MINISTRY OF LANDS & NATURAL RESOURCES
NATIONAL FOREST PLANTATION DEVELOPMENT PROGRAMME
MINISTRY OF LANDS & NATURAL RESOURCES
ANNUAL REPORT 2013
2i
FOREST SERVICES DIVISION - FORESTRY COMMISSION JUNE, 2014
Cover photos:
Photos (L - R): A member of the Deputy Minister's team expressing satisfaction after inspection of a plantation stand established by Mere Plantations Limited. A 2003 MTS teak plantation within the Opro River Forest Reserve in the Offinso Forest District. An inspection team taking sample dbh measurement in a 2002 MTS teak stand within the Mankrang River Forest Reserve - Offinso Forest District. Side Photos (T - B): Eucalyptus camaldulensis seedlings delivered at a planting site in the Kamba F/R, Lawra Forest District. Tractors used by NICOL-MIRO for site preparation in the Boumfum Forest Reserve, Kumawu Forest District. A two months old teak stand established by NICOL-MIRO in the Boumfum Forest Reserve, Kumawu Forest District.
Main Photo: The Hon. Deputy Minister for Lands and Natural Resources with the Director of Operations, Plantations, and the Ashanti Regional Manager, FSD during an inspection of the 2007 mixed plantation within the South Formangsu Forest Reserve in the Juaso Forest District. Bottom
August, 2014
3
EXECUTIVE SUMMARY This is a progress report covering key activities undertaken under the National Forest Plantation Development Programme (NFPDP) during the 2013 plantation year (April, 2013 - March, 2014). The National Forest Plantation Development Programme (NFPDP) chalked its 11th year in 2013 in pursuit of its goal of "developing a sustainable resource base that will satisfy the future demand for industrial timber and enhance environmental quality, thereby relieving the pressure on the natural forest and increasing the forest cover". The main interventions in 2013 were the establishment of forest plantations by the Forest Services Division, the FC/Timber Industry Fund Committee, the FC/FORM Ghana PPP and private commercial forest plantation developers on-reserve. The NFPDP was expected to deliver the following key outputs for 2013: establishment of 4,100ha of forest plantations on-reserve and maintenance of 18,987.55ha of 2010-2012 established plantations handed over to the FC by the Service Companies (Zoil and Ecotech Services Limited) in December 2013; creation of 3,100 jobs and production of 27,000 Metric Tonnes of food crops within 2011, 2012 and 2013 plantation coupes. A total of 5,784.86ha was established in 2013 under 3 components of the NFPDP, generating 5,184 jobs. These components comprise the FC/ Timber Industry plantations, Private Commercial Developers on-reserve and the FSD 2013 plantations. African Plantations for Sustainable Development Ghana Limited (APSD), a large scale off-reserve plantation developer, also established 1,565ha and provided 525 jobs in 2013. Under the FSD 2013 Plantations, 2,857.61ha were established out of a target of 3,000ha with 2,504 temporary jobs created and 3,174,802 seedlings supplied by forest fringe communities and private seedling nurseries. A total amount of GH¢2,524,029.92 was disbursed for the FSD plantation establishment activities. An estimated 28,919.88 Metric Tonnes (MT) of food crops were produced within the 2011 - 2013 plantation coupes (15,431.66ha) compared to 46,502.78MT within the 2010 - 2012 plantation coupes (26,582.89ha). The major crops produced in 2013 were Plantain – 14,780.90MT, Cereals (maize, millet and rice) – 5,474.64MT, Tubers (Cocoyam, Cassava and Yam) – 7,580.44MT, Legumes (Beans, Cowpea, Groundnut and Sorghum) – 834.09MT and Vegetables (Tomato, Pepper, Garden Eggs) – 1,577.92MT. A total of 2,746.51ha was planted by 56 commercial developers on-reserve in 2013. This brings the total area developed by private commercial plantation developers within forest reserves to 35,490.79ha. An estimated 2,350 jobs were generated by these private commercial developers in 2013. Sixteen (16) private developers signed Land Leases and Benefit Sharing Agreements (LL/BSAs) in 2013 resulting in One Hundred and Twenty-six (126) LL/BSAs being signed to date. In the year under review, the FC signed a Public Private Partnership (PPP) agreement with FORM Ghana to jointly undertake a commercial plantation covering 14,596ha within Tain II forest reserve in the Sunyani Forest District. Within the partnership, FORM Ghana is eligible for 80% of the plantation proceeds and benefits with the Forestry Commission, Landowners and Forest fringe communities eligible for the remaining 20%. The planting target for 2013 was 600ha and 640ha was reported planted.
4iii
The PPP to date has employed 60 permanent employees and 267 temporary labourers under this project. Most of the recruited staff were from the forest fringe communities. The temporary workers were recruited for weeding, land preparation and planting up of the project area. 650 additional workers are envisaged to be recruited for the 2014 target of 2,000ha. Wildfire reports at the end of March 2014 indicated that 3,362ha of plantations within the 2010 - 2013 coupes were affected by fire during the 2013/2014 fire season (November 2013 – March 2014). The key challenge to the NFPDP is the absence of a reliable and adequate source of funding for plantation establishment and maintenance, and adequate vehicles/motorbikes for effective monitoring by FSD field staff. Going forward, there is the need to undertake field verification of all reported past plantation establishment achievements especially the Modified Taungya System (MTS), Community Forestry Management Project (CFMP) and the Private Commercial Developers on-reserve. There is also the need to finalise and implement the Ghana Forest Plantation Strategy (2015 – 2040) which seeks to among others, create an enabling environment for public and private investments in forest plantations. Training and provision of key logistics to FSD field staff and maintenance of established plantations should be highly prioritised.
51
1.0 INTRODUCTION The Forestry Commission has been implementing the National Forest Plantation Development Programme (NFPDP) since 2002 under various components, based on funding sources and implementation strategies. The goal of the NFPDP is to develop a sustainable resource base that will satisfy the future demand for industrial timber and enhance environmental quality, thereby relieving the pressure on the natural forest and increasing the forest cover.
There are five (5) specific objectives of the NFPDP as listed below:
i. To restore the forest cover of degraded forest lands ii. To reduce the wood supply deficit situation in the country iii. To generate employment as a means to reduce rural poverty iv. To improve environmental quality and provide an opportunity for the country to tap the
emerging benefits from the climate change market for carbon sequestration v. To enhance production of food crops and contribute to food security in the country
Fig. 1: Eucalyptus camaldulensis seedlings delivered at a planting site in the Kamba F/R, Lawra Forest District
6
Fig. 2: Site within the Boumfum Forest Reserve, Kumawu Forest District, prepared for planting by NICOL-MIRO At the end of 2013, a total area of 177,296.32ha had been established under the NFPDP as detailed in Table 1 below: Table 1: NFPFP Components and achievements from 2002 to 2013
YEAR MTS (ha)
CFMP (ha)
HIPC (ha)
PRIVATE DEVELOPERS
(ha)
FSD PLANTATIONS
(ha) EXPANDED PROGRAM
(ha)
FC/ Industry
Plantations Fund (ha)
TOTAL PLANTED AREA (ha)
2002 17,341.00* 1,609.00** 18,950.00
2003 17,541.00* 1,609.00** 19,150.00
2004 16,090.00* 5,509.84 1,609.00** 23,208.84
2005 9,105.00* 1,136.00* 3,341.93 1,609.00** 15,191.93
2006 9,401.00* 2,298.00* 2,708.50 1,609.00** 16,016.50
2007 8,711.00* 2,731.00* 2,947.82 1,613.00** 78.5* 16,081.32
2008 111* 2,930.00* 1,806.67 6,107.16* 160* 11,114.83
2009 2,427.30* 4,293.00* 902.84 4,014.89* 140* 11,778.03
2010 4,733.38* 14,008.841 106.82 18,849.04
2011 4,560.42* 6719.7111 270.77 11,550.90
2012 3670.43* 5,854.341 95.3 9,620.07
2013 2746.51* 2,857.61 180.74 5,784.86
TOTAL 80,727.30 13,388.00 17,217.60 35,490.79 3,236.11 26,582.89 653.63 177,296.32
*Reported figures, yet to be verified by technical audit **Achievement of Private Developers for the period 2002-2007 has been estimated based on total establishment collated at the end of 2007 , averaged over the period, due to lack of proper documentation on yearly achievements. 1Figures reviewed in 2013 following a joint verification of the effective area planted by the Service Companies and the Forest Services Division
73
The programme was expected to deliver the following on-reserve key outputs for the year 2013: i. 4,100ha of forest plantations [3,000ha by Forest Services Division of the Forestry
Commission; 600ha of commercial plantations established under a Public Private Partnership (PPP) with FORM Ghana; and 500ha by the FC/Industry Plantations Development Fund].
ii. Maintenance of 18,987.55ha of 2010, 2011 and 2012 plantation coupes established under the Expanded Plantation Program and handed over by the Service Companies.
iii. 3,100 new jobs provided by the 4,100ha to be established by the FSD, FC - FORM Ghana
PPP and FC/Industry plantations. iv. Production of 27,000 Metric Tonnes of food within 2011, 2012 and 2013 plantation coupes.
84
2.0 BRIEF DESCRIPTION OF NFPDP COMPONENTS AND ACHIEVEMENTS Nine (9) components have been implemented to date and brief descriptions of the components and their achievements are provided below. An area of 5,784.86ha was established in 2013 under 3 components of the NFPDP. These components comprise the FC/Industry plantations, the Private Commercial Developers on-reserve and the FSD 2013 plantations.
2.1 The Modified Taungya System (MTS) 2002 - 2009 The MTS involved the establishment of forest plantations by the Forest Services Division (FSD) in partnership with farmers in forest fringe communities.
The FSD provided technical direction, surveyed and demarcated degraded forest reserve lands and supplied pegs and seedlings while the farmers provided all the labour inputs in the form of site preparation, pegging, planting, tending and fire protection.
The farmers were permitted to cultivate their food crops which were inter-planted with the tree crops on the same piece of land. The farmers, in addition to the food crops they harvested, have a 40% share in the Standing Tree Value (STV) of the planted trees. During the year, sixty (60) Benefit Sharing Agreements for the Modified Taungya System were prepared for signing in the Mampong Forest District. To date 296 forest fringe communities out of an estimated 2,000 have signed the MTS Benefit Sharing Agreements.
Fig. 4: Head Office team on an inspection visit to an MTS stand, crossing the Tano
River into the Mankrang River Forest Reserve - Offinso Forest District.
Fig. 3: A Forest Guard taking sample diameter at breast height (DBH) measurements of a 2003 MTS Cedrela stand in the Afram
Headwaters Forest Reserve - Offinso Forest District
9
5
The Government has a 40% share while the landowner and community will have a 15% and 5% share respectively. Figs. 5 and 6 below show some MTS stands in the Offinso Forest District in the Ashanti Region that require thinning and pruning. The MTS was implemented in degraded forest reserves in the High Forest Zone of Ghana. 80,727.30ha were reported planted but this has not been verified through a technical audit. The major constraint to this model has been the inability of the participating farmers to undertake the expected maintenance of the established plantations after the harvesting of their food crops. A number of MTS plantations, especially 2002 – 2005 coupes, are due for thinning and this will be a key activity in 2014.
Fig. 5: 2003 MTS teak stand in the Opro River Forest Reserve in the Offinso Forest District
Fig. 6: 2002 MTS teak stand in the Mankrang River Forest Reserve in the Offinso Forest District
106
Fig. 7: Inspection t s i a 2002 MTS teak stand within the Mankrang River Forest Reserve - Offinso Forest District
2.2 Government Plantation Development Programme (GPDP) 2004 - 2009 The GPDP utilized hired labour and contract supervisors to establish industrial plantations. Plantation workers were hired and paid a monthly allowance to establish and maintain plantations while plantation supervisors were engaged on contract basis to supervise and offer technical direction at the site level.
The FSD exercised general oversight and monitored field activities to ensure compliance with quality standards for plantation establishment. This strategy was funded through the Highly Indebted Poor Countries (HIPC) benefits. Under the scheme plantations developed are owned by government and the respective landowners who are entitled to royalty payments.
The GPDP was also implemented in degraded forest reserves within the High Forest Zone of Ghana. 17,217.60ha were established, however, maintenance has not been carried out within the stands as expected due to the lack of funds from government.
2.3 Community Forestry Management Project (CFMP) 2005 - 2009 The CFMP was funded with a loan from the African Development Bank (AfDB) and adopted the MTS model for the establishment of forest plantations.
13,388ha was reported established within degraded forest reserves in the Brong Ahafo (Sunyani Forest District), Ashanti (Offinso Forest District) and Eastern Region (Begoro and Akim Oda Forest Districts) of Ghana. The reported established area is yet to be verified through a technical audit.
eam taking sample dbh measurement n
117
2.4 Model Plantation component 2007 - 2009
In 2007 the Model Plantation component, a purely research based scheme was introduced to offer the FC plantation managers the opportunity to undertake mixed species trials and experiment with various planting designs and tree spacing. Tree spacing so far tried include 3m x 3m, 3m x 2m and 2.5m x 2.5m. Mixed exotic-indigenous species planting designs implemented include MS 3-12, MS 4-8, and MS 3-6-12.
378.5ha of model plantations was reported established within the High Forest and Transitional Zones of Ghana in degraded forest reserves.
2.5 Expanded Plantation Program (EPP) 2010 - 2012 The plantation program was expanded to include private lands located outside forest reserves. The Expanded Plantation Program (EPP) ensured that most of the Metropolitan/Municipal/District Assemblies without degraded forest reserves also benefited from the job opportunities being created through the National Forest Plantation Development Programme (NFPDP).
Under the Expanded Plantation Program, private companies were contracted to undertake the establishment and maintenance of plantations and the supply of seedlings. Messrs Zoil Services Ltd and Ecotech Services Ltd undertook the establishment and maintenance whilst Messrs African Foresters Brigade supplied the seedlings. The Forestry Commission played a monitoring and reporting role under this program. Maintenance of these stands have not been the best as shown in Fig. 8 below:
Fig. 8: 2010 EPP stand of Cedrela and Ofram trees in Bosomkese Forest Reserve, Bechem Forest District, engulfed by weeds.
128
A total of 26,582.89ha (12,318.51ha (46.3%) on-reserve and 14,264.38ha (53.6%) off-reserve) was verified as planted over the three years of implementation.
The effective area planted was jointly verified by the Forestry Commission and the Service Companies. 18,987.55ha (71.5%) had survival percentage of 31% and above and were handed over to the Forestry Commission. 49% of the area handed over were within forest reserves while the remaining area (50.21%) handed over were in off-reserve areas.
7,595.34ha (37.65% on-reserve and 62.35% off-reserve) of the areas planted by the Service Companies had survival percentage of 30% and below, and therefore classified as failed, and these would be rehabilitated at the cost of the Service Companies in 2014. Financial Bonds covering the cost of the rehabilitation have been deposited with the Forestry Commission by the two Service Companies – Ecotech Services Ltd and Zoil Services Ltd.
The replanted areas would be handed over to the Forestry Commission when joint survival surveys indicate satisfactory survival percentages (75% for the savannah zones and 80% for the High Forest and Transition Zones).
2.6 FC/Timber Industry Plantation Development Fund Plantations 2010 - 2013 The Forestry Commission – Timber Industry Plantation Development Fund Committee (FC/Timber Industry Fund Committee) tasked the Forestry Research Institute of Ghana (FORIG) to establish Best Practice forest plantations of fast growing indigenous and exotic commercial timber species with funding from the FC/Timber Industry Fund. FORIG has accordingly been establishing forest plantations on behalf of the FC/Timber Industry Fund Committee since 2010. These plantations have been established in the Eastern and Ashanti Regions, within degraded forest reserves as depicted in Table 2 below. Table 2: Details of achievements of FC/Timber Industry plantations program. Region Forest
District Forest Reserve
Compartment /Site
Verified Area Planted (ha)
Species Planted
Eastern
Oda
Esen Epam 17 109.74 Cedrela, Ofram,
Ceiba, Kusia, Wawa 3 71
Pra Anum Nkansaso Plot 1 3.35 Paulownia
Nkansaso Plot 2 10.7 Ofram, Mansonia,
Kusia, Ceiba, Otie
Charlewote 5.07 Paulownia
Awanweneso 44.95 Cedrela
Ashanti Nkawie Asenanyo Research Working
Circle (RWC)
22.8 Paulownia, Cedrela
Offinso
Opro River 2 46.1 Cedrela, Ofram,
Otie, Ceiba
Mankrang River 38, 40, 41, 42, 43,
45 and 46
339.92 Cedrela, Teak,
Ceiba, Ofram,
Total 653.63
13
9
Field verification conducted at the end of 2013 by FSD confirmed the total effective area planted to date to be 653.63ha. In 2013, an area of 180.74ha was confirmed planted in the Esen Epam Forest reserve, Oda Forest District. Additionally an estimated 339.92ha of previously failed sites in earlier coupes within the Mankrang River Forest Reserve was rehabilitated/replanted within the year (Fig. 9 & 10).
Fig. 9: 2010 Terminalia spp. plantation established by FORIG on behalf of the FC-Industry
Fund Committee within the Pra Anum Forest Reserve, Oda Forest District
Fig. 10: 2011 Teak plantation established on behalf of the FC-Industry Fund Committee
within the Mankrang River Forest Reserve, Offinso Forest District.
1410
2.7 Private Commercial Plantation Developers On-Reserve 2002 - 2013 The Private Commercial Plantation Development component involves the release of degraded forest reserve lands by the FC to private entities after vetting and endorsing their reforestation/ business plans. The operations of these private developers are then monitored through periodic field visits by the FSD to ensure compliance with the terms and conditions of the approved reforestation plans. The private investor earns 90% of the total proceeds from the plantation while the FC, Landowner and Community earn 2%, 6% and 2% respectively. The investor additionally pays ground rent of the Ghana Cedi equivalent of $2/ha/year throughout the life of the investment.
Fig. 11: A 6 month old Eucalyptus plantation established by NICOL-MIRO in Boumfum Forest Reserve, Kumawu Forest District, Ashanti Region
5,610.22ha of degraded forest reserve lands (41 compartments) was allocated to 20 private commercial developers in 2013.
This brings the total number of private developers that have been granted permits to undertake commercial plantation development within degraded forest reserves to Three Hundred and Ten (310) with a total allocated area of 124,369.28ha in 50 forest reserves.
1511
Fig. 12: NICOL-MIRO Eucalyptus spp nursery, near Ananekrom in the
Kumawu Forest District - Ashanti Region
Fig. 13: A 2 month old teak stand established by NICOL - MIRO
Fig. 14: A 6 month old teak stand established by NICOL - MIRO
1612
Fig. 15: A 3 year teak stand within NICOL-MIRO plantations in the Boumfum Forest Reserve, Kumawu Forest
District 2,746.51ha was planted by 56 commercial developers on-reserve in 2013. This brings the total area reported developed by commercial plantation developers within forest reserves to 36,200.52ha. This figure is yet to be verified through a technical audit. Details of commercial forest plantation developers within degraded forest reserves can be found in Appendix 1. Nine (9) compartments were retrieved from six (6) non-performing plantation developers in 2013. The exercise to retrieve compartments from non-performing plantation developers will be pursued in earnest in 2014. Invoices for outstanding ground rent will also be issued to all plantation developers for payment. Sixteen (16) private developers signed the Land Lease and commercial Benefit Sharing Agreements (LL/BSAs) in 2013 resulting in One Hundred and Twenty-six (126) LL/BSAs signed to date. An estimated US$40 million has so far been invested in Ghana by the four largest commercial plantation developers on-reserve namely, FORM Ghana Limited, NICOL-MIRO Forestry Company Limited, Mere Plantations Limited and Ayum Company Limited. 2.8 Large-Scale Private Forest Plantations Off-Reserve Currently there is one large-scale private forest plantation project off-reserve being undertaken by African Plantations for Sustainable Development (APSD) Ghana Limited in the Brong Ahafo Region.
17
APSD Ghana Limited is a privately owned company engaged in the establishment of fast growing plantations for bio-energy production in the Atebubu and Sene Districts of the Brong Ahafo Region. The company operates a mechanised state of the art forest tree nursery with an installed capacity of 25 million seedlings annually (Fig. 16L). The company has so far invested about US$35 million in infrastructure, equipment and plantation development in Ghana.
APSD Ghana Limited has acquired an off-reserve concession with an estimated area of 86,000ha. The company has so far established 3,076ha plantations of Eucalyptus and Acacia and employs a labour force of 1,106 predominantly sourced from the local communities within the company's catchment area.
Fig. 16: Nursery workers at the APSD Nursery (L), Four year Eucalyptus spp. stand (R).
In 2013, the company established 1,565ha of plantations and employed 525 persons. The company aims to establish efficient electrical power production based on fast growing Eucalyptus and Acacia plantations. APSD plans to plant approximately 20,000ha of these trees species to feed two 30 MWe power plants based on three to five year tree rotations. The company intends to establish 3,000ha of plantations in year 2014.
2.9 Public Private Partnership (PPP) with FORM Ghana
In May, 2013 the FC signed a Public Private Partnership (PPP) agreement with FORM Ghana to jointly undertake a commercial plantation covering 14,596ha within Tain II forest reserve in the Sunyani Forest District. The project is estimated to cost US$50.3 million to implement. The planting target for 2013 was 600ha and 640ha was reported planted. From 2014 an annual planting target of 2,000ha is to be executed.
Within the partnership, FORM Ghana is entitled to 80% of the plantation proceeds and benefits with the Forestry Commission, Landowners and Forest fringe communities entitled to the
1814
remaining 20%. FORM Ghana will pay ground rent of the Ghana Cedis equivalent of $2/ha/yr to the landowner and facilitation fee of $2/ha/yr for customary and conflict resolution roles expected of the traditional authorities. The FC will undertake survey and demarcation and fire education within fringe communities at its own cost as part of it s contribution to the project. The PPP to date has employed 60 permanent employees and 267 temporary labourers under this project. Most of the recruited staff were from the forest fringe communities. The temporary workers were recruited for weeding, land preparation and planting of the project area. Over 650 additional workers are envisaged to be recruited for the 2014 target of 2,000ha.
Fig.17: The Deputy Minister of Lands and Natural Resources Hon. Barbara Asamoah planting a teak stump at the FC-FORM Ghana PPP Site in the Tain II Forest Reserve, Sunyani Forest District.
Fig.18: (A) Six month teak stand in FC-FORM Ghana PPP holdings in Tain II Forest Reserve, Sunyani Forest District – Brong Ahafo Region (B) The Dep. Minister and her team in a 10 meter high fire observatory tower within the FC - FORM Ghana PPP plantation holdings in the Tain II Forest Reserve.
A B
1915
2.10 FSD Plantations 2013 Following the expiry of the management service contracts between the Forestry Commission and the EPP service providers, the Forest Services Division was tasked to establish 3,000ha of forest plantations in 2013, using hired labour from forest fringe communities. At the end of 2013 a total area of 2,857.61ha was verified as planted. The FSD was also tasked to undertake the maintenance of the 18,987.55ha of established plantations (2010 to 2012 coupes) handed over by the Service Companies, however due to the late handing over (December, 2013) and lack of funds the target was not achieved. 2.10.1 Implementation Arrangements To ensure the effective and efficient implementation of the 2013 plantation establishment, an implementation plan was developed to guide the participating Regional and District FSD offices who were to implement the program. The implementation arrangements are attached as Appendix 3. Meetings were held in three sectors (Northern, Middle and Southern) of the country to make clear the implementation plan (Fig. 15A). Field/community meetings were also held at the beginning of the programme (Fig. 15B). 2.10.2 2013 Achievements An area of 2,853.33ha was reported as established in 113 sites within 65 Forest Reserves and 36 Forest Districts across all the 10 regions of Ghana. Three teams from the Forest Services Division Headquarters were despatched in November 2013 to undertake field verification of the reported achievements.
Fig. 19: Mr. Raphael Yeboah, Executive Director of the FSD, taking notes during question time at the
Northern Sector meeting in Tamale with Regional and District Managers
20
16
Fig. 20: Community meeting involving the Director of Operations, Plantations (Mr. Hugh C. A. Brown) and the Tumu Forest District Management at Tanvielle in the Upper West Region
All 113 sites were tracked with GPS handsets and mapped. Out of the total of 2,853.33ha reported planted, the total verified effective area planted was 2,857.61ha. The details of the areas planted and verified are presented in Appendix 2. 2,504 temporary jobs were created in the establishment of the 2,857.61ha of plantations. These were hired forest fringe community members organised as work gangs for specific establishment activities and paid on contract basis for specific activities. 2.10.3 Budget and Expenditure The budget for the 3,000ha was GH¢5,301,600. Based on the achievement of 2857.61ha the expected expenditure was GH¢5,049,949.75. At the end of the planting year, the total expenditure stood at GH¢2,524,029.92 out of the budgeted GH¢5,049,949.75 which resulted in the unit cost of establishment for the 2013 FSD plantation being GH¢883.26 per ha. The reduction in expenditure was due to strict budget controls and prudent management; for example, contract fire patrols by fringe communities was rather undertaken by FSD Forest Guards at no additional cost. The expenditure details for the 2013 programme is depicted in Table 3 below:
2117
Table 3: Summary of Expenditure on 2013 Plantation Activities Activity Revised Budget
(2,857.61ha)(GH¢)
Actual Expenditure
(GH¢)
Variance Analysis (Analyses of significant variances)
Site Demarcation 47,150.00 49,500.00 Procurement of planting material 1,114,467.90 683,995.47 Budget included 20%
seedlings for beating up which was not undertaken. Additionally, more stumps were utilized than budgeted.
Plantation Establishment: (Site Preparation, Pegging and Planting)
1,100,179.85 987,269.07 Some illegal farms were planted up which reduced the cost of land preparation.
Tending (2x) 800,004.80 234,798.20 Due to late planting in many sites only one round of tending was undertaken instead of the two rounds budgeted for
Fire Ride Construction 121,000.00 19,033.00 Due to delayed payment of earlier contract activities, most work gangs refused to undertake the construction of fire rides resulting in very few fire rides being constructed.
Fire Patrols 1,200,007.20 - Decision to use Forest Guards instead of community contracts
Monitoring and Supervision* (Regional/District Offices)
524,282.00 466,388.80
Monitoring (FC/FSD HQ)* 142,858.00 83,045.38 TOTAL 5,049,949.75 2,524,029.92 *Monitoring and Supervision costs covered all the existing plantation coupes within the Regions/Districts
22
18
3.0 FIRE INCIDENCE IN THE 2013/2014 FIRE SEASON
The key fire protection interventions undertaken to mitigate fire incidences in the 2013/2014 fire season were sensitization and awareness creation by RMSC and FSD field officers, fire ride construction and maintenance, and regular fire patrolling during the dry season by Forest Guards (especially 2013 coupes).
At the end of March 2014, reports indicated that 3,272ha of plantations established from 2010 to 2013 had been affected by fire compared to 4,578.22ha affected by fire in 2012/2013 fire season. The affected districts and coupes are detailed in Appendix 4. The regional summary is as detailed below in Table 4.
Table 4: Area of Plantation coupes affected by fire in the 2013/2014 fire season by Region
Region 2010 Coupe (ha)
2011 Coupe (ha)
2012 Coupe (ha)
2013 Coupe (ha) Total (ha)
Upper East - - 47 65 112
Upper West 377 79 116 6 578
Northern 421 534 779 109 1,843
Brong Ahafo 131 60 105 3 299
Ashanti 162 96 81 3 342 Eastern - 0 - 0 0 Western 2 0 - 0 2 Central - 0 - 0 0
Greater Accra - 0 - 0 -
Volta 69 10 12 2 96 Total 1,191 779 1,140 188 3,272
23
4.0 FOOD PRODUCTION WITHIN 2011 TO 2013 PLANTATION COUPES In 2013, an estimated 28,919.88 Metric Tonnes (Mt) of food crops were produced from the 15,431.66ha of forest plantations planted by the FC from 2011 to 2013. The major crops produced were as follows: Plantain – 16,863.23MT, Cereals (maize, millet and rice) – 5,474.64MT, Tubers (Cocoyam, Cassava and Yam) – 7,702.65MT, Legumes (Beans, Cowpea, Groundnut and Sorghum) – 834.09MT and Vegetables (Tomato, Pepper, Garden Eggs) – 1,577.92MT. A summary of the food production per region is shown in Table 5 below with the details with respect to the various coupes shown in Appendix 5. Table 5: Summary of food production in 2013 (2011 - 2013 coupes)*
*Food production estimated as follows: Plantation Area reported intercropped with food crops x 2MOFA 2010 Av. Yield (Mt/ha) x specific crop production factor [plantain:70%, Yam:70%, Cocoyam:30%, Maize:100%]
1Agriculture in Ghana, Facts and Figures (2010). Ministry of Food and Agriculture, 2011 5.0 JOB CREATION An estimated 5,184 jobs were created in 2013 to establish forest plantations under three components of the NFPDP. The jobs created comprised the underlisted:
i. 2,504 jobs created under the FSD plantations, being recruited persons organised as work gangs to undertake plantation establishment and maintenance activities on contract basis.
ii. 330 persons recruited under the FC/Timber Industry Plantation Development Fund on casual basis.
iii. 60 permanent and 267 temporary staff recruited under the FC/FORM Ghana PPP in the Tain II Forest reserve and
iv. An estimated 2,023 persons recruited by Private Commercial Developers on-reserve on temporary basis.
An additional 525 jobs were created by APSD (off-reserve private commercial developer) in 2013 through the establishment of 1,565ha.
REGIONPLANTAIN
(Mt)
CEREALS (Maize, Millet,
Rice) (Mt)
TUBERS (Cocoyam, Cassava,
Yam) (Mt)
LEGUMES (Beans, Cowpea,
Groundnut, Sorghum) (Mt)
VEGETABLES (Tomato, Pepper, Garden
Eggs) (Mt)
TOTAL FOOD PRODUCTION
(Mt)
Western 3,269.05 5.10 275.35 - - 3,549.50
Central 600.05 72.92 69.19 0.78 20.31 763.26
Northern - 1,609.93 3,196.30 287.50 37.96 5,131.69
Eastern 1,482.59 99.93 312.99 6.99 32.83 1,935.33
Ashanti 9,222.77 1,445.73 1,933.53 55.89 1,065.22 13,723.14
Brong Ahafo 763.40 1,103.59 399.70 73.11 262.40 2,602.20
Upper East - 450.08 - 83.40 - 533.48
Upper West - 189.17 - 240.80 143.00 572.98
Greater Accra - - - - - -
Volta 3.85 99.96 - - 4.50 108.31
TOTAL 15,341.71 5,076.41 6,187.06 748.48 1,566.22 28,919.88
24
6.0 PROGRAMME MONITORING The 2013 National Forest Plantation Development Programme was monitored on various levels. Ministry of Lands and Natural Resources The Ministry of Lands and Natural Resources during the year undertook monitoring visits to selected sites within the Ashanti and Brong Ahafo Regions (Figs. 21-24). Parliamentary Select Committee on Lands and Forestry The Parliamentary Select Committee on Lands and Forestry also undertook visits to plantation sites in the Northern and Upper East Regions (Figs. 25 and 26). Forestry Commission The Forestry Commission continued its routine monitoring nationwide through the Regional and District offices, in addition to monitoring visits by Corporate FC and FSD HQ. Field visits were also undertaken by the FC Internal Audit Unit to certify the evidence of plantation expenditures. External Auditors Field visits were also undertaken by a team of External Auditors to verify the existence of the plantations established under the Expanded Plantation Program (EPP) (Figs. 27 and 28) Ghana Audit Service The Performance Audit Department of the Ghana Audit Service also carried out a Performance Audit on the EPP to ascertain whether the Forestry Commission had adhered to its performance standards in the implementation of the program (Fig. 29).
Fig. 21: Dep. Minister of Lands and Natural Resources’ entourage including Mr. Abu Juam (Technical Director, MLNR), Mr. Obiaw (Director, RMSC) and others at a fire observatory within the FORM Ghana plantations in the Asubima Forest Reserve, Ashanti Region.
2521
Fig. 22: The Deputy Minister's entourage being conducted around the FC/FORM Ghana PPP 2013 planting site by Mr. Thomas Okyere, Brong Ahafo Rrgional Manager, FSD in the Tain II Forest Reserve.
Fig. 23: The Deputy Minister of Land and Natural Resources (Hon. Barbara Asamoah) addressing the press during a field inspection of the 2007 Cedrela - indigenous species stand within the South Formangsu Forest Reserve in the Juaso Forest District.
2622
Fig. 24: Hon. Barbara Asamoah addressing the press at the ceremonial tree planting site in Abofour, Offinso Forest District of the Ashanti Region, where the Late President J.E.A Mills launched the Expanded Plantation Programme of the NFPDP in January, 2010.
Fig. 25: A group photograph after a courtesy call on the Tamale Chief by the monitoring team from the Parliamentary Select Committee on Lands and Forestry during a tour of the Upper East and Northern Regions
2723
Fig. 26: Monitoring by the Parliamentary Select Committee on Lands and Forestry in the Sinsangblegbinni Forest Reserve, Tamale Forest District - Northern Region.
Fig. 27 : Performance audit team of the Ghana Audit Service (GAS) undertaking a performance audit of the 2013 FSD plantation within the Tankwidi East Forest Reserves in the Bolgatanga Forest District.
2824
Fig. 28 : Performance audit team of the Ghana Audit Service (GAS) undertaking a performance audit of the 2013 FSD plantation within the Yaya Forest Reserve in the Sunyani Forest District.
Fig. 29: Field verification of EPP sites by external auditors.
29 25
Fig. 30: Joint Head Office and Tumu Forest District monitoring team crossing a dilapidated bridge near Tanvielle
Fig. 31: A member of the Deputy Minister's entourage, Mr. Joseph Osiakwan (Principal Planning Officer - MLNR) expressing satisfaction after inspecting a plantation site in the Afram Headwaters F/R established by Mere Plantations Ltd.
A
B A
3026
7.0 CHALLENGES
The key challenge to the NFPDP is the absence of a reliable and adequate source of funding for plantation establishment and maintenance by Government. Other challenges comprise the following:
i. Inadequate Motorbikes and vehicles for field monitoring by FSD. ii. Annual destruction of planted areas by wildfire iii. Destruction of planted seedlings by cattle (Fulani Herdsmen) iv. Disagreements over off-reserve Benefit Sharing Arrangement under the EPP between
Government and Land owners 8.0 WAY FORWARD
i. Complete field verification of all reported past plantation establishment achievements especially the Modified Taungya System (MTS), Community Forestry Management Project (CFMP) and the Private Commercial Developers on-reserve. ii. Carry out maintenance and requisite silvicultural interventions in the existing stands. iii. Provide refresher training for field staff. iv. Procure additional motorbikes and 4X4 vehicles for the various forest districts to facilitate field operations and monitoring of the NFPDP. v. Finalise and implement the Ghana Forest Plantation Strategy which seeks to among others, create an enabling environment for public and private investments in forest plantations
31
31
APPE
NDI
X 1
NO
.CO
MPA
NY
NAM
ERE
GIO
NDI
STRI
CTFO
REST
RES
ERVE
COM
PART
MEN
T/SE
RIES
AR
EA A
LLO
CATE
D (H
a)AR
EA P
LAN
TED-
2013
(Ha)
AREA
PLA
NTE
D TO
DA
TE (H
a)DA
TE O
F AL
LOCA
TIO
NSP
ECIE
S PL
ANTE
D
1Ad
dai B
roth
er &
Co.
Asha
nti
Juas
oBa
ndai
Hill
s16
, 17,
19,
25
512.
00.
045
.0-
Teak
2Ag
ogo
Chur
ch o
f Pe
ntec
ost
Asha
nti
Juas
oBa
ndai
Hill
s6,
820
5.64
0.0
23.0
-Te
ak
3
St. A
ugus
tine'
s Cat
holic
Ch
urch
(Ago
go R
oman
Ca
thol
ic C
hurc
h)As
hant
iJu
aso
Band
ai H
ills
14,1
827
6.43
0.0
60.0
-Te
ak4
Agog
o Sa
viou
r Chu
rch
Asha
nti
Juas
oBa
ndai
Hill
s55
135.
220.
045
.0-
Teak
5
Apos
tle N
icho
las A
ppia
h M
issah
& C
hild
ren
Asha
nti
Juas
oBa
ndai
Hill
s1
131.
30.
04.
013
th Ju
ne, 2
013
N/A
6Th
e Ap
osto
lic C
hurc
h -
Ghan
aAs
hant
iJu
aso
Band
ai H
ills
68,6
925
6.0
0.0
50.0
30th
Aug
ust,
2007
Teak
7
CEPA
COD
(Cen
ter f
or
Pove
rty
Alle
viat
ion
and
Com
mun
ity D
evel
opm
ent)
Asha
nti
Juas
oBa
ndai
Hill
s38
, 47
128.
00.
030
.010
th A
ugus
t, 20
06Te
ak
8Co
ncer
ned
Citiz
en G
roup
-Ag
ogo
Asha
nti
Juas
oBa
ndai
Hill
s54
128.
00.
00.
0-
N/A
9El
der S
amps
on Y
eboa
h &
Fr
ank
Aboa
gye
Asha
nti
Juas
oBa
ndai
Hill
s7
106.
130.
03.
013
th Ju
ne, 2
013
Teak
10Gy
ima
& C
o. F
arm
s Ltd
Asha
nti
Juas
oBa
ndai
Hill
s15
, 26
269.
3512
.082
.0-
Teak
11Is
aac
Ow
usu
Farm
sAs
hant
iJu
aso
Band
ai H
ills
2814
7.96
0.0
10.0
12th
Dec
embe
r, 20
11Te
ak
12K&
P Fa
rms (
Nan
a Kw
adw
o Po
ku B
onsu
)As
hant
iJu
aso
Band
ai H
ills
5616
1.97
0.0
0.0
19th
Dec
embe
r, 20
11N
/A
13Ka
te K
orom
aAs
hant
iJu
aso
Band
ai H
ills
4113
3.22
0.0
10.0
12th
Dec
embe
r, 20
11Te
ak
14Kw
ame
Kyei
Far
ms
Asha
nti
Juas
oBa
ndai
Hill
s62
117.
1511
.011
.019
th D
ecem
ber,
2011
Teak
15M
'aka
ddes
h Pr
intin
g Pr
ess
and
Farm
sAs
hant
iJu
aso
Band
ai H
ills
7220
4.74
20.5
60.5
21st
Aug
ust,
2006
Teak
16M
apad
Ent
erpr
iseAs
hant
iJu
aso
Band
ai H
ills
2716
3.39
6.0
106.
017
th O
ctob
er, 2
006
Teak
17M
r. O
tuo
Sere
bour
Asha
nti
Juas
oBa
ndai
Hill
s63
120.
610.
00.
0 4
th M
ay, 2
012
N/A
PERF
ORM
ANCE
UPD
ATE
OF
PRIV
ATE
PLAN
TATI
ON
DEV
ELO
PERS
ON
-RES
ERVE
32
NO
.CO
MPA
NY
NAM
ERE
GIO
NDI
STRI
CTFO
REST
RES
ERVE
COM
PART
MEN
T/SE
RIES
AR
EA A
LLO
CATE
D (H
a)AR
EA P
LAN
TED-
2013
(Ha)
AREA
PLA
NTE
D TO
DA
TE (H
a)DA
TE O
F AL
LOCA
TIO
NSP
ECIE
S PL
ANTE
D
18N
ana
Akuo
ku S
arpo
ng
Farm
s As
hant
iJu
aso
Band
ai H
ills
20, 2
1,22
,23,
2468
9.78
0.0
82.4
7-
Teak
19O
bebe
w V
entu
res
Asha
nti
Juas
oBa
ndai
Hill
s46
128.
00.
015
.010
th M
arch
, 200
5Te
ak
20O
ppon
g-M
ensa
h En
terp
rise
Asha
nti
Juas
oBa
ndai
Hill
s70
128.
00.
010
.05t
h Ju
ly, 2
006
Teak
21Pa
scal
Gay
eAs
hant
iJu
aso
Band
ai H
ills
2914
5.0
0.0
42.0
24th
Feb
ruar
y, 2
009
Teak
22Pa
tric
k Gy
ekye
-Men
sah
Asha
nti
Juas
oBa
ndai
Hill
s59
125
0.0
0.0
17th
Jan.
200
7N
/A23
Prof
A.B
Ako
saAs
hant
iJu
aso
Band
ai H
ills
6611
9.95
0.0
10.0
29th
Mar
ch, 2
007
Teak
24Sa
mro
se C
ompa
ny L
imite
dAs
hant
iJu
aso
Band
ai H
ills
1212
8.0
0.0
20.0
13th
Mar
ch, 2
007
Teak
25Tr
opic
al F
arm
sAs
hant
iJu
aso
Band
ai H
ills
48, 4
9, 5
0, 5
151
9.21
0.0
15.0
31st
Janu
ary,
200
1Te
ak26
Antw
i Boa
siako
Far
ms
Asha
nti
Juas
oDo
me
Rive
r5
147.
420.
07.
027
th O
ct. 2
009
Teak
27Be
naku
f Tim
ber a
nd
Trad
ing
Asha
nti
Juas
oDo
me
Rive
r30
,38
99.2
0.0
28.0
9th
Dece
mbe
r, 20
02Te
ak
28Do
uble
Ben
Con
stru
ctio
n Lt
dAs
hant
iJu
aso
Dom
e Ri
ver
2198
.91
0.0
0.0
22nd
Sep
tem
ber,
2009
N/A
29D.
T.K
Tim
bers
Asha
nti
Juas
oDo
me
Rive
r20
,26,
3538
4.0
0.0
90.0
21st
July
, 200
4Te
ak, C
edre
la
30Ju
aso
Trad
ition
al A
utho
rity
Asha
nti
Juas
oDo
me
Rive
r25
,27
250.
00.
060
.028
th A
pril,
200
3
5th
Nov
embe
r, 20
04
Waw
a,
Man
zoni
a,
Mah
ogan
y,
Ofr
am, E
mire
31KA
MVI
SAs
hant
iJu
aso
Dom
e Ri
ver
1928
1.54
0.0
12.0
16th
Apr
il, 2
003
Teak
32K.
Gre
en G
loba
lAs
hant
iJu
aso
Dom
e Ri
ver
3612
8.0
0.0
010
th D
ecem
ber,
2013
N/A
33Kw
ame
Bi K
ufou
rAs
hant
iJu
aso
Dom
e Ri
ver
3912
8.00
0.0
30.0
11th
Aug
ust,
2003
Teak
34LI
- Cha
n En
terp
rise
Gh. L
tdAs
hant
iJu
aso
Dom
e Ri
ver
1013
4.59
0.0
13.0
9th
Dec.
200
2Te
ak35
Mar
gare
t Cam
pbel
lAs
hant
iJu
aso
Dom
e Ri
ver
4611
4.64
0.0
7.0
16th
Mar
ch, 2
011
Teak
36O
bogu
Tra
ditio
nal C
ounc
ilAs
hant
iJu
aso
Dom
e Ri
ver
35, 3
6, 3
7, 4
70.
00.
0 -
N/A
37PI
DECK
Co.
Ltd
Asha
nti
Juas
oDo
me
Rive
r40
,45
250.
00.
00.
09t
h Ap
ril, 2
003
25
th Ju
ne, 2
003
N/A
38Ta
lent
o W
ood
Proc
essin
g En
terp
rise
Asha
nti
Juas
oDo
me
Rive
r29
135.
510.
040
.012
th M
ay, 2
005
Teak
39W
ukup
omaa
Exp
ort a
nd
Impo
rt C
ompa
ny L
imite
dAs
hant
iJu
aso
Dom
e Ri
ver
4413
9.35
0.0
10.0
10th
Aug
ust,
2005
Teak
32
11
33
NO
.CO
MPA
NY
NAM
ERE
GIO
NDI
STRI
CTFO
REST
RES
ERVE
COM
PART
MEN
T/SE
RIES
AR
EA A
LLO
CATE
D (H
a)AR
EA P
LAN
TED-
2013
(Ha)
AREA
PLA
NTE
D TO
DA
TE (H
a)DA
TE O
F AL
LOCA
TIO
NSP
ECIE
S PL
ANTE
D
40Y
& M
Reg
ener
atio
n Lt
dAs
hant
iJu
aso
Dom
e Ri
ver
2211
8.71
0.0
18.0
17th
Sep
tem
ber,
2009
N/A
41Ap
ostig
a Co
mpa
ny L
imite
dAs
hant
iJu
aso
Mira
sa H
ills
12,1
3,19
378.
20.
027
0.0
20th
Mar
ch, 2
003
Teak
42Be
ige
Leaf
Lim
ited
Asha
nti
Juas
oM
irasa
Hill
s18
128.
00.
00.
08t
h De
cem
ber,
2011
N/A
43Co
xwai
n In
vest
men
tAs
hant
iJu
aso
Mira
sa H
ills
21B
87.8
90.
00.
06t
h Ja
nuar
y, 2
011
N/A
44ET
IBEC
K Li
mite
dAs
hant
iJu
aso
Mira
sa H
ills
40A,
40B
256.
00.
015
.023
rd A
pril,
200
3Te
ak
45Lo
gwoo
d In
dust
ries
Lim
ited
Asha
nti
Juas
oM
irasa
Hill
s3,
725
6.0
0.0
10.0
23rd
and
24t
h Fe
brua
ry, 2
003
Teak
46Lo
u-Ra
lph
Lodg
e In
vest
men
tAs
hant
iJu
aso
Mira
sa H
ills
2212
8.57
0.0
100.
022
nd F
ebru
ary,
20
10Te
ak
47M
r. Sa
mue
l Ben
son-
Adje
iAs
hant
iJu
aso
Mira
sa H
ills
4911
7.51
17.0
31.0
22nd
Sep
tem
ber,
2009
Teak
48N
ew L
eaf I
nves
tmen
t Li
mite
dAs
hant
iJu
aso
Mira
sa H
ills
4811
3.32
0.0
113.
315
16th
Apr
il, 2
008
Teak
, M
ahog
any,
W
awa,
Kus
ia,
Odu
m, O
fram
, M
anso
nia,
Ko
krod
ua
49O
meg
a W
ood
Proc
essin
gAs
hant
iJu
aso
Mira
sa H
ills
4712
8.0
0.0
30.0
11th
Apr
il, 2
003
Teak
50Pe
n Pa
l Woo
d Pr
oces
sing
Asha
nti
Juas
oM
irasa
Hill
s25
, 26,
2750
0.0
0.0
408t
h Ju
ly, 2
003
Teak
51SK
OD
Asha
nti
Juas
oM
irasa
Hill
s50
128.
00.
010
.05t
h O
ctob
er, 2
004
23
rd Ja
nuar
y, 2
003
Teak
Asha
nti
Juas
oM
irasa
Hill
s38
127.
820.
00.
013
th D
ecem
ber,
2011
N/A
Asha
nti
Juas
oM
irasa
Hill
s39
175.
5510
.080
.020
10Te
ak53
Ups
trea
m In
vest
men
tAs
hant
iJu
aso
Mira
sa H
ills
21A
54.6
70.
00.
06t
h Ja
nuar
y, 2
011
N/A
54Ab
oagy
e D
anso
Sam
uel
Asha
nti
Juas
oN
orth
Ban
dai H
ills
4112
8.6
0.0
0.0
30th
Janu
ary,
201
3N
/A
55As
ante
Aky
em W
ood
Proc
essin
g Co
. Ltd
Asha
nti
Juas
oN
orth
Ban
dai H
ills
60,6
221
3.18
10.0
30.0
23rd
Dec
embe
r, 20
02Te
ak
56Ch
arity
Asie
duAs
hant
iJu
aso
Nor
th B
anda
i Hill
s39
124.
500.
00.
014
th O
ctob
er, 2
013
N/A
52
Tale
nto
Woo
d Pr
oces
sing
Ente
rpris
e
33
20,25,26
,27
36.9
34
34
NO
.CO
MPA
NY
NAM
ERE
GIO
NDI
STRI
CTFO
REST
RES
ERVE
COM
PART
MEN
T/SE
RIES
AR
EA A
LLO
CATE
D (H
a)AR
EA P
LAN
TED-
2013
(Ha)
AREA
PLA
NTE
D TO
DA
TE (H
a)DA
TE O
F AL
LOCA
TIO
NSP
ECIE
S PL
ANTE
D
57N
oble
'G'
Asha
nti
Juas
oN
orth
Ban
dai H
ills
4312
8.43
0.0
0.0
30th
Janu
ary,
201
3N
/A
58Ya
w A
sam
oah
Asha
nti
Juas
oN
orth
Ban
dai H
ills
5513
3.89
0.0
0.0
8th
Nov
embe
r, 20
13N
/A59
Yonk
a Fa
rms
Asha
nti
Juas
oN
orth
Ban
dai H
ills
5810
3.30
0.0
0.0
-N
/A
60
Boak
yew
aa E
nter
prise
Li
mite
d (B
EL)
Asha
nti
Juas
oO
nyim
so3,
4,5,
650
8.66
120.
047
020
th N
ov. 2
002
Alan
brak
ia,
Kusia
, Cei
ba,
Odu
m, M
akor
e,
Waw
a, O
fram
, M
ahog
any,
Em
ire
61Pr
asha
nti E
xpor
t Lim
ited
Asha
nti
Kum
awu
Anum
so22
200.
00.
091
.0-
62Ab
rofo
Far
ms &
Tra
ding
En
terp
rise
Asha
nti
Kum
awu
Boum
fum
132
, 136
, 141
384.
00.
045
.018
th M
arch
, 200
563
Aid
to A
rtisa
n Gh
ana
Asha
nti
Kum
awu
Boum
fum
153,
158
, 159
128.
00.
075
.010
th A
pril,
200
3Te
ak
64As
adu
Roya
l Was
teAs
hant
iKu
maw
uBo
umfu
m12
112
8.0
0.0
0.0
21st
Nov
embe
r, 20
12N
/A
65
Asha
nti Y
outh
Agr
o Fo
rest
ry O
rgan
izatio
n (A
YAO
)As
hant
iKu
maw
uBo
umfu
m18
149.
40.
040
.025
th Ja
nuar
y, 2
001
66
Bibi
ani L
oggi
ng a
nd
Lum
ber C
ompa
ny L
imite
d (B
LLC)
Asha
nti
Kum
awu
Boum
fum
23, 2
5-27
, 34
637.
00.
010
0-
Cedr
ela,
Tea
k
67Da
le B
rook
Com
pany
Ltd
Asha
nti
Kum
awu
Boum
fum
56,6
5,75
,76,
77,
83,
84,
85
,91,
92,9
3,98
an
d po
rtio
ns o
f 57
,66,
6716
27.2
60.
050
0-
Teak
68Du
adem
Inve
ntor
ies
Asha
nti
Kum
awu
Boum
fum
185,
186
, 192
, 19
350
0.0
0.0
9025
th Ja
nuar
y, 2
001
69Ej
isu F
ores
t Pro
duct
sAs
hant
iKu
maw
uBo
umfu
m22
0, 2
21, 2
22,
217
128.
00.
00
70Fo
rjane
Asha
nti
Kum
awu
Boum
fum
143
119.
340.
02
23rd
Janu
ary,
200
6
71Gh
ana
Saw
n Ti
mbe
r Se
llers
Ass
ocia
tion
Asha
nti
Kum
awu
Boum
fum
126,
122
255.
90.
054
15th
Dec
embe
r, 20
06
128.25
35
NO
.CO
MPA
NY
NAM
ERE
GIO
NDI
STRI
CTFO
REST
RES
ERVE
COM
PART
MEN
T/SE
RIES
AR
EA A
LLO
CATE
D (H
a)AR
EA P
LAN
TED-
2013
(Ha)
AREA
PLA
NTE
D TO
DA
TE (H
a)DA
TE O
F AL
LOCA
TIO
NSP
ECIE
S PL
ANTE
D
72
Ghan
a Ti
mbe
r Ass
ocia
tion
(G.T
.A)
Asha
nti
Kum
awu
Boum
fum
144,
145
, 147
, 14
8,15
0, 1
5186
0.0
0.0
260
25t
h Ja
nuar
y, 2
001
73
Gree
nfie
lds P
lant
atio
ns
Lim
ited
(A.G
Tim
bers
Ltd
)As
hant
iKu
maw
uBo
umfu
m4,
5, 6
, 8, 1
0,
11, 1
2, 1
3, 1
4,
17, 2
0, 2
118
30.5
60.
077
5.46
-
Teak
, Waw
a,
Cedr
ela,
M
ahog
any,
Ce
iba,
Ko
krod
ua,
Apro
, Ofr
am
74Ho
llypa
rtAs
hant
iKu
maw
uBo
umfu
m14
212
8.0
0.0
0.0
26t
h Fe
brua
ry,
2013
N
/A
75Jo
hnso
n Ag
yem
an F
arm
sAs
hant
iKu
maw
uBo
umfu
m79
, 80
190.
7810
.016
023
rd M
arch
, 200
6Te
ak
76KW
AMO
KA F
arm
s &
Proc
essin
g Li
mite
dAs
hant
iKu
maw
uBo
umfu
m22
390
.97
0.0
05t
h N
ovem
ber,
2012
N/A
77
Miro
Nat
iona
l Int
eres
t Co
mpa
ny L
imite
d (M
IRO
-N
ICO
L)As
hant
iKu
maw
uBo
umfu
m
(Ago
go P
ortio
n)
120,
123,
124,
127,
131
, 134
, 13
5, 1
38, 1
39,
140,
156
, 155
, (K
umaw
u Po
rtio
n)
29,3
0,48
,52,
53,
54,5
5,61
,62,
63,
64,7
0, 7
2, 7
5,
78, 8
9, 9
0, 9
6,
97, 1
01, 1
02,
103,
106
, 108
, 10
9, 1
11
5002
.28
405.
012
54.8
418
th M
ay, 2
009
Teak
, Ced
rela
, Eu
caly
ptus
, few
in
dige
nous
sp
ecie
s
78
Miro
Nat
iona
l Int
eres
t Co
mpa
ny L
imite
d (M
IRO
-N
ICO
L)As
hant
iKu
maw
uBo
umfu
m
87, 8
8, 9
4, 1
05,
107,
110
, 112
, 11
9, 1
30, 1
46,
160,
115
1536
.00
0.0
021
st N
ovem
ber,
2012
79N
ana
Yaw
Om
ane
Frim
pong
Asha
nti
Kum
awu
Boum
fum
99, 1
00, 1
3340
0.0
0.0
65.5
6th
Janu
ary,
200
4
35
44.7
36
NO
.CO
MPA
NY
NAM
ERE
GIO
NDI
STRI
CTFO
REST
RES
ERVE
COM
PART
MEN
T/SE
RIES
AR
EA A
LLO
CATE
D (H
a)AR
EA P
LAN
TED-
2013
(Ha)
AREA
PLA
NTE
D TO
DA
TE (H
a)DA
TE O
F AL
LOCA
TIO
NSP
ECIE
S PL
ANTE
D
80O
meg
a W
ood
Proc
essin
gAs
hant
iKu
maw
uBo
umfu
m21
3, 2
16, 2
18,
219
500.
00.
012
011
th A
pril,
200
3
81Pr
emie
r Sol
utio
nsAs
hant
iKu
maw
uBo
umfu
m12
012
8.0
0.0
04t
h De
cem
ber,
2012
82Ze
bra
Imex
Ltd
Asha
nti
Kum
awu
Boum
fum
81, 8
223
9.15
20.0
2020
th A
pril,
200
7
83Lo
gwoo
d In
dust
ries
Lim
ited
Asha
nti
Mam
pong
Abrim
asu
7,8
200.
00.
010
0.0
2002
Teak
84Sa
rprim
Far
ms &
Tra
ding
Co
mpa
ny L
tdAs
hant
iM
ampo
ngAb
rimas
u6
126.
00.
090
.09t
h Ap
ril, 2
003
Teak
85Du
fie A
mpo
nsah
Far
ms
Asha
nti
Mam
pong
Awur
a 16
109.
850.
020
.011
th Ja
nuar
y, 2
005
86Er
nest
Bes
t Com
pany
Ltd
Asha
nti
Mam
pong
Awur
a 38
121.
50.
035
.0-
Teak
87Fo
rest
Bus
ines
s Con
sult
Asha
nti
Mam
pong
Awur
a 19
128.
08t
h Ju
ly, 2
013
88
Gree
nfie
lds P
lant
atio
ns
Lim
ited
(Naj
a Da
vid
Vene
er a
nd P
lyW
ood)
As
hant
iM
ampo
ngAw
ura
65,
66,
69,
70,
71
2,03
9.3
0.0
477.
0-
Teak
, Ced
rela
, Ce
iba,
M
ahog
any
89Gy
amfi
& A
sare
Asha
nti
Mam
pong
Awur
a 41
137.
310.
05.
015
th Ja
nuar
y, 2
010
Teak
90He
lp C
rush
Aid
s Gha
naAs
hant
iM
ampo
ngAw
ura
4212
0.0
0.0
42.0
28th
Feb
ruar
y, 2
005
Teak
91Ka
ram
anga
Indu
strie
s Li
mite
dAs
hant
iM
ampo
ngAw
ura
39, 4
0, 4
5
391.
123.
014
6.4
25th
Nov
. 199
9Te
ak92
Kuul
Trad
e En
terp
rise
Asha
nti
Mam
pong
Awur
a 12
128.
496.
586
.519
th A
pril,
200
5Te
ak
93Kw
asi A
gyek
um F
arm
sAs
hant
iM
ampo
ngAw
ura
3116
5.31
8.0
48.0
-Te
ak94
Lits
wor
th Im
pex
Ltd
Asha
nti
Mam
pong
Awur
a 9
155.
589.
089
.019
th A
pril,
200
5Te
ak
95N
ABE
Woo
d Pr
oces
sing
Co. L
tdAs
hant
iM
ampo
ngAw
ura
2310
0.0
0.0
60.0
20th
Nov
. 200
2Te
ak96
R.K.
A.T
Lim
ited
Asha
nti
Mam
pong
Awur
a 20
103.
180.
025
.0-
Teak
97re
New
Com
pany
Lim
ited
Asha
nti
Mam
pong
Awur
a
47, 4
8, 4
9, 5
0,
51, 5
3, 5
4, 5
5,
56, 5
71,
347.
30.
05.
020
08Te
ak,
Mah
ogan
y
98Ab
eam
Dan
so P
oku
Sarf
oAs
hant
iM
ampo
ngCh
irim
fa86
363.
740.
020
.02n
d Fe
brua
ry, 2
010
Teak
99El
der J
ewel
lery
Asha
nti
Mam
pong
Chiri
mfa
7111
0.60
5.0
50.0
-
100
Goos
e Gr
een
Com
pany
Li
mite
dAs
hant
iM
ampo
ngCh
irim
fa12
120.
00.
01.
030
th Ja
nuar
y, 2
003
101
Gree
nfie
lds P
lant
atio
ns
Lim
ited
(Pau
l Sag
oe)
Asha
nti
Mam
pong
Chiri
mfa
1,2
129.
520.
04.
020
02Te
ak
36
37
NO
.CO
MPA
NY
NAM
ERE
GIO
NDI
STRI
CTFO
REST
RES
ERVE
COM
PART
MEN
T/SE
RIES
AR
EA A
LLO
CATE
D (H
a)AR
EA P
LAN
TED-
2013
(Ha)
AREA
PLA
NTE
D TO
DA
TE (H
a)DA
TE O
F AL
LOCA
TIO
NSP
ECIE
S PL
ANTE
D
102
JOSB
OA
Cons
ultin
g Li
mite
dAs
hant
iM
ampo
ngCh
irim
fa20
, 21
273.
8810
.010
.09t
h Ap
ril, 2
013
Teak
103
Jose
ph A
ntw
i (Kw
ame
Amoa
h)As
hant
iM
ampo
ngCh
irim
fa82
118.
190.
010
.0-
Teak
104
Kwar
teng
Pla
ntat
ions
Asha
nti
Mam
pong
Chiri
mfa
394
.11.
09.
012
th D
ecem
ber,
2008
Teak
105
Kum
asi F
arm
s Com
plex
Asha
nti
Mam
pong
Chiri
mfa
2615
1.62
0.0
41.8
520
th F
ebru
ary,
200
6Te
ak10
6K-
Wus
s Ent
erpr
iseAs
hant
iM
ampo
ngCh
irim
fa27
140.
145.
065
.020
th A
pril,
200
7Te
ak
107
Kyer
emat
eng
Tiek
u &
Son
s Lt
dAs
hant
iM
ampo
ngCh
irim
fa19
100.
90.
065
.07t
h Ap
ril, 2
004
Teak
108
Mag
K E
nter
prise
Asha
nti
Mam
pong
Chiri
mfa
2214
2.17
10.0
75.0
20th
Apr
il, 2
007
Teak
109
Ony
ame
Tum
iso S
awm
ills
Asha
nti
Mam
pong
Chiri
mfa
1391
.65
0.0
43.6
4831
st D
ecem
ber,
2002
Teak
110
Rich
ard
Will
iam
Qua
ynor
Asha
nti
Mam
pong
Chiri
mfa
8815
7.54
0.0
90-
Teak
111
Vane
xx E
nter
prise
As
hant
iM
ampo
ngCh
irim
fa77
60.3
110
.010
.015
th F
ebru
ary,
201
2Te
ak11
2Ev
ans T
imbe
rs L
tdAs
hant
iM
ampo
ngPr
u Sh
elte
r bel
t6
148.
320.
058
2002
Teak
113
Jeed
-San
Far
ms
Asha
nti
Mam
pong
Pru
Shel
ter b
elt
3612
0.0
20.0
6920
09Te
ak11
4N
siah
Gyam
erah
Asha
nti
Mam
pong
Pru
Shel
ter b
elt
512
7.40
11.0
20.5
2009
Teak
115
Opm
anpo
k En
tAs
hant
iM
ampo
ngPr
u Sh
elte
r bel
t4
120.
00.
04.
023
rd Ja
nuar
y, 2
006
Teak
16U
nity
Affo
rest
atio
n an
d Tr
ee N
urse
ry P
roje
ctAs
hant
iM
ampo
ngPr
u Sh
elte
r bel
t39
, 44
221.
4230
.012
520
th M
ay, 2
005
Teak
117
Abaa
scom
Ent
Ltd
Asha
nti
Nka
wie
Desir
i11
415
2.5
0.0
6424
th D
ecem
ber,
2002
Cedr
ela,
Tea
k11
8Du
ncan
Will
iam
sAs
hant
iN
kaw
ieDe
siri
3992
.70.
00
-
119
GAC
(Nan
a Ad
u Kw
aben
a Ga
brie
l Co.
Ltd
)As
hant
iN
kaw
ieDe
siri
88, 1
08, 1
1338
5.0
0.0
385
24th
Feb
ruar
y, 2
003
Cedr
ela,
Tea
k
120
Gree
nfie
lds P
lant
atio
ns
Lim
ited/
Sca
nsty
leAs
hant
iN
kaw
ieDe
siri
63,7
2,73
,81,
82,
91,9
2, 1
03, 1
1735
9.9
0.0
29.4
-Ce
drel
a, T
eak
37
38
NO
.CO
MPA
NY
NAM
ERE
GIO
NDI
STRI
CTFO
REST
RES
ERVE
COM
PART
MEN
T/SE
RIES
AR
EA A
LLO
CATE
D (H
a)AR
EA P
LAN
TED-
2013
(Ha)
AREA
PLA
NTE
D TO
DA
TE (H
a)DA
TE O
F AL
LOCA
TIO
NSP
ECIE
S PL
ANTE
D
121
Opa
nin
Twen
e Kw
ame
Com
pany
Ltd
.As
hant
iN
kaw
ieDe
siri
9,10
292.
020.
088
.019
84 ?
Waw
a,
Man
zoni
a,
Odu
m, E
dina
m,
Util
e,
Mah
ogan
y,
Ofr
am, O
nyin
a,
Akat
a,
Asan
fina,
Hy
edua
kyen
kye
n, T
eak,
Sap
ele,
O
tie, C
edre
la,
Teak
, Em
ire
122
TSL
(Tep
a &
Tec
him
an
Saw
mill
s Ltd
) As
hant
iN
kaw
ieDe
siri
89, 9
025
6.0
0.0
76.0
-Ce
drel
a, T
eak
123
ADK
Tim
bers
Co.
Ltd
Asha
nti
Nka
wie
Jimira
1812
8.0
0.0
44.0
-Ce
drel
a, T
eak
124
Akw
asi A
gyei
& O
puku
Ti
mbe
rs (K
AGO
)As
hant
iN
kaw
ieJim
ira8
128.
00.
060
.06t
h Ja
nuar
y, 2
004
Cedr
ela,
Tea
k
125
Bena
kuf T
imbe
r and
Tr
adin
gAs
hant
iN
kaw
ieJim
ira15
99.9
20.
025
2004
Cedr
ela,
Tea
k
126
May
brob
Co.
Ltd
/
Ce
ntra
l Mar
ket F
olks
line
Wom
en's
Asso
ciat
ion
Asha
nti
Nka
wie
Jimira
5,
7&
42, 4
0&44
683.
110.
022
1.0
23rd
Mar
ch, 2
004
6th
Janu
ary,
200
4?
15th
June
, 200
4Ce
drel
a, T
eak
OAE
K (O
duro
Ana
ne E
nt.)
Asha
nti
Nka
wie
Jimira
1412
8.0
0.0
40.0
23rd
Mar
ch, 2
004
22
nd D
ecem
ber,
2004
?Ce
drel
a, T
eak
OAE
K (O
duro
Ana
ne E
nt.)
Asha
nti
Nka
wie
Jimira
3812
8.0
0.0
45.0
2004
Cedr
ela,
Tea
k
128
Ose
i Tut
u (O
.T) B
roth
ers
Ltd
Asha
nti
Nka
wie
Jimira
1312
8.0
0.0
75.0
23rd
Janu
ary,
200
4Ce
drel
a, T
eak
129
SKO
D Ti
mbe
rsAs
hant
iN
kaw
ieJim
ira22
, 26,
30
384.
00.
05.
023
rd Ja
nuar
y, 2
003
Cedr
ela,
Teak
130
TSL
(Tep
a &
Tec
him
an
Saw
mill
s Ltd
) As
hant
iN
kaw
ieJim
ira32
129.
70.
030
.03r
d Ju
ne, 2
004
Cedr
ela,
Tea
k
131
Woo
d Pi
llar
Asha
nti
Nka
wie
Jimira
912
8.0
0.0
5.0
16th
Dec
embe
r, 20
04
132
Logw
ood
Indu
strie
s Li
mite
dAs
hant
iN
kaw
ieJim
ira
3312
8.0
0.0
4.0
2004
Cedr
ela,
Tea
k
127
38
39
NO
.CO
MPA
NY
NAM
ERE
GIO
NDI
STRI
CTFO
REST
RES
ERVE
COM
PART
MEN
T/SE
RIES
AR
EA A
LLO
CATE
D (H
a)AR
EA P
LAN
TED-
2013
(Ha)
AREA
PLA
NTE
D TO
DA
TE (H
a)DA
TE O
F AL
LOCA
TIO
NSP
ECIE
S PL
ANTE
D
133
Bibi
ani L
oggi
ng a
nd
Lum
ber C
ompa
ny L
imite
dAs
hant
iN
kaw
ieJim
ira E
xten
sion
19,2
0,23
,24
406.
730.
012
8.0
-Ce
drel
a, T
eak
134
City
Vie
w C
ompa
ny L
td
(CVC
)As
hant
iN
kaw
ieJim
ira E
xten
sion
2112
8.0
0.0
128.
010
th D
ecem
ber,
2004
Cedr
ela,
Tea
k,
Ceib
a (s
pars
ely)
135
N&
B Li
nk T
imbe
r Com
pany
Li
mite
dAs
hant
iN
kaw
ieJim
ira E
xten
sion
17, 2
025
6.0
0.0
49.0
8th
June
, 200
4Ce
drel
a, T
eak
136
Nan
a O
sei A
koto
Asha
nti
Nka
wie
Tint
e Be
po86
, 90
143.
50.
00.
020
08N
/A13
7Ah
wia
a W
ood
Prod
ucts
Asha
nti
Offi
nso
Afra
m H
eadw
ater
s33
, 35,
101
380.
00.
020
9.0
1996
Cedr
ela,
Tea
k
138
Asso
ciat
ion
for
Cons
erva
tion
and
Deve
lopm
ent
Asha
nti
Offi
nso
Afra
m H
eadw
ater
s69
100.
00.
025
.0-
Teak
139
Ben
'O' I
nves
tmen
ts L
tdAs
hant
iO
ffins
oAf
ram
Hea
dwat
ers
5, 1
2417
9.0
0.0
75.0
18th
Mar
ch, 2
005
Cedr
ela,
Tea
k14
0Ev
ans T
imbe
rs L
tdAs
hant
iO
ffins
oAf
ram
Hea
dwat
ers
107,
108
205.
990.
017
0.0
1999
Teak
141
Grow
Tea
kAs
hant
iO
ffins
oAf
ram
Hea
dwat
ers
7412
8.0
0.0
42.0
2003
Teak
142
Hon.
Baf
four
Kes
e-
Aman
kwaa
Asha
nti
Offi
nso
Afra
m H
eadw
ater
s10
612
8.00
0.0
0.0
8th
Mar
ch, 2
013
N/A
143
JOJA
YKO
Ent
erpr
iseAs
hant
iO
ffins
oAf
ram
Hea
dwat
ers
95, 1
2020
5.61
15.0
15.0
4th
Nov
embe
r, 20
12Te
ak14
4K.
B.K
Tim
bers
Asha
nti
Offi
nso
Afra
m H
eadw
ater
s92
40.3
80.
040
.38
-Te
ak14
5Kw
aduk
off C
o. L
tdAs
hant
iO
ffins
oAf
ram
Hea
dwat
ers
102
111.
9110
.070
.020
03Te
ak
146
Logw
ood
Indu
strie
s Li
mite
dAs
hant
iO
ffins
oAf
ram
Hea
dwat
ers
3410
0.0
0.0
50.0
2003
Teak
, Ced
rela
147
Mer
e Pl
anta
tions
Lim
ited
Asha
nti
Offi
nso
Afra
m H
eadw
ater
s
12-1
4,17
-23,
29-
31,1
12-1
14,1
16-
118;
41
,43,
45,4
7,80
-86
,96-
100,
104,
105
4,07
8.50
347.
015
19.5
5th
Janu
ary,
200
7Te
ak14
8Be
n Dw
omo
Asha
nti
Offi
nso
Afre
nsu
Broh
uma
23,2
4,25
,26
518.
480.
089
.0-
149
Diab
y Le
asin
g Co
mpa
ny
Lim
ited
Asha
nti
Offi
nso
Afre
nsu
Broh
uma
9,10
279.
720
45.0
135.
07t
h Ja
n. 2
004
21st
Mar
ch, 2
010
Teak
150
FORM
Gha
na L
tdAs
hant
iO
ffins
oAf
rens
u Br
ohum
a
8,12
,19,
20,2
1,2
2,
27,2
8,29
,32,
33,
34, 3
517
78.1
30.
017
78.1
291s
t Sep
tem
ber,
2012
?
Teak
, Cei
ba,
Mah
ogan
y,
Albi
zia, O
fram
, Em
ire, K
ola,
Ko
krod
ua,
Potr
adom
151
HABI
TAT
TIM
BERS
Asha
nti
Offi
nso
Afre
nsu
Broh
uma
4612
5.0
0.0
100.
0
39
40
NO
.CO
MPA
NY
NAM
ERE
GIO
NDI
STRI
CTFO
REST
RES
ERVE
COM
PART
MEN
T/SE
RIES
AR
EA A
LLO
CATE
D (H
a)AR
EA P
LAN
TED-
2013
(Ha)
AREA
PLA
NTE
D TO
DA
TE (H
a)DA
TE O
F AL
LOCA
TIO
NSP
ECIE
S PL
ANTE
D
152
Mic
hael
Lar
biAs
hant
iO
ffins
oAf
rens
u Br
ohum
a47
124.
430.
090
.016
th M
arch
, 201
0Te
ak
153
Nex
t Doo
r Far
ms
Asha
nti
Offi
nso
Afre
nsu
Broh
uma
4912
6.14
0.0
50.0
24th
Feb
ruar
y, 2
012
Teak
154
SUN
STEX
Asha
nti
Offi
nso
Afre
nsu
Broh
uma
11, 1
2, 1
4, 1
5,
17, 4
1, 4
2A,
42B,
43,
44,
45
A, 4
5B, 5
0A,
51A,
52A
, 53,
55
, 56
2,20
0.0
0.0
237.
0-
Teak
155
Uni
ty A
ffore
stat
ion
and
Tree
Nur
sery
Pro
ject
Asha
nti
Offi
nso
Afre
nsu
Broh
uma
30, 3
124
8.70
10.0
228.
405t
h M
arch
, 200
5Te
ak
156
Ahm
ed S
ulem
an F
arm
s &
Com
pany
Lim
ited
Asha
nti
Offi
nso
Asub
ima
15, 1
6, 1
7, 1
8,
19, 2
4,25
,26
1,12
8.27
0.0
1000
-Te
ak, C
assia
157
Colo
nel R
.K O
poku
Adu
sei
Asha
nti
Offi
nso
Asub
ima
5612
8.0
0.0
50.0
20th
Feb
ruar
y, 2
006
Teak
158
Form
Gha
na L
td
Asha
nti
Offi
nso
Asub
ima
1,2,
3,4,
5,6,
7,8,
9,10
,11,
12,1
3,2
7,28
1776
.50
0.0
1776
.498
30th
Oct
. 200
7
Teak
, Cei
ba,
Mah
ogan
y,
Albi
zia, O
fram
, Em
ire, K
ola,
Ko
krod
ua,
Potr
adom
159
Sule
man
Tw
i Far
ms
Asha
nti
Offi
nso
Asub
ima
61, 6
227
0.16
0.0
-
160
Inte
rnat
iona
l See
d Ce
ntre
Asha
nti
Offi
nso
Asuf
u Ea
st7,
825
6.0
0.0
28.0
-Ce
drel
a, T
eak
161
Kwak
u Po
ku T
imbe
rs L
tdAs
hant
iO
ffins
oAs
ufu
East
4,5
255.
270.
019
5.0
7th
Janu
ary,
200
4Ce
drel
a, T
eak
162
Nku
nim
Ven
ture
sAs
hant
iO
ffins
oAs
ufu
East
613
5.0
0.0
135.
0-
Pred
omin
antly
te
ak, O
fram
, W
awa
163
Offi
n Ti
mbe
rs &
Co
nstr
uctio
n Co
. Ltd
(O
.T.C
.C)
Asha
nti
Offi
nso
Asuf
u W
est
Shel
terb
elt
18 &
19
256
10.0
30.0
4th
Sept
embe
r, 20
04Ce
drel
a, T
eak
164
Sarb
eng
Lim
ited
Asha
nti
Offi
nso
Asuf
u W
est
16, 1
725
6.0
10.0
175.
0
13th
Janu
ary,
200
4;
10th
Sep
tem
ber,
2004
Cedr
ela,
Tea
k
165
Adu-
Gya
mfi
Farm
s As
hant
iO
ffins
oKw
amisa
5514
1.45
0.0
141.
4524
Dec
embe
r, 20
01Te
ak
40
96.3
41
NO
.CO
MPA
NY
NAM
ERE
GIO
NDI
STRI
CTFO
REST
RES
ERVE
COM
PART
MEN
T/SE
RIES
AR
EA A
LLO
CATE
D (H
a)AR
EA P
LAN
TED-
2013
(Ha)
AREA
PLA
NTE
D TO
DA
TE (H
a)DA
TE O
F AL
LOCA
TIO
NSP
ECIE
S PL
ANTE
D
166
Aido
o N
tim F
arm
sAs
hant
iO
ffins
oKw
amisa
5415
4.04
0.0
90.0
24 D
ecem
ber,
2001
Teak
167
ASA
BEA
Ente
rpris
eAs
hant
iO
ffins
oKw
amisa
2412
5.45
22.0
115.
0Te
ak
168
Asan
te W
iredu
&
Asso
ciat
esAs
hant
iO
ffins
oKw
amisa
215
0.17
0.0
150.
172
8th
Janu
ary,
200
4Te
ak
169
Asan
tew
aa E
nter
prise
Li
mite
dAs
hant
iO
ffins
oKw
amisa
52, 3
425
7.76
63.7
6425
7.76
4
31st
Dec
embe
r, 20
02 8
th Ja
nuar
y,
2004
Teak
170
Asot
ia B
oaky
e Co
mpa
ny
Lim
ited
Asha
nti
Offi
nso
Kwam
isa39
129.
40.
010
0.0
10th
Janu
ary,
200
5Te
ak
171
Assa
kyiri
Tim
bers
and
W
ood
Prod
ucts
Asha
nti
Offi
nso
Kwam
isa56
128.
00.
030
.026
th M
arch
, 200
3Te
ak
172
Will
iam
K. A
sum
adu
&
Mar
gare
t A. K
wab
ia
Asha
nti
Offi
nso
Kwam
isa30
112.
29.
072
.4-
Teak
173
B.Y
Ofo
ri Fr
impo
ngAs
hant
iO
ffins
oKw
amisa
2016
1.95
12.6
29.6
024
th F
ebru
ary,
200
9Te
ak
174
Boad
u Ay
eboa
fo (O
sei
Kojo
Tim
bers
)As
hant
iO
ffins
oKw
amisa
4613
6.21
18.0
110.
020
th D
ecem
ber,
20
02Te
ak
175
Bonf
rim B
usin
ess S
ervi
ces
Asha
nti
Offi
nso
Kwam
isa51
133.
160.
013
0.0
20th
Dec
embe
r, 20
02Ce
drel
a, T
eak
176
Char
les A
man
kwah
Asha
nti
Offi
nso
Kwam
isa44
129.
1442
.612
4.0
-Te
ak17
7Cl
assic
Far
ms C
o. L
tdAs
hant
iO
ffins
oKw
amisa
4812
0.20
32.0
118.
016
th M
ay, 2
005
Teak
178
CWC
Vent
ures
Lim
ited
Asha
nti
Offi
nso
Kwam
isa49
114.
930.
011
4.93
11s
t Sep
tem
ber,
2005
Teak
179
D&G
Cons
ults
As
hant
iO
ffins
oKw
amisa
4013
5.0
85.0
135.
025
th O
ctob
er, 2
007
Teak
180
Zyph
er C
onsu
ltAs
hant
iO
ffins
oKw
amisa
4313
0.2
40.0
120.
0Te
ak
181
Egha
n &
Egh
an
Inve
stm
ents
Lim
ited
Asha
nti
Offi
nso
Kwam
isa57
149.
530.
014
9.53
21st
Dec
embe
r, 20
11 1
0th
Janu
ary,
20
05Te
ak
182
EL-S
ARP
Uni
que
Com
pany
Li
mite
dAs
hant
iO
ffins
oKw
amisa
4710
0.0
0.0
100.
020
th D
ecem
ber,
2002
Teak
183
Euro
pe A
uto
and
Euro
pe
Farm
s Ltd
Asha
nti
Offi
nso
Kwam
isa36
, 37
260.
440.
026
0.43
58t
h Ja
nuar
y, 2
004
Teak
, Em
ire,
Ofr
am,
Twea
pia
184
Faus
tina
Kusi
Tim
ber C
o.
Ltd
Asha
nti
Offi
nso
Kwam
isa42
128.
00.
080
.020
th Ja
nuar
y 20
04Te
ak
185
Flor
art V
entu
res L
imite
dAs
hant
iO
ffins
oKw
amisa
1817
8.23
0.0
169.
3210
th Ja
nuar
y, 2
005
10
th?
or 1
2th?
Teak
41
42
NO
.CO
MPA
NY
NAM
ERE
GIO
NDI
STRI
CTFO
REST
RES
ERVE
COM
PART
MEN
T/SE
RIES
AR
EA A
LLO
CATE
D (H
a)AR
EA P
LAN
TED-
2013
(Ha)
AREA
PLA
NTE
D TO
DA
TE (H
a)DA
TE O
F AL
LOCA
TIO
NSP
ECIE
S PL
ANTE
D
186
Gorb
ros V
entu
res
Asha
nti
Offi
nso
Kwam
isa50
162.
170.
012
8.0
24th
Dec
embe
r, 20
02Te
ak, C
edre
la
187
Hon.
And
rew
s Adj
ei
Yebo
ahAs
hant
iO
ffins
oKw
amisa
3286
.52
10.0
30.0
Aug-
08Te
ak, C
edre
la18
8Is
aac
Opo
ku B
oate
ngAs
hant
iO
ffins
oKw
amisa
312
0.0
0.0
85.0
6th
Janu
ary,
200
4
189
JOB
CON
STRU
CT G
hana
Lt
dAs
hant
iO
ffins
oKw
amisa
2296
.99
0.0
96.9
9220
th F
ebru
ary,
200
6Te
ak
190
KAP
Farm
s Ent
erpr
ise
Lim
ited
Asha
nti
Offi
nso
Kwam
isa33
, 61
208.
790.
020
8.79
4
8th
Janu
ary,
200
4,
31st
Dec
embe
r, 20
02Te
ak19
1Ke
n Bo
atAs
hant
iO
ffins
oKw
amisa
5912
8.0
0.0
100.
0Te
ak
192
King
sley
Agye
i Agy
ekum
Asha
nti
Offi
nso
Kwam
isa23
128.
00.
041
.025
th O
ctob
er, 2
007
Teak
193
Kwad
ukof
f Co.
Ltd
Asha
nti
Offi
nso
Kwam
isa19
119.
2510
.075
.0-
Teak
194
Ora
ns L
ife L
tdAs
hant
iO
ffins
oKw
amisa
35,4
117
5.61
0.0
160.
06t
h Ja
nuar
y, 2
004
Teak
195
Ose
i Agy
eman
g Ba
duAs
hant
iO
ffins
oKw
amisa
5816
3.37
0.0
163.
37-
Teak
, Ofr
am19
6O
TK F
arm
sAs
hant
iO
ffins
oKw
amisa
2689
.11
0.0
62.4
01/0
2/20
07
197
Paul
Kw
asi (
P.K)
For
son
Asha
nti
Offi
nso
Kwam
isa38
129.
551.
548
129.
548
7th
Janu
ary,
200
4
Teak
, Ced
rela
pl
us o
ne
indi
geno
us
198
SEN
S PR
OGR
AMAs
hant
iO
ffins
oKw
amisa
2512
8.0
0.0
128.
023
rd Ja
nuar
y, 2
006
Teak
199
Soak
Far
ms &
Tra
ding
Ent
Asha
nti
Offi
nso
Kwam
isa53
, 60
253.
210.
025
3.20
631
st D
ecem
ber,
2002
200
Vica
lex
Craf
ts L
tdAs
hant
iO
ffins
oKw
amisa
4512
8.0
0.0
10.0
10th
Apr
il, 2
003
Teak
201
ANTI
CO W
ood
Asha
nti
Offi
nso
Man
kran
g29
,30
256.
00.
070
.011
th D
ecem
ber,
2002
202
BODU
KWAN
Far
ms
Asha
nti
Offi
nso
Man
kran
g
18-2
3;26
-28
;31,
52-5
5;
61
-63;
65-
672,
548.
00.
017
th Ja
mua
ry, 2
013
203
Cam
ba T
imbe
rsAs
hant
iO
ffins
oM
ankr
ang
1513
0.0
0.0
30.0
-Ce
drel
a, T
eak
204
Esaa
se W
ood
Prod
ucts
Li
mite
dAs
hant
iO
ffins
oM
ankr
ang
46,4
725
6.0
0.0
120.
028
th Ja
nuar
y, 2
004
20th
Janu
ary,
200
3
205
Glob
al B
ambo
o Pr
oduc
ts
Ltd
Asha
nti
Offi
nso
Man
kran
g39
126.
790.
030
.08t
h Ja
n. 2
003
Bam
boo,
Tea
k
206
K.A.
G Ti
mbe
rsAs
hant
iO
ffins
oM
ankr
ang
4,16
241.
610.
012
3.0
20th
Janu
ary,
200
3
207
Nat
ion
Build
ers'
Lim
ited
Asha
nti
Offi
nso
Man
kran
g24
100.
00.
010
0.0
8th
Janu
ary,
200
3Te
ak
42
43
NO
.CO
MPA
NY
NAM
ERE
GIO
NDI
STRI
CTFO
REST
RES
ERVE
COM
PART
MEN
T/SE
RIES
AR
EA A
LLO
CATE
D (H
a)AR
EA P
LAN
TED-
2013
(Ha)
AREA
PLA
NTE
D TO
DA
TE (H
a)DA
TE O
F AL
LOCA
TIO
NSP
ECIE
S PL
ANTE
D
208
Roy
C C
ompa
ny L
tdAs
hant
iO
ffins
oM
ankr
ang
3,6
384.
00.
075
31st
Dec
embe
r, 20
02Te
ak
209
Uni
ty A
ffore
stat
ion
and
Tree
Nur
sery
Pro
ject
Asha
nti
Offi
nso
Man
kran
g
Port
ions
of 1
, 15
, 57,
58
214.
620.
021
4.61
927
th A
ugus
t, 20
05?
8t
h Ja
nuar
y, 2
004
?
Wat
apuo
, Ky
enky
en,
Gmel
ina,
Al
bizia
, M
ahog
any,
W
awa,
Ofr
am,
Cedr
ela
210
Eben
ezer
Am
arkw
ei
Lary
eaAs
hant
iO
ffins
oO
pro
Rive
r95
141.
430.
00.
08t
h Ju
ly, 2
013
N/A
211
Evan
s Tim
bers
Ltd
Asha
nti
Offi
nso
Opr
o Ri
ver
19, 2
2, 7
3, 7
448
8.0
0.0
178.
020
02
212
Grow
For
est L
tdAs
hant
iO
ffins
oO
pro
Rive
r97
116.
720.
00.
020
th F
ebru
ary,
201
3N
/A
213
Iron
Mas
ters
Com
pany
Ltd
Asha
nti
Offi
nso
Opr
o Ri
ver
9212
9.82
0.0
0.0
20th
Feb
ruar
y, 2
013
N/A
214
JOB
CON
STRU
CT G
hana
Lt
dAs
hant
iO
ffins
oO
pro
Rive
r91
117.
5650
.050
.020
13
215
Joe
Sala
Saw
mill
Ltd
Asha
nti
Offi
nso
Opr
o Ri
ver
93,9
424
4.77
10.0
220.
031
st D
ecem
ber,
2002
Teak
, Ofr
am,
Mah
ogan
y,
Cedr
ela
216
J.Y.V
Co.
Ltd
Asha
nti
Offi
nso
Opr
o Ri
ver
9612
1.96
0.0
0.0
8th
Febr
uary
, 201
3N
/A
217
Kwam
e-Bi
Kuf
four
Tim
ber
Co. L
td
Asha
nti
Offi
nso
Opr
o Ri
ver
9812
8.0
5.0
65.0
11th
Aug
ust,
2003
Cedr
ela
218
Gree
nfie
lds P
lant
atio
ns
Lim
ited/
Ayum
Bron
g Ah
afo
Bech
emBo
som
kese
16-2
0, 4
9A &
49
B80
6.0
28.0
422
-
Cedr
ela,
Cei
ba,
Man
soni
a,
Ofr
am, U
tile,
M
ahog
any,
W
awa,
Otie
, O
dum
, Kus
ia,
Kokr
odua
43
44
NO
.CO
MPA
NY
NAM
ERE
GIO
NDI
STRI
CTFO
REST
RES
ERVE
COM
PART
MEN
T/SE
RIES
AR
EA A
LLO
CATE
D (H
a)AR
EA P
LAN
TED-
2013
(Ha)
AREA
PLA
NTE
D TO
DA
TE (H
a)DA
TE O
F AL
LOCA
TIO
NSP
ECIE
S PL
ANTE
D
219
Gree
nfie
lds P
lant
atio
ns
Lim
ited/
Ayum
Bron
g Ah
afo
Dorm
aaM
pam
eso
3, 4
, 5, 6
, 7, 9
, 10
, 11,
12,
13,
14
, 15,
25,
26,
27
, 180
, 181
, 18
2, 1
83, 1
84,
214,
215
, 223
, 22
4, 2
25, 2
26,
227,
228
, 229
, 22
9A, 2
40, 2
41,
242,
243
, 244
, 24
5, 2
46, 2
47,
248
4,99
2.0
157.
010
10.4
5-
Cedr
ela,
Ofr
am,
Mah
ogan
y,
Edin
am, W
awa,
Em
ire,
Kyen
kyen
, U
tile,
M
anso
nia,
Otie
, Ko
krod
ua,
Ony
ina,
Sen
na
siam
ea
220
Adam
s Far
ms
Bron
g Ah
afo
Dorm
aaPa
mu
Bere
kum
6914
0.0
0.0
807t
h M
arch
, 200
6Te
ak
221
Agya
kwa
Anya
ne &
Cha
rity
Tim
bers
Bron
g Ah
afo
Dorm
aaPa
mu
Bere
kum
9650
.00.
010
.010
th M
ay, 2
005
Teak
222
AKAB
ELS
Bron
g Ah
afo
Dorm
aaPa
mu
Bere
kum
121,
134
100.
00.
050
.024
th D
ecem
ber,
2002
Teak
223
Akua
Afr
iyie
Br
ong
Ahaf
oDo
rmaa
Pam
u Be
reku
m64
,65,
66,6
750
0.0
0.0
40.0
2002
Teak
224
Alex
ande
r Tak
yi T
imbe
rs
(ATT
S)Br
ong
Ahaf
oDo
rmaa
Pam
u Be
reku
m48
, 49,
50,
(54)
, 55
, 56,
62,
6310
00.0
10.0
185.
020
03 T
eak
225
Arth
ur F
arm
sBr
ong
Ahaf
oDo
rmaa
Pam
u Be
reku
m12
412
0.0
0.0
5.0
23rd
Janu
ary,
200
7 T
eak
226
Asom
a &
Fam
ily P
lant
atio
nBr
ong
Ahaf
oDo
rmaa
Pam
u Be
reku
m71
120.
00.
05.
020
01 T
eak
227
Asuo
wam
Com
plex
Bron
g Ah
afo
Dorm
aaPa
mu
Bere
kum
86,8
7,88
,100
480.
00.
010
0.0
2003
Tea
k 22
8AT
BED
Com
pany
Lim
ited
Bron
g Ah
afo
Dorm
aaPa
mu
Bere
kum
9212
5.0
0.0
80.0
7th
May
, 200
4Te
ak
229
Baah
(Abe
na K
wab
ena)
Bron
g Ah
afo
Dorm
aaPa
mu
Bere
kum
40,4
1,46
,47,
5374
0.0
0.0
60.0
2004
Teak
230
Baffo
ur A
sam
oah
& S
ons
Bron
g Ah
afo
Dorm
aaPa
mu
Bere
kum
130
130.
00.
030
.08t
h Ja
nuar
y, 2
004
Teak
231
Conc
erne
d Ci
tizen
Br
ong
Ahaf
oDo
rmaa
Pam
u Be
reku
m21
57.8
70.
027
.020
02Te
ak23
2De
lta-K
Ltd
& R
emor
geBr
ong
Ahaf
oDo
rmaa
Pam
u Be
reku
m13
1, 1
3250
0.0
0.0
150.
09t
h Ap
ril, 2
001
Teak
233
Dorm
aa F
ores
try
Inte
rnat
iona
l (Gl
obal
Gr
een)
Bron
g Ah
afo
Dorm
aaPa
mu
Bere
kum
5, 6
, 7, 8
, 19,
20
Port
ions
(9, 1
2,
13, 1
8, 8
0)
1,62
8.55
0.0
240.
028
th F
ebru
ary,
200
1Te
ak23
4ZO
IL S
ervi
ces L
imite
dBr
ong
Ahaf
oDo
rmaa
Pam
u Be
reku
m97
,98,
99, 1
241,
000.
00.
00.
020
1423
5Ho
n. Y
aw A
fful
Bron
g Ah
afo
Dorm
aaPa
mu
Bere
kum
123
128.
010
.012
.020
05Te
ak44
45
NO
.CO
MPA
NY
NAM
ERE
GIO
NDI
STRI
CTFO
REST
RES
ERVE
COM
PART
MEN
T/SE
RIES
AR
EA A
LLO
CATE
D (H
a)AR
EA P
LAN
TED-
2013
(Ha)
AREA
PLA
NTE
D TO
DA
TE (H
a)DA
TE O
F AL
LOCA
TIO
NSP
ECIE
S PL
ANTE
D
236
JOW
AK E
nter
prise
Lim
ited
Bron
g Ah
afo
Dorm
aaPa
mu
Bere
kum
113,
128
1,00
0.0
0.0
165.
029
th Ja
nuar
y, 2
001
Teak
237
Kym
a Pl
anta
tions
Bron
g Ah
afo
Dorm
aaPa
mu
Bere
kum
136
200.
05.
060
.022
nd M
arch
, 200
7Te
ak
238
Mire
ku C
ompl
ex L
imite
d Br
ong
Ahaf
oDo
rmaa
Pam
u Be
reku
m11
110
5.0
0.0
0.0
2012
-
239
Mor
ricom
Com
pany
Li
mite
dBr
ong
Ahaf
oDo
rmaa
Pam
u Be
reku
m13
525
9.70
15.0
79.7
07t
h Ja
nuar
y, 2
004
Teak
240
Nan
a Ko
rdie
Yeb
oah
II (D
orm
aa A
duan
ahen
e)Br
ong
Ahaf
oDo
rmaa
Pam
u Be
reku
m37
100.
00.
00.
020
12 -
241
Obo
ade
Farm
sBr
ong
Ahaf
oDo
rmaa
Pam
u Be
reku
m38
128.
00.
00.
014
th O
ctob
er, 2
013
-
242
Ohe
nba
K.D.
Fou
ndat
ion
Bron
g Ah
afo
Dorm
aaPa
mu
Bere
kum
4350
.00.
020
.08t
h Ja
nuar
y, 2
004
Teak
243
Om
anba
Sol
utio
ns L
tdBr
ong
Ahaf
oDo
rmaa
Pam
u Be
reku
m12
512
8.0
3.0
3.0
16th
Apr
il, 2
013
Teak
244
Orig
inal
Asa
se A
ban
Com
plex
Lim
ited
Bron
g Ah
afo
Dorm
aaPa
mu
Bere
kum
82, 8
310
00.
08.
09t
h Ja
nuar
y, 2
003
Teak
245
Osa
gyef
o O
sead
eyo
Agye
man
Bad
u II
(Dor
maa
hene
)Br
ong
Ahaf
oDo
rmaa
Pam
u Be
reku
m33
, 34
186.
9540
.040
.020
12Te
ak
246
Part
ners
Sus
tain
abili
ty
Lim
ited
Bron
g Ah
afo
Dorm
aaPa
mu
Bere
kum
118,
119,
120
500
0.0
10.0
7th
Janu
ary,
200
7Te
ak
247
Pegg
y Ad
dai
Bron
g Ah
afo
Dorm
aaPa
mu
Bere
kum
44, 4
550
05.
011
0.0
29th
Janu
ary,
200
2Te
ak
248
Pete
r Ans
u Ku
mih
Far
ms
Bron
g Ah
afo
Dorm
aaPa
mu
Bere
kum
7512
00.
011
.010
th M
arch
, 200
5Te
ak24
9Pr
asha
nti
Bron
g Ah
afo
Dorm
aaPa
mu
Bere
kum
94-9
864
00.
00.
07t
h Ju
ne, 2
013
N/A
250
Rosa
Com
pany
Lim
ited
Bron
g Ah
afo
Dorm
aaPa
mu
Bere
kum
70.0
128.
00.
070
.023
rd Ja
nuar
y, 2
003
Teak
251
Rura
l For
est E
nter
prise
Bron
g Ah
afo
Dorm
aaPa
mu
Bere
kum
23, 2
425
0.0
0.0
10.0
29th
Janu
ary,
200
2Te
ak25
2Sa
cred
Hea
rt F
arm
sBr
ong
Ahaf
oDo
rmaa
Pam
u Be
reku
m76
120.
00.
09.
010
th M
arch
, 200
5Te
ak25
3Tu
ah S
awm
ills &
Far
ms
Bron
g Ah
afo
Dorm
aaPa
mu
Bere
kum
25,2
6,27
309.
940.
010
0.0
2003
Teak
45
46
NO
.CO
MPA
NY
NAM
ERE
GIO
NDI
STRI
CTFO
REST
RES
ERVE
COM
PART
MEN
T/SE
RIES
AR
EA A
LLO
CATE
D (H
a)AR
EA P
LAN
TED-
2013
(Ha)
AREA
PLA
NTE
D TO
DA
TE (H
a)DA
TE O
F AL
LOCA
TIO
NSP
ECIE
S PL
ANTE
D
254
Gree
nfie
lds P
lant
atio
ns
Lim
ited/
Ayum
Bron
g Ah
afo
Suny
ani
Amam
a
6B,
7, 8
, 9, 1
0,
11, 1
2, 1
3, 1
4,
15, 1
6,17
, 18,
19
, 20,
21,
22,
23
, 24
3255
.00
0.0
3062
.0
-
Cedr
ela,
Ofr
am,
Ceib
a,
Mah
ogan
y,
Edin
am, W
awa,
Em
ire,
Kyen
kyen
, Ko
to, U
tile,
M
anso
nia,
Otie
, M
akor
e,
Asan
fina,
Ak
asa,
Odu
m,
Kokr
odua
, Eu
caly
ptus
, Pi
ne, C
assia
, M
angi
um,
Kusia
255
Gree
nfie
lds P
lant
atio
ns
Lim
ited/
Sca
nsty
leBr
ong
Ahaf
oSu
nyan
iAs
ukes
e33
, 34,
43
450.
000.
0-
256
Gree
nfie
lds P
lant
atio
ns
Lim
ited/
Ayum
Bron
g Ah
afo
Goas
oBi
a Sh
elte
rbel
t9,
14
260.
05.
021
7.0
24th
Oct
ober
, 200
8
Waw
a,
Mah
ogan
y,
Ofr
am, P
rono
o,
Kokr
odua
, O
dum
, Otie
, As
anfe
na,
Ony
ina
etc
257
Jam
es O
wus
u An
sah
Bron
g Ah
afo
Suny
ani
Saw
saw
311
9.24
0.0
0-
258
Atta
Kru
ffie
Ente
rpris
eBr
ong
Ahaf
oSu
nyan
iTa
in I
18,2
4,25
300.
00.
020
0.0
April
, 200
1Te
ak
259
Fran
co T
imbe
rsBr
ong
Ahaf
oSu
nyan
iTa
in I
11, 1
2, 1
3, 1
456
1.0
0.0
561.
025
th Ja
nuar
y, 2
001
Teak
260
Oti
Yebo
ah C
ompl
ex
Lim
ited
(OYC
L)Br
ong
Ahaf
oSu
nyan
iTa
in I
20, 2
1, 2
2, 2
6,
2753
3.0
0.0
329
14th
June
, 200
1.Te
ak
261
Abro
nye
Inve
stm
ent
Com
pany
Lim
ited
Bron
g Ah
afo
Suny
ani
Tain
II
305,
306
, 316
, 32
7, 3
28, 3
29,
330,
331
, 332
1,15
2.0
0.0
1082
.520
02Te
ak
46
47
NO
.CO
MPA
NY
NAM
ERE
GIO
NDI
STRI
CTFO
REST
RES
ERVE
COM
PART
MEN
T/SE
RIES
AR
EA A
LLO
CATE
D (H
a)AR
EA P
LAN
TED-
2013
(Ha)
AREA
PLA
NTE
D TO
DA
TE (H
a)DA
TE O
F AL
LOCA
TIO
NSP
ECIE
S PL
ANTE
D
262
Asuo
Bom
osad
u Ti
mbe
rs
& S
awm
ills L
imite
d (A
BTS)
Bron
g Ah
afo
Suny
ani
Tain
II
12,1
4,15
,16,
17,
18
,25,
26,2
7, &
Po
rtio
n of
13
(Pru
so) &
163,
16
4, 1
65, 1
75,
176,
177,
194
, 19
5 &
196
(N
amas
ua)
1,99
1.56
0.0
293.
8621
st S
epte
mbe
r, 20
01
Teak
, M
ahog
any,
Ce
drel
a, O
fram
, Ce
iba,
Em
ire
263
Form
Gha
na L
td (P
PP)
Bron
g Ah
afo
Suny
ani
Tain
II14
,596
.064
0.0
640.
0-
Teak
(d
omin
ant)
In
dige
nous
(s
pars
e)
264
Logs
and
Lum
ber L
imite
d
(LLL
)Br
ong
Ahaf
oSu
nyan
iTa
in II
207,
208
, 209
, 21
0, 2
11, 2
15,
216,
217
1211
.61
0.0
232
2006
Tea
k
265
Pace
woo
d Co
mpa
ny
Lim
ited
Bron
g Ah
afo
Suny
ani
Tain
II29
0, 2
91, 2
92,
308,
311
616.
230.
021
6.57
28th
Mar
ch, 2
003
Teak
266
Sida
kon
Woo
ds L
imite
dBr
ong
Ahaf
oSu
nyan
iTa
in II
201,
202,
203
356.
016
0.0
240.
020
11Te
ak26
7Fr
im-O
wus
u Li
mite
dBr
ong
Ahaf
oSu
nyan
iTa
in T
ribut
arie
s II
239
150.
00.
022
.020
11Te
ak
268
Mes
srs T
ropi
cal
Agric
ultu
ral M
arke
ting
and
Cons
ulta
ncy
Serv
ices
Cent
ral
Win
neba
Yenk
u F/
R,
Bl
ock
'B'
5-2
6 43
2.8
0.0
0.0
9th
Febr
uary
, 201
0
269
Atla
ntic
Dist
ribut
ion
East
ern
Akim
-Oda
Esen
Epa
m4,
1127
1.82
26.0
191.
115
th A
ugus
t, 20
05Ce
drel
a, O
fram
270
CEPA
COD
(Cen
ter f
or
Pove
rty
Alle
viat
ion
and
Com
mun
ity D
evel
opm
ent)
East
ern
Bego
roDe
de0.
00.
020
th D
ecem
ber,
2002
271
Miro
Nat
iona
l Int
eres
t Co
mpa
ny L
imite
d (M
IRO
-N
ICO
L)Ea
ster
nBe
goro
Dede
5,36
0.0
0.0
0.0
4th
May
, 200
9
272
Mik
e As
aam
(ACM
A Gr
oup)
East
ern
Bego
roSo
uthe
rn S
carp
87-9
0, 9
3-95
(A
hink
wa)
179.
510.
010
0.0
-
273
All Y
outh
Far
mer
s (N
GO)
East
ern
Bego
roSo
uthe
rn S
carp
-50
0.0
5.0
6th
Janu
ary,
200
4Ce
drel
a
47
48
NO
.CO
MPA
NY
NAM
ERE
GIO
NDI
STRI
CTFO
REST
RES
ERVE
COM
PART
MEN
T/SE
RIES
AR
EA A
LLO
CATE
D (H
a)AR
EA P
LAN
TED-
2013
(Ha)
AREA
PLA
NTE
D TO
DA
TE (H
a)DA
TE O
F AL
LOCA
TIO
NSP
ECIE
S PL
ANTE
D
274
Apst
ar E
nter
prise
East
ern
Bego
roSo
uthe
rn S
carp
51, 5
3, 5
4, 5
632
3.42
0.0
144.
09t
h Ja
nuar
y, 2
004
Teak
, Ced
rela
, O
dum
, Cei
ba,
Waw
a,
Ketr
eam
fo,
Ofr
am, E
mire
, M
ahog
any,
Ab
eko,
Ose
se,
Oda
nhom
a
275
Ever
gree
n Cl
ub o
f Gha
naEa
ster
nBe
goro
Sout
hern
Sca
rp1
50.0
0.0
50.0
-Te
ak, C
edre
la,
Ofr
am, E
mire
, Ca
ssia
276
Fore
st R
esea
rch
Inst
itute
of
Gha
na (F
ORI
G)Ea
ster
nBe
goro
Sout
hern
Sca
rp
Ahin
kwa
Serie
s
(C
lose
to F
arm
14
)50
.08.
050
.020
00O
fram
, Em
ire
277
Fore
st R
esea
rch
Inst
itute
of
Gha
na (F
ORI
G)Ea
ster
nBe
goro
Sout
hern
Sca
rpAp
aa S
erie
s
(2
05-2
06)
50.0
6.0
42.0
2000
Ofr
am, E
mire
278
Heal
th a
nd E
nviro
nmen
tal
Mon
itor
East
ern
Bego
roSo
uthe
rn S
carp
Pim
pim
so
Taun
gya
Serie
s50
.00.
040
.01s
t Mar
ch, 2
003
Teak
, Ced
rela
279
Kajo
a Fa
rms
East
ern
Bego
roSo
uthe
rn S
carp
1610
0.0
0.0
44.0
-
280
Kasa
prek
o Co
. Ltd
East
ern
Bego
roSo
uthe
rn S
carp
FRBP
234
-248
1000
.00.
030
0.0
26th
Feb
ruar
y, 2
003
Mah
ogan
y
281
Oda
Saw
mill
s/Pl
ywoo
d Ve
neer
Co.
Ltd
East
ern
Bego
roW
orob
ong
Sout
h64
,65
124.
00.
092
.01s
t Jan
uary
, 200
1
282
Ea
ster
nBe
goro
Wor
obon
g So
uth
47, 4
8,52
(P
ortio
n)13
.07
0.0
13.0
7-
283
Part
icip
ator
y Tr
opic
al
Fore
st D
evel
opm
ent b
y W
omen
in In
dige
nous
Co
mm
uniti
es
(PTF
DWIC
; 31s
t Dec
embe
r W
omen
's M
ovem
ent)
East
ern
Bego
roW
orob
ong
Sout
hFR
BP 7
8-79
800
0.0
650
2001
Emire
, Ofr
am,
Man
soni
a,
Ceib
a, T
eak,
Ce
drel
a,
Kyen
kyen
, Ed
inam
284
Trus
t Lin
kEa
ster
nM
prae
soN
kaw
anda
100
0.0
2020
06
48
49
NO
.CO
MPA
NY
NAM
ERE
GIO
NDI
STRI
CTFO
REST
RES
ERVE
COM
PART
MEN
T/SE
RIES
AR
EA A
LLO
CATE
D (H
a)AR
EA P
LAN
TED-
2013
(Ha)
AREA
PLA
NTE
D TO
DA
TE (H
a)DA
TE O
F AL
LOCA
TIO
NSP
ECIE
S PL
ANTE
D
285
BCS
Lim
ited
Nor
ther
n Sc
arp
FRBP
422
-44
of
0
286
Ahan
ns G
hana
Lim
ited
East
ern
Mpr
aeso
Sout
hern
Sca
rp
Pilla
rs 2
67 a
nd
150.
Kay
era
Villa
ge20
.00.
010
.06t
h Ju
ly, 2
005
Teak
, Ced
rela
287
Eben
ezer
B.C
Ent
erpr
iseEa
ster
nM
prae
soSo
uthe
rn S
carp
Pilla
rs 2
67 a
nd
150.
Nto
meo
20.0
0.0
10.0
6th
July
, 200
5Te
ak, C
edre
la28
8CF
SL F
arm
sEa
ster
nM
prae
soSo
uthe
rn S
carp
100.
010
.020
06
289
Colli
nsar
a &
Son
sEa
ster
nM
prae
soSo
uthe
rn S
carp
Dwer
ebea
se
Serie
s30
0.0
10.0
2004
290
Fene
boat
Ent
erpr
iseEa
ster
nM
prae
soSo
uthe
rn S
carp
5035
.020
03
291
Jet S
awm
ills L
imite
dEa
ster
nM
prae
soSo
uthe
rn S
carp
Dwer
ebea
se
Serie
s66
.30.
040
.0
292
Mos
ho E
nter
prise
Lim
ited
East
ern
Mpr
aeso
Sout
hern
Sca
rpPi
llars
267
and
15
0. N
tom
eo50
.00.
010
.011
th Ju
ly, 2
005
Teak
, Ced
rela
293
Mr.
Yaw
Baa
fiEa
ster
nM
prae
soSo
uthe
rn S
carp
FRBP
245
and
24
720
06
294
Sir H
okoe
Gha
na L
tdEa
ster
nM
prae
soSo
uthe
rn S
carp
Kaye
ra/O
buom
Vi
llage
50.0
0.0
25.0
6th
Janu
ary,
200
3Te
ak, C
edre
la29
5Gr
oman
Com
pany
Lim
ited
East
ern
Som
anya
Volta
Riv
er B
lock
IIAs
hite
y12
0.5
0.0
2.0
16th
July
, 200
9Te
ak29
6Lo
rdam
n Ve
ntur
esEa
ster
nSo
man
yaVo
lta R
iver
Blo
ck I
N/A
100.
00.
040
.014
th M
arch
, 200
7
297
Thriv
e En
terp
rise
Grea
ter A
ccra
Tem
a/Ad
aFi
anko
nya
1-6,
8-1
130
0.0
0.0
80.0
29th
Sep
tem
ber,
2005
Mah
ogan
y,
Euca
lypt
us, S
ilk
Cott
on
298
Alha
ji Is
saka
Far
ms L
tdN
orth
ern
Bole
Yera
da50
.00.
012
th Ja
nuar
y, 2
004
N/A
299
F A
Adva
nces
Nor
ther
nBo
leYe
rada
0.0
14th
May
, 201
2N
/A
300
Jaks
ally
Co.
Ltd
Nor
ther
nBo
leKe
nike
ni50
.00.
026
th Ja
nuar
y, 2
004
N/A
301
Jen
Kurig
e Se
idu
Adam
uN
orth
ern
Bole
Keni
keni
N/A
50.0
0.0
26th
Janu
ary,
200
4N
/A
302
Khan
zan
Wur
a (G
H) L
tdN
orth
ern
Bole
Keni
keni
N/A
50.0
0.0
9th
Janu
ary,
200
4N
/A
303
Sava
nnah
Inve
stm
ent
Lim
ited
Nor
ther
nBo
leKe
nike
niN
/A10
0.0
0.0
0.0
-N
/A
304
Jam
al '5
5' V
entu
res
Nor
ther
nBu
ipe/
Dam
ongo
Dam
ongo
Sca
rp49
.63
0.0
-N
/A30
5Af
ricoo
pVo
lta
Nkw
anta
Chai
Riv
erN
/A10
0.0
0.0
0.0
-N
/A30
6JO
WAK
Ent
erpr
ise L
imite
d
Nkw
anta
Chai
Riv
erN
/A5,
000.
00.
00.
016
th M
arch
, 201
2N
/A
49
50
NO
.CO
MPA
NY
NAM
ERE
GIO
NDI
STRI
CTFO
REST
RES
ERVE
COM
PART
MEN
T/SE
RIES
AR
EA A
LLO
CATE
D (H
a)AR
EA P
LAN
TED-
2013
(Ha)
AREA
PLA
NTE
D TO
DA
TE (H
a)DA
TE O
F AL
LOCA
TIO
NSP
ECIE
S PL
ANTE
D
307
Mes
srs N
oon
Esta
blish
men
t (N
ana
Ose
i Br
oni)
Wes
tern
Bi
bian
iAn
hwia
so E
ast
30,3
430
.85
0.0
10.0
2004
308
Sam
arte
x Ti
mbe
r and
Pl
yWoo
d Co
mpa
ny L
imite
dW
este
rn
Aow
in (E
nchi
)Ta
no N
imire
50,5
1,52
,53,
54,
74,7
5,76
,77
1405
.60.
028
0.0
3rd
Mar
ch, 2
003
Cedr
ela,
M
ahog
any,
Ce
iba,
Em
ire,
Ofr
am,
Nyi
ango
n,
Asan
fena
309
JCM
Wes
tern
Ju
abos
o-bi
aBi
a-Ta
wya
0.0
618.
018
th A
ugus
t, 19
99N
/A
310
JCM
Wes
tern
Ju
abos
o-bi
aM
anza
n0.
025
7.3
18th
Aug
ust,
1999
N/A
125
,700
.79
2,7
46.5
1
36,2
00.5
2 TO
TAL
50
35,490
.79
51
APPE
ND
IX 2
Regi
onFo
rest
Dis
tric
tFr
inge
Com
mun
ityFo
rest
Res
erve
Targ
etCo
mpa
rtm
ent
Num
ber
Repo
rted
Are
a Pl
ante
d (
Ha)
Verif
ied
Area
Pl
ante
d (H
a)
Perc
enta
ge
Surv
ival
%Sp
ecie
sSp
acin
g
94 (p
lot A
)30
.00
30.7
878
Teak
3X3
95 (p
lot B
)14
.45
14.4
595
Teak
3X3
49 (p
lot A
1)17
.55
75Te
ak3X
349
(plo
t A2)
4.44
70Te
ak3X
349
(plo
t A3)
3.66
70Te
ak3X
349
(plo
t B)
40.0
039
.57
87Te
ak3X
3Pa
nina
misa
1940
.00
38.6
585
Teak
3X3
Subt
otal
140.
0014
4.45
149.
10Bo
tokr
om10
330
.00
27.4
380
Teak
3X3
Nkye
nkye
nmam
u10
3/10
430
.00
31.1
088
Teak
3X3
Abrik
asu
5730
.00
30.0
972
Teak
3X3
Twum
krom
8930
.00
26.8
482
Teak
3X3
Subt
otal
120.
0012
0.00
115.
46M
alla
mkr
omYa
ya34
& 3
940
.00
40.0
086
Teak
3X3
Odum
ase
Tain
II28
6 &
287
61.0
592
.20
82Te
ak3X
3Su
btot
al16
0.00
101.
0513
2.20
Subi
n52
13.0
013
.00
833X
3
6744
.00
36.7
187
mah
ogan
y, c
edre
la,
emire
, ofra
m, m
anso
nia
3X3
6834
.00
37.9
280
waw
a, m
ahog
any,
ce
drel
a, e
mire
, ofra
m,
man
soni
a3X
3
Esia
mak
rom
87
16.0
0
19.4
778
mah
ogan
y, c
edre
la,
emire
, ofra
m, m
anso
nia,
w
awa,
cei
ba
3X3
Subt
otal
60.0
010
7.00
107.
107
30.0
021
.46
92te
ak3X
324
30.0
015
.20
77ce
drel
a, o
fram
3X3
Subt
otal
60.0
060
.00
36.6
654
0.00
532.
5054
0.51
Aseb
eim
4341
.20
51.3
975
Cedr
ela
3X3
Brem
an A
nwia
m C
amp
3422
.00
26.7
670
cedr
ela,
Ofra
m3X
3Ba
ako
5936
.00
39.6
476
cedr
ela
3X3
Boso
675.
009.
2082
Cedr
ela
3X3
Subt
otal
100.
0010
4.20
126.
98Pl
ot 1
12.3
268
cass
ia3X
3Pl
ot 2
7.20
62ca
ssia
3X3
Plot
36.
3870
cass
ia3X
3Pl
ot 4
4.68
75ca
ssia
3X3
Subt
otal
60.0
023
.90
30.5
916
0.00
128.
1015
7.57
60.0
0
140.
00
120.
00
160.
00
60.0
0
100.
00
20.0
0
Dorm
aa
Bron
g Ah
afo
Kint
ampo
Dago
mba
Lin
e
Boso
moa
Anym
a
Pam
u Be
reku
m
Suny
ani
Goas
o
Abuo
m
Bosa
m B
epo
Bech
emNt
otor
oso
Boso
mke
se
Cent
ral
Assin
Fos
uSu
pong
Baak
o
Win
neba
ACH
IEVE
MEN
T UN
DER
TH
E 20
13 N
ATIO
NAL
FO
REST
PLA
NTA
TIO
N D
EVEL
OPM
ENT
PRO
GRA
M
Gom
oa A
kyem
foAk
yem
fo60
.00
23.9
0
52
Regi
onFo
rest
Dis
tric
tFr
inge
Com
mun
ityFo
rest
Res
erve
Targ
etCo
mpa
rtm
ent
Num
ber
Repo
rted
Are
a Pl
ante
d (
Ha)
Verif
ied
Area
Pl
ante
d (H
a)
Perc
enta
ge
Surv
ival
%Sp
ecie
sSp
acin
g
Koko
mba
Lin
eAs
ubim
a21
32.4
729
.81
78.3
4Te
ak3X
3An
kono
mM
ankr
ang
6032
.26
33.6
677
.62
Teak
3X3
Subr
isoM
ankr
ang
6132
.43
32.2
787
.31
Teak
3X3
Kyeb
iAs
ufu
Wes
t9
& 10
14.6
334
.76
93.0
7Te
ak3X
3
Adaa
Nkw
anta
Afra
m
Head
wat
ers
126
38.3
337
.21
90.5
9Te
ak3X
3
Koko
mba
Op
ro51
31.9
332
.05
68.7
7Te
ak3X
3De
rma
Opro
3832
.88
34.8
976
.25
Teak
3X3
Subt
otal
200.
0021
4.93
234.
64Am
oam
anCh
rimfa
33/3
430
.00
31.5
373
.06
Teak
3X3
Kofia
seAb
oma
1330
.00
29.5
976
.21
Teak
3X3
Bepo
soOn
gwam
III
FRBP
3-6
15.0
010
.09
Teak
3X3
Atos
uagy
aAb
rimas
u11
15.0
013
.41
Teak
3X3
Mim
inas
oPr
u Sh
elte
r6
30.0
030
.76
76.6
Teak
3X3
Subt
otal
120.
0012
0.00
115.
38Ab
uakw
aaAp
apra
ma
1310
.00
10.3
072
.69
Cedr
ela,
Ofra
m3X
3M
anuk
rom
Deny
aw1
10.0
06.
8570
.59
Cedr
ela
3X
3Ad
akab
unso
Boso
mtw
i13
20.0
019
.94
83.8
2Ce
drel
a, O
fram
3X3
Tabe
soFu
m38
10.0
025
.96
60.1
Cedr
ela,
Ofra
m3X
3Pi
piiso
Fum
4510
.00
21.3
975
.76
Cedr
ela,
Ofra
m3X
3Su
btot
al60
.00
60.0
084
.43
Adan
siDo
me
Rive
r18
69.2
869
.28
64Te
ak3X
3
Tano
krom
North
For
man
gsu
14/2
567
.32
67.3
261
Teak
3X3
Pra
Rive
rSo
uth
Form
angs
u12
36.4
736
.47
63Te
ak3X
3
Subt
otal
180.
0017
3.07
173.
07Ku
maw
uDa
gom
baBo
unfu
m80
.00
219
60.0
051
.67
60Te
ak3X
3Su
btot
al80
.00
60.0
051
.67
Nkaw
ieDo
rmaa
Tint
e Be
po70
.00
2770
.00
69.6
976
.83X
3Su
btot
al70
.00
70.0
069
.69
Tota
l71
0.00
698.
0072
8.89
Odum
ase
Kabo
Riv
er19
.00
12.0
076
.26
Teak
3X3
Wor
awor
aKa
bo R
iver
10.0
08.
6175
Teak
3X3
Asuk
awka
wKa
bo R
iver
29.5
028
.10
75Of
ram
, Tea
k3X
3Su
btot
al60
.00
58.5
048
.71
Adum
adum
Asuk
awka
w24
.00
21.3
5Te
ak3X
3Tu
tukp
ene
Chai
Riv
er30
.00
23.1
1Te
ak3X
3Su
btot
al60
.00
54.0
044
.46
HoAk
oefe
Ave
nui
Kaba
kaba
Eas
t30
.00
30.0
025
.81
70.8
3Te
ak3X
3Su
btot
al30
.00
30.0
025
.81
Tota
l15
0.00
142.
5011
8.98
180.
00
60.0
0
60.0
0
200.
00
120.
00
60.0
0
Asha
nti
Offin
so
Mam
pong
Bekw
ai
Juas
o
Jasik
an
Nkw
anta
Volta
52
53
Regi
onFo
rest
Dis
tric
tFr
inge
Com
mun
ityFo
rest
Res
erve
Targ
etCo
mpa
rtm
ent
Num
ber
Repo
rted
Are
a Pl
ante
d (
Ha)
Verif
ied
Area
Pl
ante
d (H
a)
Perc
enta
ge
Surv
ival
%Sp
ecie
sSp
acin
g
Asia
mak
rom
Krok
osua
20
440
.00
34.1
873
.2Of
ram
, Ced
rela
, M
ahog
any
3X3
Nkat
ieso
Krok
osua
Hills
145
30.0
040
.55
60.0
2Ce
drel
la, O
fram
3X3
Adab
okro
mBi
a No
rth10
630
.00
33.7
570
.72
Cedr
ella
, Ofra
m3X
3Su
btot
al10
0.00
100.
0010
8.48
Sefw
i Wia
wso
Kwak
u bo
aSu
hum
a30
.00
128
20.0
08.
3578
.38
Ofra
m, A
sefe
na,
Mah
ogan
y, C
eiba
3X3
Subt
otal
30.0
020
.00
8.35
3X3
Ankw
aaso
Uppe
r Was
saw
Clos
e to
Pilla
r 71
38.0
035
.00
78.0
5Of
ram
, Ced
rela
, M
ahog
any
3X3
Subi
ri Nk
wan
taAn
hwia
so N
orth
Near
BP
122
.00
20.3
579
.85
Ofra
m, C
edre
la, E
dina
m3X
3
Anan
soTa
no S
uraw
Ext
.29
30.0
025
.61
77.6
2Of
ram
, Ced
rela
, As
anfe
na, O
tie3X
3
Subt
otal
100.
0090
.00
80.9
7To
tal
230.
0021
0.00
197.
79
Naku
ngba
guDa
ka30
.00
36.2
775
Teak
3X3
Bim
bila
Kum
bo40
.00
35.7
0Te
ak3X
3Ch
amba
Lam
bo30
.00
30.6
1Te
ak3X
3Ya
borg
uBu
lugu
30.0
029
.65
90Te
ak3X
3Ka
raga
Kara
ga30
.00
33.7
070
Teak
3X3
Subt
otal
160.
0016
0.00
165.
94Li
toLi
to I
30.0
029
.27
75Te
ak3X
3Ol
d Bu
ipe
IOl
d Bu
ipe
I30
.00
30.0
565
Teak
3X3
Old
Buip
e 2
Old
Buip
e 2
10.0
06.
1055
Teak
3X4
Plot
13.
5470
Teak
3X3
Plot
22.
1575
Teak
3X3
Plot
31.
9473
Teak
3X3
Plot
40.
8470
Teak
3X3
Plot
50.
5778
Teak
3X3
Plot
60.
7176
Teak
3X3
Plot
70.
8675
Teak
3X3
Plot
82.
4671
Teak
3X3
Plot
92.
6973
Teak
3X3
Plot
10
1.34
79Te
ak3X
3Pl
ot 1
11.
5275
Teak
3X3
Subt
otal
120.
0010
3.00
84.0
3Ba
nda
Nkw
anta
(A)
60.0
034
.59
81Te
ak3
x 3
Band
a Nk
wan
ta (B
)17
.73
86Te
ak3
x 3
Grup
eKe
nike
ni60
.00
59.2
279
Teak
3 x
3Su
btot
al12
0.00
120.
0011
1.54
160.
00
120.
00
120.
00
100.
00
100.
00
Wes
tern
Juab
oso
Bibi
ani
North
ern
Bole
Yend
i
Buip
e/Da
mon
go
Yera
da
Yaku
mbo
Old
Buip
e II
33.0
0
North
ern
53
54
Regi
onFo
rest
Dis
tric
tFr
inge
Com
mun
ityFo
rest
Res
erve
Targ
etCo
mpa
rtm
ent
Num
ber
Repo
rted
Are
a Pl
ante
d (
Ha)
Verif
ied
Area
Pl
ante
d (H
a)
Perc
enta
ge
Surv
ival
%Sp
ecie
sSp
acin
g
Zorb
orgu
60.0
061
.00
76Te
ak3
x 3
Laba
riga
20.0
020
.02
78Te
ak3
x 3
Cheb
sigu
20.0
020
.25
78Te
ak3
x 3
Subt
otal
100.
0010
0.00
101.
27Bu
kper
i30
.00
31.7
083
Teak
3 x
3Na
mor
i30
.00
40.0
386
Teak
3 x
3Ny
igar
e30
.00
32.0
292
Teak
3 x
3Su
btot
al10
0.00
90.0
010
3.75
TOTA
L60
0.00
573.
0056
6.53
Kass
ana
Tum
u30
.00
29.6
082
Cass
ia, M
ahog
any
3 x
3Ta
nvie
lliCh
ira H
eadw
ater
s30
.00
23.0
063
Cass
ia3
x 3
Subt
otal
60.0
060
.00
52.6
0Su
ke30
.00
30.9
686
Teak
3 x
3Sa
moa
30.0
032
.75
88Te
ak3
x 3
Subt
otal
60.0
060
.00
63.7
1TO
TAL
120.
0012
0.00
116.
31
Sher
igu
(Plo
t A)
30.0
030
.48
95Te
ak, C
assia
, Eu
caly
ptus
, Alb
ezia
, 3
x 3
Kem
bisi
(Plo
t B)
30.0
031
.00
90
Teak
, Cas
sia,
Euca
lypt
us, A
lbez
ia,
Mah
ogan
y, G
mel
ina
3 x
3
Subt
otal
60.0
060
.00
61.4
8Na
vron
goBa
chon
saSi
ssili
Cent
ral
30.0
030
.00
29.8
965
Teak
, Mah
ogan
y3
x 3
Subt
otal
30.0
030
.00
29.8
9Ba
syon
deUp
per T
ame
30.0
034
.63
52Te
ak3
x 3
Kusa
naba
Red
Volta
Eas
t30
.00
31.4
467
Teak
3 x
3Su
btot
al60
.00
60.0
066
.07
150.
0015
0.00
157.
44
Kade
8Ka
jeas
e40
.00
35.0
041
.12
67Te
ak3
x 3
Subt
otal
40.0
035
.00
41.1
227
/ Sun
sum
awu
13.0
013
.43
88W
awa,
Ced
rela
3 x
35/
Mof
ram
26.0
025
.72
87Ce
drel
a, M
ahog
any
3 x
3Su
btot
al60
.00
39.0
039
.15
Som
anya
Ashi
tey
IVVo
lta B
lock
II30
.00
24.0
019
.10
67Te
ak, M
ahog
any
3 x
3Su
btot
al30
.00
24.0
019
.10
Abom
osar
foBu
bu25
.00
17.9
085
Teak
3 x
3Fa
aso/
Ayef
ere
Fah
22.0
018
.00
97Te
ak3
x 3
Subt
otal
60.0
047
.00
35.9
0Pi
llar 1
036
.00
27.8
077
Teak
, Mah
ogan
y3
x 3
Faye
ase
20.0
015
.00
67Te
ak3
x 3
Ahin
kwa
Sout
hern
Sca
rp6.
096.
6075
Teak
3 x
3Su
btot
al60
.00
62.0
949
.40
Pepe
ase
North
ern
Scar
p W
est
30.0
034
.13
87Te
ak3
x 3
Dent
ehAb
isu30
.00
40.0
065
Teak
, Mah
ogan
y3
x 3
Subt
otal
60.0
060
.00
74.1
3TO
TAL
310.
0026
7.09
258.
80
60.0
0
60.0
0
60.0
0
60.0
0
60.0
0
60.0
0
60.0
0
60.0
0
100.
00
100.
00
Law
ra
Uppe
r Eas
t
Bolg
atan
ga
Baw
ku
North
ern
Tam
ale
Wal
ewal
e
Esse
n Ap
am
Wor
obon
g So
uth
East
ern
Oda
Donk
orkr
om
Bego
ro
Mpr
aeso
Sins
angl
egbi
nni
Gam
barg
a Sc
arp
East
Kam
ba
Tank
wid
i
Uppe
r Wes
t
Tum
u
54
55
Regi
onFo
rest
Dis
tric
tFr
inge
Com
mun
ityFo
rest
Res
erve
Targ
etCo
mpa
rtm
ent
Num
ber
Repo
rted
Are
a Pl
ante
d (
Ha)
Verif
ied
Area
Pl
ante
d (H
a)
Perc
enta
ge
Surv
ival
%Sp
ecie
sSp
acin
g
3.40
853
x 3
7.20
153
x 3
4.20
123
x 3
Subt
otal
30.0
014
.00
14.8
0TO
TAL
30.0
014
.00
14.8
0
GRAN
D T
OTA
L3,
000.
002,
835.
202,
857.
61
Euca
lypt
us, N
eem
, Ca
ssia
Tem
aSe
geSe
ge30
.00
14.0
0GT
Acc
ra
55
5646
APPENDIX 3: IMPLEMENTATION ARRANGEMENTS
2013 PLANTATION PROGRAM UNDER THE NATIONAL FOREST PLANTATION DEVELOPMENT PROGRAMME
1.0 PLANTATION ESTABLISHMENT TARGET This year an estimated 3,000 ha of commercial plantations will be established by the Forest Services Division (FSD) within forest reserves using best practice principles (best site, best planting materials, best silviculture). 1.1 ALLOCATION OF PLANTING TARGETS, SITE SELECTION AND LAYOUT A total of 36 forest districts with suitable on-reserve sites have been selected across the country with respective district and regional targets allocated (details attached as Appendix 1). Forest Districts will be expected to select suitable degraded forest reserve compartments. The selected compartments shall be adequately degraded (FR condition score 4 – 6; poor natural regeneration; basal area less than 5m2/ha); have good soils; relatively flat to undulating terrain with good drainage; and fairly easily accessible. Selected sites shall be verified and approved by Regional/RMSC teams. Compartments will be blocked into four approximately 30 ha sub-plots separated by 10-m wide fire rides. 2.0 IMPLEMENTATION ARRANGEMENTS 2.1 RECRUITMENT OF WORKERS AND SUPERVISION Labour will be recruited from forest fringe communities by the respective District Manager (DM). Forest-fringe community members who are willing and able will be hired to perform plantation development tasks. DMs will collaborate with District Assemblies to disseminate information about the program and clearly explain the terms and conditions of engagement. District Assemblies will play a key role in assisting DMs resolve conflicts at the community level especially issues relating to unpaid/outstanding wages from previous year’s work by African Foresters Brigade Ltd., Zoil and Ecotech Services Ltd. Hired Workers will be encouraged to organize themselves into Work Gangs with a leader to undertake short-term specific plantation development activities. Plantation development activities to be undertaken using hired labour will include; Site Preparation (initial land clearing, lopping and debris collection), Peg-cutting and Pegging, Planting of Seedlings, Weeding/Tending of established coupes, Beating Up, Re-planting of failed areas, etc. The members of the Work Gangs would be required to provide the following details to the District Manager for registration: i. Name of Gang Leader as indicated on any nationally accepted identification card [Drivers’ licence,
National Identification Card, Voters Identification Card, NHIS Card] ii. Names of Gang Members as indicated on any nationally accepted identification card as above. iii. Identification numbers on the respective nationally accepted ID cards. iv. Date of Birth v. Sex vi. Community/residential location The Work Gangs will be directly supervised by FSD Range Supervisors (RS) and Forest Guards (FGs) with an Assistant District Manager (ADM) having operational responsibility over the project at the Forest District level. Each plantation block of 30 ha will be supervised by 1 RS assisted by 3 FGs. However, during the peak pegging and planting period, additional staff within the district may be deployed to assist with supervision. Work Gangs will be assigned specific areas which will be surveyed by RS. The execution of the field work will be duly supervised by RS and FGs to ensure conformance to set standards. On completion of assigned tasks, RS will carry out final inspection and fill out an Activity Completion Form (ACF) which shall be duly endorsed by the leader of the Work Gang.
57
47
The ACF will be submitted to the DM. ADM will be tasked to verify and confirm quality and quantity of work completed. Upon satisfaction with work done, ADM will recommend to the DM for payment by endorsing the ACF. Payment of Work Gangs must be made within 7 working days upon submission of ACF by RS. All payments shall be made by cheque. 2.2 PAYMENT SYSTEM Upon receipt of the endorsed ACF by the ADM, DM will seek written authorization from RM prior to payment of certified work done. Copies of the ACFs and accompanying cheques will be submitted to RM at the end of every week. RM shall submit collated copies of ACFs and cheques monthly to FSD-HQ together with the Monthly Plantation Operations Report. Amount for each activity will be calculated by multiplying the quantum of work (i.e. number of hectares) by the standard work rate (i.e. mandays, details attached as Appendix II) and then multiplying the result by the Unit Manday Price of GHC 7.00. To ensure smooth execution of this payment system, based on expected target, amount required per month shall be transferred a month in advance to each District and Region to cover cost of plantation activities, District Office supervision and Regional Office monitoring. 2.3 FOOD CROPPING Hired Workers engaged under the project will be allowed to farm on the land to boost household income. In all cases food crops can only be planted after pegging and should be planted only within planting rows at least 50 cm from planted tree seedlings. The type of food crops and spacing shall be rigorously controlled by the supervisors and ADM to ensure the tree crops are not adversely affected by the food crops. 2.4 SUPPLY OF SEEDLINGS As much as possible, seedlings for the program will be sourced/purchased from community tree nurseries and established private tree nurseries close to planting/established sites (this could be augmented with supplies from District/Regional tree nurseries where applicable). Seedling suppliers will have to deliver seedlings in good condition to designated planting sites. DMs will be expected to identify nurseries within 20 km radius from planting sites. Such nurseries that are willing to supply seedlings to the project will be registered by the DM indicating ownership, location and quantities of various species among others. This information will be verified by RM and submitted to FSD HQ. Joint FSD/MLNR monitoring teams will visit every forest district to confirm reports prior to approval by ED-FSD granting authorization to purchase specified quantities and types of seedlings. The current seedling request and delivery forms shall be used to cover all seedling transactions. The DM will confirm and certify supplies, which shall be commensurate with certified area planted, and submit details of suppliers to the FSD-HQ through respective RM for payment directly to suppliers. No payment shall be made for the supply of inferior planting material (small or overgrown seedlings, over-sized stumps, small tender stumps, etc.) or wildlings, and respective DMs will be held personally liable if such materials are planted within the plantations. Apart from the seedlings required for the 2013 plantation establishment, seedlings shall also be procured for beating up and replanting of the 2010 to 2012 coupes, based on survival surveys conducted, both on and off reserve, in all 46 forest districts. 3.0 MONITORING AND REPORTING Monthly reports will be submitted by DMs through the respective RMs to the FSD-HQ, and these must be accompanied by copies of ACFs and cheques to enable a good comparism of cost versus achievement. There will be continuous and effective field and desk monitoring of all aspects of the program (technical, financial, social, etc.) by teams from the regional, FSD-HQ, Corporate FC and MLNR to ensure that the objectives of the National Forest Plantation Development Programme are achieved in a cost effective manner.
58
APPENDIX 4
2010 2011 2012 2013Bekwai 7.00 - - - 7.00 Juaso 105.10 68.00 40.00 - 213.10 Kumawu 5.00 - 4.00 3.00 12.00 Mampong 45.00 28.00 37.50 - 110.50
Total 162.10 96.00 81.50 3.00 342.60 Sunyani 71.67 16.50 42.50 - 130.67 Kintampo 27.50 44.20 62.84 3.50 138.04 Bechem 32.30 - - - 32.30
Total 131.47 60.70 105.34 3.50 301.01 Yendi 223.07 251.51 428.50 69.61 972.69 Buipe 102.00 124.30 96.45 - 322.75 Walewale 34.50 30.00 19.65 - 84.15 Bole 20.07 51.75 146.90 12.00 230.71 Tamale 41.60 77.00 88.00 27.50 234.10
TOTAL 421.24 534.56 779.50 109.11 1,844.40 Bolga - - - 10.00 10.00 Bawku - - 47.00 30.00 77.00 Navrongo - - - 25.50 25.50
Total - - 47.00 65.50 112.50 Lawra 337.36 74.40 84.50 - 496.26 Tumu 40.00 5.00 32.00 6.00 83.00
Total 377.36 79.40 116.50 6.00 579.26 Ho 20.00 - - 2.70 22.70 Denu 49.90 10.70 12.97 - 73.57
Total 69.90 10.70 12.97 2.70 96.27
Western Juaboso 2.00 - - - 2.00 Total 2.00 - - - 2.00 - GRAND TOTAL 1,164.07 781.36 1,142.81 189.81 3,278.04
TOTAL
SUMMARY OF AREA (Ha) OF EPP SITES BURNT BY WILDFIRES (2010 - 2013)
Ashanti
Upper East
Upper West
Volta
COUPEREGION FOREST
DISTRICT
Northern
Brong Ahafo
59
Ap
pe
nd
ix
5FO
OD
PRO
DUCT
ION
DET
AILS
PER
REG
ION
AN
D DI
STRI
CT (2
011-
2013
)(MT)
REPORTED AREA (Ha)
ESTIMATED PRODUCTION (Mt)
REPORTED AREA (Ha)
ESTIMATED PRODUCTION (Mt)
REPORTED AREA (Ha)
ESTIMATED PRODUCTION (Mt)
REPORTED AREA (Ha)
ESTIMATED PRODUCTION (Mt)
REPORTED AREA (Ha)
ESTIMATED PRODUCTION (Mt)
REPORTED AREA (Ha)
ESTIMATED PRODUCTION (Mt)
REPORTED AREA (Ha)
ESTIMATED PRODUCTION (Mt)
REPORTED AREA (Ha)
ESTIMATED PRODUCTION (Mt)
REPORTED AREA (Ha)
ESTIMATED PRODUCTION (Mt)
REPORTED AREA (Ha)
ESTIMATED PRODUCTION (Mt)
REPORTED AREA (Ha)
ESTIMATED PRODUCTION (Mt)
REPORTED AREA (Ha)
ESTIMATED PRODUCTION (Mt)
REPORTED AREA (Ha)
ESTIMATED PRODUCTION (Mt)
REPORTED AREA (Ha)
ESTIMATED PRODUCTION (Mt)
REPORTED AREA (Ha)
ESTIMATED PRODUCTION (Mt)
REPORTED AREA (Ha)
ESTIMATED PRODUCTION (Mt)
REPORTED AREA (Ha)
ESTIMATED PRODUCTION (Mt)
2010
139
1070
.326
52.2
60
00
00
00
00
00
00
00
00
00
00
00
00
00
00
020
110
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
020
1216
1.2
1241
.24
34.8
69.9
480
00
00
00
00
00
00
00
00
00
00
00
00
00
00
020
1335
269.
50
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
020
100
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
020
110
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
020
1216
9.92
213
08.3
9956
.111
2.76
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
2013
55.0
942
4.19
346
.192
.641
00
35.
10
00
00
00
00
00
00
00
00
00
00
00
00
020
100
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
020
110
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
020
120
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
020
133.
3425
.718
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
TOTA
L56
3.55
243
39.3
516
332
7.61
00
35.
10
00
00
00
00
00
00
00
00
00
00
00
00
020
100
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
020
110
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
020
120
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
020
130
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
020
100
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
020
110
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
020
128.
1695
62.9
0515
1.55
3.11
750
014
.694
24.9
80
00
00
00.
560.
784
1.23
7.99
51.
642
12.3
110
00
00.
567.
728
00
00
00
0.20
49.
1820
130
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
020
100
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
020
110
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
020
120
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
020
1369
.759
537.
1443
2958
.349
00
28.2
0247
.943
00
00
00
00
00
00
00
00
00
00
00
00
00
2010
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
2011
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
2012
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
2013
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
TOTA
L77
.928
560
0.04
9530
.661
.467
00
42.8
9672
.922
00
00
00
0.56
0.78
41.
237.
995
1.64
212
.311
00
00
0.56
7.72
80
00
00
00.
204
9.18
2010
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
2011
00
00
4143
9.11
75.6
5212
8.61
25.1
32.6
30
018
.845
.12
2.01
2.81
40
00
00
00
00
00
00
00
00
020
120
00
014
.315
3.15
50.1
85.1
71.
72.
210
021
.752
.08
25.2
35.2
80
00
00
00
00
00
00
00
00
020
130
00
03
32.1
31.
22.
040
00
01.
43.
360
00
00
00
00
00
00
00
00
00
020
100
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
020
110
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
020
120
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
020
130
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
020
100
00
012
213
06.3
107.
1518
2.15
53.8
670
.01
00
12.5
3020
.829
.12
1.8
11.7
00
00
1.6
03.
244
.16
00
00
00
00
2011
00
00
105.
411
29.3
123.
0720
9.21
72.0
593
.67
00
00
81.3
3911
3.87
4.44
28.8
60
00
00
00
00
00
00
00
020
120
00
092
.15
986.
9311
5.85
196.
9528
.05
36.4
70
00
020
.528
.71.
49.
10
00
00
01.
0514
.49
00
00
00
00
2013
00
00
4.9
52.4
7920
.434
.68
2.9
3.77
00
00
5.8
8.12
00
00
00
00
00
00
00
00
00
2010
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
2011
00
00
1010
7.1
108.
6518
4.71
80.7
104.
90
00
022
.65
31.7
10
00
00
00
00
00
00
00
00
020
120
00
07.
3478
.611
71.1
120.
8762
80.6
00
00
27.5
638
.584
00
00
00
00
00
00
00
00
00
2013
00
00
3.5
37.4
8543
73.1
4052
00
00
1521
00
00
00
00
00
00
00
00
00
2010
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
2011
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
2012
00
00
9.1
97.4
6119
.45
33.0
6518
.123
.53
00
00
2.15
3.01
00
00
00
00
00
00
00
00
00
2013
00
00
6.35
68.0
093.
66.
123.
95.
070
00
03.
154.
410
00
00
00
00
00
00
00
00
0TO
TAL
00
00
419.
144
88.1
739.
2112
56.7
388.
450
4.9
00
54.4
130.
622
6.16
316.
627.
6449
.66
00
00
1.6
04.
2558
.65
00
00
00
00
Nor
ther
n
Tam
ale
Buip
e/Da
mon
go
Yend
i
Wal
ewal
e
Bole
PAW
PAW
Wes
tern
Bibi
ani
Juab
eso
Sefw
i Wia
wso
Cent
ral
Win
neba
Cape
coa
st
Assin
Fos
u
Dunk
wa
CABB
AGE
OKR
OCA
SSAV
AO
NIO
NGA
RDEN
EGG
SW
ATER
MEL
ON
MIL
LET
SORG
HUM
RICE
BEAN
SPE
PPER
TOM
ATO
REGION
FOREST
DISTRICT
COUPE
FOO
D CR
OPS
(ON
-RES
ERVE
+O
FF R
ESER
VE)
PLAN
TAIN
COCO
YAM
YAM
MAI
ZE
60
REPORTED AREA (Ha)
ESTIMATED PRODUCTION (Mt)
REPORTED AREA (Ha)
ESTIMATED PRODUCTION (Mt)
REPORTED AREA (Ha)
ESTIMATED PRODUCTION (Mt)
REPORTED AREA (Ha)
ESTIMATED PRODUCTION (Mt)
REPORTED AREA (Ha)
ESTIMATED PRODUCTION (Mt)
REPORTED AREA (Ha)
ESTIMATED PRODUCTION (Mt)
REPORTED AREA (Ha)
ESTIMATED PRODUCTION (Mt)
REPORTED AREA (Ha)
ESTIMATED PRODUCTION (Mt)
REPORTED AREA (Ha)
ESTIMATED PRODUCTION (Mt)
REPORTED AREA (Ha)
ESTIMATED PRODUCTION (Mt)
REPORTED AREA (Ha)
ESTIMATED PRODUCTION (Mt)
REPORTED AREA (Ha)
ESTIMATED PRODUCTION (Mt)
REPORTED AREA (Ha)
ESTIMATED PRODUCTION (Mt)
REPORTED AREA (Ha)
ESTIMATED PRODUCTION (Mt)
REPORTED AREA (Ha)
ESTIMATED PRODUCTION (Mt)
REPORTED AREA (Ha)
ESTIMATED PRODUCTION (Mt)
REPORTED AREA (Ha)
ESTIMATED PRODUCTION (Mt)
PAW
PAW
CABB
AGE
OKR
OCA
SSAV
AO
NIO
NGA
RDEN
EGG
SW
ATER
MEL
ON
MIL
LET
SORG
HUM
RICE
BEAN
SPE
PPER
TOM
ATO
REGION
FOREST
DISTRICT
COUPE
FOO
D CR
OPS
(ON
-RES
ERVE
+O
FF R
ESER
VE)
PLAN
TAIN
COCO
YAM
YAM
MAI
ZE
2010
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
2011
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
2012
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
2013
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
2010
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
2011
753
.90
00
09.
7816
.626
00
00
00
00
00
00
00
00
00
00
00
00
00
2012
00
00
00
11.6
0619
.73
00
00
00
00
00
00
00
00
00
00
00
00
00
2013
00
00
00
3.46
675.
8934
00
00
00
00
00
00
00
00
00
00
00
00
00
2010
56.2
432.
7414
.128
.421
00
9.8
16.6
60
00
00
00
00
00
00
00
05.
8680
.87
00
00
00
00
2011
36.6
528
2.20
57.
5515
.176
00
13.2
22.4
40
00
00
00
00
00
00
00
01.
7524
.15
00
00
00
00
2012
30.9
275
238.
1418
7.1
14.2
610
05.
3187
9.04
180
00
00
00.
631
0.88
340
00
00
00
03.
182
43.9
10
00
00
00
020
1324
.161
518
6.04
366.
5413
.153
00
6.48
711
.028
00
00
00
00
00
00
00
00
1.95
827
.01
00
00
00
00
2010
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
2011
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
2012
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
2013
25.8
0519
8.69
8521
.242
.556
00
00
00
00
00
0.56
0.78
41.
763
11.4
60
00
00
00
00
00
00
00
020
100
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
020
110
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
020
120
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
020
1339
300.
30
00.
475
5.08
731.
425
2.42
250
00
00
03.
85.
320
02.
8521
.375
00
00
0.95
13.1
10
00
00
00
020
102.
418
.48
1.8
3.61
80
00
00
00
00
00
00
00
00
00
00
00
00
00
00
020
1116
.512
7.05
2754
.27
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
2012
12.5
96.2
530
60.3
00
7.5
12.7
50
00
00
00
00
00
00
00
00
00
00
00
00
020
130
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
0TO
TAL
251.
144
1933
.809
115
231.
760.
475
5.08
7368
.583
116.
590
00
00
04.
991
6.98
741.
763
11.4
62.
8521
.375
00
00
13.7
189.
10
00
00
00
020
100
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
020
1112
2.60
394
4.04
3127
.555
.331
00
29.0
0149
.302
00
00
00
00
00
00
00
00
00
00
00
00
00
2012
157.
8512
15.4
4510
120
3.71
00
70.8
120.
360
00
00
00
00
00
00
00
00
00
00
00
00
020
1355
.752
429.
2904
13.9
28.0
150
00
00
00
00
00
00
00
00
00
00
00
00
00
00
020
100
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
020
1118
7.42
1443
.134
53.9
108.
280
00
00
00
00
00
00
00
00
00
00
00
00
00
00
020
120
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
020
130
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
020
100
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
020
1130
.155
232.
1935
7.16
14.3
8215
.16
162.
3180
.55
136.
942.
32.
990
00
06.
385
8.93
90
00
00
00
00
00
00
00
00
020
1210
.983
.93
00
8.62
292
.342
55.3
4894
.092
00
00
00
5.5
7.7
00
00
00
00
00
00
00
00
00
2013
00
00
17.4
186.
3545
.877
.86
00
00
00
1.8
2.52
00
00
00
00
00
00
00
00
00
2010
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
2011
00
00
00
17.2
3729
.302
00
00
00
00
00
00
00
00
00
00
00
00
00
2012
00
00
3.60
138
.565
265.
3245
1.04
00
00
00
0.9
1.26
106.
769
3.9
00
00
00
00
00
00
00
00
2013
00
00
2.04
521
.920
8.25
354.
020
00
00
01.
0926
1.52
961.
093
7.10
25.
068
38.0
080
00
00
00
00
00
00
020
100
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
020
1169
.509
453
5.22
219.
0518
.196
1.59
117
.04
33.8
9457
.62
00
00
00
3.19
884.
4783
00
00
00
00
00
00
00
00
00
2012
133.
746
1029
.842
14.6
29.4
023.
413
36.5
5315
.022
25.5
370
00
00
00.
5386
0.75
40
07.
371
55.2
830
00
00
00
00
030
.377
60
00
2013
86.3
408
664.
8242
42.1
84.5
5119
.03
203.
840
00
00
00
00
00
00
00
00
00
00
00
00
00
020
100
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
020
110
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
020
120
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
020
135.
167
39.7
859
00
1.03
311
.068
20.6
6835
.136
00
00
00
12.9
1818
.085
2.58
416
.79
2.58
419
.376
00
00
00
00
00
1.03
340
00
2010
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
2011
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
2012
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
2013
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
2010
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
2011
187.
4214
43.1
3453
.910
8.28
00
00
00
00
00
1.76
2.46
432
.95
214.
20
00
00
00
00
00
00
00
0
Asha
nti
Nka
wie
Bekw
ai
Mam
pong
Offi
nso
Juas
o
Kum
awu
New
Edu
bias
e
Bekw
ai
East
ern
Donk
orkr
om
Som
anya
Akim
Oda
Bego
ro
Mpr
aeso
Kade
61
REPORTED AREA (Ha)
ESTIMATED PRODUCTION (Mt)
REPORTED AREA (Ha)
ESTIMATED PRODUCTION (Mt)
REPORTED AREA (Ha)
ESTIMATED PRODUCTION (Mt)
REPORTED AREA (Ha)
ESTIMATED PRODUCTION (Mt)
REPORTED AREA (Ha)
ESTIMATED PRODUCTION (Mt)
REPORTED AREA (Ha)
ESTIMATED PRODUCTION (Mt)
REPORTED AREA (Ha)
ESTIMATED PRODUCTION (Mt)
REPORTED AREA (Ha)
ESTIMATED PRODUCTION (Mt)
REPORTED AREA (Ha)
ESTIMATED PRODUCTION (Mt)
REPORTED AREA (Ha)
ESTIMATED PRODUCTION (Mt)
REPORTED AREA (Ha)
ESTIMATED PRODUCTION (Mt)
REPORTED AREA (Ha)
ESTIMATED PRODUCTION (Mt)
REPORTED AREA (Ha)
ESTIMATED PRODUCTION (Mt)
REPORTED AREA (Ha)
ESTIMATED PRODUCTION (Mt)
REPORTED AREA (Ha)
ESTIMATED PRODUCTION (Mt)
REPORTED AREA (Ha)
ESTIMATED PRODUCTION (Mt)
REPORTED AREA (Ha)
ESTIMATED PRODUCTION (Mt)
PAW
PAW
CABB
AGE
OKR
OCA
SSAV
AO
NIO
NGA
RDEN
EGG
SW
ATER
MEL
ON
MIL
LET
SORG
HUM
RICE
BEAN
SPE
PPER
TOM
ATO
REGION
FOREST
DISTRICT
COUPE
FOO
D CR
OPS
(ON
-RES
ERVE
+O
FF R
ESER
VE)
PLAN
TAIN
COCO
YAM
YAM
MAI
ZE
2012
112.
786
7.79
44.6
89.6
461.
5416
.493
6.78
11.5
260
00
00
05.
838.
162
00
2.75
20.6
250
00
015
.821
80
00
00
00
020
1338
.229
4.14
33.4
67.1
3411
.412
2.09
00
00
00
00
00
00
00
00
00
00
00
00
00
00
TOTA
L11
97.7
692
22.7
7440
180
6.93
84.8
390
8.56
848.
6714
42.7
2.3
2.99
00
00
39.9
2255
.891
143.
493
1.9
17.7
713
3.29
00
00
15.8
218
00
00
31.4
110
00
2010
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
2011
00
2.15
4.32
152.
526
.775
48.9
1583
.156
00
00
00
1.08
51.
5190
00
00
00
00
00
00
00
00
00
2012
1.56
512
.050
50
02.
645
28.3
284.
598
7.81
660
00
00
00.
489
0.68
460
00
00
00
00
00
00
00
00
020
130.
7914
6.09
378
00
2.98
31.9
261
.257
104.
140.
193
0.25
10
00
018
.061
25.2
861.
583
10.2
90
00
00
00
00
00
00
00
020
100
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
020
110
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
020
126.
2748
.279
2.46
4.94
468.
8394
.569
186.
731
7.39
00
00
00
10.2
6114
.365
18.9
412
3.1
3.2
240
00
00
00
00
00
00
020
138
61.6
3.6
7.23
62.
425
.704
95.6
162.
520.
40.
520
00
08
11.2
00
1410
50
00
00
00
00
00
00
020
100
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
020
110
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
020
120
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
020
1325
.662
197.
5974
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
2010
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
2011
00
00
00
34.4
2558
.523
00
00
00
1.6
2.24
00
00
00
00
00
00
00
00
00
2012
3.30
425
.440
81
2.01
00
123.
4320
9.83
00
00
00
1.26
41.
7696
00
00
00
00
00
00
00
00
00
2013
00
00
10.2
110
9.31
93.7
915
9.44
00
00
00
11.4
6416
.049
00
00
00
00
00
00
00
00
00
2010
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
2011
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
2012
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
2013
53.5
541
2.33
532
.164
.581
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
TOTA
L99
.142
476
3.39
6541
.383
.093
29.5
631
6.61
648.
7211
02.8
0.59
30.
771
00
00
52.2
2473
.113
20.5
213
3.4
17.2
129
00
00
00
00
00
00
00
2010
00
00
00
34.2
558
.225
2026
00
00
35.7
550
.05
00
00
00
00
00
00
00
00
00
2011
00
00
00
9.5
16.1
512
2.5
159.
30
00
028
39.2
00
00
00
00
00
00
00
00
00
2012
00
00
00
32.7
0555
.599
79.9
510
3.9
00
00
22.3
531
.29
00
00
00
00
00
00
00
00
00
2013
00
00
00
33.8
1457
.484
18.4
423
.98
00
00
9.22
212
.911
00
00
00
00
00
00
00
00
00
2010
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
2011
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
2012
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
2013
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
2010
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
2011
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
2012
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
2013
00
00
00
19.8
2133
.696
00
00
00
00
00
00
00
00
00
00
00
00
00
TOTA
L0
00
00
013
0.09
221.
1524
0.9
313.
20
00
095
.322
133.
450
00
00
00
00
00
00
00
00
020
100
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
020
110
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
020
120
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
020
130
00
00
00
00
00
00
063
.71
89.1
940
00
00
00
00
00
00
00
00
020
100
00
00
07.
412
.58
22.
60
00
04.
66.
440
00
00
00
00
00
00
00
00
020
110
00
00
072
122.
40
00
00
050
7022
143
00
00
00
00
00
00
00
00
2012
00
00
00
39.2
7966
.774
00
00
00
28.6
9140
.167
00
00
00
00
00
00
00
00
00
2013
00
00
00
00
00
00
00
29.6
41.4
40
00
00
00
00
023
00
00
00
0TO
TAL
00
00
00
118.
6820
1.75
22.
60
00
017
6.6
247.
2422
143
00
00
00
00
230
00
00
00
2010
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
2011
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
2012
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
2013
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
2010
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
2011
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
2012
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
2013
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
TOTA
L0
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
020
100
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
020
110
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
020
120
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
020
130.
53.
850
00
030
.451
.68
00
00
00
00
00
0.5
3.75
00
00
00
00
00
00
00
2010
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
2011
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
2012
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
2013
00
00
00
0.4
0.68
00
00
00
00
00
0.1
0.75
00
00
00
00
00
00
00
2010
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
2011
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
2012
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
2013
00
00
00
2847
.60
00
00
00
00
00
00
00
00
00
00
00
00
0TO
TAL
0.5
3.85
00
00
58.8
99.9
60
00
00
00
00
00.
64.
50
00
00
00
00
00
00
0
Grea
ter A
ccra
Amas
aman
Tem
a
Volta
Jasik
an
Ho
Nkw
anta
Upp
er E
ast
Bolg
atan
ga
Nav
rong
o
Baw
ku
Upp
er W
est
Law
ra
Tum
u
Bron
g Ah
afo
Kint
ampo
Suny
ani
Bech
em
Dorm
aa
Goas
o
Asha
nti
Bekw
ai
62
NOTES
63
64Designed & Printed @ Tel: +233 302 785415/6