30+276 30+276 Uchede
6 37+453 37+529 Gadab
7 39+740 39+743 Khapale Additional PUP as per CA
8 42+075 42+155 Kasu
9 45+149 45+225 Nigade
10 49+280 49+280 Koleti
11 50+845 50+845 Palas Additional PUP as per CA
12 55+749 55+840 Nagothane
13 68+248 68+320 Khamb
14 76+250 76+315 Talavali
15 79+080 79+140 Ratwad
Panvel - Indapur MPR No-27 April’14 Page 19
Table 1.17 Details of U-Turn Facilities
Sl. No
Chainage Village name Type of Crossing Distance between
Opening (m) Remarks
1 2+580 Turmale T Junction
2 5+000 Chinchwan VUP 2420
3 7+000 Mid block opening 2000
4 9+080 Karnala Kila T Junction 2080
5 11+995 Kolhe T Junction 2915
6 14+729 Apta Phata (SH-83)
T Junction 2734 No other cross road in between
7 17+560 Mid block opening 2831 Steep gradient in between
8 19+860 Mid block opening 2300 S-Curve in between
9 22+450 Ambivali T Junction 2590 Steep gradient & Curve portion
10 24+200 Virwadi T Junction 1750
11 25+860 Khopoli Jn (SH-87)
VUP 1660
12 27+100 VUP 1240 PUP proposed to be converted to VUP
13 27+760 VUP 660 VUP proposed to shift to this place
14 28+535 VUP 775
15 29+660 Vashi T Junction 1125
16 30+930 Wadkhal VUP 1270
17 32+940 Mid block opening 2010
18 35+880 Ispat factory Y junction 2940
19 38+590 Mid block opening 2710
20 40+900 Jui T Junction 2310
21 43+200 Aakadevi Temple
T Junction 2300
22 46+450 Amate X Junction 3250
23 47+480 Khatale T Junction 1003
24 52+800 Nidi T Junction 5347 Many PUP’s in between
25 54+451 Nagothane (SH-91)
VUP (Additional) 1651
26 56+060 Nagothane VUP 1609
27 58+720 Pali T Junction 1120
28 59+021 Alibaug (SH-93) T Junction 301
29 60+300 Rest Area Mid block opening 1279
30 61+295 MSEB (Kansui) T Junction 995
31 63+244 Sukeli T Junction 1949
32 69+400 Mid block opening 6156 Hilly terrain 64 to 66, 66+700 toll plaza, 68+320 Khamb PUP
33 72+000 Pugaon T Junction 2600
34 73+760 Kolad (SH-62) VUP 1760
35 74+780 SH-60 VUP (Additional) 1020
36 76+900 Mid block opening 2120
37 78+388 Ghotwale T Junction 1488
38 81+825 Wavediwali T Junction 3112 No important cross road in between.
39 82+760 Gangewadi T Junction 1260
40 84+387 Nagroli T Junction 1627
Panvel - Indapur MPR No-27 April’14 Page 20
1.5 Project Milestones
The Project Milestones details are given in Table 1.18 Table 1.18 Project Milestones
Milestone Description Scheduled
Date
Progress
Requirements Status
Milestone-I
First anniversary
of the Appointed
Date 19-12-2012
Physical Progress : Not
less than 25%
Expended Cost : Not
less than 25% of total capital cost
Achieved
Milestone-II
Second
anniversary of
the Appointed Date
19-12-2013
Physical Progress : Not less than 65%
Expended Cost : Not
less than 65% of total capital cost
Concessionaire vide their letter no SPITPL/P-NHAI/2003-
14/2471 dt. 28-01-’14 claimed
and informed NHAI that they have achieved Milestone-II
considering the available land. This has been reviewed and
commented by Independent Engineer.
Project
Completion
910th day from
the Appointed Date
16-06-2014
Four Lane completion
in accordance with Concession Agreement
1.6 Location Map
Raigarh District Map is given in Figure 1.1. The road network map of Raigarh
district is shown in Figure 1.2.
Figure 1.1 District map of Raigad District
Panvel - Indapur MPR No-27 April’14 Page 23
2.0 THE ESTABLISHMENT
2.1 Project Organisation
NHAI
NHAI have established a Project Implementation Unit at Panvel. The Project
Director is Mr. M. K. Wathore. He is supported by the Manager (Tech.) Mr.
Narayankar and other Administrative Staff.
Concessionaire
The Organization of Concessionaire’s is represented by its SPV Manager, Mr.
Pradeep Garole. He is responsible for day to day activities of the Concessionaire
and he also provides information to IE/NHAI as and when necessary.
Concessionaire has established their office near Km 27+800 at Pen.
Concessionaire’s Organisation chart is given in Figure 2.1.
Figure - 2.1 Concessionaire’s Organisation Chart
Concessionaire has appointed Consulting Engineering Services (India) Pvt. Ltd. as
Project Management Consultants (PMC) and they have established their office at
the same premises that of the Concessionaire.
Independent Engineer
The Independent Engineer, Yongma Engineering Co., Ltd in Association with
Feedback Infra Private Limited. mobilised on 28-12-’11 and the Consultancy
Agreement was signed on 11-01-‘12. The team at site is headed by the Team
Leader cum Sr. Highway Engineer. All Key-Professionals are already mobilised.
Part Time / Intermittent staff is visiting site on as and when required basis apart
from reviewing Design, Drawings and Submittals from main / satellite offices. In
AGM (Planning):
Mr. Umapathi T B
G M (Finance):
Mr. Kamlesh Chechani
GM (Projects)
Vice President:
Mr. P.S. Garole
Acting Team Leader :
Gangadharan C.P.
Director:
Mr. Vikas Sharma
Panvel - Indapur MPR No-27 April’14 Page 24
addition to above, Project Manager and Project Director at Head Office work as
link between site office and main office for co-ordinating issues beyond day to day
works. The Table 2.1 below shows the deployment of Independent Engineer.
Table 2.1 Deployment Details of Independent Engineer
Sl
No Position Name
Date of
Mobilisation
Date of De-
Mobilisation Remarks
A Key Professional Staff
1 Team Leader cum Sr.
Highway Engineer Mr. Gangadharan C P 30-12-‘11
2 Sr. Bridge Design Engineer Mr. Magesh Santhanam 17-01-‘12 16-06-‘12
Mr. Nandadulal Dasgupta 07-02-‘13
3 Resident Cum Highway
Engineer Mr. Rajat Parkash Sharma 28-12-‘11
4 Highway Design Engineer Mr. Dadan Singh 23-08-‘12 11-04-‘14 Manmonths
completed
5 Bridge/Structural Engineer Mr. H. Nagaraja Rao 02-02-‘12
6 Sr. Pavement Specialist Mr. Manish Kumar Shah 27-02-‘12
7 Sr. Quality cum Material
Expert Mr. M.V.K. Appa 16-01-‘12
8 Traffic and Transportation
Expert Mr. Krishna Prasad 12-04-‘12
9 Road Safety Expert Mr. Baljit Sidhu 05-09-‘12
10 Finance Expert Mr. Pankaj Sachdeva 13-06-‘12
11 Legal Expert Mr. Sunil Malhotra 21-08-'12
B Sub-Professional Staff
12 Survey Engineer-1 Mr. Sena Prasad 05-04-‘13 21-04-‘14 Manmonths
completed
13 Survey Engineer-2 Mr. Suresh Kumar 06-06-‘12
14 Asst. Highway Engr-1
Mr. Ravindra P Dongre 01-03-‘12
Mr. Neeraj Mahadeorao
Patil 28-02-‘14
15 Asst. Highway Engr-2 Mr. Arun Rajan Pillai 17-10`12
16 CAD Expert TBN -
17 Environmental Engineer Mr. Raj Kumar Singh 19-03-‘12
18 Asst. Bridge Engr-1 Mr. Shatrunjay Kumar 09-03-‘12
19 Asst. Bridge Engr-2 Mr. Vinod S Bawankar 19-04-‘12
20 Asst. Quality cum Materials
Engr-1 Mr. Raffiudin N Badure 05-04-‘12
21 Asst. Quality cum Materials
Engr-2 Mr. Sanjay Maharana 07-08-'12
22 Electrical Engineer Mr. Anand Mohan
Jayaswal 05-06-‘12
23 HTMS / Toll Expert TBN -
Panvel - Indapur MPR No-27 April’14 Page 25
24 Quantity Surveyor Mr. Satish. N.L 22-10-‘12
25 Horticulture cum
Landscaping Expert TBN -
C Support Staff
26 Office Manager Mr. Praveen Kumar 01-02-‘12
27 Accountant Ms. Vidya Baburao Ubale 01-03-12 01-08-‘12
Ms. Madhumati P Kumar 22-08-‘12
28 Cashier Ms. Shubhangi Mohre 13-02-‘12 01-07-‘12
Ms. Reshma Newalkar 01-07-‘12
29 Photocopy Machine
Operator Mr. Santosh Sharma 22-02-‘12
30 Steno Ms. Jyoti Vishnu Jadhav 23-02-‘12
31 Computer Operator Ms. Reshma Ananda
Katekar 23-02-‘12
32 Guard-1 Mr. RamCharan Vajpayee 26-03-‘12
33 Guard-2 Mr. Ganesh Bhadur 26-03-‘12
34 Office Boy Mr. Mohammed Rafiq 17-01-’12 16-07-‘12
Mr. Aditya Shetye 16-07-‘12
The office of the Independent Engineer (IE) is located at First Floor, Tejaswini
Arcade, Above PMC Bank, Takka village, Old Panvel. PIN: 410 206. The office
contact numbers are: Telephone: 022-27450391, E-Mail Id: [email protected].
Independent Engineer’s Organisation Chart is given in Figure 2.2.
Panvel - Indapur MPR No-27 April’14 Page 26
Figure 2.2. Independent Engineer’s Organisation Chart
Resident cum Highway Engineer:
Mr. Rajat Parkash Sharma
Team Leader/ Sr. Highway Engineer:
Mr. Gangadharan C.P.
Sr. Quality cum Material Expert:
Mr. M V K Appa
AHE - 1: Mr. Neeraj Mahadeorao Patil
AHE - 2: Mr. Arun Rajan Pillai
Survey Engr. - 1: (Manmonths
completed)
ABE -1: Mr. Shatrunjay Kumar
ABE -2: Mr. Vinod S Bawankar
Survey Engr.-2: Mr. Suresh Kumar
AQME -1: Mr. Raffiudin N Badure
AQME -2: Mr. Sanjay Maharana
Bridge /Structural Engineer:
Mr. Nagaraja Rao
Short Term Key Professionals:
Sr. Pavement Specialist: Mr. Manish Kumar Shah
Sr. Bridge Design Engineer: Mr. Nandadulal Dasgupta
Traffic & Transportation Expert: Mr. Krishna Prasad
Road Safety Expert: Mr. Baljit Sidhu
Highway Design Engineer: (Manmonths completed)
Financial Expert: Mr. Pankaj Sachdeva
Legal Expert: Mr. Sunil Malhotra
Support Staff:
Office Manager: Mr. Praveen Kumar
Accountant: Ms. Madhumati P Kumar
Cashier: Ms. Reshma Newalkar
Steno: Ms. Jyoti Vishnu Jadhav
Computer Operator: Ms. Reshma Ananda Katekar
Photocopy Machine Operator: Mr. Santhosh Sharma
Office Boy: Mr. Aditya Shetye
Guard-1: Mr. Ram Charan Vajpayee
Guard-2: Mr. Ganesh Bhadur
Short Term Sub-Professionals:
Quantity Surveyor: Mr. Satish. N.L HTMS / Toll Expert: TBN Electrical Engineer: Mr. Anand M Jayaswal Horticulture cum Landscaping Expert: TBN CAD Expert: TBN Environmental Engineer: Mr. Raj Kumar Singh
Panvel - Indapur MPR No-27 April’14 Page 27
EPC Contractors
Two EPC Contractors were appointed by the Concessionaire for the
construction of the Project. Details of EPC Contractors are given Table 2.2:
Table 2.2 Details of EPC Contractors
2.2 Plant & Machinery
Table 2.3 Details of Plants Mobilised
Sl No Description Location Capacity
Section-I
1 Laboratory 23+600
2 Stone Crusher Bombay Pada 200 TPH
3 Concrete Batching Plant 23+600 60 Cum /Hr
4 WMM Plant 23+600 200 TPH
5 Hot Mix Plant Bombay Pada 120 TPH
Section-II
6 Laboratory 58+000
7 Stone Crusher 58+000 200 TPH
8 Concrete Batching Plant 58+000 30 Cum /Hr
9 WMM Plant 58+000 200 TPH
10 Hot Mix Plant 58+000 160 TPH
Table 2.4 Details of Machinery
Sl No Description Available
(Nos)
1 JCB 17
2 Excavator / Poclain 28
3 Paver 03
4 Grader 08
5 Loader 09
6 Tippers 80
7 Water Tanker 11
Sl No Location EPC Contractor
1 Km 0+000 to 42+000 M/s Mahavir Roads and Infrastructure Pvt. Ltd.
2 Km 42+000 to 84+000 M/s Supreme Infrastructure India Limited
Panvel - Indapur MPR No-27 April’14 Page 28
Sl No Description Available
(Nos)
8 Vibratory Roller 24
9 Transit Mixer 18
10 Plate Compactors 04
11 Air Compressor 04
12 Hydra 08
13 Water Pump 18
14 D.G. Set 20
15 Tandem Roller 06
16 Emulsion Sprayer 06
17 Crane 08
18 Concrete Vibrator 18
Panvel - Indapur MPR No-27 April’14 Page 29
3.0 PROGRESS OF WORKS
3.1 Land Handing Over
Concession Agreement Vol-I, Clause 10.3 specify that on or prior to the Appointed
Date (that is 19-12-2011), NHAI shall have granted vacant access and Right of Way
such that the Appendix shall not include more than 20% of the total area of the Site
required and necessary for the Four-Laning of Project Highway. Also, NHAI shall
make best efforts to procure and grant, no later than 90 days from Appointed Date
(that is 18-03-2012), the Right of Way to the Concessionaire in respect of all land
included in the Appendix.
Total land to be acquired: 504 Ha
Land handed over till reporting date: 397 Ha (Approximately 78.77%).
At following locations the construction work is affected due to non-clearance by
Forest Department:
Table 3.1 Details of Forest areas
Sl No Chainage
Length (m) From To
1 2+545 2+610 65
2 6+300 6+500 200
3 6+500 6+620 120
4 6+620 6+680 60
5 6+850 6+930 80
6 6+960 7+400 440
7 7+500 7+770 270
8 7+850 7+915 65
9 7+915 8+350 435
10 8+600 10+100 1500*
11 10+580 10+625 45
12 10+625 10+640 15
13 10+640 10+680 40
14 11+135 11+275 140
15 11+630 11+900 270
16 11+900 11+950 50
17 12+110 12+220 110
18 12+220 12+580 360
19 12+580 12+925 345
20 12+925 13+130 205
21 13+130 13+250 120
22 13+250 13+565 315
23 13+565 13+620 55
Panvel - Indapur MPR No-27 April’14 Page 30
* Karnala Bird Sanctuary Approval Pending.
Eco-Sensitive Zone: NHAI vide their letter No. NHAI/PIU/PNVL/BOT/NH-17/PNL-
IND/ECO/2012/1841 dt. 24-12-‘12 has instructed Concessionaire to stop the
construction works in the Eco-Sensitive zone (Ch. 0+000 to 20+100).
3.2 Tree Cutting
Details of tree cutting are given in Table 3.2. Tree cutting works are in advanced
progress.
Table 3.2 Details of Tree Cutting
Chainage Length (Km)
Scheduled Trees
Non-Scheduled
Trees
Remarks From To
0+000 8+000
6.40 344 1,214
NHAI Issued Letter No. NHAI/PIU/PANVEL/P-I/Tree
Cutting/2012/1033 dt. 29-08-’12 for the
tree cutting permission & disposal. 11+000 12+000
16+000 21+050
13.25 354 1,397
NHAI Issued Letter No.
NHAI/PIU/PANVEL/P-I/Tree
Cutting/2012/1757 dt. 17-12-’12 for the tree cutting permission & disposal.
21+700 31+300
34+000 42+300 8.30 143 518
NHAI Issued Letter No.
NHAI/PIU/PANVEL/P-I/Tree Cutting/2012/1757 dt. 17-12-’12 for the
tree cutting permission & disposal.
42+300 48+730 6.43 62 374
NHAI Issued Letter No. NHAI/PIU/PANVEL/P-I/Tree
Cutting/2012/1757 dt. 17-12-’12 for the tree cutting permission & disposal.
48+730 63+910 8.13 901 1,538
NHAI Issued Letter No.
NHAI/PIU/PANVEL/P-I/Tree Cutting/2012/1153 dt. 15-09-’12 for the
tree cutting permission & disposal.
65+980 76+000 7.07 278 1,600
NHAI Issued Letter No. NHAI/PIU/PANVEL/P-I/Tree
Cutting/2012/1757 dt. 17-12-’12 for the
tree cutting permission & disposal.
76+000 84+600 8.33 308 1,323
NHAI Issued Letter NO.
NHAI/PIU/PANVEL/P-I/Tree
Cutting/2012/1033 dt. 29-08-’12 for the tree cutting permission & disposal.
Total 2,390 7,964
24 13+910 14+120 210
25 14+310 14+575 265
26 15+745 15+775 30
27 15+775 15+790 15
28 16+540 16+800 260
TOTAL 6,085
Panvel - Indapur MPR No-27 April’14 Page 31
3.3 Utility Shifting
Details of utility shifting is given in Table 3.3 & 3.4
Table 3.3 Details of Utility Shifting Yet to be Tackled:
Table 3.4 Details of Other Utility Shifting (In Progress):
Sl No
Description Total
Affected Length (m) Status
C MSEDCL Electrical Lines & Poles (737
poles & 13 Transformers)
4,850m LHS
21,050m RHS Shifting works in progress.
D MJP Water Pipeline (200 to 450 mm Ø Water line)
19,840m LHS
4,180m RHS Shifting works in progress.
E ISPAT Water Pipeline 21,670m LHS
70m RHS Shifting works in progress.
F ZP water pipeline 5,090m LHS
4,030m RHS Shifting works in progress
3.4 Hindrance due to Utilities/Building/Structure
Details of hindrance due to Utilities/Building/Structure etc. is given in Table 3.5. Summary is
given in Table 3.6
Table 3.5 Details of Hindrance due to various Utilities/encroachments as on date
Sl.
No Description
Affected Length (m)
Main Carriageway Service Road
LHS RHS LHS RHS
1 Electric Pole & Line 3,100 7,100 2,650 2,150
2 Land Acquisition 13,180 13,180 4,770 3,820
3 Forest Land 6,085 6,085 550 300
4 CIDCO Pipe Line 2,950 550 800 700
5 ISPAT Pipe line 4,220 70 14,440 0
6 MJP Water Pipeline 0 0 0 0
7 ZP Water pipeline 0 0 0 0
8 Salt pan land 1,500 1,500 0 0
9 Reliance Gas Pipe line 610 610 0 0
10 Diversion Problem 7,850 11,800 4,150 8,080
11 Eco - Sensitive Zone 20,100 20,100 4,050 4,050
Sl No
Description Total
Affected Length (m) Status
A CIDCO Water Pipe Lines 5080 m Estimate Not Yet Approved
B Reliance / NOCIL Gas Pipeline 330 m Yet to be shifted
Panvel - Indapur MPR No-27 April’14 Page 32
Table 3.6 Summary of Hindrance free land available for construction:
Sl.
No Description
Main Carriageway (m) Service Road (m)
LHS RHS LHS RHS
1 Project Length 84,600 84,600 19,544 17,386
2 Affected Length 63,250 57,850 19,544 17,386
3 Length available for construction 21,350 26,750 0 0
3.5 Design Review & Status
Table 3.7 Design Review Status
Sl
No Description Status
1 Plan & Profile Drawing Main Carriageway
77.747 Km Concurred. (Ch. 43+000 to 44+000
withdrawn). 3.000 Km (Ch. 7+500 to 10+500) not yet
concurred.
2 Plan & Profile Drawing Service Road 19.410 Km. on LHS concurred. 17.275 Km. on RHS Concurred.
3 Structures 732 Nos. drawings concurred.
4 Major Junctions 11 nos are Concurred.
5 Minor junctions 88 nos are Concurred.
6 Quality Assurance Manual Concurred. Two more copies to be submitted by
Concessionaire.
7 Health, Safety and Environment Plan Concurred. Two more copies to be submitted by Concessionaire.
8 Environmental Management Plan Concessionaire has not submitted EMP incorporating
IE’s comments.
9 Construction Programme Concurred
10 Borrow Areas for Section-1 24 nos are concurred.
11 Borrow Areas for Section-2 29 nos are concurred.
12
Section - I Concrete mix designs M10,M15, M20, M25, M30,M35,M40,
M40-pile, with Natural sand +Crusher sand ,M-45 PSC With 100% Natural sand
Concurred
13
Section - II Concrete mix designs M15,
M20, M25, M30, with Natural sand +Crusher sand , M-45PSC With 100%
Natural sand
Concurred
14 Hume pipes source approval for M/s Sagar Spun Pipes
Concurred
15 GSB Gradation Concurred
16 WMM Mix design Concurred
17 DBM Mix Designs - Grading I for both
sections Concurred
18 DBM Mix Designs - Grading II for Section II
Concurred
19
Source Approval for Coarse aggregates,
Fine aggregates, water, ACC cement OPC Grade-53, SS1 & RS1 for section I
Concurred
20 Source Approval for Coarse aggregates,
Fine aggregates, water, Ambuja cement Concurred
Panvel - Indapur MPR No-27 April’14 Page 33
Sl
No Description Status
OPC Grade-53 for section II
21 Source Approval for Bitumen VG30
(BPCL) for both Sections Concurred
22 BM Mix Design for section-I Concurred
23
Section-1 Concrete mix design M-10, M-
20, M-30, M-35, with 100% crusher sand with Ambuja & ACC cement.
Concurred
24 Concrete mix design M-20 for Kerb both
sections Concurred
25
Concrete mix design M-40 grade with
100% crusher sand for Crash Barrier for section- I
Concurred
26 Concrete Mix Design for Cable Grout with
Cebex 100 FOSROC Concurred
27 Source Approval for Bitumen Emulsion SS-1 & RS-1 from IWL INDIA Ltd
Concurred
28 Source Approval for Curing Compound BASF MASTERKURE 1061
Concurred
29
Source Approval for Procurement of
Steel Reinforcement, Fe-500 Grade-RINL (Vizag Steel)
Concurred
30 Source Approval for Procurement of
Cement, 53 Grade- Ultra Tech Cement Concurred
31 Source Approval for Procurement of
Steel Reinforcement, Fe-500 Grade-SAIL Concurred
32 Source Approval for Procurement of Cement, 53 Grade- ACC Cement
Concurred
33 Source Approval for Procurement Wedge
and Anchor Cones Concurred
34 Source Approval for Procurement of
Admixture, Fosroc - Conplast SP 430 Concurred
35 Source Approval for Procurement of Admixture, BASF Rheobuild 821 EJ
Concurred
36 Source Approval for Procurement of
Cement, 53 Grade- SANGHI Cement Concurred
37 Section-II- Concrete Mix Design of M-30
(RE Block) With ACC Cement 53 Grade Concurred
38 Section-II- Concrete Mix Design of M-40
RCC With Ambuja Cement 53 Grade Concurred
39 Source Approval for Procurement of
Admixture, Chembond KEM SP 40 Concurred
40 Source Approval for Procurement of Steel SAIL TMT EQR
Concurred
41
Section - II Concrete Mix Design for M-
15 PCC, M-20 RCC, M- 20 PCC Kerb, M-25 RCC, M-30 RCC, M- 35 RCC and M-40
RCC with ACC Cement (53 Grade) With CHEMBOND and BASF Admixture with
100% Crusher Sand.
Concurred
42
Section - II Concrete Mix Design for M-15 PCC, M-20 RCC, , M-25 RCC, M-30
RCC, M- 35 RCC and M-40 RCC with
SANGHI Cement (53 Grade) With
Concurred
Panvel - Indapur MPR No-27 April’14 Page 34
Sl
No Description Status
CHEMBOND and BASF Admixture with
100% Crusher Sand.
43 Source Approval for HT strands Procured From TATA Steel
Concurred
44 Concurrence of Mix Design for Mastic Asphalt For Section-(I Km 0+000 to
42+000)
Concurred
45 Mix Design For Dry Lean Concrete Concurred
3.6 Progress of Works
The cumulative quantities are given in Table 3.8
Table 3.8 Cumulative Quantities Executed
Sl No
Description Unit Planned*
Executed
Reported by
Concessionaire* Assessed by IE
1 Excavation Soil -Highway Cum 846,540
2 Excavation - Hard rock Cum 34,000
3 Embankment Cum 3,498,436
4 Subgrade Cum 441,230
5 Granular Sub base Cum 148,247
6 Wet Mix Macadam Cum 121,555
7 Dense Bituminous Macadam
Cum 41,903
8 Bituminous Concrete Cum -
9 Excavation-Structures Cum 29,650
10 PCC M15 Cum 5,774
11 RCC M20, M25, M30 Cum 38,279
12 RCC M35 / RE wall fascia
blocks Cum 8,405
13 RCC M40,M45 Cum 2,630
14 Reinforcement Tonne 3,895
15 PSC Strand Tonne 27.4
*Concessionaire has not submitted Progress Report for the month.
Table 3.9 Highway Works Lengths Completed
Description LHS (m) RHS (m)
Clearing & Grubbing 30,830 54,740
Embankment 30,279 53,471
Subgrade 20,940 39,870
Granular Subbase (GSB) 19,380 34,280
Wet Mix Macadam (WMM) 19,100 31,281
Dense Bituminous Macadam (DBM) 17,350 29,897
Bituminous Concrete (BC) - 2,600
Panvel - Indapur MPR No-27 April’14 Page 35
Table 3.10 Summary of Progress of Structures Sl.
No. Description Total Nos
Work in
Progress
Not yet
Started
1 Major Bridges 6 6 0
2 Flyovers 2 1 1 (Deleted)
3 ROB’s 3 1 2
4 Minor Bridges 23 22 1
5 Vehicular Underpasses 9 8 1
6 Pedestrian Underpasses 16 6 10
7 Pipe culverts 208+20 98 130
8 Box culverts 135+1 93 48
3.7 Miscellaneous Works
Miscellaneous works are not yet started.
3.8 Overall Progress
Concessionaire’s reported progress details are on higher side. Independent Engineer
estimated the approximate quantities executed and accordingly approximate
percentage progress was estimated.
Total Project Cost: Rs. 942.69 Crores. (As per Concession Agreement) Total Project Cost: Rs. 1205.72 Crores (As reported by Concessionaire) Time Elapsed: 28.5 Months
Description Planned
Achieved
Reported by Concessionaire*
Reported by Concessionaire*
Physical Progress :
Cumulative Physical Progress (%) 99.17% 33.56%
Cumulative Percentage Physical Lag (-) / Lead (+)
(-) 65.61%
Financial Progress :
Cumulative Financial Progress (Rs. Crores)
1191.45 413.32
Cumulative Financial Progress (%) 98.82% 34.28%
Cumulative Financial
Lag (-) / Lead (+)
(-) 778.13 Crores
(-) 64.54%
*Concessionaire has not submitted Progress Report for the month so far.
Panvel - Indapur MPR No-27 April’14 Page 36
Table 3.11 Details of Physical Progress
Month Monthly Physical Progress (%) Cumulative Physical Progress (%)
Scheduled Actual Scheduled Actual
Dec. ‘11 0.36 0.00 0.36 0.00
Jan. ‘12 1.57 1.75 1.93 1.75
Feb. ‘12 3.17 1.22 5.10 2.97
Mar. ‘12 4.50 0.60 9.60 3.57
Apr. ‘12 5.01 0.90 14.61 4.47
May ‘12 4.90 1.30 19.51 5.77
Jun. ‘12 2.48 0.99 21.99 6.76
Jul. ‘12 1.79 0.33 23.78 7.09
Aug. ‘12 1.25 0.69 25.03 7.78
Sept. ‘12 0.30 0.69 25.33 8.47
Oct. ‘12 0.60 1.58 25.93 10.05
Nov. ‘12 0.85 2.14 26.78 12.19
Dec. ‘12 0.76 0.45 27.54 12.64
Jan. ‘13 3.49 1.61 31.03 14.25
Feb. ‘13 4.39 2.90 35.42 17.15
Mar. ‘13 4.92 3.21 40.34 20.36
Apr. ‘13 5.20 4.59 45.54 24.95
May ‘13 5.65 2.77 51.19 27.72
Jun. ‘13 4.40 0.25 55.59 27.97
Jul. ‘13 2.71 0.29 58.30 28.26
Aug. ‘13 2.86 0.22 61.16 28.48
Sept. ‘13 3.27 0.17 64.43 28.65
Oct. ‘13 4.39 0.30 68.82 28.95
Nov. ‘13 4.89 0.78 73.71 29.73
Dec. ‘13 5.62 0.49 79.33 30.22
Jan. ‘14 5.90 0.53 85.23 30.75
Feb. ‘14 6.06 0.42 91.29 31.17
Mar. ‘14 6.41 1.37 97.70 32.54
Apr. ‘14 1.47 1.02 99.17 33.56
May ‘14 0.83 100.00
Table 3.12 Details of Financial Progress
Month
Monthly Financial Progress Cumulative Financial Progress
Rs. Crores Percentage (%) Rs. Crores Percentage (%)
Scheduled Actual Scheduled Actual Scheduled Actual Scheduled Actual
Dec. ‘11 117.57 98.72 9.75% 8.19% 117.57 98.72 9.75% 8.19%
Jan. ‘12 18.93 16.12 1.57% 1.34% 136.50 114.84 11.32% 9.52%
Feb. ‘12 20.93 11.70 1.74% 0.97% 157.43 126.54 13.06% 10.49%
Mar. ‘12 25.08 6.72 2.08% 0.56% 182.51 133.26 15.14% 11.05%
Apr. ‘12 28.75 9.22 2.38% 0.76% 211.26 142.48 17.52% 11.82%
May ‘12 33.05 12.41 2.74% 1.03% 244.31 154.89 20.26% 12.85%
Jun. ‘12 28.75 9.90 2.38% 0.82% 273.06 164.79 22.65% 13.67%
Jul. ‘12 22.84 4.44 1.89% 0.37% 295.90 169.23 24.54% 14.04%
Aug. ‘12 17.74 7.45 1.47% 0.62% 313.64 176.68 26.01% 14.65%
Sept. ‘12 21.74 7.57 1.80% 0.63% 335.38 184.25 27.82% 15.28%
Panvel - Indapur MPR No-27 April’14 Page 37
Month
Monthly Financial Progress Cumulative Financial Progress
Rs. Crores Percentage (%) Rs. Crores Percentage (%)
Scheduled Actual Scheduled Actual Scheduled Actual Scheduled Actual
Oct. ‘12 24.16 14.40 2.00% 1.19% 359.54 198.65 29.82% 16.48%
Nov. ‘12 30.27 14.98 2.51% 1.24% 389.81 213.63 32.33% 17.72%
Dec. ‘12 34.31 4.24 2.85% 0.35% 424.12 217.87 35.18% 18.07%
Jan. ‘13 38.96 15.18 3.23% 1.26% 463.08 233.05 38.41% 19.33%
Feb. ‘13 44.91 26.90 3.72% 2.23% 507.99 259.95 42.13% 21.56%
Mar. ‘13 50.11 30.27 4.16% 2.51% 558.10 290.22 46.29% 24.07%
Apr. ‘13 53.86 43.44 4.47% 3.60% 611.96 333.66 50.75% 27.69%
May ‘13 58.28 26.34 4.83% 2.18% 670.24 360.00 55.59% 29.86%
Jun. ‘13 45.96 2.40 3.81% 0.20% 716.20 362.40 59.40% 30.06%
Jul. ‘13 29.36 0.98 2.44% 0.08% 745.56 363.38 61.84% 30.14%
Aug. ‘13 30.76 2.07 2.55% 0.17% 776.32 365.45 64.39% 30.31%
Sept. ‘13 34.82 1.61 2.89% 0.13% 811.14 367.04 67.27% 30.44%
Oct. ‘13 47.02 2.89 3.90% 0.24% 858.16 369.93 71.17% 30.68%
Nov. ‘13 51.96 7.36 4.31% 0.61% 910.12 377.29 75.48% 31.29%
Dec. ‘13 59.16 4.56 4.91% 0.38% 969.28 381.85 80.39% 31.67%
Jan. ‘14 62.96 5.07 5.22% 0.42% 1032.24 386.92 85.61% 32.09%
Feb. ‘14 64.56 3.97 5.35% 0.33% 1096.80 390.89 90.97% 32.42%
Mar. ‘14 73.75 12.91 6.12% 1.07% 1170.55 403.80 97.08% 33.49%
Apr. ‘14 20.90 9.52 1.73% 0.79% 1191.45 413.32 98.82% 34.28%
May ‘14 14.27 1.18% 1205.72 100.00%
Panvel - Indapur MPR No-27 April’14 Page 38
Cumulative Physical Progress (%)
Cumulative Financial Progress (%)
34.28%
65.72%
Achieved Balance
Panvel - Indapur MPR No-27 April’14 Page 39
Physical Progress (%) S - Curve
0
10
20
30
40
50
60
70
80
90
100
De
c '1
1
Jan
'12
Feb
'12
Mar
'12
Ap
r '1
2
May
'12
Jun
'12
Jul '
12
Au
g '1
2
Sep
'12
Oct
'12
No
v '1
2
De
c '1
2
Jan
'13
Feb
'13
Mar
'13
Ap
r '1
3
May
'13
Jun
'13
Jul '
13
Au
g '1
3
Sep
'13
Oct
'13
No
v '1
3
De
c '1
3
Jan
'14
Feb
'14
Mar
'14
Ap
r '1
4
May
'14
Cumulative Scheduled Progress (%) Cumulative Actual Progress (%)
65
25
MILE STONE - II (65%)
MILE STONE - I (25%)
MIL
E S
TO
NE -
I (2
5%
)
MIL
E S
TO
NE -
II (
65%
)
Panvel - Indapur MPR No-27 April’14 Page 40
Physical Progress (%) - Histogram
0
1
2
3
4
5
6
7
De
c '1
1
Jan
'12
Feb
'12
Mar
'12
Ap
r '1
2
May
'12
Jun
'12
Jul '
12
Au
g '1
2
Sep
'12
Oct
'12
No
v '1
2
De
c '1
2
Jan
'13
Feb
'13
Mar
'13
Ap
r '1
3
May
'13
Jun
'13
Jul '
13
Au
g '1
3
Sep
'13
Oct
'13
No
v '1
3
De
c '1
3
Jan
'14
Feb
'14
Mar
'14
Ap
r '1
4
May
'14
Scheduled Progress (%) Actual Progress (%)
Panvel - Indapur MPR No-27 April’14 Page 41
Financial Progress (Rs. Crores) S - Curve
0
100
200
300
400
500
600
700
800
900
1000
1100
1200
1300
De
c '1
1
Jan
'12
Feb
'12
Mar
'12
Ap
r '1
2
May
'12
Jun
'12
Jul '
12
Au
g '1
2
Sep
'12
Oct
'12
No
v '1
2
De
c '1
2
Jan
'13
Feb
'13
Mar
'13
Ap
r '1
3
May
'13
Jun
'13
Jul '
13
Au
g '1
3
Sep
'13
Oct
'13
No
v '1
3
De
c '1
3
Jan
'14
Feb
'14
Mar
'14
Ap
r '1
4
May
'14
Cumulative Scheduled Progress (Rs. Crores) Cumulative Actual Progress (Rs. Crores)
MILE STONE - II (65%)
MILE STONE - I (25%)
MIL
E S
TO
NE -
II (
65%
)
MIL
E S
TO
NE -
I (2
5%
)
Panvel - Indapur MPR No-27 April’14 Page 42
Financial Progress (Rs. Crores) - Histogram
0
20
40
60
80
100
120
De
c '1
1
Jan
'12
Feb
'12
Mar
'12
Ap
r '1
2
May
'12
Jun
'12
Jul '
12
Au
g '1
2
Sep
'12
Oct
'12
No
v '1
2
De
c '1
2
Jan
'13
Feb
'13
Mar
'13
Ap
r '1
3
May
'13
Jun
'13
Jul '
13
Au
g '1
3
Sep
'13
Oct
'13
No
v '1
3
De
c '1
3
Jan
'14
Feb
'14
Mar
'14
Ap
r '1
4
May
'14
Scheduled (Rs Crores) Actual (Rs. Crores)
Panvel - Indapur MPR No-27 April’14 Page 43
4.0 QUALITY CONTROL & QUALITY ASSURANCE
4.1 Quality Control & Quality Assurance
Quality Assurance of a Project is defined as a process which exercises various checks at
different stages of a work right from its inception till its acceptance, to put it in services
to ensure that the work has been properly designed and constructed as per approved
designs, drawings and specifications.
Quality Control is defined as the procedure adopted and control exercised to ensure that
the materials proposed to be used in production, processes adopted for production and
workmanship of production conform to the prescribed standards and laid down
acceptance criteria.
The Quality Control is exercised by construction agency that ensures that the defined
objective is achieved through appropriate tests, checks and inspections by suitable
qualified personnel. Furthermore, the objective evidences of all tests, checks and
inspections carried out from time to time are documented in prescribed formats for
reference and record.
Independent Engineer’s professional staff is frequently checking various works at site
and wherever found necessary, corrective measures are suggested to the
Concessionaire.
4.2 Compliance/Non-Compliance
Non-Compliance cases are being reported through Non-Conformance Reports.
Concessionaire is constantly advised to take necessary rectifications for such non-
compliances. A list of NCR’s issued and its status are given in Table 4.1. Concessionaire
have been constantly advised to make necessary rectifications and submit for closure of
NCR.
4.3 Routine Inspection by Independent Engineer
Independent Engineer is conducting routine inspection of the works at site and notifying
the Concessionaire about any non-compliance observed. List of Site Inspection Note
issued so far is given in Table 4.2. Details of Audit Reports issued to the Concessionaire
are given in Table 4.3. Details of tests carried out are given in Table 4.4
Independent Engineer is conducting routine inspection of the works at site and notifying
Concessionaire about any non-compliance observed.
Details of RFI’s reviewed by Independent Engineer
Month Percentage of RFI’s Reviewed
April ’14 15%
Panvel - Indapur MPR No-27 April’14 Page 44
Table 4.1 Status of NCR’s Issued by Independent Engineer
NCR
No Date
Chainages &
Side
Description Rectifications Proposed by
Concessionaire
Details of Rectifications
Done Status
1 18-04-'12 40+246 (RHS) Length of Box Culvert on
RHS is less by 500mm. 11-09-‘12
Structure is Constructed as
per Revised Drawing No.
MRIPL/SC/LSD/40+246,
Rev No. R1
Closed
out
2 18-04-'12 21+310 to
21+380 (LHS)
WMM works without
concurrence of drawings
/ Mix Design.
14-06-'12
GSB & WMM Mix design
concurred vide IE's Letter
No. PIP/IE/SPITPL/2012 /
0197 and 198 dt. 03-05-
'12.
Closed
out
3 20-04-'12 79+940 to
80+530 (RHS)
WMM works without
compaction &
concurrence of Mix
Design.
14-06-'12
GSB & WMM Mix design
concurred vide IE's Letter
No. PIP/IE/SPITPL/2012/
0197 and 198 dt. 03-05-
'12.
Closed
out
4 21-04-'12 0+544 (Minor
Bridge)
SBC of foundation not
determined 27-07-'12
Safe Bearing Capacity
assessed and details
submitted.
Closed
out
5 21-04-'12
20+144
(Balganga
Major Bridge)
SBC of foundation not
determined 27-07-'12
Safe Bearing Capacity
assessed and details
submitted.
Closed
out
6 21-04-'12
26+188
(Bhogeshwari
Major Bridge)
SBC of foundation not
determined 27-07-'12
Safe Bearing Capacity
assessed and details
submitted.
Closed
out
7 21-04-'12 52+155 (Nidi
Minor bridge)
SBC of foundation not
determined 27-07-'12
Safe Bearing Capacity
assessed and details
submitted.
Closed
out
8 21-04-'12
72+936
(Kundlika
Major bridge)
SBC of foundation not
determined 27-07-'12
Safe Bearing Capacity
assessed and details
submitted.
Closed
out
9 21-04-'12
77+804
(Bhuvan
Minor bridge)
SBC of foundation not
determined 27-07-'12
Safe Bearing Capacity
assessed and details
submitted.
Closed
out
10 21-04-'12
81+600
(Wave Minor
bridge)
SBC of foundation not
determined 27-07-'12
Safe Bearing Capacity
assessed and details
submitted.
Closed
out
11 21-04-'12
84+488
(Indapur
Major bridge)
SBC of foundation not
determined 27-07-'12
Safe Bearing Capacity
assessed and details
submitted.
Closed
out
12 25-04-'12 20+754
Minor bridge Non-Curing of structure. 16-07-'13
Rebound hammer test &
ultra sonic test conducted
and found acceptable.
Closed
out
13 25-04-'12 80+840 Checking of Horizontal
Alignment 29-06-'12
Horizontal alignment
checked through RFI No-
12058 dt. 22-06-'12
Closed
out
14 25-05-'12 38+801 (RHS) Length less by 506 mm 11-09-`12 Structure is constructed as Closed
Panvel - Indapur MPR No-27 April’14 Page 45
NCR
No Date
Chainages
&
Side
Description
Rectifications
Proposed by
Concessionaire
Details of Rectifications
Done Status
Box Culvert-
39/1
per Revised Drawing No.
MRIPL/SC/LSD/38+801,
Rev No. R1.
out
15 25-05-'12
39+030 (RHS)
Box Culvert-
39/2,
Length less by 465mm 11-09-`12
Structure is constructed as
per Revised Drawing No.
MRIPL/SC/LSD/39+030,
Rev No. R1.
Closed
out
16 25-05-'12
39+133 (RHS)
Box Culvert-
39/3,
Length less by 400mm 11-09-`12
Structure is constructed as
per Revised Drawing No.
MRIPL/SC/LSD/39+133,
Rev No. R1.
Closed
out
17 25-05-'12
39+562 (RHS)
Box Culvert-
40/1,
Length less by 500mm 11-09-`12
Structure is constructed as
per Revised Drawing No.
MRIPL/SC/LSD/39+640,
Rev No. R1.
Closed
out
18 25-05-'12
39+807 (RHS)
Box Culvert-
40/2,
Length less by 500mm 11-09-`12
Structure is constructed as
per Revised Drawing No.
MRIPL/SC/LSD/39+807,
Rev No. R1.
Closed
out
19 25-05-'12
40+906 (RHS)
Box Culvert-
41/2,
Length less by 506mm 11-09-`12
Structure is constructed as
per Revised Drawing No.
MRIPL/SC/LSD/40+906,
Rev No. R1.
Closed
out
20 25-05-'12
41+189 (RHS)
Box Culvert-
41/4,
Length more by 1.4m 09-10-`12 Superstructure constructed
as per concurred drawing.
Closed
out
21 25-05-'12
41+336
(RHS)- Box
Culvert-41/5,
Length more by 1.58m 06-10-`12 Superstructure constructed
as per concurred drawing.
Closed
out
22 26-05-'12 47+244 (RHS)
Slab Culvert Concrete
bulged due to improper
support
11-09-`12 Rectification done. Closed
out
23 15-06-'12
26+188
Bhogeshwari
Bridge
Abutment A2-3rd
Lift.(RFI No.-2819) 11-07-'13
Rebound hammer test &
ultrasonic test conducted.
Results found acceptable.
Closed
out
24 16-06-'12 45+460 to
45+560 (RHS)
Embankment 8th Layer
failed in compaction and
boulders present.
06-12-`12
Boulder removed,
compacted and retested.
Achieved required
compaction.
Closed
out
25 22-06-'12
21+200 to
21+890
Diversion
(RHS)
Diversion Plan not
concurred and No Sign
Board Provided.
26 22-06-'12 80+040 (RHS)
DBM Works without
Removal of Electric Pole
Ch. 80+040 (RHS) Main
Carriageway.
27 22-06-'12 79+990 to
80+150 (RHS)
DBM Mix not Conforming
to Concurred JMF. 02-08-`12
Core sample collected and
retested. Found
Closed
out
Panvel - Indapur MPR No-27 April’14 Page 46
NCR
No Date
Chainages
&
Side
Description
Rectifications
Proposed by
Concessionaire
Details of Rectifications
Done Status
& 80+220 to
80+285
acceptable.
28 16-07-'12
44+194
Nigade bridge
A2 Raft.
Concreting was carried
out With excavator and
Chute without planning.
Height of fall of concrete
is more than 1.5 m and
concrete is totally
segregated. Due to delay
placing of concrete, cold
joints were formed and
rain protection is not
done.
29 25-08-'12 45+864 (RHS)
Finished concrete of
Corbel is not in line.
Honeycombing also
observed in final lift wall.
17-12-'12
Rectified as per line and
level, offsets was ground
and honeycombing
repaired with PMC mortar
Closed
out
30 06-11-'12
Kharpada
Bridge P12
Foundation
Founding Strata is not
embedded 1500 mm in
Soft rock. Also
Confirmatory SBC test
not Carried out.
31-12-`12
Further excavated to a
depth of 600 mm in hard
Rock and PCC laid.
Closed
out
31 22-11-'12
78+200 to
78+510
(RHS)
DBM Carried without
Casting of Kerb,
Development of Cracks,
and DBM thickness is not
adequate.
32 12-01-'13
69+140,
77+376 &
46+122
Concrete cubes (28
Days) Failed - M20, M25,
& M30,
24-04-‘14
Retesting done using
ultrasonic pulse velocity
and rebound hammer.
Closed
out
33 23-01-'13 68+988
Minor Bridge
Highway alignment &
structure alignment not
matching
34 30-01-'13 52+155 (RHS)
Minor Bridge
Honeycombing in Pier,
7th lift. This might have
happened due to
improper support,
vibration and poor
quality of concrete.
35 04-01-'13 23+650 (RHS)
Retaining wall under
construction without
concurrence of design &
drawings. Provision for
existing Pipe culvert on
the retaining wall not
provided.
36 20-02-'13
69+140 (RHS)
Minor Bridge
Slab
Superstructure staging
and scaffolding was
carried out without any
20-11-‘13
Staging and scaffolding
RFI’s checked by PMC. The
design calculation
Closed
out
Panvel - Indapur MPR No-27 April’14 Page 47
NCR
No Date
Chainages
&
Side
Description
Rectifications
Proposed by
Concessionaire
Details of Rectifications
Done Status
design and drawing as
per Concession
Agreement clause no. -
70.11.
submitted now. Deck slab
concreting successfully
completed.
37 20-02-'13
69+140 (RHS)
Minor Bridge
Slab
SANGAM steel is used for
reinforcement of deck
slab without source
approval.
38 21-02-'13 57+533
Box Culvert
The vertical main bars
and slab main
reinforcement SUN -
TMX Un - approved steel
used.
39 02-04-‘13
80+850 to
80+890
(Fresh Kerb
Casting) and
80+890 to
81+140 (Old
Laid Kerb) -
Casting of Kerb after
cutting already laid DBM
resulting in gap between
Kerb and DBM.
Development of crack on
freshly laid Kerb. Saw
cut grooves not made in
the previously laid / old
Kerb, development of
cracks. No curing
arrangement /
application of curing
compound.
40 12-04-‘13 2+200
Diversion plan not
Submitted for
concurrence. Entry/Exit
to diversion are not
smoothly merged with
the existing road causing
sag formation at joining.
Location of diversion is
chosen wrongly; At
entry, one electric pole is
obstructing the width of
diversion. Sign /
diversion boards have
not been placed
properly.
41 17-04-‘13
24+550 to
24+730
(RHS)
DBM levels checked and
found beyond
permissible limits.
42 30-04-'13
25+300
(RHS)
Pipe Culvert
Honeycombing is
observed in pipe culvert
encasing concrete. Due
to this reinforcement is
exposed.
28-05-'13 Honeycombing repairing
done.
Closed
out
Panvel - Indapur MPR No-27 April’14 Page 48
NCR
No Date
Chainages
&
Side
Description
Rectifications
Proposed by
Concessionaire
Details of Rectifications
Done Status
43 30-04-'13 26+188
(RHS)
PCC is carried out
without safe bearing
capacity test. Founding
level is 1.381m above
founding level as per
concurred drawing.
03-07-'13
(1) The rock sample at the
PCC level where the
foundation is to be rest
is tested at third party
laboratory.
(2) The foundation for
Abutment A1 on RHS
is resting at level 0.653
m which is 0.95m
below design
foundation level.
Closed
out
44 01-04-'13 39+430 to
39+450 (RHS)
GSB sample collected
and tested in Lab and
found on coarser side.
45 01-04-'13 52+335
Slab Culvert
Slab culvert is widened
on RHS side with pipe
culvert.
46 02-05-'13
20+144 (RHS)
Balganga P1
Footing
M-35 grade concrete
cubes has failed for 28
day's strength.
16-07-'13
Rebound hammer test &
ultra sonic test conducted
and found acceptable.
Closed
out
47 03-05-'13 0+530 to
1+020
Diversion plan not
submitted to IE for
Concurrence. Entry
(LHS) is very close to
Minor bridge (km
0+545), where width is
restricted due to
construction of RCC
crash barriers. Earthen
shoulders in the entire
stretch has not been
made fully on LHS and
RHS widening towards,
existing road.
48 03-05-'13 25+330 to
25+900 (RHS)
Diversion plan not
submitted to IE for
Concurrence. Entry/exit
are not smooth with
sufficient length. Possible
chances for overtopping
of loaded vehicle coming
from Indapur side and
going towards Panvel
while shifting from new
carriageway to existing
carriageway through
insufficient length of
merging due to big level
difference and sharp
Panvel - Indapur MPR No-27 April’14 Page 49
NCR
No Date
Chainages
&
Side
Description
Rectifications
Proposed by
Concessionaire
Details of Rectifications
Done Status
turning towards left.
49 16-05-'13 6+490
Diversion plan not
submitted to IE for
Concurrence. Diversion is
sharp and unsafe.
50 16-05-'13 0+544
DBM is laid on deck slab
of minor bridge. (As per
concurred drawing
wearing course consists
of 25 mm thick mastic
asphalt overlaid by
bituminous concrete).
51 16-05-'13 38+801
(RHS)
Approach slab not laid as
per drawing no.
MRIPL/SC/LSD/38+801
R1. It was already
intimated wide Letter No.
PIP/IE/SPITPL/2013/
0908 dt. 30-01-’13 and
inspection note no-17.
52 16-05-'13 39+030
(RHS)
Approach slab not laid as
per drawing no.
MRIPL/SC/LSD/ 39+030
R1. It was already
intimated earlier Letter
No. PIP/ IE/SPITPL/2013
/0908 dt. - 30-01-’13 and
inspection note no-17.
53 16-05-'13 39+133
(RHS)
Approach slab not laid as
per drawing no.
MRIPL/SC/LSD/ 39+133
R1. It is already
intimated wide Letter No.
PIP/IE/SPITPL/2013/
0908 dt. 30-01-’13 and
inspection note no-17.
54 16-05-'13 40+564 (RHS)
Approach slab not laid as
per drawing no.
MRIPL/SC/LSD/ 40+564
R1. It was already
intimated wide Letter No.
PIP/IE/SPITPL/2013/
0908 dt. 30-01-’13 and
inspection note no-17.
55 16-05-'13 40+750
(RHS)
Approach slab not laid as
per drawing no.
MRIPL/SC/LSD/ 40+750
R1. It was already
intimated wide Letter No.
Panvel - Indapur MPR No-27 April’14 Page 50
NCR
No Date
Chainages
&
Side
Description
Rectifications
Proposed by
Concessionaire
Details of Rectifications
Done Status
PIP/IE/SPITPL/2013/
0908 dt. 30-01-’13 and
inspection note no-17.
56 16-05-'13 40+906
Box Culvert
Approach slab not laid as
per drawing no.
MRIPL/SC/LSD/ 40+906
R1. It was already
intimated wide Letter No.
PIP/IE/SPITPL/2013/
0908 dt. 30-01-’13 and
inspection note no-17.
57 22-05-'13 40+246 (RHS)
Box Culvert
Honeycombing was
observed in both sides of
crash barrier wall.
09-07-'13
The finishing rectification
of concrete surface for
crash barrier done as per
specifications.
Closed
out
58 28-05-'13 29+610
(LHS)
Non - removal of tree
stump located at the left
edge of existing road is
safety hazard.
59 28-05-'13
Wadkhal
Flyover P-31
Foundation
RHS
Reinforcement steel used
is brittle and cracks are
developed in bending of
reinforcement steel (32
mm dia).
60 28-05-'13 4+375
(RHS)
NP4 pipe laid is not fitted
and matched properly.
Gap is observed in
jointing at pipes.
05-07-'13
The finishing of the pipe
joint is done as per
Specifications.
Closed
out
61 31-05-'13 70+560
(RHS)
NP4 pipe laid is not fitted
and matched properly.
Gap is observed in
jointing of pipes and PCC
is partially done below
pipe.
62 14-06-'13
Due to improper stacking
of RCC girders, one of
the girder is tilled. It will
affect the quality and
safety of the structure.
63 15-06-'13 77+900
(RHS)
DBM Surface Totally
damaged (new
construction).
64 15-06-'13
78+180 to
78+460
(RHS)
DBM Surface Totally
damaged (new
construction).
65 15-06-'13 80+650 (LHS) DBM Overlaid surface
totally damaged.
66 17-06-'13 39+920 to
39+930 (RHS)
DBM Surface Totally
Damaged (New
Panvel - Indapur MPR No-27 April’14 Page 51
NCR
No Date
Chainages
&
Side
Description
Rectifications
Proposed by
Concessionaire
Details of Rectifications
Done Status
Construction).
67 18-06-'13 39+130
Box Culvert
Settlement near Box
Culvert.
68 18-06-'13 41+110 to
41+120 (RHS)
Patches on DBM Surface
on New Carriageway.
69 18-06-'13 40+210 to
40+220 (RHS)
Patches on DBM Surface
on New Carriageway.
70 19-06-'13 2+400
(LHS)
Damage of DBM Edges
due to Non Construction
of Proper earthen
Shoulders to left hand
Carriageway.
71 19-06-'13 46+620
(RHS)
Damage of DBM towards
Shoulder and lack of
protection made to the
slope of return wall of
structure.
72 19-06-'13 0+000 to
42+800
Diversions provided on
Project road are not
confirming to IRC: SP:
55 and IRC: SP: 84.
73 19-06-'13
2+400 (RHS)
and 2+780
(LHS)
DBM Settlement in the
full width of New
Carriageway.
74 19-06-'13 42+000 to
84+000
Diversions provided on
Project road are not
confirming to IRC: SP:
55 and IRC: SP: 84.
75 16-07-'13 53+661
(RHS)
“Vaishnav Prime” Steel
used in slab Box culvert
and it’s working drawing
not submitted for IE’s
Concurrence.
76 18-07-'13 81+606
Vave Bridge
Highway alignment and
bridge alignment appears
to be not matching.
77 19-07-'13 44+119
Nigade Bridge
Pile foundation work is
carried out without
conducting the initial pile
load test and routine pile
load test at P2 & P4
locations as per Clause-
1113 of MoRTH
specifications.
78 19-07-'13
15+480
Kharpada
Bridge
Pile foundation work is
carried out without
conducting the initial pile
load test and routine pile
load test at A1, P1, P3,
Panvel - Indapur MPR No-27 April’14 Page 52
NCR
No Date
Chainages
&
Side
Description
Rectifications
Proposed by
Concessionaire
Details of Rectifications
Done Status
P4 & P5 locations as per
Clause-1113 of MoRTH
specifications.
79 22-07-'13 57+976
Patansai
The centerline of
highway and bridge
structure not matching.
Center line of alignment
not checked.
80 22-07-'13 62+348
Local Nallah
The centerline of
highway and bridge
structure not matching.
Center line of alignment
not checked.
81 22-07-'13 69+140 Local
Nallah
The centerline of
highway and bridge
structure not matching.
Center line of alignment
not checked.
82 23-07-'13
77+804
Bhuwan
Bridge
The centerline of
highway and bridge
structure not matching.
Center line of alignment
not checked.
83 23-07-'13 52+089
Nidi Bridge
The centerline of
highway and bridge
structure not matching.
Center line of alignment
not checked.
84 23-07-'13 63+300
Local Nallah
The centerline of
highway and bridge
structure not matching.
Center line of alignment
not checked.
85 23-07-'13 84+488
Indapur Side
The centerline of
highway and bridge
structure not matching.
86 02-08-'13
15+878
kharpada
bridge
Girder G-2 stacked
improperly on ground.
Supports are not
provided on bearing
point of girder and
supports are sunk, due
to poor ground strata.
Cracks also observed on
surface of girder,
diaphragm wall
reinforcement are bent.
Panvel - Indapur MPR No-27 April’14 Page 53
NCR
No Date
Chainages
&
Side
Description
Rectifications
Proposed by
Concessionaire
Details of Rectifications
Done Status
87 07-08-'13 Amba Bridge
SAIL EQR steel is used
for girder reinforcement
without source approval.
21-12-‘13
Source approval of steel
SAIL TMT EQR accorded as
per Letter no. PIP/IE/
SPITPL/2013/1849
dt. 21-12-’13.
Closed
out
88 07-08-'13 Pali Plant
“VAISHNAVI PRIME”
steel is used for
reinforcement of friction
slab and crash barrier
without source approval.
89 08-08-'13 RE Panel
Casting
Lifting hook not been
provided with Epoxy
Paint.
90 08-08-'13
Wadkhal
Flyover girder
(J-2 outer
7 no.)
Precast girder is lifted
and shifted to the
stacking yard without
carrying the grouting
operation of cable.
Further, support
provided below girder is
not proper. This will
affect the quality and
durability of structure.
91 21-08-'13
Wadkhal
Flyover girder
No-1 to 9
(J-2 outer)
Pre-stressed girder
concrete for Wadkhal
Flyover was done with
100 % crusher sand.
92 21-08-'13 15+878 (RHS)
SAIL EQR and VAISHNAV
Prime steel used in G-A
type (P-12 to P-13)
girder without source
approval. There is no
CPCC treatment carried
out on reinforcement.
93 27-08-'13
26+188
Bhogeshawari
Bridge
(RHS)
“VAISHNAV Prime” steel
used in deck slab (P4-
P5) Without source
approval. Also concrete
slump observed at site is
180 mm. This is not
acceptable as per MoRTH
specification Clause-
81704.1.
94 27-08-'13
26+188
Bhogeshawari
Bridge
(RHS)
Structure cracks formed
at the girder no. G4 (P5-
A2) span near A2 side
bearing.
95 27-08-'13 23+450 to
23 +480
Work carried out for the
wall without concurrence
Panvel - Indapur MPR No-27 April’14 Page 54
NCR
No Date
Chainages
&
Side
Description
Rectifications
Proposed by
Concessionaire
Details of Rectifications
Done Status
(RHS) of drawing. Also, SBC
test is not carried out for
foundation strata.
96 27-08-'13
57+650
RE Block
(LHS)
Unapproved cement
“SANGHI” is used for
casting at RE blocks.
25-11-‘13
Now, the SANGHI cement
source approval is
concurred vide IE’s letter
No. PIP/IE/SPITPL/2013 /
1724 dt. 08-11-‘13
Closed
out
97 31-08-‘13
Wadkhal
Flyover J2
outer girder
Prestressing girder is
failed during second pre-
stressing. cones have
gone inside and cracks
have developed on
diaphragm. This might
have happened due to
improper supporting
system, poor quality of
concrete and improper
compaction of concrete.
98 31-08-‘13
Wadkhal
Flyover J2
outer girder
Prestressing girder is
failed during second pre-
stressing. cones have
gone inside and cracks
have developed on
diaphragm. This might
have happened due to
improper supporting
system, poor quality of
concrete and improper
compaction of concrete.
99 01-10-‘13 Wadkhal
Flyover
Procedure for CPCC
treatment is not being
followed. Steel which is
being used for
reinforcement of
Wadkhal girder has rust.
100 04-10-‘13
Wadkhal
Girder P20 -
P21 (LHS)
Anchor cone plate was
broken and went inside
after second stage
stressing. This may be
happened due to
improper supporting
system, poor quality of
concrete and improper
compaction of concrete.
101 20-11-‘13
Minor/Major
Bridge
Location
Crash barrier/hard rails
are missing / broken in
many locations. This is
dangerous for the traffic
Panvel - Indapur MPR No-27 April’14 Page 55
NCR
No Date
Chainages
&
Side
Description
Rectifications
Proposed by
Concessionaire
Details of Rectifications
Done Status
and road users.
102 02-12-‘13
57+976
RHS Patansai
Bridge
The centerline of
highway and bridge are
not matching. The issue
was notified many times,
NCR No-79 already
issued, slab is cast,
Centerline is still not
modified.
103 07-01-‘14 5+000 VUP
(LHS)
During the concreting it
was observed that the
concrete mix of M-30G,
slump measured 175 mm
which is more than the
specification limit of 75-
125mm. This will affect
the quality and durability
of the structure.
104 07-01-‘14 5+000
(LHS)
Unapproved steel
Vaishnav Prime TMT
steel is used in Raft
without concurrence
from IE. Concreting of
raft also done without
concurrence.
105 18-01-‘14 22+800
Pipe Culvert
Pipe culvert at Ch.
22+800 is not
constructed. Road work
including WMM is
completed at above
location without
construction of pipe
culvert required as per
Concession Agreement
and concurred drawing.
106 20-01-‘14 42+000 to
84+000
Hume pipes of 1200 mm
diameter (NP3) procured
for pipe culverts. These
are not as per
specifications. Also the
frequency testing is not
being carried out before
procurement.
18-03-‘14
The RCC hume pipes
intended for the Project
were tested. Test results
are satisfactory.
Closed
out
107 23-01-‘14 15+878
Reinforcement steel not
stacked properly. Major
stock of the steel is lying
on the ground which
leads to the corrosion.
Panvel - Indapur MPR No-27 April’14 Page 56
NCR
No Date
Chainages
&
Side
Description
Rectifications
Proposed by
Concessionaire
Details of Rectifications
Done Status
108 27-01-‘14 27+100
(LHS)
Concreting of raft
foundation is abruptly
stopped due to shortage
of cement. Due to this
cold joint formed more
than 50% area of raft
which is structurally
unsafe. Further
concreting is resumed
after more than 10 hours
without concurrence of
IE.
109 27-01-‘14
26+188
Bhogeshawari
Bridge
Abutment A2
&
Independent
Return Wall.
Filter media behind
abutment A2 is being
laid without cleaning of
weep holes.
110 28-01-‘14
RE Panel
Casting in
Section-I
Casting Yard
Curing is not carried out
on RE panel which is
stacked in the casting
yard. Further casting
date is not mentioned in
RE panels. This will
effect the quality &
durability of the RE
panel.
111 30-01-‘14
26+188
(RHS)
Bhogeshwari
Bridge
Major honey combing
was observed in the
bottom of I girder of P1-
P2 span of Bhogeshwari
bridge. This might have
happened due to poor
quality concrete and
improper vibration.
112 30-01-‘14
38+245 to
39+380
(LHS)
DBM first layer had been
laid from 38+245 to
39+380 (LHS) and
diversion. During routine
lab testing retained
stability was found
67.42%, which is less
than the required
minimum stability (80%
as per MoRTH).
113 30-01-‘14
22+705 to
22+900
DBM is having very high
marshall stability (2300
kg against the design of
Panvel - Indapur MPR No-27 April’14 Page 57
NCR
No Date
Chainages
&
Side
Description
Rectifications
Proposed by
Concessionaire
Details of Rectifications
Done Status
(RHS) DBM 1150 kg). The flow
observed is 75 mm
against the MoRTH value
of 2-4 mm.
114 30-01-‘14
38+800 to
41+600 (LHS)
and 22+700
to 22+900
(RHS)
Pneumatic Tyred Roller
(PTR) has not been used
for DBM compaction as
per approved method
statement.
115 04-02-‘14 45+751
(LHS)
Structural cracks
developed on the
independent retaining
wall (Panvel side) 3rd
lift. This might have
happened due to non-
curing of structure.
116 04-02-‘14 60+984
(RHS)
Pipe culvert at above
chainage is constructed
without concurrence of
working drawing. Also, it
appears that pipe culvert
top level is above
Finished Road Level.
117 12-02-‘14 0+000 to
84+000
Drawing for applicable
typical cross sections not
yet submitted in spite of
several reminders. This is
very important during
Project execution.
118 19-02-‘14
26+188 (RHS)
Bhogeshwari
Bridge P1 &
P2 crash
barrier
Concreting is carried out
from transit mixer which
parked on existing bridge
without any safety
measures. Also it is
observed that concrete
poured in chute without
proper angle. This
improper way of
concreting is not
acceptable.
119 01-03-‘14 66+808 (RHS)
PCC and foundation is
carried out without
establishing/ confirming
safe bearing capacity of
foundation strata.
Panvel - Indapur MPR No-27 April’14 Page 58
NCR
No Date
Chainages
&
Side
Description
Rectifications
Proposed by
Concessionaire
Details of Rectifications
Done Status
120 21-04-‘14 42+155
(RHS)
Unapproved/unsuitable
soil dumped in the
Panvel side approach of
PUP at Ch. 42+155
(Kasu). This was notified
during site inspection on
12-04-‘2014.
121 21-04-‘14
69+200 to
69+340 (RHS)
& 69+800 to
69+900
(RHS).
Bituminous Concrete
without laid constructing
kerb.
122 21-04-‘14 58+040
(RHS)
(1) Kink formation due
to abrupt merging of
kerb near structure
location.
(2) Kerb line is out of
alignment and not
matching as per the
latest concurred
drawings.
123 21-04-‘14
61+330 to
61+410
(RHS)
Heaps of WMM mix
dumped directly on the
Bed of WMM first layer
couple of days ago. The
moisture from the WMM
mix has already been
dried up whereas it was
required to be placed
and rolled at a moisture
content +1 or -2% of
OMC.
124 21-04-‘14 44+155
Nigade (RHS)
Even after several
reminders initial pile load
test is not carried out.
Further piling/ sub
structure work is carried
out at P2 and P4
locations without doing
the initial and routine
pile load tests.
125 21-04-‘14 15+878
(LHS)
Even after several
reminders initial pile load
test is not carried out.
Further piling/
substructure work is
carried out at A1, P1, P3,
Panvel - Indapur MPR No-27 April’14 Page 59
NCR
No Date
Chainages
&
Side
Description
Rectifications
Proposed by
Concessionaire
Details of Rectifications
Done Status
P4, P5, P22, P23 and P24
locations without doing
the initial and routine
pile load tests.
126 21-04-‘14 42+155
(RHS)
RE wall backfill material
laid without approval of
the material.
127 21-04-‘14 70+227
Bituminous Concrete is
laid on culvert slab and
approach slab without
laying mastic asphalt.
128 21-04-‘14 69+849
Bituminous Concrete is
laid on culvert slab and
approach slab without
laying mastic asphalt.
129 21-04-‘14 57+976
(RHS)
Settlement of DBM and
development of Cracks
towards shoulder of
freshly laid DBM in the
approach to the minor
bridge.
130 21-04-‘14
69+200 to
70+380
(RHS)
Surface Regularity Test
not Carried Out Over
DBM Surface - BC carried
out in the above stretch
without conducting the
surface regularity test
over the previously laid
DBM surface.
131 21-04-‘14
26+188
Bhogeshwari
bridge (RHS)
Abutment A2 Retaining
Wall, it is observed that
weep hole is not
provided/cleaned before
placing of filter media as
per concurred drawing.
132 21-04-‘14
26+188
Bhogeshwari
bridge (RHS)
Unapproved VAISHNAV
500 PRIME steel is used
for reinforcement.
133 21-04-‘14
30+930
VUP Raft
(RHS)
Unapproved SUN TMX
and VAISHNAV 500
PRIME steel is used for
reinforcement.
134 21-04-‘14
28+535
ROB R/w
(LHS)
Unapproved SUN TMX
and VAISHNAV 500
PRIME steel is used for
reinforcement.
Panvel - Indapur MPR No-27 April’14 Page 60
NCR
No Date
Chainages
&
Side
Description
Rectifications
Proposed by
Concessionaire
Details of Rectifications
Done Status
135 21-04-‘14 71+000 to
71+050 (RHS)
Laying temperature of
BC in the above stretch
was checked and found
75.4° C, which is much
below the required
temperature as per
MoRTH specifications.
Table 4.2. Details of Site Inspection Note No.
Inspection Note No Date
Site Inspection No-1 22-02-2012 & 29-02-2012
Site Inspection No-2 15-03-2012
Site Inspection No-3 29-03-2012
Site Inspection No-4 20-04-2012
Site Inspection No-5 30-05-2012
Site Inspection No-6 11-06-2012
Site Inspection No-7 23-06-2012
Site Inspection No-8 28-08-2012
Site Inspection No-9 22-10-2012
Site Inspection No-10 07-11-2012
Site Inspection No-11 03-12-2012
Site Inspection No-12 20-12-2012
Site Inspection No-13 04-01-2013
Site Inspection No-14 16-01-2013
Site Inspection No-15 31-01-2013
Site Inspection No-16 13-02-2013
Site Inspection No-17 26-02-2013
Site Inspection No-18 15-03-2013
Site Inspection No-19 26-03-2013
Site Inspection No-20 12-04-2013
Site Inspection No-21 29-04-2013
Site Inspection No-22 27-05-2013
Site Inspection No-23 15-06-2013
Site Inspection No-24 17-07-2013
Site Inspection No-25 23-08-2013
Site Inspection No-26 26-09-2013
Site Inspection No-27 28-10-2013
Site Inspection No-28 28-11-2013
Panvel - Indapur MPR No-27 April’14 Page 61
Inspection Note No Date
Site Inspection No-29 31-12-2013
Site Inspection No-30 15-01-2014
Site Inspection No-31 19-02-2014
Site Inspection No-32 19-03-2014
Site Inspection No-33 10-04-2014
Site Inspection No-34 22-04-2014
Table 4.3. Details of Audit Reports
Table 4.4 Details of Tests Carried Out
Material Test Reference
Up to
Last Month
During
the Month*
Cumulative*
Earthwork in
Embankment
(a) Sand Content IS:2720(Part-4)
(b) Liquid Limit Test IS:2720(Part-5)
(c ) Plasticity Test IS:2720(Part-5)
(d) Lab. Density test IS:2720(Part-8)
(f) Moisture content test IS:2720(Part-2)
(g) Field Density by sand replacement method
IS:2720(Part-28)
Subgrade
(a) Sand Content IS:2720(Part-4)
(b) Liquid Limit Test IS:2720(Part-5)
(c) Plasticity Test IS:2720(Part-5)
(d) Lab. Dry Density IS:2720(Part-8)
(f) Moisture content test IS:2720(Part-2)
(g) CBR Test IS:2720(Part-16)
(h) Field Density by sand
replacement method IS:2720(Part-28)
Granular Subbase
(a) Gradation IS 2386(Part-1)
(b) Liquid Limit Test IS:2720(Part-5)
(c) Plasticity Test IS:2720(Part-5)
(d) Moisture content Prior to
compaction IS: 2720( Part-2)
(e) Deleterious Content test. IS: 2720( Part-2)
(f) CBR test IS:2720(Part-16)
(g)Density of compacted layer IS:2720(Part-28)
(h) Water absorption IS: 2386( part-3)
(i) 10% Fines BS:812(Part-III)
Wet Mix Macadam
(Crushed
Stone Aggregates)
(a) Gradation IS 2386(Part-1)
(b) Aggregate Impact value IS:2386(Part-4)
(c) Water Absorption IS: 2386( part-3)
(d) Flakiness and Elongation
Index IS: 2386(Part-1)
(e) Liquid Limit Test IS:2720(Part-5)
(f) Plasticity Test IS:2720(Part-5)
Sl. No Audit Report No Date of Audit
1 Audit Report No-1 13-12-2012
2 Audit Report No-2 14-12-2012
Panvel - Indapur MPR No-27 April’14 Page 62
Material Test Reference
Up to
Last Month
During
the Month*
Cumulative*
(g ) Field Density by sand
replace method IS:2720(Part-28)
Ordinary
Portland Cement
(a) Fineness
(b) Initial Setting time
(c) Final Setting time
(d) Compressive Strength
3 Days
7 Days
28 Days
(e) Chemical Requirements
Coarse
Aggregates
(a) Gradation Individual & All in One Agg.
IS:383 and MORT&H Table
1000-1
(b) Water absorption IS:2386(Part3)
(c) Specific gravity IS:2386(Part3)
(d)Los Angeles abrasion value IS:2386(Part4)
(e) Aggregate Impact value
(f) Flakiness and Elongation
Index IS:2386(Part-1)
(g) Soundness IS:2386(Part5)
(h)Alkali-aggregate reactivity IS:2386(Part7)
Fine Aggregates
(a) Gradation
IS:383 and
MORT&H Table 1000-1
(b) Water absorption IS:2386(Part3)
(c) Specific gravity IS:2386(Part3)
(d) Fineness Modulus Section 1008 of
MORT&H
Water Chemical
Tests
(a) Organic matter
(b) Inorganic matter
(c) Sulphates(as So4) (d) Suspended matter
(e) Chlorides(as Cl)
(f) pH Value
Admixtures
(a) Dry material content
(b) Ash content
(c) Relative Density
(d) Chloride ion content
(e) pH value
Concrete
(a)Compressive/ Flexural Strength
Section 900 and
Section 1700 of
MORT&H IS:516
For M-10 Grade 7 Days
28 Days
For M-15 Grade 7 Days
28 Days
For M-20 Grade 7 Days
28 Days
For M-25 Grade 7 Days
28 Days
For M-30 Grade 7 Days
28 Days
For M-35 Grade 7 Days
28 Days
Panvel - Indapur MPR No-27 April’14 Page 63
Material Test Reference
Up to
Last Month
During
the Month*
Cumulative*
For M-40 Grade (Str.) 7 Days
28 Days
For M-40 Pile Grade 7 Days
28 Days
For M-20 Grade Kerb 7 Days
28 Days
For M-45 Grade Girder 7 Days
28 Days
For PQC 7 Days
28 Days
For DLC
Reinforcing
Steel
(a) Chemical Analysis
IS:1786-1985
IS:1608-1972 IS:226-1975
IS:1599-1974 IS:2770(Part 1)-
1967
% of Carbon
% of Sulphur
% of Phosphorus
(b) Nominal Mass
(c) 0.2%Proof Stress
(d) Tensile Strength
(e) Elongation%
(g) Bend Test
(h) Rebend Test
NP4 class
precast 1000mm dia
pipe
Physical test IS: 458
NP4 class precast
1200mm dia pipe
Physical test
Prime Coat (Bituminous
Emulsion)
(a) Quality of Binder
IS:8887 &
MORT&H CI.502
(b) Binder Temperature for
application
(c) Rate of Application
Track Coat (Bituminous
Emulsion)
(a) Quality of Binder
IS:8887 &
MORT&H CI.503
(b) Binder Temperature for
application
(c) Rate of Application
Dense
Bituminous
Macadam
(a) Quality of Binder IS:73
(b) Aggregate Impact Value IS:2386 (Part-4)
(c) Los Angeles Abrasion test
(d) Flakiness and Elongation
Index IS:2386 (Part-1)
(e) Stripping Value IS:6241 and
AASTHO-T182
(f) Water Absorption of Aggregated
(g) Soundness I670S:2386 (Part-
5)
(h) Grading MORT&H Tables 500.9 MORT&H
(i) Bitumen Content %
(j) Density of Compacted layer % by 100mm Dia
Panvel - Indapur MPR No-27 April’14 Page 64
Material Test Reference
Up to
Last Month
During
the Month*
Cumulative*
core
(k) Temperature for Laying
(l) Stability of Mix ASTM D 1559 and
As per MORT&H Tables 500-11
(m) Flow of Mix
(n) Water sensitivity of Mix
* Details not provided by the Concessionaire in spite of several reminders
Panvel - Indapur MPR No-27 April’14 Page 65
5.0 TRAFFIC & SAFETY
5.1 Safety Issues at Site
(1) There is an urgent need to provide all the required traffic control & safety
devices viz., signs, delineators, blinkers, barriers, etc. at the work sites as per
relevant standards viz, NHAI-Technical Specifications, IRC-SP-55 & IRC-SP-84
wherever lapses are observed.
(2) All ‘Working Zone’ must be provided with adequate lateral & longitudinal buffer
clearances as per IRC-SP-55.
(3) Workers at site must be provided with necessary PPE viz., Safety Shoe, Gloves,
Jackets, etc.
(4) Traffic Diversions are potential accident spots since vehicles approach the
diversions at high speeds. Appropriate temporary signs, delineators, blinkers,
New Jersey barriers & barricades must be provided at the diversions and at
proper locations to guide the vehicles to safety before passing by the work
zones.
(5) The Concessionaire have been advised to comply the deficiencies observed in
the traffic safety measures taken.
5.2 Accident data
The accident data is given in Appendix-I.
5.3 Traffic Diversion
Traffic diversions are potential accident spots during construction period. Necessary
signs to be provided at such locations. Many of the diversions provided at site are
sharp and not with proper geometry which leads to accidents. Many letters are issued
to Concessionaire to rectify the safety issues at site.
5.4 Maintenance of Existing Highway
Concessionaire is being advised to maintain the existing highway to traffic-worthy
condition. Site Inspection notes / letters are issued to Concessionaire in this regard.
Concessionaire has mostly made the Project Highway to motorable condition except
the diversions. Further, advices were given to the Concessionaire to maintain the
hand rail of structures, vents of structures etc. Also, Concessionaire is advised to take
up pending maintenance issues on priority in view of upcoming monsoon.
Concession Agreement, Vol-I, Clause-12.2 specifies that “During the construction
period the Concessionaire shall maintain, at its cost, the existing lane(s) of the
Project Highways so that the traffic worthiness and safety thereof are at no time
Panvel - Indapur MPR No-27 April’14 Page 66
materially inferior as compared to their condition 7 (Seven) days prior to the date of
this Agreement, and shall undertake the necessary repair and maintenance works for
this purpose; provided that the Concessionaire may, at its cost, interrupt and divert
the flow of traffic if such interruption and diversion is necessary for the efficient
progress of Construction Works and conforms to Good Industry Practice; provided
further that such interruption and diversion shall be undertaken by the
Concessionaire only with the prior written approval of the Independent Engineer
which approval shall not be unreasonably withheld. For the avoidance of doubt, it is
agreed that the Concessionaire shall at all times be responsible for ensuring safe
operation of the Project Highway.”
Panvel - Indapur MPR No-27 April’14 Page 67
6.0 CONTRACTUAL ISSUES
6.1 Change of Scope The Details of Change of Scope proposals are given in Table 6.1.
Table 6.1 Details of Change of Scope Proposals
Sl.
No
Description of Change of
Scope
Appr. Cost Implication
(Rs. Crores)
Status Pending With
1 Deletion of Palaspe Flyover
at Ch. 0+260 (-) 20.06
Reply to NHAI HQ’s queries
submitted. NHAI
2
Nallah diversion through box
culvert at Ch. 4+700 to
4+800 and 5+700 to 5+800.
(+) 9.32
Sufficient land available for
diversion of Nallah. Accordingly,
Change of Scope is not admissible.
-
3
Nallah diversion through box
culvert at Ch. 4+900 to
4+993
(+) 4.22 Clarifications also sent to NHAI. NHAI
4 Mitigation Measures in
Karnala Bird Sanctuary Area. (+) 55.88
NHAI has approved in principle.
Concessionaire was advised to
submit detailed proposal.
However, NBWL’s clearance not
yet obtained.
Approved in
principle by NHAI
5
Retaining wall at Ch. 16+720
to 16+870 (LHS & 23+430 to
23+480 (LHS)
(+) 1.31
In both the stretches the ROW
available is 60m. Hence Change of
Scope is not admissible.
-
6
Shifting the location of Jite
PUP (from Ch. 18+240 to
18+700)
0.00
NHAI has approved this Change of
Scope with no Financial
implication
-
7 Retaining Wall at Ch. 23+400
to 23+640 (RHS) (+) 2.39
Concessionaire has not followed
the procedures for Change of
Scope. CIDCO water pipeline at
this location was already buried in
embankment without any
protection measures. Thus,
Change of scope not admissible.
-
8 Deletion of pipe culvert at
Ch. 22+798 -
Recommended to NHAI. Cost
implication not yet submitted. NHAI
9 VUP at 23+450 (Hamrapur)
on RHS main carriageway. -
Can be considered on
administrative grounds (To be
confirmed by NHAI)
NHAI
10 Underpasses in Pen City (+) 10.25
NHAI has returned with comments
”Ünactioned”. Further
concessionaire again submitted
and IE has recommended.
NHAI
11 Change in number of spans
of ROB at Pen Ch. 28+283 (+) 17.44
Recommended to NHAI.
Clarifications also sent to NHAI. NHAI
Panvel - Indapur MPR No-27 April’14 Page 68
Sl. No
Description of Change of Scope
Appr. Cost Implication
(Rs. Crores)
Status Pending With
12
Wadkhal Bypass by changing
ROB to RUB. Increase in
length from 2.8 km to 3.6
Km.
(+) 20.63
Concessionaire again submitted
proposal to NHAI HQ directly. IE
has recommended the proposal.
NHAI
13 Increase in length of
Wadkhal Bypass by 805m (+) 0.81 Recommended to NHAI. NHAI
14
Reconstruction of Damaged
Slab culvert at Ch 39+030 &
39+133
(+) 0.324 Change of scope not admissible as
it comes under rehabilitation. -
15
Increase in Span for
Structure at Ch. 38+336 and
Ch. 43+133
(+) 0.8267
Change of Scope proposal
recommended to NHAI.
Clarifications submitted to NHAI.
NHAI
16
Additional VUP on both ends
of Amba Bridge. (Pali
Junction at Ch. 58+660 and
Roha/ Alibaug Junction at
Ch. 58+960)
(+) 28.62
NHAI has rejected the proposal
and advised Concessionaire to
proceed as per Concession
Agreement.
-
17 Additional Culverts at various
locations (+) 2.52
Recommended to NHAI. Reply to
queries by NHAI HQ also
submitted.
NHAI
18
Difference in width of median
for approach to
Underpasses/Flyovers/ROB
etc Type X Section
-
Rejected as it is not admissible as
per Concession Agreement
provisions
-
19
Concrete pavement below
RUB at Ch. 56+560
(Nagothane)
-
Rejected as it is required as per
site conditions and vertical
clearance requirements.
-
20 Increase in Length Service
Road (+) 5.17
Recommended to NHAI.
Clarifications submitted to NHAI. NHAI
6.2 Project Milestones
Project Milestone - I
The Concessionaire has to achieve Project Milestone - I by 19-12-2012 as per
Schedule - G of the Concession Agreement. They have requested/applied for shifting
the date of Project Milestone - I for a period of 135 days. The Independent Engineer
advised the Concessionaire to submit the details of actual progress (both Physical &
Financial) with substantiating supporting details to enable Independent Engineer to
critically analyse the case.
Concession Agreement, Clause-13.4, Specify that ”Without prejudice to the provision
of Clause 12.4.2 if the Concessionaire does not achieve any of Project Milestone or
Panvel - Indapur MPR No-27 April’14 Page 69
the Independent Engineer shall have reasonably determined that the rate of Progress
of Construction works is such that Four-Laning is not likely to be achieved by the
Scheduled Four-laning date, it shall notify the Concessionaire to this effect, and the
Concessionaire shall, within 15 (fifteen) days of such notice, by a communication
inform the Independent Engineer in reasonable detail about the steps it proposes to
take to expedite Progress and the period within which it shall achieve the Project
Completion Date”.
Concession Agreement Clause-12.4.2 Specify that “The Concessionaire shall construct
the Project Highway in accordance with the Project completion Schedule set forth in
Schedule-G. In the invent that the Concessionaire fails to achieve any Project
Milestone within the period of 90 (Ninety) days from the date set forth for such
Milestone in Schedule-G, unless such failure has occurred due to force Majeure or for
reasons solely attributable to the Authority, it shall pay Damages to the Authority in a
Sum calculated at the rate of 0.1% (zero point of one per cent) of the amount of
Performance Security for delay of each day until such Milestones is achieved;
provided that if any or all project milestone or the scheduled four-Laning Date are
extended in accordance with the provisions of this Agreement, the date set forth in
Schedule-G shall be deemed to be modified accordingly and the Provisions of this
Agreement shall apply as if schedule-G has been amended as above; provided further
that in the event Project Completion Date is achieved on or before the scheduled
Four- Laning, date the Damage paid under this Clause- 12.4.2 shall be refunded by
the Authority to the Concessionaire, but without any interest thereon. For the
avoidance of doubt, it is agreed that recovery of Damage under this Clause-12.4.2
shall be without prejudice to the right of the Authority under this Agreement
including the right of Termination thereof.”
Independent Engineer has critically assessed the allowable Extension of Time (EOT)
for achieving Milestone-1. Accordingly, it was observed that the allowable Extension
of Time (EOT) due to various issues such as delayed handing over of land, delay in
approval of GAD for ROB’s, delay in shifting of various utilities etc. is assessed to be
152 days (That is upto 20-05-2013). However, Concessionaire requested for
Extension of Time, for 135 days from stipulated Milestone -1 date (That is upto 03-
05-2013). Accordingly, Independent Engineer has recommended the Extension of
Time upto 03-05-2013, based on following conditions to be agreed by
Concessionaire.
(a) Concessionaire will not be eligible for any extension of Concession Period on
account of extension of Milestone No-1.
(b) Concessionaire will complete the Milestone No-1 by 03-05-2013 (135 days from
scheduled Milestone No-1 date).
Panvel - Indapur MPR No-27 April’14 Page 70
(c) No damages for delay in handing over of land/approval of estimate for utility
shifting/Force Majeure during the period upto extended period of Milestone No-1
(that is upto 03-05-2013) will be claimed as the Extension of Time (EOT)
granted is mutually agreeable to the Concessionaire.
(d) The additional machineries and manpower as promised will be mobilized
immediately.
(e) Further scheduled completion milestone dates including final completion will not
get extended due to extension of Milestone No-1 as provided in schedule ‘G’ of
the Concession Agreement.
While recommending Extension of Time for Milestone no-1, Independent Engineer
has critically assessed and concluded that Concessionaire is eligible for 152 days
extension (That is upto 20-05-2013). However, Concessionaire has requested for
Extension of Time for 135 days only which fall on 03-05-2013. The Milestone no-1
was achieved on 01-05-2013 that is 133rd day from Schedule milestone no-1 date,
which was within the recommended period of Extension of Time. However, the
Extension of Time (EOT) for Milestone no-1 is not approved by NHAI.
Project Milestone - II
The Concessionaire has to achieve Project Milestone-II by 19-12-2013 as per
Schedule-G of the Concession Agreement. Concessionaire vide their letter no.
SPITPL/P-NHAI/2013-14/2471 dt 28-01-’14 has claimed and informed NHAI that they
have achieved Milestone-II by 19-12-’13 considering the land available for
construction. Independent Engineer has reviewed and commented vide letter
no. PIP/IE/NHAI/2014/2164 dt. 03-04-2014.
Panvel - Indapur MPR No-27 April’14 Page 71
7.0 CRITICAL ISSUES AND RECOMMENDATIONS
(1) Land Acquisition: As per the Concession Agreement, the NHAI shall make best
efforts to procure and grant, no later than 90 days from the Appointed Date, the
Right of Way to the Concessionaire in respect of all land included in the Appendix.
12.66 Km length is not yet handed over for construction. NHAI may speed up further
land acquisition process.
(2) RE Wall Works: Though Concessionaire has recently initiated the RE wall works,
progress is very slow. This will be critical activity on the Project. Concessionaire
should immediately pursue this matter.
(3) Non-Removal of Encroachments: NHAI has issued notice under section 26 of the
Control of National Highways (Land and Traffic) Act, 2002 to unauthorized
occupants. Police support is sought. Encroachment removal not yet started.
(4) Non-Relocation of CIDCO water Pipeline: Non-relocation of CIDCO water
pipeline is affecting the works for approximately 5.08 Km length of the Project.
(5) Eco-Sensitive Zone / Forest Land: Approval of Forest land except Ch. 0+000 to
20+100 issued by NHAI vide letter No. NHAI/ PIU/ PANVEL/ PI/ SPITPL/ Forest/
2013/ 1201 dt.23-08-’13. The approval for the forest land between Ch. 0+000 to
20+100 is still pending. This portion comes under Eco-sensitive zone.
(6) Progress of Structure Works: The progress of structure works need to be
improved by concessionaire.
Panvel - Indapur MPR No-27 April’14 Page 72
8.0 PROJECT PHOTOGRAPHS
Photo - 01: Embankment layer at Ch. 18+050 (RHS) Photo - 02: WMM Layer at Ch. 18+100 ( LHS).
Photo - 03: GSB Laying at Ch. 26+ 340 (RHS).
Photo - 04: Compaction Checking of Subgrade top
at Ch. 66+850 ( RHS)
Photo - 05: DBM laid at Ch. 76+575 to 76+845
(RHS)
Photo - 06: Prime coat at Ch. 76+575 to 76+846
(RHS)
Panvel - Indapur MPR No-27 April’14 Page 73
Photo - 07: P-23 Cap reinforcement in progress at Kharpada bridge at Ch.15+878.
Photo - 08: Approach slab PCC of Bhogeshwari at Ch. 26+188 Indapur side.
Photo-09: RE Wall construction at Ch. 42 +155
(RHS). Photo - 10: PUP at Ch. 79+140 (RHS).
Photo - 11: Stability And Flow Test. Photo - 12: Non-Destructive Tests (NDT) Of RE
Panel
Panvel - Indapur MPR No-27 April’14 Page 74
Appendix-A
Comments on Concessionaire’s Monthly Progress Report
Concessionaire has not submitted Progress Report for the current month so far. However,
the comments on the progress report for the month of March’14 are given below.
(1) Details of proposed Changes of Scope not given.
(2) Various issues such as road maintenance, Traffic and safety arrangement at site,
compliance to IE’s NCR’s/Inspection Notes etc. have not been included in the MPR.
(3) The actual quantities executed at site and the reported quantities are different. The
actual quantities are less than what is reported.
(4) As per Chapter - 5.3 ie. Machinery & Manpower list, mobilization details of plant &
machinery number of Pneumatic Tyred Roller (PTR) being used at site are not shown.
(5) List of source approval of different major materials being used in Project work has not
been included in Monthly Progress Report.
(6) Material test details not given.
Panvel - Indapur MPR No-27 April’14 Page 75
Appendix-B
Weather
Date
Section-I Section-II
Temperature (◦C) Rainfall (mm)
Temperature (◦C) Rainfall (mm) Minimum Maximum Minimum Maximum
26-03-‘14 27.2 33.8 - 18.0 39.5 -
27-03-‘14 27.0 34.4 - 18.5 40.0 -
28-03-‘14 23.7 35.7 - 16.6 39.1 -
29-03-‘14 23.3 36.8 - 17.4 39.4 -
30-03-‘14 23.3 37.9 - 18.5 39.2 -
31-03-‘14 23.3 37.9 19.4 39.6
01-04-‘14 23.0 37.7 - 20.5 39.9 -
02-04-‘14 22.5 35.0 - 21.3 39.7 -
03-04-‘14 22.4 37.2 - 21.2 39.9 -
04-04-‘14 23.1 38.6 - 22.0 39.5 -
05-04-‘14 23.8 38.9 - 22.4 40.5 -
06-04-‘14 24.6 37.4 - 23.0 39.8 -
07-04-‘14 25.0 37.2 - 22.8 39.0 -
08-04-‘14 25.2 37.3 - 23.0 38.1 -
09-04-‘14 23.9 34.9 - 23.4 38.5 -
10-04-‘14 23.4 35.0 - 23.2 38.1 -
11-04-‘14 22.4 36.2 - 22.5 38.4 -
12-04-‘14 22.5 36.2 - 23.0 38.7 -
13-04-‘14 22.0 36.8 - 23.2 38.5 -
14-04-‘14 22.0 34.3 - 23.0 38.6 -
15-04-‘14 22.0 34.3 - 23.6 39.4 -
16-04-‘14 24.3 35.1 - 23.5 38.0 -
17-04-‘14 25.5 36.5 - 22.4 39.2 -
18-04-‘14 27.1 34.9 - 23.1 39.6 -
19-04-‘14 25.7 35.7 - 23.6 39.0 -
20-04-‘14 25.8 35.4 - 23.2 39.8 -
21-04-‘14 26.0 38.6 - 23.5 39.9 -
22-04-‘14 27.5 38.8 - 23.0 39.6 -
23-04-‘14 27.8 38.8 - 22.8 40.0 -
24-04-‘14 27.9 39.0 - 23.5 39.8 -
25-04-‘14 26.4 38.1 - 23.2 40.1 -
Panvel - Indapur MPR No-27 April’14 Page 77
Appendix-D
Minutes of Monthly Progress Review Meeting
Four-Laning of Panvel-Indapur Section of NH-17 (Package No : NHDP-
III/DL4/05)
Nil.
Panvel - Indapur MPR No-27 April’14 Page 78
Appendix-E
Four-Laning of Panvel-Indapur Section of NH-17 (Package No: NHDP-III/DL4/05)
Site Inspection Note No -33
Inspection Note
No.
: 33
Date :
3
10-04-2014
Construction
Package :
Four Laning of Panvel-Indapur Section of NH-17 (From Km 0+000 to
84+000) in the State of Maharashtra under NHDP Phase-III on DBFOT
Basis (Package No : NHDP-III/DL4/05)
Concessionaire : Supreme Panvel Indapur Tollways Private Limited
Independent
Engineer :
M/s Yongma Engineering Co., Ltd. In association with M/s Feedback
Infrastructure Services Pvt. Ltd.
Project
Management
Consultants
: Consulting Engineering Services (India) Pvt. Ltd.
EPC Contractors : Ch. 0+000 to 42+000: M/s Mahavir Roads and Infrastructure Pvt. Ltd.
Ch. 42+000 to 84+000 : M/s Supreme Infrastructure India Limited
Appointed Date : 19-12-2011
Scheduled date of
Completion : 16-06-2014 (910 Days Construction Period)
Sl.
No Chainage/
Location Description of Problem Photo
33.1 0+300
(RHS)
Drainage problem exist near the
poultry farm. Proper side drain to be
provided. The cross pipe laid near the
entrance to be lowered to make
smooth flow of drainage water.
Panvel - Indapur MPR No-27 April’14 Page 79
Sl.
No Chainage/
Location Description of Problem Photo
33.2 0+600 (RHS) Pavement cutting arrangement to be
deployed
33.3 1+400 (LHS) The electric pole to be shifted before
any further layer works.
33.4 6+060 (LHS) Dismantled bituminous material to be
properly disposed off
Panvel - Indapur MPR No-27 April’14 Page 80
Sl.
No Chainage/
Location Description of Problem Photo
33.5 26+188 (LHS)
Bhogeshwari
Existing Bridge
Potholes to be repaired.
33.6 42+155 (RHS)
Kasu PUP
Unsuitable/un-approved soil dumped in
the approach (Panvel side) of
Underpass.
33.7 45+900 (LHS)
DBM edge cutting not proper. WMM
surface should be compacted/tested
before corrective DBM is laid as
explained at site.
Panvel - Indapur MPR No-27 April’14 Page 81
Sl.
No Chainage/
Location Description of Problem Photo
33.8 45+800 to
48+650 (LHS)
Many of the portions, DBM completely
damaged. Full width has to be cut and
fresh DBM may be laid after making
good the WMM bed below it.
Panvel - Indapur MPR No-27 April’14 Page 82
Sl.
No Chainage/
Location Description of Problem Photo
33.9 45+900 to
46+200 (LHS)
Loose dust layer observed below the
removed DBM layer. Such material to
be removed before further
rectifications.
33.10 60+200 to
60+700 (LHS)
Deep cutting. No proper safety
barricading provided.
33.11 66+920 (RHS)
For carrying out field compaction test
with sand replacement method, Rapid
Moisture meter not being used.
Panvel - Indapur MPR No-27 April’14 Page 83
Four-Laning of Panvel-Indapur Section of NH-17 (Package No: NHDP-III/DL4/05)
Site Inspection Note No -34
Inspection Note
No.
: 34
Date :
3
22-04-2014
Construction
Package :
Four Laning of Panvel-Indapur Section of NH-17 (From Km 0+000 to
84+000) in the State of Maharashtra under NHDP Phase-III on DBFOT
Basis (Package No : NHDP-III/DL4/05)
Concessionaire : Supreme Panvel Indapur Tollways Private Limited
Independent
Engineer :
M/s Yongma Engineering Co., Ltd. In association with M/s Feedback
Infrastructure Services Pvt. Ltd.
Project
Management
Consultants
: Consulting Engineering Services (India) Pvt. Ltd.
EPC Contractors : Ch. 0+000 to 42+000: M/s Mahavir Roads and Infrastructure Pvt. Ltd.
Ch. 42+000 to 84+000 : M/s Supreme Infrastructure India Limited
Appointed Date : 19-12-2011
Scheduled date of
Completion : 16-06-2014 (910 Days Construction Period)
Sl.
No Chainage/
Location Description of Problem Photo
34.1 0+360 to 0+440
(RHS)
WMM carried out in the widening portion
towards median was segregated and loose.
Panvel - Indapur MPR No-27 April’14 Page 84
Sl.
No Chainage/
Location Description of Problem Photo
34.2 6+870 (RHS)
Existing structure deck slab is in bad
condition. Before putting over burden on
existing structure, its adequacy may be
checked.
34.3 42+155 (Kasu
PUP)
Un-approved fill material used in the
approach of RE wall towards Panvel side.
34.4 71+000 to
71+050
Laying temperature of BC was found to be
much lower than specified in MoRTH
specifications.
34.5 71+050
Stakes for the support of sensor wire for
laying of BC were fixed at a larger intervals
(approx 20 m).
Panvel - Indapur MPR No-27 April’14 Page 85
Sl.
No Chainage/
Location Description of Problem Photo
34.6 71+050 Labours engaged for BC works did not
wear safety shoes
Panvel - Indapur MPR No-27 April’14 Page 86
Appendix-F
Letters from NHAI to Independent Engineer
Sl. No
Date Letter No. Subject
1 01-04-'14 NHAI/PIU/PNVL/P-I/SPITPL/2014/2853 Removal of New Encroachments- Reg
2 01-04-'14 NHAI/PIU/PNVL/BOT/NH-17/PNL-0IND/2014/2881 Maintenance of the Project Highway
3 01-04-'14 NHAI/PIU-PANVEL/P-I/CMS/2014/2886 Diversion of Forest Land (23.6865 Ha.) & Stoppage of work from
65.760 to 66.390 on forest land-Reg.
4 01-04-'14 NHAI/PIU/PNVL/BOT/NH-17/PNL-IND/2014/001 Non Closure of long pending NCR's and Site Inspection Reports-Reg.
5 01-04-'14 NHAI/PIU/PNVL/P-I/SPITPL/2014/2877 Temporary Permission for Installation of Stall on ROW of NH-17 near
village Kharpale, Taluka Pen-Reg.
7 05-04-'14 NHAI/PIU/PNVL/P-I/NH-17/COS/2014/2898 Change of Scope for increase in length of Service Road.
8 05-04-'14 NHAI/PIU/Panvel/PI/IE/2014/2899 Traffic Police Centre, Palaspe.
9 05-04-'14 NHAI/PIU/Panvel/PI/OFC/2014/17 Grant of Permission for Laying Optical Fiber cable.
10 05-04-'14 NHAI/PIU/PANVEL/PI/RetailOutlet/2014/022 Access Permission for S. No. 27/1 (P), 28/4A(P), 3B, 3A1(P) of Village
Balivali, Tal. Pen
11 05-04-'14 NHAI/PIU/PNVL/P-I/NH-17/COS/2014/023 Change of Scope for increase in span for structures at km. 38.336
and km. 43.133- Reg.
12 09-04-'14 NHAI/PIU-PANVEL/P-I/CMS/2014/2887 Work carried out without Approval of Change of Scope.
13 09-04-'14 NHAI/PIU/PNVL/P-I/SPITPL/GEN/2014/048 The Concessionaire regarding the Jindal Charitable Hospital & School
at Ch, 62.650 on RHS.
14 09-04-'14 NHAI/PIU/PNVL/P-I/C Section/20014/052 Proposal for modified cross Section-Reg.
15 09-04-'14 NHAI/PIU/PNVL/P-I/IE/2014/53 Drawing for Rest Area-Reg.
16 09-04-'14 NHAI/PIU/PNVL/P-I/IE/2014/054 Land Acquisition Between Balganga Bridge & Balivali Bridge.
17 09-04-'14 NHAI/PIU/PNVL/P-I/IE/2014/055 Proposal for modified cross Section-Reg.
Panvel - Indapur MPR No-27 April’14 Page 87
18 09-04-'14 NHAI/PIU/PNVL/P-I/IE/2014/060 Verification of HFL of Balganga Bridge -Reg.
19 09-04-'14 NHAI/PIU/Panvel/PI/IE/2014/061
HPCL's 12" dia, 165km long underground Uran - Chakan - Shikrapur
LPG Pipeline -Permi8ssion for laying underground 18" dia casing pipe
having 12" dia piggable carrier LPG pipeline along with 3x2" dia OFC
across the NH-17 in Kharpada village-Reg.
20 09-04-'14 NHAI/PIU/Panvel/PI/IE/NOC/2014/062 Proposal for N.A. of Surey No. 11/3,4,5 Village Chinchavan, Tal.
Panvel-Reg.
21 09-04-'14 NHAI/PIU/Panvel/PI/IE/Access/2014/063
Permission to have access of Private property for residential building
on S. No. 82/5A, 82/5B, 82/6, 82/7 at Village Palaspe, Taluka Panvel,
Dist. Raigad on NH-17 at km 2.597 (LHS)-Reg.
22 09-04-'14 NHAI/PIU/Panvel/PI/IE/Retail/Outlet/2014/045
Permission to access from M/S Hindustan Petroleum Ltd. On S. No.
17/1(B) (P) at village Jite, Tal. Pen. Dist. Raigad on NH-17 at Km
18.329 to Km 18.371- Reg.
23 11-04-'14 NHAI/PIU/Panvel/PI/IE/OFC/2014/072 Permission for laying Optical Fiber Cable along NH-17 from Km 0.00
to km 28.824 for the total length of 28.824 km. -Reg.
24 11-04-'14 NHAI/PIU/PNVL/P-I/SPITPL/2014/111 Construction of Balganga Major Bridge@ Ch. 20.144- Non availability
of land for Construction of A1 return wall, RHS-Reg.
25 11-04-'14 NHAI/PIU/PANVEL/P-I/COS/2014/112 Change of Scope proposal for diversion of Nallah at various location
between Ch. 4.900 to Ch. 6.000 (RHS) -Reg.
26 11-04-'14 NHAI/PIU/Panvel/PI/Utility/2014/113 Delay in Payment against IPCs for Electrical Utilities Shifting -Reg.
27 11-04-'14 NHAI/PIU/PNVL/P-I/SPITPL/2014/076 Stoppage of work by Villagers (Karav Village) from Ch. 35+800 to Ch.
38+500 for Demarcation of ROW of NHAI-Reg.
28 11-04-'14 NHAI/PIU/PNVL/P-I/IE/2014/077 Verification of HFL of Balganga Bridge -Reg.
29 16-04-'14 NHAI/PIU/PNVL/P-I/NH-17/COS/2014/125 Change of Scope for increase in length of Service Road-Reg.
30 16-04-'14 NHAI/PIU/PNVL/P-I/SPITPL/2014/128 Interruption Free Telecom Services during general Election 2014 -
Reg.
31 19-04-'14 NHAI/PIU/PNVL/ADMN./2014/141 Closing of NHAI, PIU- Panvel in connection with the General Election
to the Lok Sabha on 17th April, 2014-Reg.
32 22-04-'14 NHAI/PIU/PNVL/P-I/SPITPL/2014/143 Shifting of Water Supply Pipe line of MJP-Reg.
Panvel - Indapur MPR No-27 April’14 Page 88
33 24-04-'14 NHAI/PIU/PNVL/P-I/IE & SPITPL/MEETING/2014 /171 Review Meeting Scheduled on 26.04.2014 at PIU Office, NHAI Pune -
Reg.
34 24-04-'14 NHAI/PIU/PNVL/P-I/IE & SPITPL/MEETING/ 2014/ 174 Review Meeting Scheduled on 26.04.2014 at Pune-Reg.
35 29-04-'14 NHAI/PIU/PNVL/P-I/Csection/2014/236 Proposal for modified cross Section -Reg.
36 29-04-'14 NHAI/PIU/PNVL/P-I/Csection/2014/237 Proposal for modified cross Section -Reg.
37 29-04-'14 NHAI/PIU/Panvel/PI/NOC/2014/203 Proposal for N.A. of Gut No. 106 at Village Ambewadi, Tal. Roha,
Dist. Raigad on NH-17 at km 73.528 to km 73.547 on RHS-Reg.
38 29-04-'14 NHAI/PIU/Panvel/PI/IE/NOC/2014/205 Proposal for N.A. of Survey No. 154/3 at village Varasgaon, Tal.
Roha, Dist. Raigad on NH-17 at km 74.299 to km 74.350 on LHS-Reg.
39 29-04-'14 NHAI/PIU-Panvel/P-I/Utility-ZP/2014/207 Shifting of Water Supply lines-Reg.
40 29-04-'14 NHAI/PIU/Panvel/PI/IE/2014/212 Representation from Grampanchayat Jite-Reg.
Panvel - Indapur MPR No-27 April’14 Page 89
Appendix-G Letters from Concessionaire to Independent Engineer
Sl No
Date Letter No. Subject
1 01-04-'14 SPITPL/P-IE/2013-14/2729 Proposal for Change of Scope Underpass at Hamrapur Junction.
2 01-04-'14 SPITPL/P-NHAI/2013-14/2732 Land Availability for the Improvement of the Junction at Phalspe Phata (Ch. 0+270).
3 01-04-'14 SPITPL/P-NHAI/2013-14/2733 Access to Jindal Charitable Hospital and School at Ch. 62+650, RHS-Reg.
4 01-04-'14 SPITPL/P-IE/2013-14/2734 Submission of Group Strata Photos - NCR No. 119.
5 01-04-'14 SPITPL/P-NHAI/2013-14/2741 Constraints in Land Acquisition -Proposal for Modified Cross Section -Reg.
6 03-04-'14 SPITPL/P-IE/2013-14/2749 Submission of Mix Design for Bituminous Concrete.
7 03-04-'14 SPITPL/P-IE/2013-14/2750 Submission of Mix Design for Mastic Asphalt.
8 03-04-'14 SPITPL/P-IE/2013-14/2751 Shifting of Electrical Utilities -Undertaking for Release of withheld amounts.
9 05-04-'14 SPITPL/P-NHAI/2012-13/2752 Land Acquisition Between Balganga Bridge & Balivali Bridge.
10 05-04-'14 SPITPL/P-IE/2013-14/2753 Submission of Design & drawing of Friction Slab with Crash Barrier at approaches.
11 09-04-'14 SPITPL/P-NHAI/2013-14/2758 Stoppage of work by Villagers (Karav Village) from Ch. 35+800 to Ch. 38+500 for Demarcation
of ROW of NHAI-Reg.
12 09-04-'14 SPITPL/P-IE/2013-14/2760 Submission of Design & Drawing of plan & Profile from km 22+000 to 24+000 for MCW and km
23+000 to 23+800 RHS for Service Road.
13 14-04-'14 SPITPL/P-IE/2014-15/2761 Submission of drawing Plan & Profile -Left side service Road km 39+430 to 40+040 (Kharpale
Village).
14 14-04-'14 SPITPL/P-IE/2014-15/2762 Submission of drawing Plan & Profile Main Carriageway from km 16+000 to km 21+000 for your
review.
15 14-04-'14 SPITPL/P-IE/2014-15/2763 Plan & Profile drawings of Main Carriageway from km 25+000 to 27+000 for your Concurrence.
16 19-04-'14 SPITPL/P-IE/2014-15/2783 Request for Source Approval for procurement of Strip Seal Expansion Joints- MAGEBA Bridge
Products Pvt. LTD.
17 19-04-'14 SPITPL/P-IE/2014-15/2789 Submission of Test Results of Borrow Area No. 043 suitable -Request for Concurrence.
18 14-04-'14 SPITPL/P-IE/2014-15/2766 Submission of Monthly Progress Report for March 2014.
Panvel - Indapur MPR No-27 April’14 Page 90
Sl No
Date Letter No. Subject
19 14-04-'14 SPITPL/P-IE/2014-15/2767 Submission of RFI along with Ultrasonic Pulse Velocity and Rebound Hammer Test Results -NCR
No. 32.
20 14-04-'14 SPITPL/P-IE/2014-15/2768 Road Safety Audit- Construction Stage 4th Quarter- Submission of Compliances -Reg.
21 14-04-'14 SPITPL/P-IE/2014-15/2769 Submission of RFI along with Ultrasonic Pulse Velocity Rebound Hammer Test Results - NCR NO.
.34
22 14-04-'14 SPITPL/P-IE/2014-15/2770 Submission of RFI along with Ultrasonic Pulse Velocity and Rebound Hammer Rebound Hummer
Test results -NCR No. 28.
23 14-04-'14 SPITPL/P-NHAI/2014-15/2771 Demarcation of NHAI Boundary (ROW) from Ch. 54+300 to Ch. 55+800, LHS-Stoppage of
Works -Reg.
24 15-04-'14 SPITPL/P-NHAI/2014-15/2782 Video Graphy of Highway NH-17 Panvel to Indapur Km 0+000 to 84+600 for the quarter ending
March 2014.
25 19-04-'14 SPITPL/P-IE/2014-15/2790 Submission of Mix Design for DRY LEAN CEMENT CONCRETE -Request for Concurrence.
26 19-04-'14 SPITPL/P-IE/2014-15/2791 Submission of Mix Design for PAVEMENT QUALITY CONCRETE-Request for Concurrence.
27 19-04-'14 SPITPL/P-IE/2014-15/2792 Submission of Revised Plan & Profile drawings -Main Carriageway from 30+000 to 31+000 for
your Concurrence.
28 24-04-'14 SPITPL/P-IE/2013-14/2796 Submission of Design Temporary work for PUP at Ch. 27+755.
29 24-04-'14 SPITPL/P-NHAI/2014-15/2815 Proposal for Change of Scope for Increase in Length of Service Road.
30 24-04-'14 SPITPL/P-IE/2013-14/2816 Proposal for Change of Scope for Diversion of Nalla at Ch. 4+900 to 4+993
31 24-04-'14 SPITPL/P-NHAI/2014-15/2817 Proposal for Change of Scope for Replacement of Slab culvert to Minor Bridge at km 38.336 &
43.133.
32 26-04-'14 SPITPL/P-NHAI/2014-14/2830 Construction of Bhogeswari Major Bridge @ Ch. 26+188 - Non Availability of Land Construction
of A1 Return Wall and Approaches , RHS-Reg.
33 26-04-'14 SPITPL/P-NHAI/2014-14/2831 Construction of Balganga Major Bridge Bridge @ Ch. 20+144 -Non Availability of Land for
Construction of A1 Return Walls, RHS-Reg.
34 30-04-'14 SPITPL/P-NHAI/2013-14/2832 Condition of Existiing Bhogeswari Major Bridge @ Ch. 26+188, LHS-Reg.
35 30-04-'14 SPITPL/P-NHAI/2013-14/2864 Site Status.
36 30-04-'14 SPITPL/P-IE/2013-14/2865 Lifting hook has not been provided with epoxy point -NCR No. 89
Panvel - Indapur MPR No-27 April’14 Page 91
Sl No
Date Letter No. Subject
37 30-04-'14 SPITPL/P-IE/2013-14/2866 During observation anchor cone plate was broken and went inside after second stage stressing -
NCR No. 100.
38 30-04-'14 SPITPL/P-IE/2013-14/2867 During second stage pestering cones have gone inside & cracks have development on
diaphragm- NCR No. 97
39 30-04-'14 SPITPL/P-IE/2013-14/2868 During second stage pestering cones have gone inside & cracks have development on
diaphragm- NCR No. 98.
40 30-04-'14 SPITPL/P-IE/2013-14/2869
During observation Road work including WMM is complete in above chainage without
construction of Pipe culvert as in concession agreement and concurred Plan and Profile
drawings-NCR No. 105.
41 30-04-'14 SPITPL/P-IE/2013-14/2870 Retaining wall under construction without concurrence of design and drawing Provision for
existing pipe culvert on the retaining wall not Provided. - NCR No. 35.
Panvel - Indapur MPR No-27 April’14 Page 92
Appendix-H
Letters Issued by Independent Engineer
Sl
No Date Letter No. To Subject
1 02-04-'14 PIP/IE/NHAI/2014/2159 NHAI Deceleration/Acceleration lanes to the New Fuel Station Under Construction at Km
18+350 (RHS) Not as per Norms and Specifications.
2 02-04-'14 PIP/IE/SPITPL/2014/2160 Concessionaire Site Inspection No-033.
3 02-04-'14 PIP/IE/NHAI/2014/2161 NHAI Leave Absence of Team Leader Cum Sr. Highway Engineer.
4 03-04-'14 PIP/IE/NHAI/2014/2162 NHAI Proposal for Interim Improvements to the Junction at Palaspe (Ch. 0+270)-
Reminder No-3.
5 03-04-'14 PIP/IE/SPITPL/2014/2163 Concessionaire Non Closure-NCR No-119-Minor Bridge at Ch. 66+808 (RHS).
6 03-04-'14 PIP/IE/NHAI/2014/2164 NHAI Project Milestone -II-Comments.
7 03-04-'14 PIP/IE/NHAI/2014/2165 NHAI Realistic Target DBM Lengths.
8 05-04-'14 PIP/IE/SPITPL/2014/2166 Concessionaire Quality Issues.
9 07-04-'14 PIP/IE/SPITPL/2014/2167 Concessionaire Air Pollution Inside Crusher Plant at Pali.
10 07-04-'14 PIP/IE/SPITPL/2014/2168 Concessionaire Maintenance of Highway-Comments.
11 07-04-'14 PIP/IE/SPITPL/2014/2169 Concessionaire Letters From Traffic Police.
12 09-04-'14 PIP/IE/NHAI/2014/2170 NHAI Submission of Insurance Documents for Consultancy Services.
13 09-04-'14 PIP/IE/SPITPL/2014/2171 Concessionaire Non- Submission of Monthly Progress Report of March ’14.
14 09-04-'14 PIP/IE/NHAI/2014/2172 NHAI Monthly Progress Report No-26 (March ‘14).
15 09-04-'14 PIP/IE/SPITPL/2014/2173 Concessionaire Drawings For Strip Seal Expansion Joint by M/s Sanfield India Ltd-Concurrence.
16 09-04-'14 PIP/IE/NHAI/2014/2174 NHAI Verification of HFL of Balganga Bridge.
17 10-04-'14 PIP/IE/NHAI/2014/2175 NHAI Copy of Power of Attorney to Mr. Sushil Kumar Singhal to Act as Engineer of the
Project.
18 10-04-'14 PIP/IE/SPITPL/2014/2176 Concessionaire Copy of Power of Attorney to Mr. Sushil Kumar Singhal to Act as Engineer of the
Project.
19 10-04-'14 PIP/IE/NHAI/2014/2177 NHAI Permission to Access from M/s Hindustan Petroleum Ltd. on S. No. 17/1(B) (P) at
Panvel - Indapur MPR No-27 April’14 Page 93
Sl
No Date Letter No. To Subject
Village - Jite, Tal. Pen, Dist. Raigad on NH -17 at Km 18+329 to Km 18+371.
20 10-04-'14 PIP/IE/NHAI/2014/2178 NHAI
Permission for Access to the Private Property for Residential Building on Survey No.
82/3, 82/5A, 82/5B, 82/6, 82/7 at Village - Palaspe, Tal. Panvel, Dist. Raigad on NH
-17 Km 2+597 (LHS)-Comments.
21 11-04-'14 PIP/IE/NHAI/2014/2179 NHAI Leave Absence of Assistant Highway Engineer Mr. Pillai Arun Rajan.
22 11-04-'14 PIP/IE/SPITPL/2014/2180 Concessionaire Drawing For Rest Area at Ch. 60+285.
23 11-04-'14 PIP/IE/NHAI/2014/2181 NHAI
Application by M/s Hindustan Petroleum Limited Seeking Permission For laying
Underground 18” dia Casing pipe having 12” dia Piggable Carrier LPG Pipeline along
with 3X2” dia OFC Across the NH-17, Village -Kharpada, Tal- Pen-Comments.
24 11-04-'14 PIP/IE/NHAI/2014/2182 NHAI Change of Scope Proposal For Vehicular Underpass at Hamarapur Phata at Ch.
23+460.
25 11-04-'14 PIP/IE/SPITPL/2014/2183 Concessionaire Plan and Profile Drawings for Ch. 22+000 to 24+000 for MCW and Ch. 23+000 to
23+800 RHS for Service Road (Near Hamarapur Junction)-Comments.
26 11-04-'14 PIP/IE/NHAI/2014/2184 NHAI Proposal For N.A. Permission of Survey No. 11/3, 4, 5 Village - Chinchwan, Tal.
Panvel, Dist. Raigad on NH -17-Comments.
27 11-04-'14 PIP/IE/SPITPL/2014/2185 Concessionaire Revised Plan and Profile Drawing to Km 16+000 to 21+000 with Modified Cross
Section.
28 11-04-'14 PIP/IE/NHAI/2014/2186 NHAI Land Acquisition between Balganga (Ch. 20+144) and Bhogeshwari (Ch. 20+754)-
Comments.
29 11-04-'14 PIP/IE/SPITPL/2014/2187 Concessionaire Ultrasonic Pulse Velocity and Rebound Hammer Test Results- NCR No - 028- Non-
Closure.
30 11-04-'14 PIP/IE/NHAI/2014/2188 NHAI Proposal for Modified Cross Section for at-grade Construction Where Land
Constraints Exist-Comments.
31 11-04-'14 PIP/IE/SPITPL/2014/2189 Concessionaire Concurrence of Mix Design for Mastic Asphalt For Section-(I Km 0+000 to 42+000).
32 11-04-'14 PIP/IE/SPITPL/2014/2190 Concessionaire Mix Design for Bituminous Concrete For Section-I (Km 0+000 to 42+000)- Trial
Section to be Done.
33 12-04-'14 PIP/IE/NHAI/2014/2191 NHAI Quarterly Progress Report No-09 (January - March 2014)
Panvel - Indapur MPR No-27 April’14 Page 94
Sl
No Date Letter No. To Subject
34 12-04-'14 PIP/IE/SPITPL/2014/2192 Concessionaire Site Inspection Note No-33 dt. 10-04-’14.
35 12-04-'14 PIP/IE/SPITPL/2014/2193 Concessionaire Design and Drawings of Crash Barrier And Friction Slab-Comments.
36 12-04-'14 PIP/IE/SPITPL/2014/2194 Concessionaire Section-II- Un-Suitable/Un-Approved Soil Dumped in Embankment at Ch. 42+155
(RHS).
37 12-04-'14 PIP/IE/SPITPL/2014/2195 Concessionaire Change of Scope Proposal For Diversion of Nallah at Ch. 4+900 to 4+993 (RHS)-
Comments
38 12-04-'14 PIP/IE/SPITPL/2014/2196 Concessionaire Non- Closure of Long Pending NCR’s and Site Inspection Reports- Reminder No-3.
39 12-04-'14 PIP/IE/NHAI/2014/2197 NHAI Request Seeking Permission For Laying Optical Fiber Cable by Reliance Jio along NH-
17 from Km 0+000 to 28+824 -Comments.
40 12-04-'14 PIP/IE/NHAI/2014/2198 NHAI Parliament Election Polling Day.
41 19-04-'14 PIP/IE/SPITPL/2014/2199 Concessionaire Site Inspection No-034.
42 21-04-'14 PIP/IE/SPITPL/2014/2200 Concessionaire Revised Plan and Profile Drawing For Ch. 16+000 to 21+000 with Modified Cross
Section.
43 21-04-'14 PIP/IE/SPITPL/2014/2201 Concessionaire Revised Plan and Profile Drawing Main Carriageway For Ch. 30+000 to 31+000-
Concurrence.
44 21-04-'14 PIP/IE/SPITPL/2014/2202 Concessionaire Revised Plan and Profile Drawings of Main Carriageway For Ch. 25+000 to 27+000-
Comments.
45 21-04-'14 PIP/IE/NHAI/2014/2203 NHAI Leave Absence of Assistant Highway Engineer Mr. Neeraj. M. Patil.
46 21-04-'14 PIP/IE/SPITPL/2014/2204 Concessionaire NCR No-120-Kasu PUP Approach Panvel Side at Ch. 42+155 (RHS).
47 21-04-'14 PIP/IE/SPITPL/2014/2205 Concessionaire NCR No-121-Bituminous Concrete Done Without Constructing Kerb From Ch.
69+200 to 69+340 (RHS) & Ch. 69+800 to 69+900 (RHS).
48 21-04-'14 PIP/IE/SPITPL/2014/2206 Concessionaire NCR No-122-Kerb at Ch. 58+040 (RHS)- Formation of Kink Near Structure Location
(Minor Bridge).
49 21-04-'14 PIP/IE/SPITPL/2014/2207 Concessionaire NCR No-123-WMM IInd layer From Ch. 61+330 to 61+410 (RHS).
50 21-04-'14 PIP/IE/SPITPL/2014/2208 Concessionaire NCR No-124-Major Bridge at Ch. 44+155 Nigade (RHS).
51 21-04-'14 PIP/IE/SPITPL/2014/2209 Concessionaire NCR No-125-Kharpada Bridge at Ch. 15+878 (LHS).
Panvel - Indapur MPR No-27 April’14 Page 95
Sl
No Date Letter No. To Subject
52 21-04-'14 PIP/IE/SPITPL/2014/2210 Concessionaire NCR No-126- Kasu PUP RE wall Backfilling Panvel Side at Ch. 42+155 (RHS).
53 21-04-'14 PIP/IE/NHAI/2014/2211 NHAI Submission of Insurance Documents for Consultancy Services.
54 21-04-'14 PIP/IE/SPITPL/2014/2212 Concessionaire Design and Drawings of VUP at Ch. 23+460 (Hamarapur).
55 21-04-'14 PIP/IE/SPITPL/2014/2213 Concessionaire Section-II- Rectification Works For Mismatching of Highway And Structures.
56 21-04-'14 PIP/IE/SPITPL/2014/2214 Concessionaire NCR No-127- Box/Slab Culvert at Ch. 70+227.
57 21-04-'14 PIP/IE/SPITPL/2014/2215 Concessionaire NCR No-128-Box/Slab Culvert at Ch. 69+849.
58 21-04-'14 PIP/IE/SPITPL/2014/2216 Concessionaire NCR No-129-DBM in the Approach of Minor Bridge ‘Patansai’ at Ch. 57+976 (RHS).
59 21-04-'14 PIP/IE/SPITPL/2014/2217 Concessionaire Various Quality Issues.
60 21-04-'14 PIP/IE/SPITPL/2014/2218 Concessionaire Stoppage of Works From Ch. 54+300 to 55+800-Comments.
61 21-04-'14 PIP/IE/NHAI/2014/2219 NHAI Site Status Report No- 36 as on 15-04-’14.
62 23-04-'14 PIP/IE/SPITPL/2014/2220 Concessionaire NCR No-130-BC From Ch. 69+200 to 70+380 (RHS)-Surface Regularity Test not
Carried Out Over DBM Surface.
63 23-04-'14 PIP/IE/SPITPL/2014/2221 Concessionaire NCR No-131- Bhogeshwari Bridge at Ch. 26+188 (RHS)-Abutment A2 Retaining Wall.
64 23-04-'14 PIP/IE/SPITPL/2014/2222 Concessionaire NCR No-132- Bhogeshwari Bridge at Ch. 26+188 (RHS) Abutment A2 Crash Barrier.
65 23-04-'14 PIP/IE/SPITPL/2014/2223 Concessionaire NCR No-133- VUP Raft at Ch. 30+930 (RHS).
66 23-04-'14 PIP/IE/SPITPL/2014/2224 Concessionaire NCR No-134- Pen ROB Retaining Wall at Ch. 28+535 (LHS).
67 23-04-'14 PIP/IE/NHAI/2014/2225 NHAI Leave Absence of Sr. Quality Cum Material Expert Mr. M. V. K. Appa.
68 23-04-'14 PIP/IE/SPITPL/2014/2226 Concessionaire NCR No-135- BC Laying At CH. 71+000 to 71+050 (RHS).
69 23-04-'14 PIP/IE/SPITPL/2014/2227 Concessionaire Borrow Area No-43- Concurrence.
70 23-04-'14 PIP/IE/SPITPL/2014/2228 Concessionaire Source Approval For Procurement of Strip Seal Expansion Joint MAGEBA Bridge
Products. Pvt. Ltd-Comments.
71 23-04-'14 PIP/IE/SPITPL/2014/2229 Concessionaire Mix Design For Dry Lean Concrete -Concurrence.
72 24-04-'14 PIP/IE/SPITPL/2014/2230 Concessionaire Plan and Profile Drawing Service Road For Ch. 39+430 to 40+040-Comments.
73 24-04-'14 PIP/IE/SPITPL/2014/2231 Concessionaire NCR No-032- Ultrasonic Pulse Velocity and Rebound Hammer Test Results-Closure of
NCR.
Panvel - Indapur MPR No-27 April’14 Page 96
Sl
No Date Letter No. To Subject
74 24-04-'14 PIP/IE/SPITPL/2014/2232 Concessionaire Non Closure of NCR No-028- Nigade Major Bridge (Ch. 44+194) A2 Raft.
75 24-04-'14 PIP/IE/SPITPL/2014/2233 Concessionaire Site Inspection Note No-34 dt. 22-04-’14.
76 24-04-'14 PIP/IE/NHAI/2014/2234 NHAI Change of Scope Proposal for Increase In Span For Structures at Ch. 38+336 and
Ch. 43+133-Comments.
77 24-04-'14 PIP/IE/SPITPL/2014/2235 Concessionaire NCR No-034- Ultrasonic Pulse Velocity and Rebound Hammer Test Results- Closure.
78 24-04-'14 PIP/IE/SPITPL/2014/2236 Concessionaire Slow Progress of Shifting of MJP Water Pipeline.
79 24-04-'14 PIP/IE/NHAI/2014/2237 NHAI Change of Scope for Increase in Length of Service Road-Comments.
80 24-04-'14 PIP/IE/NHAI/2014/2238 NHAI Review Meeting Scheduled on 26-04-2014 at PIU Office, NHAI Pune-Details of
Attended.
81 28-04-'14 PIP/IE/SPITPL/2014/2239 Concessionaire Section-II-Mix Design For Pavement Quality Concrete -Concurrence.
82 28-04-'14 PIP/IE/NHAI/2014/2240 NHAI Leave Absence of Bridge Engineer Mr. Nagaraja Rao.
83 28-04-'14 PIP/IE/NHAI/2014/2241 NHAI Leave Absence of Asst. Quality Material Engineer Mr. Raffiuddin .N. Badure.
84 28-04-'14 PIP/IE/NHAI/2014/2242 NHAI Request to Release Withheld Amounts of our Invoices -Reminder No-12.
85 28-04-'14 PIP/IE/SPITPL/2014/2243 Concessionaire Quality Issues.
86 29-04-'14 PIP/IE/NHAI/2014/2244 NHAI Change of Scope Proposal For Diversion of Nallah at Ch. 4+900 to 4+993 (RHS)-
Comments
87 29-04-'14 PIP/IE/SPITPL/2014/2245 Concessionaire Design and Drawings of Crash Barrier And Friction Slab-Comments.
88 29-04-'14 PIP/IE/NHAI/2014/2246 NHAI Leave Absence of Assistant Highway Engineer Mr. Pillai Arun Rajan.
Panvel - Indapur MPR No-27 April’14 Page 97
Appendix-I
1. Stretch Panvel to Indapur Accident Data & Observations 2. Stretch Chainage 0+000 to 84+600. 3. State Maharashtra. 4. District Raigad
5. Police Station Palaspe, Nagothane, New Panvel, SP Traffic Control Office Alibag.
6. National Highway No. NH - 17
Month : April-2014
Sl No
Date Time of Accident (am/pm)
A B C D E F G H
Vehicle Responsible
No. of Affected Persons
No. of Animals Killed, if
any
Help provided by
Ambulance/ Patrol Vehicle
Remarks Accident Location
Nature of
Accident
Classification
of Acciden
t
Causes Road
Features
Road Condit
ion
Intersection
Type & Control
Weather Condition
Fatal
Grievous
Minor Non-
Injured
1 04-04-2014 12.45
Nagothen
petrol pump 4 3 2 1 6 1 Tralour +Truck Police
2 05-04-2014 19.00 Pugoan 4 3 2 1 4 1 Tanker + Tractor
Police
3 12-04-2014 11.00 khamb 4 3 2 4 4 1 car + car
Police
4 13-04-2014 16.45 Sukeli Pass 3 2 2 2 6 1 Maruti car +
M/cycle 2 Police
5 14-04-2014 14.45 Varas goan 3 2 2 4 4 1 2M/cycles 4 Police
6 15-04-2014 10.45 Barpada 3 2 2 4 4 1 unknown 1 Police
7 15-04-2014 JWR
Company 1 2 2 1 4 1 Tanker/ M Cycle 1 Police
8 16-04-2014 2.30 Sukeli Pass 2 3 2 4 1 1 ST Bus/ Mcycle 1 Police
9 16-04-2014 2.45 Namrata
Hotel 2 4 2 1 4 1 Tempo / Mcycle 3 Police
10 16-04-2014 16.30 Varas goan 4 3 2 1 4 1 car Police
11 17-04-2014 14.15 Nidi 1 2 2 4 5 1 Gas Tanker /
Mcycle 1 Police
12 17-04-2014 Turmale 2 3 2 4 4 1 Tempo/M cycle 1 Police
13 18-04-2014 16.10 Talavali 4 3 2 4 4 1 Jeep / car/ jeep Police
Panvel - Indapur MPR No-27 April’14 Page 98
14 19-04-2014 13.05 Patni
Pandapur 4 3 2 1 4 1 Police Jeep /car Police
15 24-04-2014 12.30 Ghandhe
pada 3 2 2 1 4 1
Container /
mcycle 1 Police
16 14-04-2014 9.45 Vakan 4 2 2 1 6 1 ST Bus / Tanker Police
17 24-04-2014 21.00 Ghotwal 2 2 2 4 4 1 Tanker / Tempo 3 Police
18 27-04-2014 15.00 Aamtem 3 2 2 1 4 1 Magic / Car 1 Police
19 27-04-2014 15.15 Palas 4 3 2 1 4 1 ST Bus / Dumper Police
20 27-04-2014 23.00 Ratwad 2 2 2 4 4 1 Car / Unknown 1 Police
21 30-04-2014 8.30 Khamb 1+2 2 2 4 4 1 Truck / Car 1 1 Police
'A' : Urban / Rural and Details of surrounding land use
'B' : 1 - Overturning, 2-Head on collision, 3 - Rear End Collision, 4 - Collision Brush / Side Wipe, 5 - Right Turn Collision, 6-Skidding, 7 - Right Turn Collision, 8 - Others (Pls Specific)
'C' : 1- Fata, 2 - Grievous Injury, 3 - Minor Injured, 4 - Non Injury
'D' :1 - Drunken, 2 - Overspending, 3 - Vehicle out of control, 4 - Fault of driver of motor vehicle / driver of other vehicle / cyclist / pedestrarian /, 5 - Defect in mechanical condition of motor vehicle / road condition
'E' : 1 - Single lane, 2 - Two lanes, 3 - three lanes or more without central divider (median), 4 - Four lanes or emore with Central divider
‘F’ : 1 - Straight road, 2 - Slight curve, 3 Sharp Curve, 4 - Flat Road, 5-Gentlre incline, 6 - Steel incline, 7 - Hump, 8-Dip
'G' : 1-T-Junction, 2 - Y-Junction, 3 - Four arm junction, 4-Staggered junction, 5-Junctioin with more than 4 arms, 6-Roundabout junction 7 - Manned rail crossing, 9-Unmanned rail crossing
'H' : 1 - Fine, 2 - Mist / Flag, 3- Cloudy, 4 - Light rain, 5-Heavy rain, 6-Hail / Sleet, 7 - Strong Wind, 9-Dust Storm, 10-Very Hot, 11-Very Cold, 12-Othe extraordinary weather condition
Panvel - Indapur MPR No-27 April’14 Page 99
The Accident data reported since May ’12 shows that frequent accidents are occurring at following locations:
Sl. No. Chainage (km) Village
1 37 + 500 Gadab
2 56 + 320 Nagothane
3 62 + 500 Sukheli
4 68 + 180 Khamb
Independent Road Safety Consultants (M/s CRAPHTS Consultants Pvt. Ltd.) has
identified the following locations as black spots:
(1) Nagothane (Ch. 54+000)
(2) Sukheli Khind (Ch. 65+000)
Panvel - Indapur MPR No-27 April’14 Page 102
`
Work Completed Till End of Last Month
P-1 P-3P-12 P-13 P-14 P-15 P-16 P-17P-2 P-4 P-5 P-6
P-8 P-9 P-10 P-11
P-7
Wadhkal Flyover at ch-33+860 LHS (Indapur bound)
P-6 P-17 P-18P-14 P-15 P-16 P-19P-7P-5P-4 P-12 P-13
Progress during this month
A-1 P-1 P-2 P-3
Wadhkal Flyover at ch-33+860 RHS (Indapur bound)
P-18 P-19P-8 P-9 P-10 P-11A-1
Panvel - Indapur MPR No-27 April’14 Page 103
`
`
P-39P-35 P-36 P-38P-22 P-23 P-24 P-25 P-26 P-37P-33 A-2
Wadhkal Flyover at ch-33+860 LHS (Indapur bound)
Wadhkal Flyover at ch-33+860 RHS (Panvel bound)
P-27 P-28 P-29 P-30 P-31 P-32P-20 P-21 P-34
P-30 P-31 P-39 A-2P-33 P-34 P-35 P-36 P-37 P-38P-32P-20 P-21 P-22 P-23 P-24 P-25 P-26 P-27 P-28 P-29
No. of Girder cast during this month : 2 NosWork Completed Till End of Last
Month
Progress during this month Total no of Girders : 304 Nos
No. of Girder cast till end of last month : 12 No
cc c c c c c c c c
c c c c c c c c c c
Panvel - Indapur MPR No-27 April’14 Page 104
`
No. of Girder cast till end of last month :24 Nos
Progress during this month Total no of Girders : 91 Nos
No. of Girder cast during this month : 2 NosWork Completed Till End of Last Month
A-1P-16 P-17P-11
Major Bridge at Ch. 15+879 (Kharpada)P-3
P-24 A-25P-18 P-19 P-20 P-21 P-22 P-23P-10 P-12 P-13 P-14 P-15
P-5P-4
P-6 P-7 P-8 P-9
P-2P-1
Panvel - Indapur MPR No-27 April’14 Page 105
No. of Girder cast till end of last month : 16NosProgress during this month
Major Bridge at Ch. 20+144 (Balganga)-RHS
Work Completed Till End of Last Month
Total no of Girders : 16 Nos
No. of Girder cast during this month : 0 Nos
A1P1 P2 P3
A2
Panvel - Indapur MPR No-27 April’14 Page 106
`
Major bridge at Ch. 26+188 (Bhogeshwari)-RHS-New Construction
A-1 P-1 P-2 P-3
P-4 P-5 P-6
A-2
Panvel - Indapur MPR No-27 April’14 Page 107
Major bridge at Ch. 26+188 (Bhogeshwari)-LHS-Existing Bridge Reconstruction
Progress during this monthTotal no of Girders : 28 Nos
No. of Girder cast till end of last month : 28 Nos
Work Completed Till End of Last Month No. of Girder cast during this month : 0 Nos
Panvel - Indapur MPR No-27 April’14 Page 108
Total No. of Girder : 24 No.Progress during this month
Work Completed Till End of Last Month
Major bridge at Ch. 44+155 (Nigade)-RHS
No. of Girder cast during this month : 2
No. of Girder cast ti l l end of last month : 11 Nos
P-2 P-4
A-2A-1 P-1 P-3 P-5
Panvel - Indapur MPR No-27 April’14 Page 109
Major bridge at Ch. 58+928 (Amba)-LHS
A-1 P-2 P-3 A-2P-1 P-4
Panvel - Indapur MPR No-27 April’14 Page 110
Total No. of Girder : 32 No.
No. of Girder cast till end of last month : 16 Nos
No. of Girder cast during this month : 1 Nos.
A-1 P-2 P-3 A-2P-1 P-4
Work Completed Till End of Last Month
Progress during this month
Major bridge at Ch. 58+928 (Amba)-RHS
Panvel - Indapur MPR No-27 April’14 Page 111
Progress during this month
P-9
Major bridge at ch. 72+936 (Kundlika)-RHS
P-5 P-6 P-7 P-8
Work Completed Till End of Last Month
P-10
A-2
P-11A-1
P-1 P-2 P-3 P-4
Panvel - Indapur MPR No-27 April’14 Page 112
Minor Bridge at Ch. 0+554 (LHS)
A-1P-1
P-2 A-2
A-2
Minor Bridge at Ch. 0+554 (RHS)
A-1 P-1 P-2
A2P-1 A-2
A1Minor Bridge at Ch. 9+363-LHS
A2P-1
Work Completed Till End of Last Month
A-2A1
Minor Bridge at Ch. 9+363-RHS
Progress during this month
Panvel - Indapur MPR No-27 April’14 Page 113
Minor Bridge at Ch. 20+754 (Balivali) -LHS
A2A1P1 P2 P3
A-1 P-2 A-2P-1
Minor Bridge at Ch. 29+728 (LHS)
A2
Minor Bridge at Ch. 30+557 (Uchede)-RHS
P-1
Progress during this month
Work Completed Till End of Last Month
A-2A1
Panvel - Indapur MPR No-27 April’14 Page 114
Minor Bridge at Ch. 52+155 (Nidhi)-RHS
A1 P1 P2 P3 A2
A2P-1 A-2A1
Minor Bridge at Ch. 57+976 (Patansai)-RHS
A2A- 2A-1
Minor Bridge at Ch. 59+396 (RHS)
A2
Work Completed Till End of Last Month
Progress during this month
A- 2A-1 Minor Bridge at Ch. 59+848 (Godsai)-RHS
Panvel - Indapur MPR No-27 April’14 Page 115
62+01
`
A2
Minor Bridge at Ch. 62+345-(RHS) A- 2A-1
A2
Minor Bridge at Ch. 63+333-(RHS) A- 2A-1
A2P-1 A-2A1
Minor Bridge at Ch. 64+236-(RHS)
A2
Minor Bridge at Ch. 66+810(LHS)
Progress during this month
Work Completed Till End of Last Month
Panvel - Indapur MPR No-27 April’14 Page 116
A2
Minor Bridge at Ch. 66+810(RHS)
A2Minor Bridge at Ch. 67+099 (LHS)A-1 A- 2
A2A1 A-2
Minor Bridge at Ch. 67+099-(RHS)
A2
Work Completed Till End of Last Month
Progress during this month
P-1 A-2A1
Minor Bridge at Ch. 67+878-(RHS)
Panvel - Indapur MPR No-27 April’14 Page 117
A2
Minor Bridge at Ch. 68+988-(RHS) A- 2A-1
A2A- 2A-1 Minor Bridge at Ch. 69+140-(RHS)
A-1 P-2 A-2P-1
Minor Bridge at Ch. 72+250-(LHS)
A-2P-1P-3
P-4
Progress during this month
Work Completed Till End of Last Month
A-1 P-2
Minor Bridge at Ch. 73+350-(RHS)
Panvel - Indapur MPR No-27 April’14 Page 118
Minor Bridge at Ch. 77+804 (BHUVAN)-(RHS)
A1 P1 A2
Minor Bridge at Ch. 81+660-(RHS)
A-1 A-2P-2P-1
A2
Minor Bridge at Ch. 83+920(LHS)
A- 2A-1
P-2 A-2P-1A-1
Work Completed Till End of Last Month
Minor Bridge at Ch. 84+488 (INDAPUR)-(RHS)
A-1 P-1 P-2
Progress during this month
A-2
Panvel - Indapur MPR No-27 April’14 Page 119
Appendix-L
Status of Vehicular Underpasses
Vehicular Underpass (VUP) at Ch. 5+000 - Chinchvan
RHSLHS
Vehicular Underpass (VUP) at Ch. 25+873 (LHS) - Khopoli
Work Completed Till End of Last Month
Progress during this month
Vehicular Underpass (VUP) at Ch. 27+155 - Pen(Converted to VUP)
LHS RHS
Panvel - Indapur MPR No-27 April’14 Page 120
LHS RHSVehicular Underpass (VUP) at Ch. 27+760 - PEN
Vehicular Underpass (VUP) at Ch. 28+535 - (PEN) PUP Converted to VUPLHS RHS
LHS RHS
Vehicular Underpass (VUP) at Ch. 30+930 WADKHAL
Work Completed Till End of Last Month
LHS RHS
Vehicular Underpass (VUP) at Ch. 33+670 WADKHAL
Progress during this month
Panvel - Indapur MPR No-27 April’14 Page 121
Vehicular Underpass (VUP) at Ch. 54+450 - Nagothane(ADDITIONAL)LHS RHS
Vehicular Underpass (VUP) at Ch. 56+060 - NagothaneLHS RHS
Vehicular Underpass (VUP) at Ch. 73+760 - Kolad LHS RHS
Work Completed Till End of Last Month
LHS RHS
Progress during this month
Vehicular Underpass (VUP) at Ch. 74+780 - Kolad(SH-60)(ADDITIONAL)
Panvel - Indapur MPR No-27 April’14 Page 122
Appendix-M
Status of Pedestrian Underpasses
Pedestrian Underpass (PUP) at Ch. 1+230 - Palaspe
LHS RHS
Pedestrian Underpass (PUP) at Ch. 13+625 -Tara
LHS RHS
Pedestriann Underpass (PUP) at Ch. 18+700 - Jite
LHS RHS
Work Completed Till End of Last Month
Progress during this month
Pedestrian Underpass (PUP) at Ch. 30+112 (UCHEDE)
LHS RHS
Panvel - Indapur MPR No-27 April’14 Page 123
Pedestrian Underpass (PUP) at Ch. 37+529
LHS RHS
Pedestrian Underpass (PUP) at Ch. 39+740 KHAPALE (ADDITIONAL)
LHS RHS
Pedestrian Underpass (PUP) at Ch. 42+155 - KasuLHS RHS
q
Work Completed Till End of Last Month
Progress during this month
Pedestrian Underpass (PUP) at Ch. 45+225 - NigadeLHS RHS
Panvel - Indapur MPR No-27 April’14 Page 124
Pedestrian Underpass (PUP) at Ch. 49+280 - KoletiLHS RHS
Pedestrian Underpass (PUP) at Ch. 50+845 -PALAS (ADDITIONAL)
LHS RHS
Pedestrian Underpass (PUP) at Ch. 55+840 - NagothaneLHS RHS
Work Completed Till End of Last Month
Progress during this month
Pedestrian Underpass (PUP) at Ch. 68+320 - KhambLHS RHS
Panvel - Indapur MPR No-27 April’14 Page 125
RHSPedestrian Underpass (PUP) at Ch. 76+315 - Talavali
LHS
Work Completed Till End of Last Month
LHS RHSPedestrian Underpass (PUP) at Ch. 79+140 - Ratvad
Progress during this month
Panvel - Indapur MPR No-27 April’14 Page 126
Appendix-N
1 5+349 5+381
2 5+435 5+493
3 6+524 6+531
4 6+864 6+872
5 7+011 7+014
6 8+087 8+095
7 8+305 8+248
8 8+541 8+498
9 8+915 8+879
10 9+571 9+570
11 9+937 9+984
12 16+815 16+813
13 17+514 17+513
14 18+040 18+038
15 18+446 18+481
16 20+963 20+968
17 24+259 24+248
18 27+524 27+508
19 28+383 28+091
20 30+898 30+940
21 32+740 32+946
22 33+050 33+019
23 34+100 34+130
24 34+273 34+348
25 34+594 34+687
26 34+726 34+804
27 35+706 35+786
28 35+941 36+019
29 36+157 36+235
30 36+319 36+408
31 36+504 36+581
32 36+665 36+743
33 36+837 36+915
34 37+028 37+106
35 37+432 37+520
36 38+269 38+336
37 38+801 38+801
38 38+952 39+030
39 39+030 39+133
40 39+358 39+436
41 39+454 39+532
42 39+640 39+640
43 39+807 39+807
44 40+246 40+246
45 40+564 40+564
Progress during this Month
PC
C
Fo
un
da
tio
n
Ab
utm
en
t/
Wa
ll
Work Completed Till End of Last Month
Ab
utm
en
t/
Wa
ll
De
sig
n
Ch
ain
ag
e
SR LHS
Ex
ca
va
tio
n
PC
C
Status Of Slab Culverts/Box Culverts MCW LHS MCW RHS
Ex
ca
va
tio
n
PC
C
Fo
un
da
tio
n
Ab
utm
en
t/
Wa
ll
Ex
ca
va
tio
n
Sl.
NoC
ha
ina
ge
(A
s
pe
r C
A)
Fo
un
da
tio
n
Ab
utm
en
t/
Wa
ll
SR RHS
Ex
ca
va
tio
n
PC
C
Fo
un
da
tio
n
Panvel - Indapur MPR No-27 April’14 Page 127
46 40+750 40+750
47 40+906 40+906
48 41+125 41+125
49 41+268 41+268
50 41+414 41+414
51 41+481 41+559
52 41+888 41+966
53 42+170 42+249
54 42+442 42+520
55 42+967 42+922
56 43+055 43+045
57 43+326 43+133
58 45+264 45+343
59 45+489 45+568
60 45+672 45+751
61 45+784 45+864
62 45+889 45+977
63 45+939 46+016
64 46+042 46+122
65 46+238 46+313
66 46+544 46+619
67 47+169 47+244
68 47+353 47+428
69 47+428 47+627
70 47+752 47+750
71 47+833 47+909
72 48+725 48+722
73 48+800 48+870
74 50+093 50+163
75 50+460 50+531
76 51+407 51+478
77 51+611 51+681
78 52+269 52+335
79 52+416 52+484
80 52+773 52+841
81 53+390 53+456
82 53+594 53+661
83 53+825 53+900
84 54+746 54+815
85 55+266 55+335
86 56+099 56+165
87 56+449 56+517
88 56+583 56+651
89 57+022 57+090
90 57+256 57+325
Work Completed Till End of Last Month Progress during this Month
PC
C
Fo
un
da
tio
n
Ab
utm
en
t/
Wa
ll
SR RHS
Ex
ca
va
tio
n
PC
C
Fo
un
da
tio
n
Ab
utm
en
t/
Wa
ll
Status Of Slab Culverts/Box Culverts
Sl.
No
Ch
ain
ag
e (
As
pe
r C
A)
MCW LHS MCW RHS
Ex
ca
va
tio
n
PC
C
Fo
un
da
tio
n
Ab
utm
en
t/
Wa
ll
Ex
ca
va
tio
n
PC
C
Fo
un
da
tio
n
Ab
utm
en
t/
Wa
ll
De
sig
n C
ha
ina
ge
SR LHS
Ex
ca
va
tio
n
Panvel - Indapur MPR No-27 April’14 Page 128
91 57+465 57+533
92 57+733 57+801
93 58+133 58+201
94 64+057 64+119
95 64+317 64+391
96 67+977 68+036
97 68+556 68+615
98 68+768 68+827
99 69+789 69+849
100 70+167 70+227
101 70+477 70+537
102 70+636 70+694
103 70+911 70+971
104 71+019 71+086
105 71+441 71+502
106 71+626 71+685
107 73+577 73+686
108 74+264 74+323
109 74+404 74+463
110 74+611 74+650
111 74+750 74+809
112 74+877 74+936
113 75+100 75+159
114 75+306 75+365
115 75+502 75+561
116 75+548 75+608
117 75+530 75+790
118 75+852 75+912
119 75+906 75+963
120 76+038 76+097
121 76+141 76+200
122 76+393 76+452
123 76+512 76+571
124 76+979 77+038
125 77+206 77+265
126 77+315 77+376
127 77+934 77+997
128 78+105 78+167
129 78+803 78+855
130 79+221 79+221
131 79+403 79+464
132 80+110 80+169
133 80+494 80+554
134 81+155 81+213
135 82+525 82+583
136 84+252 84+308
Work Completed Till End of Last Month Progress during this Month
Status Of Slab Culverts/Box Culverts
De
sig
n
Ch
ain
ag
e
SR LHS
Ex
ca
va
tio
n
PC
C
Fo
un
da
tio
n
Ab
utm
en
t/
Wa
ll
SR RHS
Ex
ca
va
tio
n
PC
C
Fo
un
da
tio
n
Ab
utm
en
t/
Wa
ll
Sl.
NoC
ha
ina
ge
(A
s
pe
r C
A)
MCW LHS MCW RHS
PC
C
Fo
un
da
tio
n
Ab
utm
en
t/
Wa
ll
Ex
ca
va
tio
n
PC
C
Fo
un
da
tio
n
Ab
utm
en
t/
Wa
ll
Ex
ca
va
tio
n
Panvel - Indapur MPR No-27 April’14 Page 129
Appendix-O
1 0+393 0+402
2 0+578 0+607
3 0+657 0+698
4 0+900 0+900
5 1+188 1+198
6 1+280 1+288
7 1+667 1+678
8 1+774 1+753
9 2+092 2+100
10 2+196 2+208
11 2+395 2+405
12 2+660 2+774
13 3+066 3+075
14 3+242 3+251
15 3+403 3+467
16 3+658 3+676
17 3+884 3+893
18 4+365 4+375
19 4+794 4+804
20 5+031 5+040
21 5+331 5+360
22 5+637 5+638
23 5+724 5+731
24 5+756 5+767
25 5+845 5+852
26 6+012 6+021
27 6+183 6+190
28 6+448 6+454
29 6+595 6+605
30 6+728 6+736
31 7+170 7+014
32 7+308 7+310
33 7+567 7+571
34 7+811 7+816
35 8+047 8+055
36 8+195 8+130
37 8+246 8+192
38 8+303 8+306
39 8+499 8+444
40 8+606 8+538
41 8+670 8+606
42 8+723 8+672
43 8+758 8+725
44 8+967 8+920
45 9+107 9+110
46 9+265 9+264
47 9+460 9+460
48 9+612 9+612
49 9+705 9+709
50 9+844 9+849
51 10+164 10+168
52 10+260 10+264
53 10+412 10+413
Work Completed Till End of Last Month Progress during this Month
MCW RHS
Ex
ca
va
tio
n
PC
C
Pip
e L
ay
ing
He
ad
Wa
ll
Ex
ca
va
tio
n
PC
C
Pip
e L
ay
ing
Sl.
No
Ch
ain
ag
e
Status Of Hume Pipe Culverts
MCW LHS
He
ad
Wa
ll
De
sig
n C
ha
ina
ge
SR LHS
Ex
ca
va
tio
n
PC
C
Pip
e L
ay
ing
He
ad
Wa
ll
SR RHS
Ex
ca
va
tio
n
PC
C
Pip
e L
ay
ing
He
ad
Wa
ll
Panvel - Indapur MPR No-27 April’14 Page 130
54 10+464 10+466
55 10+602 10+603
56 10+901 10+903
57 11+100 11+102
58 11+175 11+174
59 11+292 11+295
60 11+422 11+421
61 11+481 11+480
62 11+595 11+599
63 11+678 11+677
64 11+760 11+764
65 11+877 11+880
66 12+055 12+055
67 12+144 12+148
68 12+259 12+258
69 12+497 12+497
70 12+566 12+567
71 12+658 12+659
72 12+825 12+826
73 13+179 13+180
74 13+395 13+394
75 13+527 13+524
76 13+924 13+922
77 14+172 14+170
78 14+242 14+272
79 14+380 14+380
80 14+511 14+511
81 14+858 14+858
82 15+169 15+170
83 17+970 17+970
84 18+379 18+428
85 18+482 18+557
86 18+556 18+935
87 18+808 19+322
88 18+918 19+425
89 19+208 19+711
90 19+323 19+820
91 21+284 21+284
92 21+551 21+551
93 22+169 22+168
94 22+804 22+798
95 23+077 23+070
96 23+166 23+158
97 23+315 23+377
98 23+375 23+377
99 23+562 23+564
100 23+945 23+950
101 23+643 23+635
102 24+454 24+460
103 24+710 24+701
104 24+848 24+841
105 24+930 24+921
106 25+181 25+172
107 25+447 25+450
108 25+301 25+292
109 25+672 25+667
110 25+668 25+701
111 25+968 25+954
Work Completed Till End of Last Month Progress during this Month
PC
C
Pip
e L
ay
ing
He
ad
Wa
ll
Ch
ain
ag
e
De
sig
n
Ch
ain
ag
e
Ex
cav
ati
on
PC
C
Pip
e L
ay
ing
Status Of Hume Pipe Culverts
Ex
cav
ati
on
PC
C
Pip
e L
ay
ing
He
ad
Wa
ll
SR LHS SR RHS
Ex
cav
ati
on
Sl.
No
MCW LHS MCW RHS
Ex
cav
ati
on
PC
C
Pip
e L
ay
ing
He
ad
Wa
ll
He
ad
Wa
ll
Panvel - Indapur MPR No-27 April’14 Page 131
112 26+409 26+410
113 26+587 26+574
114 26+662 26+660
115 26+769 26+769
116 26+863 26+865
117 27+132 27+122
118 27+493 27+459
119 27+785 27+768
120 28+583 29+103
121 29+298 29+290
122 29+959 29+959
123 30+201 30+193
124 30+700 30+679
125 31+007 31+017
126 31+315 31+323
127 31+449 31+461
128 32+220 32+217
129 34+445 34+522
130 34+791 34+871
131 35+003 35+079
132 35+040 35+254
133 35+178 35+501
134 35+238 35+606
135 35+425 35+519
136 35+529 35+725
137 37+223 37+301
138 37+378 37+368
139 37+586 37+664
140 37+694 37+771
141 37+805 37+883
142 41+736 41+783
143 42+134 42+127
144 42+325 42+412
145 42+844 42+808
146 43+436 43+514
147 43+637 43+719
148 44+415 44+620
149 44+731 44+838
150 48+265 48+230
151 48+375 48+340
152 48+652 48+700
153 49+073 49+146
154 49+178 49+250
155 49+527 49+597
156 49+683 49+756
157 49+963 50+033
158 50+040 50+111
159 50+365 50+435
160 50+562 50+694
161 50+738 50+808
162 50+874 50+916
163 51+303 51+367
164 51+705 51+775
165 51+758 51+829
166 51+916 51+985
167 52+604 52+672
Work Completed Till End of Last Month Progress during this Month
Pip
e L
ay
ing
He
ad
Wa
ll
PC
C
MCW LHS
PC
C
Pip
e L
ay
ing
He
ad
Wa
ll
Ex
cav
ati
on
Status Of Hume Pipe Culverts
Sl.
No
Ch
ain
ag
e
SR RHS
Ex
cav
ati
on
PC
C
Pip
e L
ay
ing
He
ad
Wa
ll
He
ad
Wa
ll
De
sig
n
Ch
ain
ag
e
SR LHS
Ex
cav
ati
on
PC
C
Pip
e L
ay
ing
MCW RHS
Ex
cav
ati
on
Panvel - Indapur MPR No-27 April’14 Page 132
168 53+126 53+204
169 53+276 53+355
170 53+977 54+015
171 54+254 54+254
172 54+446 54+515
173 54+563 54+630
174 54+971 54+980
175 54+987 55+055
176 55+018 55+087
177 55+553 55+621
178 55+794 55+862
179 56+166 56+234
180 56+544 56+517
181 57+952 58+018
182 58+173 58+241
183 58+222 58+290
184 58+632 58+700
185 59+290 59+350
186 60+921 60+984
187 62+397 62+460
188 63+000 63+063
189 63+486 63+548
190 63+805 63+866
191 64+149 64+210
192 64+608 64+665
193 64+685 64+742
194 64+808 64+808
195 64+874 64+842
196 64+915 64+931
197 65+069 65+060
198 65+115 65+127
199 65+348 65+407
200 65+987 66+0691
201 66+073 66+135
202 66+314 66+373
203 67+485 67+544
204 67+676 67+735
205 67+743 67+801
207 68+207 68+266
208 68+328 68+400
209 68+408 68+480
210 69+520 69+580
211 70+477 70+537
212 70+574 70+660
213 70+765 70+825
214 71+018 71+078
215 71+205 71+265
216 72+016 72+075
217 72+213 72+085
218 72+391 73+450
219 72+491 73+550
220 74+591 74+575
221 74+970 75+029
222 76+341 76+400
223 78+537 78+598
224 78+697 78+755
225 79+714 79+764
226 80+912 80+941
227 81+772 81+861
228 82+986 82+900
229 83+629 83+687
Work Completed Till End of Last Month Progress during this Month
Ex
cav
ati
on
PC
C
He
ad
Wa
ll
SR LHS
Ex
cav
ati
on
PC
C
Pip
e L
ay
ing
He
ad
Wa
ll
Status Of Hume Pipe Culverts
Pip
e L
ay
ing
De
sig
n C
ha
ina
ge
He
ad
Wa
ll
Sl.
No
Ch
ain
ag
e
MCW LHS MCW RHS
Ex
cav
ati
on
PC
C
SR LHS
Ex
cav
ati
on
PC
C
Pip
e L
ay
ing
Pip
e L
ay
ing
He
ad
Wa
ll