Page 1: NATIONAL FOREST PLANTATION DEVELOPMENT PROGRAMME … Annual Report... · The National Forest Plantation Development Programme (NFPDP) ... established plantations handed over to the

1

MINISTRY OF LANDS & NATURAL RESOURCES

NATIONAL FOREST PLANTATION DEVELOPMENT PROGRAMME

MINISTRY OF LANDS & NATURAL RESOURCES

ANNUAL REPORT 2013

Page 2: NATIONAL FOREST PLANTATION DEVELOPMENT PROGRAMME … Annual Report... · The National Forest Plantation Development Programme (NFPDP) ... established plantations handed over to the

2i

FOREST SERVICES DIVISION - FORESTRY COMMISSION JUNE, 2014

Cover photos:

Photos (L - R): A member of the Deputy Minister's team expressing satisfaction after inspection of a plantation stand established by Mere Plantations Limited. A 2003 MTS teak plantation within the Opro River Forest Reserve in the Offinso Forest District. An inspection team taking sample dbh measurement in a 2002 MTS teak stand within the Mankrang River Forest Reserve - Offinso Forest District. Side Photos (T - B): Eucalyptus camaldulensis seedlings delivered at a planting site in the Kamba F/R, Lawra Forest District. Tractors used by NICOL-MIRO for site preparation in the Boumfum Forest Reserve, Kumawu Forest District. A two months old teak stand established by NICOL-MIRO in the Boumfum Forest Reserve, Kumawu Forest District.

Main Photo: The Hon. Deputy Minister for Lands and Natural Resources with the Director of Operations, Plantations, and the Ashanti Regional Manager, FSD during an inspection of the 2007 mixed plantation within the South Formangsu Forest Reserve in the Juaso Forest District. Bottom

August, 2014

Page 3: NATIONAL FOREST PLANTATION DEVELOPMENT PROGRAMME … Annual Report... · The National Forest Plantation Development Programme (NFPDP) ... established plantations handed over to the

3

EXECUTIVE SUMMARY This is a progress report covering key activities undertaken under the National Forest Plantation Development Programme (NFPDP) during the 2013 plantation year (April, 2013 - March, 2014). The National Forest Plantation Development Programme (NFPDP) chalked its 11th year in 2013 in pursuit of its goal of "developing a sustainable resource base that will satisfy the future demand for industrial timber and enhance environmental quality, thereby relieving the pressure on the natural forest and increasing the forest cover". The main interventions in 2013 were the establishment of forest plantations by the Forest Services Division, the FC/Timber Industry Fund Committee, the FC/FORM Ghana PPP and private commercial forest plantation developers on-reserve. The NFPDP was expected to deliver the following key outputs for 2013: establishment of 4,100ha of forest plantations on-reserve and maintenance of 18,987.55ha of 2010-2012 established plantations handed over to the FC by the Service Companies (Zoil and Ecotech Services Limited) in December 2013; creation of 3,100 jobs and production of 27,000 Metric Tonnes of food crops within 2011, 2012 and 2013 plantation coupes. A total of 5,784.86ha was established in 2013 under 3 components of the NFPDP, generating 5,184 jobs. These components comprise the FC/ Timber Industry plantations, Private Commercial Developers on-reserve and the FSD 2013 plantations. African Plantations for Sustainable Development Ghana Limited (APSD), a large scale off-reserve plantation developer, also established 1,565ha and provided 525 jobs in 2013. Under the FSD 2013 Plantations, 2,857.61ha were established out of a target of 3,000ha with 2,504 temporary jobs created and 3,174,802 seedlings supplied by forest fringe communities and private seedling nurseries. A total amount of GH¢2,524,029.92 was disbursed for the FSD plantation establishment activities. An estimated 28,919.88 Metric Tonnes (MT) of food crops were produced within the 2011 - 2013 plantation coupes (15,431.66ha) compared to 46,502.78MT within the 2010 - 2012 plantation coupes (26,582.89ha). The major crops produced in 2013 were Plantain – 14,780.90MT, Cereals (maize, millet and rice) – 5,474.64MT, Tubers (Cocoyam, Cassava and Yam) – 7,580.44MT, Legumes (Beans, Cowpea, Groundnut and Sorghum) – 834.09MT and Vegetables (Tomato, Pepper, Garden Eggs) – 1,577.92MT. A total of 2,746.51ha was planted by 56 commercial developers on-reserve in 2013. This brings the total area developed by private commercial plantation developers within forest reserves to 35,490.79ha. An estimated 2,350 jobs were generated by these private commercial developers in 2013. Sixteen (16) private developers signed Land Leases and Benefit Sharing Agreements (LL/BSAs) in 2013 resulting in One Hundred and Twenty-six (126) LL/BSAs being signed to date. In the year under review, the FC signed a Public Private Partnership (PPP) agreement with FORM Ghana to jointly undertake a commercial plantation covering 14,596ha within Tain II forest reserve in the Sunyani Forest District. Within the partnership, FORM Ghana is eligible for 80% of the plantation proceeds and benefits with the Forestry Commission, Landowners and Forest fringe communities eligible for the remaining 20%. The planting target for 2013 was 600ha and 640ha was reported planted.

Page 4: NATIONAL FOREST PLANTATION DEVELOPMENT PROGRAMME … Annual Report... · The National Forest Plantation Development Programme (NFPDP) ... established plantations handed over to the

4iii

The PPP to date has employed 60 permanent employees and 267 temporary labourers under this project. Most of the recruited staff were from the forest fringe communities. The temporary workers were recruited for weeding, land preparation and planting up of the project area. 650 additional workers are envisaged to be recruited for the 2014 target of 2,000ha. Wildfire reports at the end of March 2014 indicated that 3,362ha of plantations within the 2010 - 2013 coupes were affected by fire during the 2013/2014 fire season (November 2013 – March 2014). The key challenge to the NFPDP is the absence of a reliable and adequate source of funding for plantation establishment and maintenance, and adequate vehicles/motorbikes for effective monitoring by FSD field staff. Going forward, there is the need to undertake field verification of all reported past plantation establishment achievements especially the Modified Taungya System (MTS), Community Forestry Management Project (CFMP) and the Private Commercial Developers on-reserve. There is also the need to finalise and implement the Ghana Forest Plantation Strategy (2015 – 2040) which seeks to among others, create an enabling environment for public and private investments in forest plantations. Training and provision of key logistics to FSD field staff and maintenance of established plantations should be highly prioritised.

Page 5: NATIONAL FOREST PLANTATION DEVELOPMENT PROGRAMME … Annual Report... · The National Forest Plantation Development Programme (NFPDP) ... established plantations handed over to the

51

1.0 INTRODUCTION The Forestry Commission has been implementing the National Forest Plantation Development Programme (NFPDP) since 2002 under various components, based on funding sources and implementation strategies. The goal of the NFPDP is to develop a sustainable resource base that will satisfy the future demand for industrial timber and enhance environmental quality, thereby relieving the pressure on the natural forest and increasing the forest cover.

There are five (5) specific objectives of the NFPDP as listed below:

i. To restore the forest cover of degraded forest lands ii. To reduce the wood supply deficit situation in the country iii. To generate employment as a means to reduce rural poverty iv. To improve environmental quality and provide an opportunity for the country to tap the

emerging benefits from the climate change market for carbon sequestration v. To enhance production of food crops and contribute to food security in the country

Fig. 1: Eucalyptus camaldulensis seedlings delivered at a planting site in the Kamba F/R, Lawra Forest District

Page 6: NATIONAL FOREST PLANTATION DEVELOPMENT PROGRAMME … Annual Report... · The National Forest Plantation Development Programme (NFPDP) ... established plantations handed over to the

6

Fig. 2: Site within the Boumfum Forest Reserve, Kumawu Forest District, prepared for planting by NICOL-MIRO At the end of 2013, a total area of 177,296.32ha had been established under the NFPDP as detailed in Table 1 below: Table 1: NFPFP Components and achievements from 2002 to 2013

YEAR MTS (ha)

CFMP (ha)

HIPC (ha)

PRIVATE DEVELOPERS

(ha)

FSD PLANTATIONS

(ha) EXPANDED PROGRAM

(ha)

FC/ Industry

Plantations Fund (ha)

TOTAL PLANTED AREA (ha)

2002 17,341.00* 1,609.00** 18,950.00

2003 17,541.00* 1,609.00** 19,150.00

2004 16,090.00* 5,509.84 1,609.00** 23,208.84

2005 9,105.00* 1,136.00* 3,341.93 1,609.00** 15,191.93

2006 9,401.00* 2,298.00* 2,708.50 1,609.00** 16,016.50

2007 8,711.00* 2,731.00* 2,947.82 1,613.00** 78.5* 16,081.32

2008 111* 2,930.00* 1,806.67 6,107.16* 160* 11,114.83

2009 2,427.30* 4,293.00* 902.84 4,014.89* 140* 11,778.03

2010 4,733.38* 14,008.841 106.82 18,849.04

2011 4,560.42* 6719.7111 270.77 11,550.90

2012 3670.43* 5,854.341 95.3 9,620.07

2013 2746.51* 2,857.61 180.74 5,784.86

TOTAL 80,727.30 13,388.00 17,217.60 35,490.79 3,236.11 26,582.89 653.63 177,296.32

*Reported figures, yet to be verified by technical audit **Achievement of Private Developers for the period 2002-2007 has been estimated based on total establishment collated at the end of 2007 , averaged over the period, due to lack of proper documentation on yearly achievements. 1Figures reviewed in 2013 following a joint verification of the effective area planted by the Service Companies and the Forest Services Division

Page 7: NATIONAL FOREST PLANTATION DEVELOPMENT PROGRAMME … Annual Report... · The National Forest Plantation Development Programme (NFPDP) ... established plantations handed over to the

73

The programme was expected to deliver the following on-reserve key outputs for the year 2013: i. 4,100ha of forest plantations [3,000ha by Forest Services Division of the Forestry

Commission; 600ha of commercial plantations established under a Public Private Partnership (PPP) with FORM Ghana; and 500ha by the FC/Industry Plantations Development Fund].

ii. Maintenance of 18,987.55ha of 2010, 2011 and 2012 plantation coupes established under the Expanded Plantation Program and handed over by the Service Companies.

iii. 3,100 new jobs provided by the 4,100ha to be established by the FSD, FC - FORM Ghana

PPP and FC/Industry plantations. iv. Production of 27,000 Metric Tonnes of food within 2011, 2012 and 2013 plantation coupes.

Page 8: NATIONAL FOREST PLANTATION DEVELOPMENT PROGRAMME … Annual Report... · The National Forest Plantation Development Programme (NFPDP) ... established plantations handed over to the

84

2.0 BRIEF DESCRIPTION OF NFPDP COMPONENTS AND ACHIEVEMENTS Nine (9) components have been implemented to date and brief descriptions of the components and their achievements are provided below. An area of 5,784.86ha was established in 2013 under 3 components of the NFPDP. These components comprise the FC/Industry plantations, the Private Commercial Developers on-reserve and the FSD 2013 plantations.

2.1 The Modified Taungya System (MTS) 2002 - 2009 The MTS involved the establishment of forest plantations by the Forest Services Division (FSD) in partnership with farmers in forest fringe communities.

The FSD provided technical direction, surveyed and demarcated degraded forest reserve lands and supplied pegs and seedlings while the farmers provided all the labour inputs in the form of site preparation, pegging, planting, tending and fire protection.

The farmers were permitted to cultivate their food crops which were inter-planted with the tree crops on the same piece of land. The farmers, in addition to the food crops they harvested, have a 40% share in the Standing Tree Value (STV) of the planted trees. During the year, sixty (60) Benefit Sharing Agreements for the Modified Taungya System were prepared for signing in the Mampong Forest District. To date 296 forest fringe communities out of an estimated 2,000 have signed the MTS Benefit Sharing Agreements.

Fig. 4: Head Office team on an inspection visit to an MTS stand, crossing the Tano

River into the Mankrang River Forest Reserve - Offinso Forest District.

Fig. 3: A Forest Guard taking sample diameter at breast height (DBH) measurements of a 2003 MTS Cedrela stand in the Afram

Headwaters Forest Reserve - Offinso Forest District

Page 9: NATIONAL FOREST PLANTATION DEVELOPMENT PROGRAMME … Annual Report... · The National Forest Plantation Development Programme (NFPDP) ... established plantations handed over to the

9

5

The Government has a 40% share while the landowner and community will have a 15% and 5% share respectively. Figs. 5 and 6 below show some MTS stands in the Offinso Forest District in the Ashanti Region that require thinning and pruning. The MTS was implemented in degraded forest reserves in the High Forest Zone of Ghana. 80,727.30ha were reported planted but this has not been verified through a technical audit. The major constraint to this model has been the inability of the participating farmers to undertake the expected maintenance of the established plantations after the harvesting of their food crops. A number of MTS plantations, especially 2002 – 2005 coupes, are due for thinning and this will be a key activity in 2014.

Fig. 5: 2003 MTS teak stand in the Opro River Forest Reserve in the Offinso Forest District

Fig. 6: 2002 MTS teak stand in the Mankrang River Forest Reserve in the Offinso Forest District

Page 10: NATIONAL FOREST PLANTATION DEVELOPMENT PROGRAMME … Annual Report... · The National Forest Plantation Development Programme (NFPDP) ... established plantations handed over to the

106

Fig. 7: Inspection t s i a 2002 MTS teak stand within the Mankrang River Forest Reserve - Offinso Forest District

2.2 Government Plantation Development Programme (GPDP) 2004 - 2009 The GPDP utilized hired labour and contract supervisors to establish industrial plantations. Plantation workers were hired and paid a monthly allowance to establish and maintain plantations while plantation supervisors were engaged on contract basis to supervise and offer technical direction at the site level.

The FSD exercised general oversight and monitored field activities to ensure compliance with quality standards for plantation establishment. This strategy was funded through the Highly Indebted Poor Countries (HIPC) benefits. Under the scheme plantations developed are owned by government and the respective landowners who are entitled to royalty payments.

The GPDP was also implemented in degraded forest reserves within the High Forest Zone of Ghana. 17,217.60ha were established, however, maintenance has not been carried out within the stands as expected due to the lack of funds from government.

2.3 Community Forestry Management Project (CFMP) 2005 - 2009 The CFMP was funded with a loan from the African Development Bank (AfDB) and adopted the MTS model for the establishment of forest plantations.

13,388ha was reported established within degraded forest reserves in the Brong Ahafo (Sunyani Forest District), Ashanti (Offinso Forest District) and Eastern Region (Begoro and Akim Oda Forest Districts) of Ghana. The reported established area is yet to be verified through a technical audit.

eam taking sample dbh measurement n

Page 11: NATIONAL FOREST PLANTATION DEVELOPMENT PROGRAMME … Annual Report... · The National Forest Plantation Development Programme (NFPDP) ... established plantations handed over to the

117

2.4 Model Plantation component 2007 - 2009

In 2007 the Model Plantation component, a purely research based scheme was introduced to offer the FC plantation managers the opportunity to undertake mixed species trials and experiment with various planting designs and tree spacing. Tree spacing so far tried include 3m x 3m, 3m x 2m and 2.5m x 2.5m. Mixed exotic-indigenous species planting designs implemented include MS 3-12, MS 4-8, and MS 3-6-12.

378.5ha of model plantations was reported established within the High Forest and Transitional Zones of Ghana in degraded forest reserves.

2.5 Expanded Plantation Program (EPP) 2010 - 2012 The plantation program was expanded to include private lands located outside forest reserves. The Expanded Plantation Program (EPP) ensured that most of the Metropolitan/Municipal/District Assemblies without degraded forest reserves also benefited from the job opportunities being created through the National Forest Plantation Development Programme (NFPDP).

Under the Expanded Plantation Program, private companies were contracted to undertake the establishment and maintenance of plantations and the supply of seedlings. Messrs Zoil Services Ltd and Ecotech Services Ltd undertook the establishment and maintenance whilst Messrs African Foresters Brigade supplied the seedlings. The Forestry Commission played a monitoring and reporting role under this program. Maintenance of these stands have not been the best as shown in Fig. 8 below:

Fig. 8: 2010 EPP stand of Cedrela and Ofram trees in Bosomkese Forest Reserve, Bechem Forest District, engulfed by weeds.

Page 12: NATIONAL FOREST PLANTATION DEVELOPMENT PROGRAMME … Annual Report... · The National Forest Plantation Development Programme (NFPDP) ... established plantations handed over to the

128

A total of 26,582.89ha (12,318.51ha (46.3%) on-reserve and 14,264.38ha (53.6%) off-reserve) was verified as planted over the three years of implementation.

The effective area planted was jointly verified by the Forestry Commission and the Service Companies. 18,987.55ha (71.5%) had survival percentage of 31% and above and were handed over to the Forestry Commission. 49% of the area handed over were within forest reserves while the remaining area (50.21%) handed over were in off-reserve areas.

7,595.34ha (37.65% on-reserve and 62.35% off-reserve) of the areas planted by the Service Companies had survival percentage of 30% and below, and therefore classified as failed, and these would be rehabilitated at the cost of the Service Companies in 2014. Financial Bonds covering the cost of the rehabilitation have been deposited with the Forestry Commission by the two Service Companies – Ecotech Services Ltd and Zoil Services Ltd.

The replanted areas would be handed over to the Forestry Commission when joint survival surveys indicate satisfactory survival percentages (75% for the savannah zones and 80% for the High Forest and Transition Zones).

2.6 FC/Timber Industry Plantation Development Fund Plantations 2010 - 2013 The Forestry Commission – Timber Industry Plantation Development Fund Committee (FC/Timber Industry Fund Committee) tasked the Forestry Research Institute of Ghana (FORIG) to establish Best Practice forest plantations of fast growing indigenous and exotic commercial timber species with funding from the FC/Timber Industry Fund. FORIG has accordingly been establishing forest plantations on behalf of the FC/Timber Industry Fund Committee since 2010. These plantations have been established in the Eastern and Ashanti Regions, within degraded forest reserves as depicted in Table 2 below. Table 2: Details of achievements of FC/Timber Industry plantations program. Region Forest

District Forest Reserve

Compartment /Site

Verified Area Planted (ha)

Species Planted

Eastern

Oda

Esen Epam 17 109.74 Cedrela, Ofram,

Ceiba, Kusia, Wawa 3 71

Pra Anum Nkansaso Plot 1 3.35 Paulownia

Nkansaso Plot 2 10.7 Ofram, Mansonia,

Kusia, Ceiba, Otie

Charlewote 5.07 Paulownia

Awanweneso 44.95 Cedrela

Ashanti Nkawie Asenanyo Research Working

Circle (RWC)

22.8 Paulownia, Cedrela

Offinso

Opro River 2 46.1 Cedrela, Ofram,

Otie, Ceiba

Mankrang River 38, 40, 41, 42, 43,

45 and 46

339.92 Cedrela, Teak,

Ceiba, Ofram,

Total 653.63

Page 13: NATIONAL FOREST PLANTATION DEVELOPMENT PROGRAMME … Annual Report... · The National Forest Plantation Development Programme (NFPDP) ... established plantations handed over to the

13

9

Field verification conducted at the end of 2013 by FSD confirmed the total effective area planted to date to be 653.63ha. In 2013, an area of 180.74ha was confirmed planted in the Esen Epam Forest reserve, Oda Forest District. Additionally an estimated 339.92ha of previously failed sites in earlier coupes within the Mankrang River Forest Reserve was rehabilitated/replanted within the year (Fig. 9 & 10).

Fig. 9: 2010 Terminalia spp. plantation established by FORIG on behalf of the FC-Industry

Fund Committee within the Pra Anum Forest Reserve, Oda Forest District

Fig. 10: 2011 Teak plantation established on behalf of the FC-Industry Fund Committee

within the Mankrang River Forest Reserve, Offinso Forest District.

Page 14: NATIONAL FOREST PLANTATION DEVELOPMENT PROGRAMME … Annual Report... · The National Forest Plantation Development Programme (NFPDP) ... established plantations handed over to the

1410

2.7 Private Commercial Plantation Developers On-Reserve 2002 - 2013 The Private Commercial Plantation Development component involves the release of degraded forest reserve lands by the FC to private entities after vetting and endorsing their reforestation/ business plans. The operations of these private developers are then monitored through periodic field visits by the FSD to ensure compliance with the terms and conditions of the approved reforestation plans. The private investor earns 90% of the total proceeds from the plantation while the FC, Landowner and Community earn 2%, 6% and 2% respectively. The investor additionally pays ground rent of the Ghana Cedi equivalent of $2/ha/year throughout the life of the investment.

Fig. 11: A 6 month old Eucalyptus plantation established by NICOL-MIRO in Boumfum Forest Reserve, Kumawu Forest District, Ashanti Region

5,610.22ha of degraded forest reserve lands (41 compartments) was allocated to 20 private commercial developers in 2013.

This brings the total number of private developers that have been granted permits to undertake commercial plantation development within degraded forest reserves to Three Hundred and Ten (310) with a total allocated area of 124,369.28ha in 50 forest reserves.

Page 15: NATIONAL FOREST PLANTATION DEVELOPMENT PROGRAMME … Annual Report... · The National Forest Plantation Development Programme (NFPDP) ... established plantations handed over to the

1511

Fig. 12: NICOL-MIRO Eucalyptus spp nursery, near Ananekrom in the

Kumawu Forest District - Ashanti Region

Fig. 13: A 2 month old teak stand established by NICOL - MIRO

Fig. 14: A 6 month old teak stand established by NICOL - MIRO

Page 16: NATIONAL FOREST PLANTATION DEVELOPMENT PROGRAMME … Annual Report... · The National Forest Plantation Development Programme (NFPDP) ... established plantations handed over to the

1612

Fig. 15: A 3 year teak stand within NICOL-MIRO plantations in the Boumfum Forest Reserve, Kumawu Forest

District 2,746.51ha was planted by 56 commercial developers on-reserve in 2013. This brings the total area reported developed by commercial plantation developers within forest reserves to 36,200.52ha. This figure is yet to be verified through a technical audit. Details of commercial forest plantation developers within degraded forest reserves can be found in Appendix 1. Nine (9) compartments were retrieved from six (6) non-performing plantation developers in 2013. The exercise to retrieve compartments from non-performing plantation developers will be pursued in earnest in 2014. Invoices for outstanding ground rent will also be issued to all plantation developers for payment. Sixteen (16) private developers signed the Land Lease and commercial Benefit Sharing Agreements (LL/BSAs) in 2013 resulting in One Hundred and Twenty-six (126) LL/BSAs signed to date. An estimated US$40 million has so far been invested in Ghana by the four largest commercial plantation developers on-reserve namely, FORM Ghana Limited, NICOL-MIRO Forestry Company Limited, Mere Plantations Limited and Ayum Company Limited. 2.8 Large-Scale Private Forest Plantations Off-Reserve Currently there is one large-scale private forest plantation project off-reserve being undertaken by African Plantations for Sustainable Development (APSD) Ghana Limited in the Brong Ahafo Region.

Page 17: NATIONAL FOREST PLANTATION DEVELOPMENT PROGRAMME … Annual Report... · The National Forest Plantation Development Programme (NFPDP) ... established plantations handed over to the

17

APSD Ghana Limited is a privately owned company engaged in the establishment of fast growing plantations for bio-energy production in the Atebubu and Sene Districts of the Brong Ahafo Region. The company operates a mechanised state of the art forest tree nursery with an installed capacity of 25 million seedlings annually (Fig. 16L). The company has so far invested about US$35 million in infrastructure, equipment and plantation development in Ghana.

APSD Ghana Limited has acquired an off-reserve concession with an estimated area of 86,000ha. The company has so far established 3,076ha plantations of Eucalyptus and Acacia and employs a labour force of 1,106 predominantly sourced from the local communities within the company's catchment area.

Fig. 16: Nursery workers at the APSD Nursery (L), Four year Eucalyptus spp. stand (R).

In 2013, the company established 1,565ha of plantations and employed 525 persons. The company aims to establish efficient electrical power production based on fast growing Eucalyptus and Acacia plantations. APSD plans to plant approximately 20,000ha of these trees species to feed two 30 MWe power plants based on three to five year tree rotations. The company intends to establish 3,000ha of plantations in year 2014.

2.9 Public Private Partnership (PPP) with FORM Ghana

In May, 2013 the FC signed a Public Private Partnership (PPP) agreement with FORM Ghana to jointly undertake a commercial plantation covering 14,596ha within Tain II forest reserve in the Sunyani Forest District. The project is estimated to cost US$50.3 million to implement. The planting target for 2013 was 600ha and 640ha was reported planted. From 2014 an annual planting target of 2,000ha is to be executed.

Within the partnership, FORM Ghana is entitled to 80% of the plantation proceeds and benefits with the Forestry Commission, Landowners and Forest fringe communities entitled to the

Page 18: NATIONAL FOREST PLANTATION DEVELOPMENT PROGRAMME … Annual Report... · The National Forest Plantation Development Programme (NFPDP) ... established plantations handed over to the

1814

remaining 20%. FORM Ghana will pay ground rent of the Ghana Cedis equivalent of $2/ha/yr to the landowner and facilitation fee of $2/ha/yr for customary and conflict resolution roles expected of the traditional authorities. The FC will undertake survey and demarcation and fire education within fringe communities at its own cost as part of it s contribution to the project. The PPP to date has employed 60 permanent employees and 267 temporary labourers under this project. Most of the recruited staff were from the forest fringe communities. The temporary workers were recruited for weeding, land preparation and planting of the project area. Over 650 additional workers are envisaged to be recruited for the 2014 target of 2,000ha.

Fig.17: The Deputy Minister of Lands and Natural Resources Hon. Barbara Asamoah planting a teak stump at the FC-FORM Ghana PPP Site in the Tain II Forest Reserve, Sunyani Forest District.

Fig.18: (A) Six month teak stand in FC-FORM Ghana PPP holdings in Tain II Forest Reserve, Sunyani Forest District – Brong Ahafo Region (B) The Dep. Minister and her team in a 10 meter high fire observatory tower within the FC - FORM Ghana PPP plantation holdings in the Tain II Forest Reserve.

A B

Page 19: NATIONAL FOREST PLANTATION DEVELOPMENT PROGRAMME … Annual Report... · The National Forest Plantation Development Programme (NFPDP) ... established plantations handed over to the

1915

2.10 FSD Plantations 2013 Following the expiry of the management service contracts between the Forestry Commission and the EPP service providers, the Forest Services Division was tasked to establish 3,000ha of forest plantations in 2013, using hired labour from forest fringe communities. At the end of 2013 a total area of 2,857.61ha was verified as planted. The FSD was also tasked to undertake the maintenance of the 18,987.55ha of established plantations (2010 to 2012 coupes) handed over by the Service Companies, however due to the late handing over (December, 2013) and lack of funds the target was not achieved. 2.10.1 Implementation Arrangements To ensure the effective and efficient implementation of the 2013 plantation establishment, an implementation plan was developed to guide the participating Regional and District FSD offices who were to implement the program. The implementation arrangements are attached as Appendix 3. Meetings were held in three sectors (Northern, Middle and Southern) of the country to make clear the implementation plan (Fig. 15A). Field/community meetings were also held at the beginning of the programme (Fig. 15B). 2.10.2 2013 Achievements An area of 2,853.33ha was reported as established in 113 sites within 65 Forest Reserves and 36 Forest Districts across all the 10 regions of Ghana. Three teams from the Forest Services Division Headquarters were despatched in November 2013 to undertake field verification of the reported achievements.

Fig. 19: Mr. Raphael Yeboah, Executive Director of the FSD, taking notes during question time at the

Northern Sector meeting in Tamale with Regional and District Managers

Page 20: NATIONAL FOREST PLANTATION DEVELOPMENT PROGRAMME … Annual Report... · The National Forest Plantation Development Programme (NFPDP) ... established plantations handed over to the

20

16

Fig. 20: Community meeting involving the Director of Operations, Plantations (Mr. Hugh C. A. Brown) and the Tumu Forest District Management at Tanvielle in the Upper West Region

All 113 sites were tracked with GPS handsets and mapped. Out of the total of 2,853.33ha reported planted, the total verified effective area planted was 2,857.61ha. The details of the areas planted and verified are presented in Appendix 2. 2,504 temporary jobs were created in the establishment of the 2,857.61ha of plantations. These were hired forest fringe community members organised as work gangs for specific establishment activities and paid on contract basis for specific activities. 2.10.3 Budget and Expenditure The budget for the 3,000ha was GH¢5,301,600. Based on the achievement of 2857.61ha the expected expenditure was GH¢5,049,949.75. At the end of the planting year, the total expenditure stood at GH¢2,524,029.92 out of the budgeted GH¢5,049,949.75 which resulted in the unit cost of establishment for the 2013 FSD plantation being GH¢883.26 per ha. The reduction in expenditure was due to strict budget controls and prudent management; for example, contract fire patrols by fringe communities was rather undertaken by FSD Forest Guards at no additional cost. The expenditure details for the 2013 programme is depicted in Table 3 below:

Page 21: NATIONAL FOREST PLANTATION DEVELOPMENT PROGRAMME … Annual Report... · The National Forest Plantation Development Programme (NFPDP) ... established plantations handed over to the

2117

Table 3: Summary of Expenditure on 2013 Plantation Activities Activity Revised Budget

(2,857.61ha)(GH¢)

Actual Expenditure

(GH¢)

Variance Analysis (Analyses of significant variances)

Site Demarcation 47,150.00 49,500.00 Procurement of planting material 1,114,467.90 683,995.47 Budget included 20%

seedlings for beating up which was not undertaken. Additionally, more stumps were utilized than budgeted.

Plantation Establishment: (Site Preparation, Pegging and Planting)

1,100,179.85 987,269.07 Some illegal farms were planted up which reduced the cost of land preparation.

Tending (2x) 800,004.80 234,798.20 Due to late planting in many sites only one round of tending was undertaken instead of the two rounds budgeted for

Fire Ride Construction 121,000.00 19,033.00 Due to delayed payment of earlier contract activities, most work gangs refused to undertake the construction of fire rides resulting in very few fire rides being constructed.

Fire Patrols 1,200,007.20 - Decision to use Forest Guards instead of community contracts

Monitoring and Supervision* (Regional/District Offices)

524,282.00 466,388.80

Monitoring (FC/FSD HQ)* 142,858.00 83,045.38 TOTAL 5,049,949.75 2,524,029.92 *Monitoring and Supervision costs covered all the existing plantation coupes within the Regions/Districts

Page 22: NATIONAL FOREST PLANTATION DEVELOPMENT PROGRAMME … Annual Report... · The National Forest Plantation Development Programme (NFPDP) ... established plantations handed over to the

22

18

3.0 FIRE INCIDENCE IN THE 2013/2014 FIRE SEASON

The key fire protection interventions undertaken to mitigate fire incidences in the 2013/2014 fire season were sensitization and awareness creation by RMSC and FSD field officers, fire ride construction and maintenance, and regular fire patrolling during the dry season by Forest Guards (especially 2013 coupes).

At the end of March 2014, reports indicated that 3,272ha of plantations established from 2010 to 2013 had been affected by fire compared to 4,578.22ha affected by fire in 2012/2013 fire season. The affected districts and coupes are detailed in Appendix 4. The regional summary is as detailed below in Table 4.

Table 4: Area of Plantation coupes affected by fire in the 2013/2014 fire season by Region

Region 2010 Coupe (ha)

2011 Coupe (ha)

2012 Coupe (ha)

2013 Coupe (ha) Total (ha)

Upper East - - 47 65 112

Upper West 377 79 116 6 578

Northern 421 534 779 109 1,843

Brong Ahafo 131 60 105 3 299

Ashanti 162 96 81 3 342 Eastern - 0 - 0 0 Western 2 0 - 0 2 Central - 0 - 0 0

Greater Accra - 0 - 0 -

Volta 69 10 12 2 96 Total 1,191 779 1,140 188 3,272

Page 23: NATIONAL FOREST PLANTATION DEVELOPMENT PROGRAMME … Annual Report... · The National Forest Plantation Development Programme (NFPDP) ... established plantations handed over to the

23

4.0 FOOD PRODUCTION WITHIN 2011 TO 2013 PLANTATION COUPES In 2013, an estimated 28,919.88 Metric Tonnes (Mt) of food crops were produced from the 15,431.66ha of forest plantations planted by the FC from 2011 to 2013. The major crops produced were as follows: Plantain – 16,863.23MT, Cereals (maize, millet and rice) – 5,474.64MT, Tubers (Cocoyam, Cassava and Yam) – 7,702.65MT, Legumes (Beans, Cowpea, Groundnut and Sorghum) – 834.09MT and Vegetables (Tomato, Pepper, Garden Eggs) – 1,577.92MT. A summary of the food production per region is shown in Table 5 below with the details with respect to the various coupes shown in Appendix 5. Table 5: Summary of food production in 2013 (2011 - 2013 coupes)*

*Food production estimated as follows: Plantation Area reported intercropped with food crops x 2MOFA 2010 Av. Yield (Mt/ha) x specific crop production factor [plantain:70%, Yam:70%, Cocoyam:30%, Maize:100%]

1Agriculture in Ghana, Facts and Figures (2010). Ministry of Food and Agriculture, 2011 5.0 JOB CREATION An estimated 5,184 jobs were created in 2013 to establish forest plantations under three components of the NFPDP. The jobs created comprised the underlisted:

i. 2,504 jobs created under the FSD plantations, being recruited persons organised as work gangs to undertake plantation establishment and maintenance activities on contract basis.

ii. 330 persons recruited under the FC/Timber Industry Plantation Development Fund on casual basis.

iii. 60 permanent and 267 temporary staff recruited under the FC/FORM Ghana PPP in the Tain II Forest reserve and

iv. An estimated 2,023 persons recruited by Private Commercial Developers on-reserve on temporary basis.

An additional 525 jobs were created by APSD (off-reserve private commercial developer) in 2013 through the establishment of 1,565ha.

REGIONPLANTAIN

(Mt)

CEREALS (Maize, Millet,

Rice) (Mt)

TUBERS (Cocoyam, Cassava,

Yam) (Mt)

LEGUMES (Beans, Cowpea,

Groundnut, Sorghum) (Mt)

VEGETABLES (Tomato, Pepper, Garden

Eggs) (Mt)

TOTAL FOOD PRODUCTION

(Mt)

Western 3,269.05 5.10 275.35 - - 3,549.50

Central 600.05 72.92 69.19 0.78 20.31 763.26

Northern - 1,609.93 3,196.30 287.50 37.96 5,131.69

Eastern 1,482.59 99.93 312.99 6.99 32.83 1,935.33

Ashanti 9,222.77 1,445.73 1,933.53 55.89 1,065.22 13,723.14

Brong Ahafo 763.40 1,103.59 399.70 73.11 262.40 2,602.20

Upper East - 450.08 - 83.40 - 533.48

Upper West - 189.17 - 240.80 143.00 572.98

Greater Accra - - - - - -

Volta 3.85 99.96 - - 4.50 108.31

TOTAL 15,341.71 5,076.41 6,187.06 748.48 1,566.22 28,919.88

Page 24: NATIONAL FOREST PLANTATION DEVELOPMENT PROGRAMME … Annual Report... · The National Forest Plantation Development Programme (NFPDP) ... established plantations handed over to the

24

6.0 PROGRAMME MONITORING The 2013 National Forest Plantation Development Programme was monitored on various levels. Ministry of Lands and Natural Resources The Ministry of Lands and Natural Resources during the year undertook monitoring visits to selected sites within the Ashanti and Brong Ahafo Regions (Figs. 21-24). Parliamentary Select Committee on Lands and Forestry The Parliamentary Select Committee on Lands and Forestry also undertook visits to plantation sites in the Northern and Upper East Regions (Figs. 25 and 26). Forestry Commission The Forestry Commission continued its routine monitoring nationwide through the Regional and District offices, in addition to monitoring visits by Corporate FC and FSD HQ. Field visits were also undertaken by the FC Internal Audit Unit to certify the evidence of plantation expenditures. External Auditors Field visits were also undertaken by a team of External Auditors to verify the existence of the plantations established under the Expanded Plantation Program (EPP) (Figs. 27 and 28) Ghana Audit Service The Performance Audit Department of the Ghana Audit Service also carried out a Performance Audit on the EPP to ascertain whether the Forestry Commission had adhered to its performance standards in the implementation of the program (Fig. 29).

Fig. 21: Dep. Minister of Lands and Natural Resources’ entourage including Mr. Abu Juam (Technical Director, MLNR), Mr. Obiaw (Director, RMSC) and others at a fire observatory within the FORM Ghana plantations in the Asubima Forest Reserve, Ashanti Region.

Page 25: NATIONAL FOREST PLANTATION DEVELOPMENT PROGRAMME … Annual Report... · The National Forest Plantation Development Programme (NFPDP) ... established plantations handed over to the

2521

Fig. 22: The Deputy Minister's entourage being conducted around the FC/FORM Ghana PPP 2013 planting site by Mr. Thomas Okyere, Brong Ahafo Rrgional Manager, FSD in the Tain II Forest Reserve.

Fig. 23: The Deputy Minister of Land and Natural Resources (Hon. Barbara Asamoah) addressing the press during a field inspection of the 2007 Cedrela - indigenous species stand within the South Formangsu Forest Reserve in the Juaso Forest District.

Page 26: NATIONAL FOREST PLANTATION DEVELOPMENT PROGRAMME … Annual Report... · The National Forest Plantation Development Programme (NFPDP) ... established plantations handed over to the

2622

Fig. 24: Hon. Barbara Asamoah addressing the press at the ceremonial tree planting site in Abofour, Offinso Forest District of the Ashanti Region, where the Late President J.E.A Mills launched the Expanded Plantation Programme of the NFPDP in January, 2010.

Fig. 25: A group photograph after a courtesy call on the Tamale Chief by the monitoring team from the Parliamentary Select Committee on Lands and Forestry during a tour of the Upper East and Northern Regions

Page 27: NATIONAL FOREST PLANTATION DEVELOPMENT PROGRAMME … Annual Report... · The National Forest Plantation Development Programme (NFPDP) ... established plantations handed over to the

2723

Fig. 26: Monitoring by the Parliamentary Select Committee on Lands and Forestry in the Sinsangblegbinni Forest Reserve, Tamale Forest District - Northern Region.

Fig. 27 : Performance audit team of the Ghana Audit Service (GAS) undertaking a performance audit of the 2013 FSD plantation within the Tankwidi East Forest Reserves in the Bolgatanga Forest District.

Page 28: NATIONAL FOREST PLANTATION DEVELOPMENT PROGRAMME … Annual Report... · The National Forest Plantation Development Programme (NFPDP) ... established plantations handed over to the

2824

Fig. 28 : Performance audit team of the Ghana Audit Service (GAS) undertaking a performance audit of the 2013 FSD plantation within the Yaya Forest Reserve in the Sunyani Forest District.

Fig. 29: Field verification of EPP sites by external auditors.

Page 29: NATIONAL FOREST PLANTATION DEVELOPMENT PROGRAMME … Annual Report... · The National Forest Plantation Development Programme (NFPDP) ... established plantations handed over to the

29 25

Fig. 30: Joint Head Office and Tumu Forest District monitoring team crossing a dilapidated bridge near Tanvielle

Fig. 31: A member of the Deputy Minister's entourage, Mr. Joseph Osiakwan (Principal Planning Officer - MLNR) expressing satisfaction after inspecting a plantation site in the Afram Headwaters F/R established by Mere Plantations Ltd.

A

B A

Page 30: NATIONAL FOREST PLANTATION DEVELOPMENT PROGRAMME … Annual Report... · The National Forest Plantation Development Programme (NFPDP) ... established plantations handed over to the

3026

7.0 CHALLENGES

The key challenge to the NFPDP is the absence of a reliable and adequate source of funding for plantation establishment and maintenance by Government. Other challenges comprise the following:

i. Inadequate Motorbikes and vehicles for field monitoring by FSD. ii. Annual destruction of planted areas by wildfire iii. Destruction of planted seedlings by cattle (Fulani Herdsmen) iv. Disagreements over off-reserve Benefit Sharing Arrangement under the EPP between

Government and Land owners 8.0 WAY FORWARD

i. Complete field verification of all reported past plantation establishment achievements especially the Modified Taungya System (MTS), Community Forestry Management Project (CFMP) and the Private Commercial Developers on-reserve. ii. Carry out maintenance and requisite silvicultural interventions in the existing stands. iii. Provide refresher training for field staff. iv. Procure additional motorbikes and 4X4 vehicles for the various forest districts to facilitate field operations and monitoring of the NFPDP. v. Finalise and implement the Ghana Forest Plantation Strategy which seeks to among others, create an enabling environment for public and private investments in forest plantations

Page 31: NATIONAL FOREST PLANTATION DEVELOPMENT PROGRAMME … Annual Report... · The National Forest Plantation Development Programme (NFPDP) ... established plantations handed over to the

31

31

APPE

NDI

X 1

NO

.CO

MPA

NY

NAM

ERE

GIO

NDI

STRI

CTFO

REST

RES

ERVE

COM

PART

MEN

T/SE

RIES

AR

EA A

LLO

CATE

D (H

a)AR

EA P

LAN

TED-

2013

(Ha)

AREA

PLA

NTE

D TO

DA

TE (H

a)DA

TE O

F AL

LOCA

TIO

NSP

ECIE

S PL

ANTE

D

1Ad

dai B

roth

er &

Co.

Asha

nti

Juas

oBa

ndai

Hill

s16

, 17,

19,

25

512.

00.

045

.0-

Teak

2Ag

ogo

Chur

ch o

f Pe

ntec

ost

Asha

nti

Juas

oBa

ndai

Hill

s6,

820

5.64

0.0

23.0

-Te

ak

3

St. A

ugus

tine'

s Cat

holic

Ch

urch

(Ago

go R

oman

Ca

thol

ic C

hurc

h)As

hant

iJu

aso

Band

ai H

ills

14,1

827

6.43

0.0

60.0

-Te

ak4

Agog

o Sa

viou

r Chu

rch

Asha

nti

Juas

oBa

ndai

Hill

s55

135.

220.

045

.0-

Teak

5

Apos

tle N

icho

las A

ppia

h M

issah

& C

hild

ren

Asha

nti

Juas

oBa

ndai

Hill

s1

131.

30.

04.

013

th Ju

ne, 2

013

N/A

6Th

e Ap

osto

lic C

hurc

h -

Ghan

aAs

hant

iJu

aso

Band

ai H

ills

68,6

925

6.0

0.0

50.0

30th

Aug

ust,

2007

Teak

7

CEPA

COD

(Cen

ter f

or

Pove

rty

Alle

viat

ion

and

Com

mun

ity D

evel

opm

ent)

Asha

nti

Juas

oBa

ndai

Hill

s38

, 47

128.

00.

030

.010

th A

ugus

t, 20

06Te

ak

8Co

ncer

ned

Citiz

en G

roup

-Ag

ogo

Asha

nti

Juas

oBa

ndai

Hill

s54

128.

00.

00.

0-

N/A

9El

der S

amps

on Y

eboa

h &

Fr

ank

Aboa

gye

Asha

nti

Juas

oBa

ndai

Hill

s7

106.

130.

03.

013

th Ju

ne, 2

013

Teak

10Gy

ima

& C

o. F

arm

s Ltd

Asha

nti

Juas

oBa

ndai

Hill

s15

, 26

269.

3512

.082

.0-

Teak

11Is

aac

Ow

usu

Farm

sAs

hant

iJu

aso

Band

ai H

ills

2814

7.96

0.0

10.0

12th

Dec

embe

r, 20

11Te

ak

12K&

P Fa

rms (

Nan

a Kw

adw

o Po

ku B

onsu

)As

hant

iJu

aso

Band

ai H

ills

5616

1.97

0.0

0.0

19th

Dec

embe

r, 20

11N

/A

13Ka

te K

orom

aAs

hant

iJu

aso

Band

ai H

ills

4113

3.22

0.0

10.0

12th

Dec

embe

r, 20

11Te

ak

14Kw

ame

Kyei

Far

ms

Asha

nti

Juas

oBa

ndai

Hill

s62

117.

1511

.011

.019

th D

ecem

ber,

2011

Teak

15M

'aka

ddes

h Pr

intin

g Pr

ess

and

Farm

sAs

hant

iJu

aso

Band

ai H

ills

7220

4.74

20.5

60.5

21st

Aug

ust,

2006

Teak

16M

apad

Ent

erpr

iseAs

hant

iJu

aso

Band

ai H

ills

2716

3.39

6.0

106.

017

th O

ctob

er, 2

006

Teak

17M

r. O

tuo

Sere

bour

Asha

nti

Juas

oBa

ndai

Hill

s63

120.

610.

00.

0 4

th M

ay, 2

012

N/A

PERF

ORM

ANCE

UPD

ATE

OF

PRIV

ATE

PLAN

TATI

ON

DEV

ELO

PERS

ON

-RES

ERVE

Page 32: NATIONAL FOREST PLANTATION DEVELOPMENT PROGRAMME … Annual Report... · The National Forest Plantation Development Programme (NFPDP) ... established plantations handed over to the

32

NO

.CO

MPA

NY

NAM

ERE

GIO

NDI

STRI

CTFO

REST

RES

ERVE

COM

PART

MEN

T/SE

RIES

AR

EA A

LLO

CATE

D (H

a)AR

EA P

LAN

TED-

2013

(Ha)

AREA

PLA

NTE

D TO

DA

TE (H

a)DA

TE O

F AL

LOCA

TIO

NSP

ECIE

S PL

ANTE

D

18N

ana

Akuo

ku S

arpo

ng

Farm

s As

hant

iJu

aso

Band

ai H

ills

20, 2

1,22

,23,

2468

9.78

0.0

82.4

7-

Teak

19O

bebe

w V

entu

res

Asha

nti

Juas

oBa

ndai

Hill

s46

128.

00.

015

.010

th M

arch

, 200

5Te

ak

20O

ppon

g-M

ensa

h En

terp

rise

Asha

nti

Juas

oBa

ndai

Hill

s70

128.

00.

010

.05t

h Ju

ly, 2

006

Teak

21Pa

scal

Gay

eAs

hant

iJu

aso

Band

ai H

ills

2914

5.0

0.0

42.0

24th

Feb

ruar

y, 2

009

Teak

22Pa

tric

k Gy

ekye

-Men

sah

Asha

nti

Juas

oBa

ndai

Hill

s59

125

0.0

0.0

17th

Jan.

200

7N

/A23

Prof

A.B

Ako

saAs

hant

iJu

aso

Band

ai H

ills

6611

9.95

0.0

10.0

29th

Mar

ch, 2

007

Teak

24Sa

mro

se C

ompa

ny L

imite

dAs

hant

iJu

aso

Band

ai H

ills

1212

8.0

0.0

20.0

13th

Mar

ch, 2

007

Teak

25Tr

opic

al F

arm

sAs

hant

iJu

aso

Band

ai H

ills

48, 4

9, 5

0, 5

151

9.21

0.0

15.0

31st

Janu

ary,

200

1Te

ak26

Antw

i Boa

siako

Far

ms

Asha

nti

Juas

oDo

me

Rive

r5

147.

420.

07.

027

th O

ct. 2

009

Teak

27Be

naku

f Tim

ber a

nd

Trad

ing

Asha

nti

Juas

oDo

me

Rive

r30

,38

99.2

0.0

28.0

9th

Dece

mbe

r, 20

02Te

ak

28Do

uble

Ben

Con

stru

ctio

n Lt

dAs

hant

iJu

aso

Dom

e Ri

ver

2198

.91

0.0

0.0

22nd

Sep

tem

ber,

2009

N/A

29D.

T.K

Tim

bers

Asha

nti

Juas

oDo

me

Rive

r20

,26,

3538

4.0

0.0

90.0

21st

July

, 200

4Te

ak, C

edre

la

30Ju

aso

Trad

ition

al A

utho

rity

Asha

nti

Juas

oDo

me

Rive

r25

,27

250.

00.

060

.028

th A

pril,

200

3

5th

Nov

embe

r, 20

04

Waw

a,

Man

zoni

a,

Mah

ogan

y,

Ofr

am, E

mire

31KA

MVI

SAs

hant

iJu

aso

Dom

e Ri

ver

1928

1.54

0.0

12.0

16th

Apr

il, 2

003

Teak

32K.

Gre

en G

loba

lAs

hant

iJu

aso

Dom

e Ri

ver

3612

8.0

0.0

010

th D

ecem

ber,

2013

N/A

33Kw

ame

Bi K

ufou

rAs

hant

iJu

aso

Dom

e Ri

ver

3912

8.00

0.0

30.0

11th

Aug

ust,

2003

Teak

34LI

- Cha

n En

terp

rise

Gh. L

tdAs

hant

iJu

aso

Dom

e Ri

ver

1013

4.59

0.0

13.0

9th

Dec.

200

2Te

ak35

Mar

gare

t Cam

pbel

lAs

hant

iJu

aso

Dom

e Ri

ver

4611

4.64

0.0

7.0

16th

Mar

ch, 2

011

Teak

36O

bogu

Tra

ditio

nal C

ounc

ilAs

hant

iJu

aso

Dom

e Ri

ver

35, 3

6, 3

7, 4

70.

00.

0 -

N/A

37PI

DECK

Co.

Ltd

Asha

nti

Juas

oDo

me

Rive

r40

,45

250.

00.

00.

09t

h Ap

ril, 2

003

25

th Ju

ne, 2

003

N/A

38Ta

lent

o W

ood

Proc

essin

g En

terp

rise

Asha

nti

Juas

oDo

me

Rive

r29

135.

510.

040

.012

th M

ay, 2

005

Teak

39W

ukup

omaa

Exp

ort a

nd

Impo

rt C

ompa

ny L

imite

dAs

hant

iJu

aso

Dom

e Ri

ver

4413

9.35

0.0

10.0

10th

Aug

ust,

2005

Teak

32

11

Page 33: NATIONAL FOREST PLANTATION DEVELOPMENT PROGRAMME … Annual Report... · The National Forest Plantation Development Programme (NFPDP) ... established plantations handed over to the

33

NO

.CO

MPA

NY

NAM

ERE

GIO

NDI

STRI

CTFO

REST

RES

ERVE

COM

PART

MEN

T/SE

RIES

AR

EA A

LLO

CATE

D (H

a)AR

EA P

LAN

TED-

2013

(Ha)

AREA

PLA

NTE

D TO

DA

TE (H

a)DA

TE O

F AL

LOCA

TIO

NSP

ECIE

S PL

ANTE

D

40Y

& M

Reg

ener

atio

n Lt

dAs

hant

iJu

aso

Dom

e Ri

ver

2211

8.71

0.0

18.0

17th

Sep

tem

ber,

2009

N/A

41Ap

ostig

a Co

mpa

ny L

imite

dAs

hant

iJu

aso

Mira

sa H

ills

12,1

3,19

378.

20.

027

0.0

20th

Mar

ch, 2

003

Teak

42Be

ige

Leaf

Lim

ited

Asha

nti

Juas

oM

irasa

Hill

s18

128.

00.

00.

08t

h De

cem

ber,

2011

N/A

43Co

xwai

n In

vest

men

tAs

hant

iJu

aso

Mira

sa H

ills

21B

87.8

90.

00.

06t

h Ja

nuar

y, 2

011

N/A

44ET

IBEC

K Li

mite

dAs

hant

iJu

aso

Mira

sa H

ills

40A,

40B

256.

00.

015

.023

rd A

pril,

200

3Te

ak

45Lo

gwoo

d In

dust

ries

Lim

ited

Asha

nti

Juas

oM

irasa

Hill

s3,

725

6.0

0.0

10.0

23rd

and

24t

h Fe

brua

ry, 2

003

Teak

46Lo

u-Ra

lph

Lodg

e In

vest

men

tAs

hant

iJu

aso

Mira

sa H

ills

2212

8.57

0.0

100.

022

nd F

ebru

ary,

20

10Te

ak

47M

r. Sa

mue

l Ben

son-

Adje

iAs

hant

iJu

aso

Mira

sa H

ills

4911

7.51

17.0

31.0

22nd

Sep

tem

ber,

2009

Teak

48N

ew L

eaf I

nves

tmen

t Li

mite

dAs

hant

iJu

aso

Mira

sa H

ills

4811

3.32

0.0

113.

315

16th

Apr

il, 2

008

Teak

, M

ahog

any,

W

awa,

Kus

ia,

Odu

m, O

fram

, M

anso

nia,

Ko

krod

ua

49O

meg

a W

ood

Proc

essin

gAs

hant

iJu

aso

Mira

sa H

ills

4712

8.0

0.0

30.0

11th

Apr

il, 2

003

Teak

50Pe

n Pa

l Woo

d Pr

oces

sing

Asha

nti

Juas

oM

irasa

Hill

s25

, 26,

2750

0.0

0.0

408t

h Ju

ly, 2

003

Teak

51SK

OD

Asha

nti

Juas

oM

irasa

Hill

s50

128.

00.

010

.05t

h O

ctob

er, 2

004

23

rd Ja

nuar

y, 2

003

Teak

Asha

nti

Juas

oM

irasa

Hill

s38

127.

820.

00.

013

th D

ecem

ber,

2011

N/A

Asha

nti

Juas

oM

irasa

Hill

s39

175.

5510

.080

.020

10Te

ak53

Ups

trea

m In

vest

men

tAs

hant

iJu

aso

Mira

sa H

ills

21A

54.6

70.

00.

06t

h Ja

nuar

y, 2

011

N/A

54Ab

oagy

e D

anso

Sam

uel

Asha

nti

Juas

oN

orth

Ban

dai H

ills

4112

8.6

0.0

0.0

30th

Janu

ary,

201

3N

/A

55As

ante

Aky

em W

ood

Proc

essin

g Co

. Ltd

Asha

nti

Juas

oN

orth

Ban

dai H

ills

60,6

221

3.18

10.0

30.0

23rd

Dec

embe

r, 20

02Te

ak

56Ch

arity

Asie

duAs

hant

iJu

aso

Nor

th B

anda

i Hill

s39

124.

500.

00.

014

th O

ctob

er, 2

013

N/A

52

Tale

nto

Woo

d Pr

oces

sing

Ente

rpris

e

33

20,25,26

,27

36.9

Page 34: NATIONAL FOREST PLANTATION DEVELOPMENT PROGRAMME … Annual Report... · The National Forest Plantation Development Programme (NFPDP) ... established plantations handed over to the

34

34

NO

.CO

MPA

NY

NAM

ERE

GIO

NDI

STRI

CTFO

REST

RES

ERVE

COM

PART

MEN

T/SE

RIES

AR

EA A

LLO

CATE

D (H

a)AR

EA P

LAN

TED-

2013

(Ha)

AREA

PLA

NTE

D TO

DA

TE (H

a)DA

TE O

F AL

LOCA

TIO

NSP

ECIE

S PL

ANTE

D

57N

oble

'G'

Asha

nti

Juas

oN

orth

Ban

dai H

ills

4312

8.43

0.0

0.0

30th

Janu

ary,

201

3N

/A

58Ya

w A

sam

oah

Asha

nti

Juas

oN

orth

Ban

dai H

ills

5513

3.89

0.0

0.0

8th

Nov

embe

r, 20

13N

/A59

Yonk

a Fa

rms

Asha

nti

Juas

oN

orth

Ban

dai H

ills

5810

3.30

0.0

0.0

-N

/A

60

Boak

yew

aa E

nter

prise

Li

mite

d (B

EL)

Asha

nti

Juas

oO

nyim

so3,

4,5,

650

8.66

120.

047

020

th N

ov. 2

002

Alan

brak

ia,

Kusia

, Cei

ba,

Odu

m, M

akor

e,

Waw

a, O

fram

, M

ahog

any,

Em

ire

61Pr

asha

nti E

xpor

t Lim

ited

Asha

nti

Kum

awu

Anum

so22

200.

00.

091

.0-

62Ab

rofo

Far

ms &

Tra

ding

En

terp

rise

Asha

nti

Kum

awu

Boum

fum

132

, 136

, 141

384.

00.

045

.018

th M

arch

, 200

563

Aid

to A

rtisa

n Gh

ana

Asha

nti

Kum

awu

Boum

fum

153,

158

, 159

128.

00.

075

.010

th A

pril,

200

3Te

ak

64As

adu

Roya

l Was

teAs

hant

iKu

maw

uBo

umfu

m12

112

8.0

0.0

0.0

21st

Nov

embe

r, 20

12N

/A

65

Asha

nti Y

outh

Agr

o Fo

rest

ry O

rgan

izatio

n (A

YAO

)As

hant

iKu

maw

uBo

umfu

m18

149.

40.

040

.025

th Ja

nuar

y, 2

001

66

Bibi

ani L

oggi

ng a

nd

Lum

ber C

ompa

ny L

imite

d (B

LLC)

Asha

nti

Kum

awu

Boum

fum

23, 2

5-27

, 34

637.

00.

010

0-

Cedr

ela,

Tea

k

67Da

le B

rook

Com

pany

Ltd

Asha

nti

Kum

awu

Boum

fum

56,6

5,75

,76,

77,

83,

84,

85

,91,

92,9

3,98

an

d po

rtio

ns o

f 57

,66,

6716

27.2

60.

050

0-

Teak

68Du

adem

Inve

ntor

ies

Asha

nti

Kum

awu

Boum

fum

185,

186

, 192

, 19

350

0.0

0.0

9025

th Ja

nuar

y, 2

001

69Ej

isu F

ores

t Pro

duct

sAs

hant

iKu

maw

uBo

umfu

m22

0, 2

21, 2

22,

217

128.

00.

00

70Fo

rjane

Asha

nti

Kum

awu

Boum

fum

143

119.

340.

02

23rd

Janu

ary,

200

6

71Gh

ana

Saw

n Ti

mbe

r Se

llers

Ass

ocia

tion

Asha

nti

Kum

awu

Boum

fum

126,

122

255.

90.

054

15th

Dec

embe

r, 20

06

128.25

Page 35: NATIONAL FOREST PLANTATION DEVELOPMENT PROGRAMME … Annual Report... · The National Forest Plantation Development Programme (NFPDP) ... established plantations handed over to the

35

NO

.CO

MPA

NY

NAM

ERE

GIO

NDI

STRI

CTFO

REST

RES

ERVE

COM

PART

MEN

T/SE

RIES

AR

EA A

LLO

CATE

D (H

a)AR

EA P

LAN

TED-

2013

(Ha)

AREA

PLA

NTE

D TO

DA

TE (H

a)DA

TE O

F AL

LOCA

TIO

NSP

ECIE

S PL

ANTE

D

72

Ghan

a Ti

mbe

r Ass

ocia

tion

(G.T

.A)

Asha

nti

Kum

awu

Boum

fum

144,

145

, 147

, 14

8,15

0, 1

5186

0.0

0.0

260

25t

h Ja

nuar

y, 2

001

73

Gree

nfie

lds P

lant

atio

ns

Lim

ited

(A.G

Tim

bers

Ltd

)As

hant

iKu

maw

uBo

umfu

m4,

5, 6

, 8, 1

0,

11, 1

2, 1

3, 1

4,

17, 2

0, 2

118

30.5

60.

077

5.46

-

Teak

, Waw

a,

Cedr

ela,

M

ahog

any,

Ce

iba,

Ko

krod

ua,

Apro

, Ofr

am

74Ho

llypa

rtAs

hant

iKu

maw

uBo

umfu

m14

212

8.0

0.0

0.0

26t

h Fe

brua

ry,

2013

N

/A

75Jo

hnso

n Ag

yem

an F

arm

sAs

hant

iKu

maw

uBo

umfu

m79

, 80

190.

7810

.016

023

rd M

arch

, 200

6Te

ak

76KW

AMO

KA F

arm

s &

Proc

essin

g Li

mite

dAs

hant

iKu

maw

uBo

umfu

m22

390

.97

0.0

05t

h N

ovem

ber,

2012

N/A

77

Miro

Nat

iona

l Int

eres

t Co

mpa

ny L

imite

d (M

IRO

-N

ICO

L)As

hant

iKu

maw

uBo

umfu

m

(Ago

go P

ortio

n)

120,

123,

124,

127,

131

, 134

, 13

5, 1

38, 1

39,

140,

156

, 155

, (K

umaw

u Po

rtio

n)

29,3

0,48

,52,

53,

54,5

5,61

,62,

63,

64,7

0, 7

2, 7

5,

78, 8

9, 9

0, 9

6,

97, 1

01, 1

02,

103,

106

, 108

, 10

9, 1

11

5002

.28

405.

012

54.8

418

th M

ay, 2

009

Teak

, Ced

rela

, Eu

caly

ptus

, few

in

dige

nous

sp

ecie

s

78

Miro

Nat

iona

l Int

eres

t Co

mpa

ny L

imite

d (M

IRO

-N

ICO

L)As

hant

iKu

maw

uBo

umfu

m

87, 8

8, 9

4, 1

05,

107,

110

, 112

, 11

9, 1

30, 1

46,

160,

115

1536

.00

0.0

021

st N

ovem

ber,

2012

79N

ana

Yaw

Om

ane

Frim

pong

Asha

nti

Kum

awu

Boum

fum

99, 1

00, 1

3340

0.0

0.0

65.5

6th

Janu

ary,

200

4

35

44.7

Page 36: NATIONAL FOREST PLANTATION DEVELOPMENT PROGRAMME … Annual Report... · The National Forest Plantation Development Programme (NFPDP) ... established plantations handed over to the

36

NO

.CO

MPA

NY

NAM

ERE

GIO

NDI

STRI

CTFO

REST

RES

ERVE

COM

PART

MEN

T/SE

RIES

AR

EA A

LLO

CATE

D (H

a)AR

EA P

LAN

TED-

2013

(Ha)

AREA

PLA

NTE

D TO

DA

TE (H

a)DA

TE O

F AL

LOCA

TIO

NSP

ECIE

S PL

ANTE

D

80O

meg

a W

ood

Proc

essin

gAs

hant

iKu

maw

uBo

umfu

m21

3, 2

16, 2

18,

219

500.

00.

012

011

th A

pril,

200

3

81Pr

emie

r Sol

utio

nsAs

hant

iKu

maw

uBo

umfu

m12

012

8.0

0.0

04t

h De

cem

ber,

2012

82Ze

bra

Imex

Ltd

Asha

nti

Kum

awu

Boum

fum

81, 8

223

9.15

20.0

2020

th A

pril,

200

7

83Lo

gwoo

d In

dust

ries

Lim

ited

Asha

nti

Mam

pong

Abrim

asu

7,8

200.

00.

010

0.0

2002

Teak

84Sa

rprim

Far

ms &

Tra

ding

Co

mpa

ny L

tdAs

hant

iM

ampo

ngAb

rimas

u6

126.

00.

090

.09t

h Ap

ril, 2

003

Teak

85Du

fie A

mpo

nsah

Far

ms

Asha

nti

Mam

pong

Awur

a 16

109.

850.

020

.011

th Ja

nuar

y, 2

005

86Er

nest

Bes

t Com

pany

Ltd

Asha

nti

Mam

pong

Awur

a 38

121.

50.

035

.0-

Teak

87Fo

rest

Bus

ines

s Con

sult

Asha

nti

Mam

pong

Awur

a 19

128.

08t

h Ju

ly, 2

013

88

Gree

nfie

lds P

lant

atio

ns

Lim

ited

(Naj

a Da

vid

Vene

er a

nd P

lyW

ood)

As

hant

iM

ampo

ngAw

ura

65,

66,

69,

70,

71

2,03

9.3

0.0

477.

0-

Teak

, Ced

rela

, Ce

iba,

M

ahog

any

89Gy

amfi

& A

sare

Asha

nti

Mam

pong

Awur

a 41

137.

310.

05.

015

th Ja

nuar

y, 2

010

Teak

90He

lp C

rush

Aid

s Gha

naAs

hant

iM

ampo

ngAw

ura

4212

0.0

0.0

42.0

28th

Feb

ruar

y, 2

005

Teak

91Ka

ram

anga

Indu

strie

s Li

mite

dAs

hant

iM

ampo

ngAw

ura

39, 4

0, 4

5

391.

123.

014

6.4

25th

Nov

. 199

9Te

ak92

Kuul

Trad

e En

terp

rise

Asha

nti

Mam

pong

Awur

a 12

128.

496.

586

.519

th A

pril,

200

5Te

ak

93Kw

asi A

gyek

um F

arm

sAs

hant

iM

ampo

ngAw

ura

3116

5.31

8.0

48.0

-Te

ak94

Lits

wor

th Im

pex

Ltd

Asha

nti

Mam

pong

Awur

a 9

155.

589.

089

.019

th A

pril,

200

5Te

ak

95N

ABE

Woo

d Pr

oces

sing

Co. L

tdAs

hant

iM

ampo

ngAw

ura

2310

0.0

0.0

60.0

20th

Nov

. 200

2Te

ak96

R.K.

A.T

Lim

ited

Asha

nti

Mam

pong

Awur

a 20

103.

180.

025

.0-

Teak

97re

New

Com

pany

Lim

ited

Asha

nti

Mam

pong

Awur

a

47, 4

8, 4

9, 5

0,

51, 5

3, 5

4, 5

5,

56, 5

71,

347.

30.

05.

020

08Te

ak,

Mah

ogan

y

98Ab

eam

Dan

so P

oku

Sarf

oAs

hant

iM

ampo

ngCh

irim

fa86

363.

740.

020

.02n

d Fe

brua

ry, 2

010

Teak

99El

der J

ewel

lery

Asha

nti

Mam

pong

Chiri

mfa

7111

0.60

5.0

50.0

-

100

Goos

e Gr

een

Com

pany

Li

mite

dAs

hant

iM

ampo

ngCh

irim

fa12

120.

00.

01.

030

th Ja

nuar

y, 2

003

101

Gree

nfie

lds P

lant

atio

ns

Lim

ited

(Pau

l Sag

oe)

Asha

nti

Mam

pong

Chiri

mfa

1,2

129.

520.

04.

020

02Te

ak

36

Page 37: NATIONAL FOREST PLANTATION DEVELOPMENT PROGRAMME … Annual Report... · The National Forest Plantation Development Programme (NFPDP) ... established plantations handed over to the

37

NO

.CO

MPA

NY

NAM

ERE

GIO

NDI

STRI

CTFO

REST

RES

ERVE

COM

PART

MEN

T/SE

RIES

AR

EA A

LLO

CATE

D (H

a)AR

EA P

LAN

TED-

2013

(Ha)

AREA

PLA

NTE

D TO

DA

TE (H

a)DA

TE O

F AL

LOCA

TIO

NSP

ECIE

S PL

ANTE

D

102

JOSB

OA

Cons

ultin

g Li

mite

dAs

hant

iM

ampo

ngCh

irim

fa20

, 21

273.

8810

.010

.09t

h Ap

ril, 2

013

Teak

103

Jose

ph A

ntw

i (Kw

ame

Amoa

h)As

hant

iM

ampo

ngCh

irim

fa82

118.

190.

010

.0-

Teak

104

Kwar

teng

Pla

ntat

ions

Asha

nti

Mam

pong

Chiri

mfa

394

.11.

09.

012

th D

ecem

ber,

2008

Teak

105

Kum

asi F

arm

s Com

plex

Asha

nti

Mam

pong

Chiri

mfa

2615

1.62

0.0

41.8

520

th F

ebru

ary,

200

6Te

ak10

6K-

Wus

s Ent

erpr

iseAs

hant

iM

ampo

ngCh

irim

fa27

140.

145.

065

.020

th A

pril,

200

7Te

ak

107

Kyer

emat

eng

Tiek

u &

Son

s Lt

dAs

hant

iM

ampo

ngCh

irim

fa19

100.

90.

065

.07t

h Ap

ril, 2

004

Teak

108

Mag

K E

nter

prise

Asha

nti

Mam

pong

Chiri

mfa

2214

2.17

10.0

75.0

20th

Apr

il, 2

007

Teak

109

Ony

ame

Tum

iso S

awm

ills

Asha

nti

Mam

pong

Chiri

mfa

1391

.65

0.0

43.6

4831

st D

ecem

ber,

2002

Teak

110

Rich

ard

Will

iam

Qua

ynor

Asha

nti

Mam

pong

Chiri

mfa

8815

7.54

0.0

90-

Teak

111

Vane

xx E

nter

prise

As

hant

iM

ampo

ngCh

irim

fa77

60.3

110

.010

.015

th F

ebru

ary,

201

2Te

ak11

2Ev

ans T

imbe

rs L

tdAs

hant

iM

ampo

ngPr

u Sh

elte

r bel

t6

148.

320.

058

2002

Teak

113

Jeed

-San

Far

ms

Asha

nti

Mam

pong

Pru

Shel

ter b

elt

3612

0.0

20.0

6920

09Te

ak11

4N

siah

Gyam

erah

Asha

nti

Mam

pong

Pru

Shel

ter b

elt

512

7.40

11.0

20.5

2009

Teak

115

Opm

anpo

k En

tAs

hant

iM

ampo

ngPr

u Sh

elte

r bel

t4

120.

00.

04.

023

rd Ja

nuar

y, 2

006

Teak

16U

nity

Affo

rest

atio

n an

d Tr

ee N

urse

ry P

roje

ctAs

hant

iM

ampo

ngPr

u Sh

elte

r bel

t39

, 44

221.

4230

.012

520

th M

ay, 2

005

Teak

117

Abaa

scom

Ent

Ltd

Asha

nti

Nka

wie

Desir

i11

415

2.5

0.0

6424

th D

ecem

ber,

2002

Cedr

ela,

Tea

k11

8Du

ncan

Will

iam

sAs

hant

iN

kaw

ieDe

siri

3992

.70.

00

-

119

GAC

(Nan

a Ad

u Kw

aben

a Ga

brie

l Co.

Ltd

)As

hant

iN

kaw

ieDe

siri

88, 1

08, 1

1338

5.0

0.0

385

24th

Feb

ruar

y, 2

003

Cedr

ela,

Tea

k

120

Gree

nfie

lds P

lant

atio

ns

Lim

ited/

Sca

nsty

leAs

hant

iN

kaw

ieDe

siri

63,7

2,73

,81,

82,

91,9

2, 1

03, 1

1735

9.9

0.0

29.4

-Ce

drel

a, T

eak

37

Page 38: NATIONAL FOREST PLANTATION DEVELOPMENT PROGRAMME … Annual Report... · The National Forest Plantation Development Programme (NFPDP) ... established plantations handed over to the

38

NO

.CO

MPA

NY

NAM

ERE

GIO

NDI

STRI

CTFO

REST

RES

ERVE

COM

PART

MEN

T/SE

RIES

AR

EA A

LLO

CATE

D (H

a)AR

EA P

LAN

TED-

2013

(Ha)

AREA

PLA

NTE

D TO

DA

TE (H

a)DA

TE O

F AL

LOCA

TIO

NSP

ECIE

S PL

ANTE

D

121

Opa

nin

Twen

e Kw

ame

Com

pany

Ltd

.As

hant

iN

kaw

ieDe

siri

9,10

292.

020.

088

.019

84 ?

Waw

a,

Man

zoni

a,

Odu

m, E

dina

m,

Util

e,

Mah

ogan

y,

Ofr

am, O

nyin

a,

Akat

a,

Asan

fina,

Hy

edua

kyen

kye

n, T

eak,

Sap

ele,

O

tie, C

edre

la,

Teak

, Em

ire

122

TSL

(Tep

a &

Tec

him

an

Saw

mill

s Ltd

) As

hant

iN

kaw

ieDe

siri

89, 9

025

6.0

0.0

76.0

-Ce

drel

a, T

eak

123

ADK

Tim

bers

Co.

Ltd

Asha

nti

Nka

wie

Jimira

1812

8.0

0.0

44.0

-Ce

drel

a, T

eak

124

Akw

asi A

gyei

& O

puku

Ti

mbe

rs (K

AGO

)As

hant

iN

kaw

ieJim

ira8

128.

00.

060

.06t

h Ja

nuar

y, 2

004

Cedr

ela,

Tea

k

125

Bena

kuf T

imbe

r and

Tr

adin

gAs

hant

iN

kaw

ieJim

ira15

99.9

20.

025

2004

Cedr

ela,

Tea

k

126

May

brob

Co.

Ltd

/

Ce

ntra

l Mar

ket F

olks

line

Wom

en's

Asso

ciat

ion

Asha

nti

Nka

wie

Jimira

5,

7&

42, 4

0&44

683.

110.

022

1.0

23rd

Mar

ch, 2

004

6th

Janu

ary,

200

4?

15th

June

, 200

4Ce

drel

a, T

eak

OAE

K (O

duro

Ana

ne E

nt.)

Asha

nti

Nka

wie

Jimira

1412

8.0

0.0

40.0

23rd

Mar

ch, 2

004

22

nd D

ecem

ber,

2004

?Ce

drel

a, T

eak

OAE

K (O

duro

Ana

ne E

nt.)

Asha

nti

Nka

wie

Jimira

3812

8.0

0.0

45.0

2004

Cedr

ela,

Tea

k

128

Ose

i Tut

u (O

.T) B

roth

ers

Ltd

Asha

nti

Nka

wie

Jimira

1312

8.0

0.0

75.0

23rd

Janu

ary,

200

4Ce

drel

a, T

eak

129

SKO

D Ti

mbe

rsAs

hant

iN

kaw

ieJim

ira22

, 26,

30

384.

00.

05.

023

rd Ja

nuar

y, 2

003

Cedr

ela,

Teak

130

TSL

(Tep

a &

Tec

him

an

Saw

mill

s Ltd

) As

hant

iN

kaw

ieJim

ira32

129.

70.

030

.03r

d Ju

ne, 2

004

Cedr

ela,

Tea

k

131

Woo

d Pi

llar

Asha

nti

Nka

wie

Jimira

912

8.0

0.0

5.0

16th

Dec

embe

r, 20

04

132

Logw

ood

Indu

strie

s Li

mite

dAs

hant

iN

kaw

ieJim

ira

3312

8.0

0.0

4.0

2004

Cedr

ela,

Tea

k

127

38

Page 39: NATIONAL FOREST PLANTATION DEVELOPMENT PROGRAMME … Annual Report... · The National Forest Plantation Development Programme (NFPDP) ... established plantations handed over to the

39

NO

.CO

MPA

NY

NAM

ERE

GIO

NDI

STRI

CTFO

REST

RES

ERVE

COM

PART

MEN

T/SE

RIES

AR

EA A

LLO

CATE

D (H

a)AR

EA P

LAN

TED-

2013

(Ha)

AREA

PLA

NTE

D TO

DA

TE (H

a)DA

TE O

F AL

LOCA

TIO

NSP

ECIE

S PL

ANTE

D

133

Bibi

ani L

oggi

ng a

nd

Lum

ber C

ompa

ny L

imite

dAs

hant

iN

kaw

ieJim

ira E

xten

sion

19,2

0,23

,24

406.

730.

012

8.0

-Ce

drel

a, T

eak

134

City

Vie

w C

ompa

ny L

td

(CVC

)As

hant

iN

kaw

ieJim

ira E

xten

sion

2112

8.0

0.0

128.

010

th D

ecem

ber,

2004

Cedr

ela,

Tea

k,

Ceib

a (s

pars

ely)

135

N&

B Li

nk T

imbe

r Com

pany

Li

mite

dAs

hant

iN

kaw

ieJim

ira E

xten

sion

17, 2

025

6.0

0.0

49.0

8th

June

, 200

4Ce

drel

a, T

eak

136

Nan

a O

sei A

koto

Asha

nti

Nka

wie

Tint

e Be

po86

, 90

143.

50.

00.

020

08N

/A13

7Ah

wia

a W

ood

Prod

ucts

Asha

nti

Offi

nso

Afra

m H

eadw

ater

s33

, 35,

101

380.

00.

020

9.0

1996

Cedr

ela,

Tea

k

138

Asso

ciat

ion

for

Cons

erva

tion

and

Deve

lopm

ent

Asha

nti

Offi

nso

Afra

m H

eadw

ater

s69

100.

00.

025

.0-

Teak

139

Ben

'O' I

nves

tmen

ts L

tdAs

hant

iO

ffins

oAf

ram

Hea

dwat

ers

5, 1

2417

9.0

0.0

75.0

18th

Mar

ch, 2

005

Cedr

ela,

Tea

k14

0Ev

ans T

imbe

rs L

tdAs

hant

iO

ffins

oAf

ram

Hea

dwat

ers

107,

108

205.

990.

017

0.0

1999

Teak

141

Grow

Tea

kAs

hant

iO

ffins

oAf

ram

Hea

dwat

ers

7412

8.0

0.0

42.0

2003

Teak

142

Hon.

Baf

four

Kes

e-

Aman

kwaa

Asha

nti

Offi

nso

Afra

m H

eadw

ater

s10

612

8.00

0.0

0.0

8th

Mar

ch, 2

013

N/A

143

JOJA

YKO

Ent

erpr

iseAs

hant

iO

ffins

oAf

ram

Hea

dwat

ers

95, 1

2020

5.61

15.0

15.0

4th

Nov

embe

r, 20

12Te

ak14

4K.

B.K

Tim

bers

Asha

nti

Offi

nso

Afra

m H

eadw

ater

s92

40.3

80.

040

.38

-Te

ak14

5Kw

aduk

off C

o. L

tdAs

hant

iO

ffins

oAf

ram

Hea

dwat

ers

102

111.

9110

.070

.020

03Te

ak

146

Logw

ood

Indu

strie

s Li

mite

dAs

hant

iO

ffins

oAf

ram

Hea

dwat

ers

3410

0.0

0.0

50.0

2003

Teak

, Ced

rela

147

Mer

e Pl

anta

tions

Lim

ited

Asha

nti

Offi

nso

Afra

m H

eadw

ater

s

12-1

4,17

-23,

29-

31,1

12-1

14,1

16-

118;

41

,43,

45,4

7,80

-86

,96-

100,

104,

105

4,07

8.50

347.

015

19.5

5th

Janu

ary,

200

7Te

ak14

8Be

n Dw

omo

Asha

nti

Offi

nso

Afre

nsu

Broh

uma

23,2

4,25

,26

518.

480.

089

.0-

149

Diab

y Le

asin

g Co

mpa

ny

Lim

ited

Asha

nti

Offi

nso

Afre

nsu

Broh

uma

9,10

279.

720

45.0

135.

07t

h Ja

n. 2

004

21st

Mar

ch, 2

010

Teak

150

FORM

Gha

na L

tdAs

hant

iO

ffins

oAf

rens

u Br

ohum

a

8,12

,19,

20,2

1,2

2,

27,2

8,29

,32,

33,

34, 3

517

78.1

30.

017

78.1

291s

t Sep

tem

ber,

2012

?

Teak

, Cei

ba,

Mah

ogan

y,

Albi

zia, O

fram

, Em

ire, K

ola,

Ko

krod

ua,

Potr

adom

151

HABI

TAT

TIM

BERS

Asha

nti

Offi

nso

Afre

nsu

Broh

uma

4612

5.0

0.0

100.

0

39

Page 40: NATIONAL FOREST PLANTATION DEVELOPMENT PROGRAMME … Annual Report... · The National Forest Plantation Development Programme (NFPDP) ... established plantations handed over to the

40

NO

.CO

MPA

NY

NAM

ERE

GIO

NDI

STRI

CTFO

REST

RES

ERVE

COM

PART

MEN

T/SE

RIES

AR

EA A

LLO

CATE

D (H

a)AR

EA P

LAN

TED-

2013

(Ha)

AREA

PLA

NTE

D TO

DA

TE (H

a)DA

TE O

F AL

LOCA

TIO

NSP

ECIE

S PL

ANTE

D

152

Mic

hael

Lar

biAs

hant

iO

ffins

oAf

rens

u Br

ohum

a47

124.

430.

090

.016

th M

arch

, 201

0Te

ak

153

Nex

t Doo

r Far

ms

Asha

nti

Offi

nso

Afre

nsu

Broh

uma

4912

6.14

0.0

50.0

24th

Feb

ruar

y, 2

012

Teak

154

SUN

STEX

Asha

nti

Offi

nso

Afre

nsu

Broh

uma

11, 1

2, 1

4, 1

5,

17, 4

1, 4

2A,

42B,

43,

44,

45

A, 4

5B, 5

0A,

51A,

52A

, 53,

55

, 56

2,20

0.0

0.0

237.

0-

Teak

155

Uni

ty A

ffore

stat

ion

and

Tree

Nur

sery

Pro

ject

Asha

nti

Offi

nso

Afre

nsu

Broh

uma

30, 3

124

8.70

10.0

228.

405t

h M

arch

, 200

5Te

ak

156

Ahm

ed S

ulem

an F

arm

s &

Com

pany

Lim

ited

Asha

nti

Offi

nso

Asub

ima

15, 1

6, 1

7, 1

8,

19, 2

4,25

,26

1,12

8.27

0.0

1000

-Te

ak, C

assia

157

Colo

nel R

.K O

poku

Adu

sei

Asha

nti

Offi

nso

Asub

ima

5612

8.0

0.0

50.0

20th

Feb

ruar

y, 2

006

Teak

158

Form

Gha

na L

td

Asha

nti

Offi

nso

Asub

ima

1,2,

3,4,

5,6,

7,8,

9,10

,11,

12,1

3,2

7,28

1776

.50

0.0

1776

.498

30th

Oct

. 200

7

Teak

, Cei

ba,

Mah

ogan

y,

Albi

zia, O

fram

, Em

ire, K

ola,

Ko

krod

ua,

Potr

adom

159

Sule

man

Tw

i Far

ms

Asha

nti

Offi

nso

Asub

ima

61, 6

227

0.16

0.0

-

160

Inte

rnat

iona

l See

d Ce

ntre

Asha

nti

Offi

nso

Asuf

u Ea

st7,

825

6.0

0.0

28.0

-Ce

drel

a, T

eak

161

Kwak

u Po

ku T

imbe

rs L

tdAs

hant

iO

ffins

oAs

ufu

East

4,5

255.

270.

019

5.0

7th

Janu

ary,

200

4Ce

drel

a, T

eak

162

Nku

nim

Ven

ture

sAs

hant

iO

ffins

oAs

ufu

East

613

5.0

0.0

135.

0-

Pred

omin

antly

te

ak, O

fram

, W

awa

163

Offi

n Ti

mbe

rs &

Co

nstr

uctio

n Co

. Ltd

(O

.T.C

.C)

Asha

nti

Offi

nso

Asuf

u W

est

Shel

terb

elt

18 &

19

256

10.0

30.0

4th

Sept

embe

r, 20

04Ce

drel

a, T

eak

164

Sarb

eng

Lim

ited

Asha

nti

Offi

nso

Asuf

u W

est

16, 1

725

6.0

10.0

175.

0

13th

Janu

ary,

200

4;

10th

Sep

tem

ber,

2004

Cedr

ela,

Tea

k

165

Adu-

Gya

mfi

Farm

s As

hant

iO

ffins

oKw

amisa

5514

1.45

0.0

141.

4524

Dec

embe

r, 20

01Te

ak

40

96.3

Page 41: NATIONAL FOREST PLANTATION DEVELOPMENT PROGRAMME … Annual Report... · The National Forest Plantation Development Programme (NFPDP) ... established plantations handed over to the

41

NO

.CO

MPA

NY

NAM

ERE

GIO

NDI

STRI

CTFO

REST

RES

ERVE

COM

PART

MEN

T/SE

RIES

AR

EA A

LLO

CATE

D (H

a)AR

EA P

LAN

TED-

2013

(Ha)

AREA

PLA

NTE

D TO

DA

TE (H

a)DA

TE O

F AL

LOCA

TIO

NSP

ECIE

S PL

ANTE

D

166

Aido

o N

tim F

arm

sAs

hant

iO

ffins

oKw

amisa

5415

4.04

0.0

90.0

24 D

ecem

ber,

2001

Teak

167

ASA

BEA

Ente

rpris

eAs

hant

iO

ffins

oKw

amisa

2412

5.45

22.0

115.

0Te

ak

168

Asan

te W

iredu

&

Asso

ciat

esAs

hant

iO

ffins

oKw

amisa

215

0.17

0.0

150.

172

8th

Janu

ary,

200

4Te

ak

169

Asan

tew

aa E

nter

prise

Li

mite

dAs

hant

iO

ffins

oKw

amisa

52, 3

425

7.76

63.7

6425

7.76

4

31st

Dec

embe

r, 20

02 8

th Ja

nuar

y,

2004

Teak

170

Asot

ia B

oaky

e Co

mpa

ny

Lim

ited

Asha

nti

Offi

nso

Kwam

isa39

129.

40.

010

0.0

10th

Janu

ary,

200

5Te

ak

171

Assa

kyiri

Tim

bers

and

W

ood

Prod

ucts

Asha

nti

Offi

nso

Kwam

isa56

128.

00.

030

.026

th M

arch

, 200

3Te

ak

172

Will

iam

K. A

sum

adu

&

Mar

gare

t A. K

wab

ia

Asha

nti

Offi

nso

Kwam

isa30

112.

29.

072

.4-

Teak

173

B.Y

Ofo

ri Fr

impo

ngAs

hant

iO

ffins

oKw

amisa

2016

1.95

12.6

29.6

024

th F

ebru

ary,

200

9Te

ak

174

Boad

u Ay

eboa

fo (O

sei

Kojo

Tim

bers

)As

hant

iO

ffins

oKw

amisa

4613

6.21

18.0

110.

020

th D

ecem

ber,

20

02Te

ak

175

Bonf

rim B

usin

ess S

ervi

ces

Asha

nti

Offi

nso

Kwam

isa51

133.

160.

013

0.0

20th

Dec

embe

r, 20

02Ce

drel

a, T

eak

176

Char

les A

man

kwah

Asha

nti

Offi

nso

Kwam

isa44

129.

1442

.612

4.0

-Te

ak17

7Cl

assic

Far

ms C

o. L

tdAs

hant

iO

ffins

oKw

amisa

4812

0.20

32.0

118.

016

th M

ay, 2

005

Teak

178

CWC

Vent

ures

Lim

ited

Asha

nti

Offi

nso

Kwam

isa49

114.

930.

011

4.93

11s

t Sep

tem

ber,

2005

Teak

179

D&G

Cons

ults

As

hant

iO

ffins

oKw

amisa

4013

5.0

85.0

135.

025

th O

ctob

er, 2

007

Teak

180

Zyph

er C

onsu

ltAs

hant

iO

ffins

oKw

amisa

4313

0.2

40.0

120.

0Te

ak

181

Egha

n &

Egh

an

Inve

stm

ents

Lim

ited

Asha

nti

Offi

nso

Kwam

isa57

149.

530.

014

9.53

21st

Dec

embe

r, 20

11 1

0th

Janu

ary,

20

05Te

ak

182

EL-S

ARP

Uni

que

Com

pany

Li

mite

dAs

hant

iO

ffins

oKw

amisa

4710

0.0

0.0

100.

020

th D

ecem

ber,

2002

Teak

183

Euro

pe A

uto

and

Euro

pe

Farm

s Ltd

Asha

nti

Offi

nso

Kwam

isa36

, 37

260.

440.

026

0.43

58t

h Ja

nuar

y, 2

004

Teak

, Em

ire,

Ofr

am,

Twea

pia

184

Faus

tina

Kusi

Tim

ber C

o.

Ltd

Asha

nti

Offi

nso

Kwam

isa42

128.

00.

080

.020

th Ja

nuar

y 20

04Te

ak

185

Flor

art V

entu

res L

imite

dAs

hant

iO

ffins

oKw

amisa

1817

8.23

0.0

169.

3210

th Ja

nuar

y, 2

005

10

th?

or 1

2th?

Teak

41

Page 42: NATIONAL FOREST PLANTATION DEVELOPMENT PROGRAMME … Annual Report... · The National Forest Plantation Development Programme (NFPDP) ... established plantations handed over to the

42

NO

.CO

MPA

NY

NAM

ERE

GIO

NDI

STRI

CTFO

REST

RES

ERVE

COM

PART

MEN

T/SE

RIES

AR

EA A

LLO

CATE

D (H

a)AR

EA P

LAN

TED-

2013

(Ha)

AREA

PLA

NTE

D TO

DA

TE (H

a)DA

TE O

F AL

LOCA

TIO

NSP

ECIE

S PL

ANTE

D

186

Gorb

ros V

entu

res

Asha

nti

Offi

nso

Kwam

isa50

162.

170.

012

8.0

24th

Dec

embe

r, 20

02Te

ak, C

edre

la

187

Hon.

And

rew

s Adj

ei

Yebo

ahAs

hant

iO

ffins

oKw

amisa

3286

.52

10.0

30.0

Aug-

08Te

ak, C

edre

la18

8Is

aac

Opo

ku B

oate

ngAs

hant

iO

ffins

oKw

amisa

312

0.0

0.0

85.0

6th

Janu

ary,

200

4

189

JOB

CON

STRU

CT G

hana

Lt

dAs

hant

iO

ffins

oKw

amisa

2296

.99

0.0

96.9

9220

th F

ebru

ary,

200

6Te

ak

190

KAP

Farm

s Ent

erpr

ise

Lim

ited

Asha

nti

Offi

nso

Kwam

isa33

, 61

208.

790.

020

8.79

4

8th

Janu

ary,

200

4,

31st

Dec

embe

r, 20

02Te

ak19

1Ke

n Bo

atAs

hant

iO

ffins

oKw

amisa

5912

8.0

0.0

100.

0Te

ak

192

King

sley

Agye

i Agy

ekum

Asha

nti

Offi

nso

Kwam

isa23

128.

00.

041

.025

th O

ctob

er, 2

007

Teak

193

Kwad

ukof

f Co.

Ltd

Asha

nti

Offi

nso

Kwam

isa19

119.

2510

.075

.0-

Teak

194

Ora

ns L

ife L

tdAs

hant

iO

ffins

oKw

amisa

35,4

117

5.61

0.0

160.

06t

h Ja

nuar

y, 2

004

Teak

195

Ose

i Agy

eman

g Ba

duAs

hant

iO

ffins

oKw

amisa

5816

3.37

0.0

163.

37-

Teak

, Ofr

am19

6O

TK F

arm

sAs

hant

iO

ffins

oKw

amisa

2689

.11

0.0

62.4

01/0

2/20

07

197

Paul

Kw

asi (

P.K)

For

son

Asha

nti

Offi

nso

Kwam

isa38

129.

551.

548

129.

548

7th

Janu

ary,

200

4

Teak

, Ced

rela

pl

us o

ne

indi

geno

us

198

SEN

S PR

OGR

AMAs

hant

iO

ffins

oKw

amisa

2512

8.0

0.0

128.

023

rd Ja

nuar

y, 2

006

Teak

199

Soak

Far

ms &

Tra

ding

Ent

Asha

nti

Offi

nso

Kwam

isa53

, 60

253.

210.

025

3.20

631

st D

ecem

ber,

2002

200

Vica

lex

Craf

ts L

tdAs

hant

iO

ffins

oKw

amisa

4512

8.0

0.0

10.0

10th

Apr

il, 2

003

Teak

201

ANTI

CO W

ood

Asha

nti

Offi

nso

Man

kran

g29

,30

256.

00.

070

.011

th D

ecem

ber,

2002

202

BODU

KWAN

Far

ms

Asha

nti

Offi

nso

Man

kran

g

18-2

3;26

-28

;31,

52-5

5;

61

-63;

65-

672,

548.

00.

017

th Ja

mua

ry, 2

013

203

Cam

ba T

imbe

rsAs

hant

iO

ffins

oM

ankr

ang

1513

0.0

0.0

30.0

-Ce

drel

a, T

eak

204

Esaa

se W

ood

Prod

ucts

Li

mite

dAs

hant

iO

ffins

oM

ankr

ang

46,4

725

6.0

0.0

120.

028

th Ja

nuar

y, 2

004

20th

Janu

ary,

200

3

205

Glob

al B

ambo

o Pr

oduc

ts

Ltd

Asha

nti

Offi

nso

Man

kran

g39

126.

790.

030

.08t

h Ja

n. 2

003

Bam

boo,

Tea

k

206

K.A.

G Ti

mbe

rsAs

hant

iO

ffins

oM

ankr

ang

4,16

241.

610.

012

3.0

20th

Janu

ary,

200

3

207

Nat

ion

Build

ers'

Lim

ited

Asha

nti

Offi

nso

Man

kran

g24

100.

00.

010

0.0

8th

Janu

ary,

200

3Te

ak

42

Page 43: NATIONAL FOREST PLANTATION DEVELOPMENT PROGRAMME … Annual Report... · The National Forest Plantation Development Programme (NFPDP) ... established plantations handed over to the

43

NO

.CO

MPA

NY

NAM

ERE

GIO

NDI

STRI

CTFO

REST

RES

ERVE

COM

PART

MEN

T/SE

RIES

AR

EA A

LLO

CATE

D (H

a)AR

EA P

LAN

TED-

2013

(Ha)

AREA

PLA

NTE

D TO

DA

TE (H

a)DA

TE O

F AL

LOCA

TIO

NSP

ECIE

S PL

ANTE

D

208

Roy

C C

ompa

ny L

tdAs

hant

iO

ffins

oM

ankr

ang

3,6

384.

00.

075

31st

Dec

embe

r, 20

02Te

ak

209

Uni

ty A

ffore

stat

ion

and

Tree

Nur

sery

Pro

ject

Asha

nti

Offi

nso

Man

kran

g

Port

ions

of 1

, 15

, 57,

58

214.

620.

021

4.61

927

th A

ugus

t, 20

05?

8t

h Ja

nuar

y, 2

004

?

Wat

apuo

, Ky

enky

en,

Gmel

ina,

Al

bizia

, M

ahog

any,

W

awa,

Ofr

am,

Cedr

ela

210

Eben

ezer

Am

arkw

ei

Lary

eaAs

hant

iO

ffins

oO

pro

Rive

r95

141.

430.

00.

08t

h Ju

ly, 2

013

N/A

211

Evan

s Tim

bers

Ltd

Asha

nti

Offi

nso

Opr

o Ri

ver

19, 2

2, 7

3, 7

448

8.0

0.0

178.

020

02

212

Grow

For

est L

tdAs

hant

iO

ffins

oO

pro

Rive

r97

116.

720.

00.

020

th F

ebru

ary,

201

3N

/A

213

Iron

Mas

ters

Com

pany

Ltd

Asha

nti

Offi

nso

Opr

o Ri

ver

9212

9.82

0.0

0.0

20th

Feb

ruar

y, 2

013

N/A

214

JOB

CON

STRU

CT G

hana

Lt

dAs

hant

iO

ffins

oO

pro

Rive

r91

117.

5650

.050

.020

13

215

Joe

Sala

Saw

mill

Ltd

Asha

nti

Offi

nso

Opr

o Ri

ver

93,9

424

4.77

10.0

220.

031

st D

ecem

ber,

2002

Teak

, Ofr

am,

Mah

ogan

y,

Cedr

ela

216

J.Y.V

Co.

Ltd

Asha

nti

Offi

nso

Opr

o Ri

ver

9612

1.96

0.0

0.0

8th

Febr

uary

, 201

3N

/A

217

Kwam

e-Bi

Kuf

four

Tim

ber

Co. L

td

Asha

nti

Offi

nso

Opr

o Ri

ver

9812

8.0

5.0

65.0

11th

Aug

ust,

2003

Cedr

ela

218

Gree

nfie

lds P

lant

atio

ns

Lim

ited/

Ayum

Bron

g Ah

afo

Bech

emBo

som

kese

16-2

0, 4

9A &

49

B80

6.0

28.0

422

-

Cedr

ela,

Cei

ba,

Man

soni

a,

Ofr

am, U

tile,

M

ahog

any,

W

awa,

Otie

, O

dum

, Kus

ia,

Kokr

odua

43

Page 44: NATIONAL FOREST PLANTATION DEVELOPMENT PROGRAMME … Annual Report... · The National Forest Plantation Development Programme (NFPDP) ... established plantations handed over to the

44

NO

.CO

MPA

NY

NAM

ERE

GIO

NDI

STRI

CTFO

REST

RES

ERVE

COM

PART

MEN

T/SE

RIES

AR

EA A

LLO

CATE

D (H

a)AR

EA P

LAN

TED-

2013

(Ha)

AREA

PLA

NTE

D TO

DA

TE (H

a)DA

TE O

F AL

LOCA

TIO

NSP

ECIE

S PL

ANTE

D

219

Gree

nfie

lds P

lant

atio

ns

Lim

ited/

Ayum

Bron

g Ah

afo

Dorm

aaM

pam

eso

3, 4

, 5, 6

, 7, 9

, 10

, 11,

12,

13,

14

, 15,

25,

26,

27

, 180

, 181

, 18

2, 1

83, 1

84,

214,

215

, 223

, 22

4, 2

25, 2

26,

227,

228

, 229

, 22

9A, 2

40, 2

41,

242,

243

, 244

, 24

5, 2

46, 2

47,

248

4,99

2.0

157.

010

10.4

5-

Cedr

ela,

Ofr

am,

Mah

ogan

y,

Edin

am, W

awa,

Em

ire,

Kyen

kyen

, U

tile,

M

anso

nia,

Otie

, Ko

krod

ua,

Ony

ina,

Sen

na

siam

ea

220

Adam

s Far

ms

Bron

g Ah

afo

Dorm

aaPa

mu

Bere

kum

6914

0.0

0.0

807t

h M

arch

, 200

6Te

ak

221

Agya

kwa

Anya

ne &

Cha

rity

Tim

bers

Bron

g Ah

afo

Dorm

aaPa

mu

Bere

kum

9650

.00.

010

.010

th M

ay, 2

005

Teak

222

AKAB

ELS

Bron

g Ah

afo

Dorm

aaPa

mu

Bere

kum

121,

134

100.

00.

050

.024

th D

ecem

ber,

2002

Teak

223

Akua

Afr

iyie

Br

ong

Ahaf

oDo

rmaa

Pam

u Be

reku

m64

,65,

66,6

750

0.0

0.0

40.0

2002

Teak

224

Alex

ande

r Tak

yi T

imbe

rs

(ATT

S)Br

ong

Ahaf

oDo

rmaa

Pam

u Be

reku

m48

, 49,

50,

(54)

, 55

, 56,

62,

6310

00.0

10.0

185.

020

03 T

eak

225

Arth

ur F

arm

sBr

ong

Ahaf

oDo

rmaa

Pam

u Be

reku

m12

412

0.0

0.0

5.0

23rd

Janu

ary,

200

7 T

eak

226

Asom

a &

Fam

ily P

lant

atio

nBr

ong

Ahaf

oDo

rmaa

Pam

u Be

reku

m71

120.

00.

05.

020

01 T

eak

227

Asuo

wam

Com

plex

Bron

g Ah

afo

Dorm

aaPa

mu

Bere

kum

86,8

7,88

,100

480.

00.

010

0.0

2003

Tea

k 22

8AT

BED

Com

pany

Lim

ited

Bron

g Ah

afo

Dorm

aaPa

mu

Bere

kum

9212

5.0

0.0

80.0

7th

May

, 200

4Te

ak

229

Baah

(Abe

na K

wab

ena)

Bron

g Ah

afo

Dorm

aaPa

mu

Bere

kum

40,4

1,46

,47,

5374

0.0

0.0

60.0

2004

Teak

230

Baffo

ur A

sam

oah

& S

ons

Bron

g Ah

afo

Dorm

aaPa

mu

Bere

kum

130

130.

00.

030

.08t

h Ja

nuar

y, 2

004

Teak

231

Conc

erne

d Ci

tizen

Br

ong

Ahaf

oDo

rmaa

Pam

u Be

reku

m21

57.8

70.

027

.020

02Te

ak23

2De

lta-K

Ltd

& R

emor

geBr

ong

Ahaf

oDo

rmaa

Pam

u Be

reku

m13

1, 1

3250

0.0

0.0

150.

09t

h Ap

ril, 2

001

Teak

233

Dorm

aa F

ores

try

Inte

rnat

iona

l (Gl

obal

Gr

een)

Bron

g Ah

afo

Dorm

aaPa

mu

Bere

kum

5, 6

, 7, 8

, 19,

20

Port

ions

(9, 1

2,

13, 1

8, 8

0)

1,62

8.55

0.0

240.

028

th F

ebru

ary,

200

1Te

ak23

4ZO

IL S

ervi

ces L

imite

dBr

ong

Ahaf

oDo

rmaa

Pam

u Be

reku

m97

,98,

99, 1

241,

000.

00.

00.

020

1423

5Ho

n. Y

aw A

fful

Bron

g Ah

afo

Dorm

aaPa

mu

Bere

kum

123

128.

010

.012

.020

05Te

ak44

Page 45: NATIONAL FOREST PLANTATION DEVELOPMENT PROGRAMME … Annual Report... · The National Forest Plantation Development Programme (NFPDP) ... established plantations handed over to the

45

NO

.CO

MPA

NY

NAM

ERE

GIO

NDI

STRI

CTFO

REST

RES

ERVE

COM

PART

MEN

T/SE

RIES

AR

EA A

LLO

CATE

D (H

a)AR

EA P

LAN

TED-

2013

(Ha)

AREA

PLA

NTE

D TO

DA

TE (H

a)DA

TE O

F AL

LOCA

TIO

NSP

ECIE

S PL

ANTE

D

236

JOW

AK E

nter

prise

Lim

ited

Bron

g Ah

afo

Dorm

aaPa

mu

Bere

kum

113,

128

1,00

0.0

0.0

165.

029

th Ja

nuar

y, 2

001

Teak

237

Kym

a Pl

anta

tions

Bron

g Ah

afo

Dorm

aaPa

mu

Bere

kum

136

200.

05.

060

.022

nd M

arch

, 200

7Te

ak

238

Mire

ku C

ompl

ex L

imite

d Br

ong

Ahaf

oDo

rmaa

Pam

u Be

reku

m11

110

5.0

0.0

0.0

2012

-

239

Mor

ricom

Com

pany

Li

mite

dBr

ong

Ahaf

oDo

rmaa

Pam

u Be

reku

m13

525

9.70

15.0

79.7

07t

h Ja

nuar

y, 2

004

Teak

240

Nan

a Ko

rdie

Yeb

oah

II (D

orm

aa A

duan

ahen

e)Br

ong

Ahaf

oDo

rmaa

Pam

u Be

reku

m37

100.

00.

00.

020

12 -

241

Obo

ade

Farm

sBr

ong

Ahaf

oDo

rmaa

Pam

u Be

reku

m38

128.

00.

00.

014

th O

ctob

er, 2

013

-

242

Ohe

nba

K.D.

Fou

ndat

ion

Bron

g Ah

afo

Dorm

aaPa

mu

Bere

kum

4350

.00.

020

.08t

h Ja

nuar

y, 2

004

Teak

243

Om

anba

Sol

utio

ns L

tdBr

ong

Ahaf

oDo

rmaa

Pam

u Be

reku

m12

512

8.0

3.0

3.0

16th

Apr

il, 2

013

Teak

244

Orig

inal

Asa

se A

ban

Com

plex

Lim

ited

Bron

g Ah

afo

Dorm

aaPa

mu

Bere

kum

82, 8

310

00.

08.

09t

h Ja

nuar

y, 2

003

Teak

245

Osa

gyef

o O

sead

eyo

Agye

man

Bad

u II

(Dor

maa

hene

)Br

ong

Ahaf

oDo

rmaa

Pam

u Be

reku

m33

, 34

186.

9540

.040

.020

12Te

ak

246

Part

ners

Sus

tain

abili

ty

Lim

ited

Bron

g Ah

afo

Dorm

aaPa

mu

Bere

kum

118,

119,

120

500

0.0

10.0

7th

Janu

ary,

200

7Te

ak

247

Pegg

y Ad

dai

Bron

g Ah

afo

Dorm

aaPa

mu

Bere

kum

44, 4

550

05.

011

0.0

29th

Janu

ary,

200

2Te

ak

248

Pete

r Ans

u Ku

mih

Far

ms

Bron

g Ah

afo

Dorm

aaPa

mu

Bere

kum

7512

00.

011

.010

th M

arch

, 200

5Te

ak24

9Pr

asha

nti

Bron

g Ah

afo

Dorm

aaPa

mu

Bere

kum

94-9

864

00.

00.

07t

h Ju

ne, 2

013

N/A

250

Rosa

Com

pany

Lim

ited

Bron

g Ah

afo

Dorm

aaPa

mu

Bere

kum

70.0

128.

00.

070

.023

rd Ja

nuar

y, 2

003

Teak

251

Rura

l For

est E

nter

prise

Bron

g Ah

afo

Dorm

aaPa

mu

Bere

kum

23, 2

425

0.0

0.0

10.0

29th

Janu

ary,

200

2Te

ak25

2Sa

cred

Hea

rt F

arm

sBr

ong

Ahaf

oDo

rmaa

Pam

u Be

reku

m76

120.

00.

09.

010

th M

arch

, 200

5Te

ak25

3Tu

ah S

awm

ills &

Far

ms

Bron

g Ah

afo

Dorm

aaPa

mu

Bere

kum

25,2

6,27

309.

940.

010

0.0

2003

Teak

45

Page 46: NATIONAL FOREST PLANTATION DEVELOPMENT PROGRAMME … Annual Report... · The National Forest Plantation Development Programme (NFPDP) ... established plantations handed over to the

46

NO

.CO

MPA

NY

NAM

ERE

GIO

NDI

STRI

CTFO

REST

RES

ERVE

COM

PART

MEN

T/SE

RIES

AR

EA A

LLO

CATE

D (H

a)AR

EA P

LAN

TED-

2013

(Ha)

AREA

PLA

NTE

D TO

DA

TE (H

a)DA

TE O

F AL

LOCA

TIO

NSP

ECIE

S PL

ANTE

D

254

Gree

nfie

lds P

lant

atio

ns

Lim

ited/

Ayum

Bron

g Ah

afo

Suny

ani

Amam

a

6B,

7, 8

, 9, 1

0,

11, 1

2, 1

3, 1

4,

15, 1

6,17

, 18,

19

, 20,

21,

22,

23

, 24

3255

.00

0.0

3062

.0

-

Cedr

ela,

Ofr

am,

Ceib

a,

Mah

ogan

y,

Edin

am, W

awa,

Em

ire,

Kyen

kyen

, Ko

to, U

tile,

M

anso

nia,

Otie

, M

akor

e,

Asan

fina,

Ak

asa,

Odu

m,

Kokr

odua

, Eu

caly

ptus

, Pi

ne, C

assia

, M

angi

um,

Kusia

255

Gree

nfie

lds P

lant

atio

ns

Lim

ited/

Sca

nsty

leBr

ong

Ahaf

oSu

nyan

iAs

ukes

e33

, 34,

43

450.

000.

0-

256

Gree

nfie

lds P

lant

atio

ns

Lim

ited/

Ayum

Bron

g Ah

afo

Goas

oBi

a Sh

elte

rbel

t9,

14

260.

05.

021

7.0

24th

Oct

ober

, 200

8

Waw

a,

Mah

ogan

y,

Ofr

am, P

rono

o,

Kokr

odua

, O

dum

, Otie

, As

anfe

na,

Ony

ina

etc

257

Jam

es O

wus

u An

sah

Bron

g Ah

afo

Suny

ani

Saw

saw

311

9.24

0.0

0-

258

Atta

Kru

ffie

Ente

rpris

eBr

ong

Ahaf

oSu

nyan

iTa

in I

18,2

4,25

300.

00.

020

0.0

April

, 200

1Te

ak

259

Fran

co T

imbe

rsBr

ong

Ahaf

oSu

nyan

iTa

in I

11, 1

2, 1

3, 1

456

1.0

0.0

561.

025

th Ja

nuar

y, 2

001

Teak

260

Oti

Yebo

ah C

ompl

ex

Lim

ited

(OYC

L)Br

ong

Ahaf

oSu

nyan

iTa

in I

20, 2

1, 2

2, 2

6,

2753

3.0

0.0

329

14th

June

, 200

1.Te

ak

261

Abro

nye

Inve

stm

ent

Com

pany

Lim

ited

Bron

g Ah

afo

Suny

ani

Tain

II

305,

306

, 316

, 32

7, 3

28, 3

29,

330,

331

, 332

1,15

2.0

0.0

1082

.520

02Te

ak

46

Page 47: NATIONAL FOREST PLANTATION DEVELOPMENT PROGRAMME … Annual Report... · The National Forest Plantation Development Programme (NFPDP) ... established plantations handed over to the

47

NO

.CO

MPA

NY

NAM

ERE

GIO

NDI

STRI

CTFO

REST

RES

ERVE

COM

PART

MEN

T/SE

RIES

AR

EA A

LLO

CATE

D (H

a)AR

EA P

LAN

TED-

2013

(Ha)

AREA

PLA

NTE

D TO

DA

TE (H

a)DA

TE O

F AL

LOCA

TIO

NSP

ECIE

S PL

ANTE

D

262

Asuo

Bom

osad

u Ti

mbe

rs

& S

awm

ills L

imite

d (A

BTS)

Bron

g Ah

afo

Suny

ani

Tain

II

12,1

4,15

,16,

17,

18

,25,

26,2

7, &

Po

rtio

n of

13

(Pru

so) &

163,

16

4, 1

65, 1

75,

176,

177,

194

, 19

5 &

196

(N

amas

ua)

1,99

1.56

0.0

293.

8621

st S

epte

mbe

r, 20

01

Teak

, M

ahog

any,

Ce

drel

a, O

fram

, Ce

iba,

Em

ire

263

Form

Gha

na L

td (P

PP)

Bron

g Ah

afo

Suny

ani

Tain

II14

,596

.064

0.0

640.

0-

Teak

(d

omin

ant)

In

dige

nous

(s

pars

e)

264

Logs

and

Lum

ber L

imite

d

(LLL

)Br

ong

Ahaf

oSu

nyan

iTa

in II

207,

208

, 209

, 21

0, 2

11, 2

15,

216,

217

1211

.61

0.0

232

2006

Tea

k

265

Pace

woo

d Co

mpa

ny

Lim

ited

Bron

g Ah

afo

Suny

ani

Tain

II29

0, 2

91, 2

92,

308,

311

616.

230.

021

6.57

28th

Mar

ch, 2

003

Teak

266

Sida

kon

Woo

ds L

imite

dBr

ong

Ahaf

oSu

nyan

iTa

in II

201,

202,

203

356.

016

0.0

240.

020

11Te

ak26

7Fr

im-O

wus

u Li

mite

dBr

ong

Ahaf

oSu

nyan

iTa

in T

ribut

arie

s II

239

150.

00.

022

.020

11Te

ak

268

Mes

srs T

ropi

cal

Agric

ultu

ral M

arke

ting

and

Cons

ulta

ncy

Serv

ices

Cent

ral

Win

neba

Yenk

u F/

R,

Bl

ock

'B'

5-2

6 43

2.8

0.0

0.0

9th

Febr

uary

, 201

0

269

Atla

ntic

Dist

ribut

ion

East

ern

Akim

-Oda

Esen

Epa

m4,

1127

1.82

26.0

191.

115

th A

ugus

t, 20

05Ce

drel

a, O

fram

270

CEPA

COD

(Cen

ter f

or

Pove

rty

Alle

viat

ion

and

Com

mun

ity D

evel

opm

ent)

East

ern

Bego

roDe

de0.

00.

020

th D

ecem

ber,

2002

271

Miro

Nat

iona

l Int

eres

t Co

mpa

ny L

imite

d (M

IRO

-N

ICO

L)Ea

ster

nBe

goro

Dede

5,36

0.0

0.0

0.0

4th

May

, 200

9

272

Mik

e As

aam

(ACM

A Gr

oup)

East

ern

Bego

roSo

uthe

rn S

carp

87-9

0, 9

3-95

(A

hink

wa)

179.

510.

010

0.0

-

273

All Y

outh

Far

mer

s (N

GO)

East

ern

Bego

roSo

uthe

rn S

carp

-50

0.0

5.0

6th

Janu

ary,

200

4Ce

drel

a

47

Page 48: NATIONAL FOREST PLANTATION DEVELOPMENT PROGRAMME … Annual Report... · The National Forest Plantation Development Programme (NFPDP) ... established plantations handed over to the

48

NO

.CO

MPA

NY

NAM

ERE

GIO

NDI

STRI

CTFO

REST

RES

ERVE

COM

PART

MEN

T/SE

RIES

AR

EA A

LLO

CATE

D (H

a)AR

EA P

LAN

TED-

2013

(Ha)

AREA

PLA

NTE

D TO

DA

TE (H

a)DA

TE O

F AL

LOCA

TIO

NSP

ECIE

S PL

ANTE

D

274

Apst

ar E

nter

prise

East

ern

Bego

roSo

uthe

rn S

carp

51, 5

3, 5

4, 5

632

3.42

0.0

144.

09t

h Ja

nuar

y, 2

004

Teak

, Ced

rela

, O

dum

, Cei

ba,

Waw

a,

Ketr

eam

fo,

Ofr

am, E

mire

, M

ahog

any,

Ab

eko,

Ose

se,

Oda

nhom

a

275

Ever

gree

n Cl

ub o

f Gha

naEa

ster

nBe

goro

Sout

hern

Sca

rp1

50.0

0.0

50.0

-Te

ak, C

edre

la,

Ofr

am, E

mire

, Ca

ssia

276

Fore

st R

esea

rch

Inst

itute

of

Gha

na (F

ORI

G)Ea

ster

nBe

goro

Sout

hern

Sca

rp

Ahin

kwa

Serie

s

(C

lose

to F

arm

14

)50

.08.

050

.020

00O

fram

, Em

ire

277

Fore

st R

esea

rch

Inst

itute

of

Gha

na (F

ORI

G)Ea

ster

nBe

goro

Sout

hern

Sca

rpAp

aa S

erie

s

(2

05-2

06)

50.0

6.0

42.0

2000

Ofr

am, E

mire

278

Heal

th a

nd E

nviro

nmen

tal

Mon

itor

East

ern

Bego

roSo

uthe

rn S

carp

Pim

pim

so

Taun

gya

Serie

s50

.00.

040

.01s

t Mar

ch, 2

003

Teak

, Ced

rela

279

Kajo

a Fa

rms

East

ern

Bego

roSo

uthe

rn S

carp

1610

0.0

0.0

44.0

-

280

Kasa

prek

o Co

. Ltd

East

ern

Bego

roSo

uthe

rn S

carp

FRBP

234

-248

1000

.00.

030

0.0

26th

Feb

ruar

y, 2

003

Mah

ogan

y

281

Oda

Saw

mill

s/Pl

ywoo

d Ve

neer

Co.

Ltd

East

ern

Bego

roW

orob

ong

Sout

h64

,65

124.

00.

092

.01s

t Jan

uary

, 200

1

282

Ea

ster

nBe

goro

Wor

obon

g So

uth

47, 4

8,52

(P

ortio

n)13

.07

0.0

13.0

7-

283

Part

icip

ator

y Tr

opic

al

Fore

st D

evel

opm

ent b

y W

omen

in In

dige

nous

Co

mm

uniti

es

(PTF

DWIC

; 31s

t Dec

embe

r W

omen

's M

ovem

ent)

East

ern

Bego

roW

orob

ong

Sout

hFR

BP 7

8-79

800

0.0

650

2001

Emire

, Ofr

am,

Man

soni

a,

Ceib

a, T

eak,

Ce

drel

a,

Kyen

kyen

, Ed

inam

284

Trus

t Lin

kEa

ster

nM

prae

soN

kaw

anda

100

0.0

2020

06

48

Page 49: NATIONAL FOREST PLANTATION DEVELOPMENT PROGRAMME … Annual Report... · The National Forest Plantation Development Programme (NFPDP) ... established plantations handed over to the

49

NO

.CO

MPA

NY

NAM

ERE

GIO

NDI

STRI

CTFO

REST

RES

ERVE

COM

PART

MEN

T/SE

RIES

AR

EA A

LLO

CATE

D (H

a)AR

EA P

LAN

TED-

2013

(Ha)

AREA

PLA

NTE

D TO

DA

TE (H

a)DA

TE O

F AL

LOCA

TIO

NSP

ECIE

S PL

ANTE

D

285

BCS

Lim

ited

Nor

ther

n Sc

arp

FRBP

422

-44

of

0

286

Ahan

ns G

hana

Lim

ited

East

ern

Mpr

aeso

Sout

hern

Sca

rp

Pilla

rs 2

67 a

nd

150.

Kay

era

Villa

ge20

.00.

010

.06t

h Ju

ly, 2

005

Teak

, Ced

rela

287

Eben

ezer

B.C

Ent

erpr

iseEa

ster

nM

prae

soSo

uthe

rn S

carp

Pilla

rs 2

67 a

nd

150.

Nto

meo

20.0

0.0

10.0

6th

July

, 200

5Te

ak, C

edre

la28

8CF

SL F

arm

sEa

ster

nM

prae

soSo

uthe

rn S

carp

100.

010

.020

06

289

Colli

nsar

a &

Son

sEa

ster

nM

prae

soSo

uthe

rn S

carp

Dwer

ebea

se

Serie

s30

0.0

10.0

2004

290

Fene

boat

Ent

erpr

iseEa

ster

nM

prae

soSo

uthe

rn S

carp

5035

.020

03

291

Jet S

awm

ills L

imite

dEa

ster

nM

prae

soSo

uthe

rn S

carp

Dwer

ebea

se

Serie

s66

.30.

040

.0

292

Mos

ho E

nter

prise

Lim

ited

East

ern

Mpr

aeso

Sout

hern

Sca

rpPi

llars

267

and

15

0. N

tom

eo50

.00.

010

.011

th Ju

ly, 2

005

Teak

, Ced

rela

293

Mr.

Yaw

Baa

fiEa

ster

nM

prae

soSo

uthe

rn S

carp

FRBP

245

and

24

720

06

294

Sir H

okoe

Gha

na L

tdEa

ster

nM

prae

soSo

uthe

rn S

carp

Kaye

ra/O

buom

Vi

llage

50.0

0.0

25.0

6th

Janu

ary,

200

3Te

ak, C

edre

la29

5Gr

oman

Com

pany

Lim

ited

East

ern

Som

anya

Volta

Riv

er B

lock

IIAs

hite

y12

0.5

0.0

2.0

16th

July

, 200

9Te

ak29

6Lo

rdam

n Ve

ntur

esEa

ster

nSo

man

yaVo

lta R

iver

Blo

ck I

N/A

100.

00.

040

.014

th M

arch

, 200

7

297

Thriv

e En

terp

rise

Grea

ter A

ccra

Tem

a/Ad

aFi

anko

nya

1-6,

8-1

130

0.0

0.0

80.0

29th

Sep

tem

ber,

2005

Mah

ogan

y,

Euca

lypt

us, S

ilk

Cott

on

298

Alha

ji Is

saka

Far

ms L

tdN

orth

ern

Bole

Yera

da50

.00.

012

th Ja

nuar

y, 2

004

N/A

299

F A

Adva

nces

Nor

ther

nBo

leYe

rada

0.0

14th

May

, 201

2N

/A

300

Jaks

ally

Co.

Ltd

Nor

ther

nBo

leKe

nike

ni50

.00.

026

th Ja

nuar

y, 2

004

N/A

301

Jen

Kurig

e Se

idu

Adam

uN

orth

ern

Bole

Keni

keni

N/A

50.0

0.0

26th

Janu

ary,

200

4N

/A

302

Khan

zan

Wur

a (G

H) L

tdN

orth

ern

Bole

Keni

keni

N/A

50.0

0.0

9th

Janu

ary,

200

4N

/A

303

Sava

nnah

Inve

stm

ent

Lim

ited

Nor

ther

nBo

leKe

nike

niN

/A10

0.0

0.0

0.0

-N

/A

304

Jam

al '5

5' V

entu

res

Nor

ther

nBu

ipe/

Dam

ongo

Dam

ongo

Sca

rp49

.63

0.0

-N

/A30

5Af

ricoo

pVo

lta

Nkw

anta

Chai

Riv

erN

/A10

0.0

0.0

0.0

-N

/A30

6JO

WAK

Ent

erpr

ise L

imite

d

Nkw

anta

Chai

Riv

erN

/A5,

000.

00.

00.

016

th M

arch

, 201

2N

/A

49

Page 50: NATIONAL FOREST PLANTATION DEVELOPMENT PROGRAMME … Annual Report... · The National Forest Plantation Development Programme (NFPDP) ... established plantations handed over to the

50

NO

.CO

MPA

NY

NAM

ERE

GIO

NDI

STRI

CTFO

REST

RES

ERVE

COM

PART

MEN

T/SE

RIES

AR

EA A

LLO

CATE

D (H

a)AR

EA P

LAN

TED-

2013

(Ha)

AREA

PLA

NTE

D TO

DA

TE (H

a)DA

TE O

F AL

LOCA

TIO

NSP

ECIE

S PL

ANTE

D

307

Mes

srs N

oon

Esta

blish

men

t (N

ana

Ose

i Br

oni)

Wes

tern

Bi

bian

iAn

hwia

so E

ast

30,3

430

.85

0.0

10.0

2004

308

Sam

arte

x Ti

mbe

r and

Pl

yWoo

d Co

mpa

ny L

imite

dW

este

rn

Aow

in (E

nchi

)Ta

no N

imire

50,5

1,52

,53,

54,

74,7

5,76

,77

1405

.60.

028

0.0

3rd

Mar

ch, 2

003

Cedr

ela,

M

ahog

any,

Ce

iba,

Em

ire,

Ofr

am,

Nyi

ango

n,

Asan

fena

309

JCM

Wes

tern

Ju

abos

o-bi

aBi

a-Ta

wya

0.0

618.

018

th A

ugus

t, 19

99N

/A

310

JCM

Wes

tern

Ju

abos

o-bi

aM

anza

n0.

025

7.3

18th

Aug

ust,

1999

N/A

125

,700

.79

2,7

46.5

1

36,2

00.5

2 TO

TAL

50

35,490

.79

Page 51: NATIONAL FOREST PLANTATION DEVELOPMENT PROGRAMME … Annual Report... · The National Forest Plantation Development Programme (NFPDP) ... established plantations handed over to the

51

APPE

ND

IX 2

Regi

onFo

rest

Dis

tric

tFr

inge

Com

mun

ityFo

rest

Res

erve

Targ

etCo

mpa

rtm

ent

Num

ber

Repo

rted

Are

a Pl

ante

d (

Ha)

Verif

ied

Area

Pl

ante

d (H

a)

Perc

enta

ge

Surv

ival

%Sp

ecie

sSp

acin

g

94 (p

lot A

)30

.00

30.7

878

Teak

3X3

95 (p

lot B

)14

.45

14.4

595

Teak

3X3

49 (p

lot A

1)17

.55

75Te

ak3X

349

(plo

t A2)

4.44

70Te

ak3X

349

(plo

t A3)

3.66

70Te

ak3X

349

(plo

t B)

40.0

039

.57

87Te

ak3X

3Pa

nina

misa

1940

.00

38.6

585

Teak

3X3

Subt

otal

140.

0014

4.45

149.

10Bo

tokr

om10

330

.00

27.4

380

Teak

3X3

Nkye

nkye

nmam

u10

3/10

430

.00

31.1

088

Teak

3X3

Abrik

asu

5730

.00

30.0

972

Teak

3X3

Twum

krom

8930

.00

26.8

482

Teak

3X3

Subt

otal

120.

0012

0.00

115.

46M

alla

mkr

omYa

ya34

& 3

940

.00

40.0

086

Teak

3X3

Odum

ase

Tain

II28

6 &

287

61.0

592

.20

82Te

ak3X

3Su

btot

al16

0.00

101.

0513

2.20

Subi

n52

13.0

013

.00

833X

3

6744

.00

36.7

187

mah

ogan

y, c

edre

la,

emire

, ofra

m, m

anso

nia

3X3

6834

.00

37.9

280

waw

a, m

ahog

any,

ce

drel

a, e

mire

, ofra

m,

man

soni

a3X

3

Esia

mak

rom

87

16.0

0

19.4

778

mah

ogan

y, c

edre

la,

emire

, ofra

m, m

anso

nia,

w

awa,

cei

ba

3X3

Subt

otal

60.0

010

7.00

107.

107

30.0

021

.46

92te

ak3X

324

30.0

015

.20

77ce

drel

a, o

fram

3X3

Subt

otal

60.0

060

.00

36.6

654

0.00

532.

5054

0.51

Aseb

eim

4341

.20

51.3

975

Cedr

ela

3X3

Brem

an A

nwia

m C

amp

3422

.00

26.7

670

cedr

ela,

Ofra

m3X

3Ba

ako

5936

.00

39.6

476

cedr

ela

3X3

Boso

675.

009.

2082

Cedr

ela

3X3

Subt

otal

100.

0010

4.20

126.

98Pl

ot 1

12.3

268

cass

ia3X

3Pl

ot 2

7.20

62ca

ssia

3X3

Plot

36.

3870

cass

ia3X

3Pl

ot 4

4.68

75ca

ssia

3X3

Subt

otal

60.0

023

.90

30.5

916

0.00

128.

1015

7.57

60.0

0

140.

00

120.

00

160.

00

60.0

0

100.

00

20.0

0

Dorm

aa

Bron

g Ah

afo

Kint

ampo

Dago

mba

Lin

e

Boso

moa

Anym

a

Pam

u Be

reku

m

Suny

ani

Goas

o

Abuo

m

Bosa

m B

epo

Bech

emNt

otor

oso

Boso

mke

se

Cent

ral

Assin

Fos

uSu

pong

Baak

o

Win

neba

ACH

IEVE

MEN

T UN

DER

TH

E 20

13 N

ATIO

NAL

FO

REST

PLA

NTA

TIO

N D

EVEL

OPM

ENT

PRO

GRA

M

Gom

oa A

kyem

foAk

yem

fo60

.00

23.9

0

Page 52: NATIONAL FOREST PLANTATION DEVELOPMENT PROGRAMME … Annual Report... · The National Forest Plantation Development Programme (NFPDP) ... established plantations handed over to the

52

Regi

onFo

rest

Dis

tric

tFr

inge

Com

mun

ityFo

rest

Res

erve

Targ

etCo

mpa

rtm

ent

Num

ber

Repo

rted

Are

a Pl

ante

d (

Ha)

Verif

ied

Area

Pl

ante

d (H

a)

Perc

enta

ge

Surv

ival

%Sp

ecie

sSp

acin

g

Koko

mba

Lin

eAs

ubim

a21

32.4

729

.81

78.3

4Te

ak3X

3An

kono

mM

ankr

ang

6032

.26

33.6

677

.62

Teak

3X3

Subr

isoM

ankr

ang

6132

.43

32.2

787

.31

Teak

3X3

Kyeb

iAs

ufu

Wes

t9

& 10

14.6

334

.76

93.0

7Te

ak3X

3

Adaa

Nkw

anta

Afra

m

Head

wat

ers

126

38.3

337

.21

90.5

9Te

ak3X

3

Koko

mba

Op

ro51

31.9

332

.05

68.7

7Te

ak3X

3De

rma

Opro

3832

.88

34.8

976

.25

Teak

3X3

Subt

otal

200.

0021

4.93

234.

64Am

oam

anCh

rimfa

33/3

430

.00

31.5

373

.06

Teak

3X3

Kofia

seAb

oma

1330

.00

29.5

976

.21

Teak

3X3

Bepo

soOn

gwam

III

FRBP

3-6

15.0

010

.09

Teak

3X3

Atos

uagy

aAb

rimas

u11

15.0

013

.41

Teak

3X3

Mim

inas

oPr

u Sh

elte

r6

30.0

030

.76

76.6

Teak

3X3

Subt

otal

120.

0012

0.00

115.

38Ab

uakw

aaAp

apra

ma

1310

.00

10.3

072

.69

Cedr

ela,

Ofra

m3X

3M

anuk

rom

Deny

aw1

10.0

06.

8570

.59

Cedr

ela

3X

3Ad

akab

unso

Boso

mtw

i13

20.0

019

.94

83.8

2Ce

drel

a, O

fram

3X3

Tabe

soFu

m38

10.0

025

.96

60.1

Cedr

ela,

Ofra

m3X

3Pi

piiso

Fum

4510

.00

21.3

975

.76

Cedr

ela,

Ofra

m3X

3Su

btot

al60

.00

60.0

084

.43

Adan

siDo

me

Rive

r18

69.2

869

.28

64Te

ak3X

3

Tano

krom

North

For

man

gsu

14/2

567

.32

67.3

261

Teak

3X3

Pra

Rive

rSo

uth

Form

angs

u12

36.4

736

.47

63Te

ak3X

3

Subt

otal

180.

0017

3.07

173.

07Ku

maw

uDa

gom

baBo

unfu

m80

.00

219

60.0

051

.67

60Te

ak3X

3Su

btot

al80

.00

60.0

051

.67

Nkaw

ieDo

rmaa

Tint

e Be

po70

.00

2770

.00

69.6

976

.83X

3Su

btot

al70

.00

70.0

069

.69

Tota

l71

0.00

698.

0072

8.89

Odum

ase

Kabo

Riv

er19

.00

12.0

076

.26

Teak

3X3

Wor

awor

aKa

bo R

iver

10.0

08.

6175

Teak

3X3

Asuk

awka

wKa

bo R

iver

29.5

028

.10

75Of

ram

, Tea

k3X

3Su

btot

al60

.00

58.5

048

.71

Adum

adum

Asuk

awka

w24

.00

21.3

5Te

ak3X

3Tu

tukp

ene

Chai

Riv

er30

.00

23.1

1Te

ak3X

3Su

btot

al60

.00

54.0

044

.46

HoAk

oefe

Ave

nui

Kaba

kaba

Eas

t30

.00

30.0

025

.81

70.8

3Te

ak3X

3Su

btot

al30

.00

30.0

025

.81

Tota

l15

0.00

142.

5011

8.98

180.

00

60.0

0

60.0

0

200.

00

120.

00

60.0

0

Asha

nti

Offin

so

Mam

pong

Bekw

ai

Juas

o

Jasik

an

Nkw

anta

Volta

52

Page 53: NATIONAL FOREST PLANTATION DEVELOPMENT PROGRAMME … Annual Report... · The National Forest Plantation Development Programme (NFPDP) ... established plantations handed over to the

53

Regi

onFo

rest

Dis

tric

tFr

inge

Com

mun

ityFo

rest

Res

erve

Targ

etCo

mpa

rtm

ent

Num

ber

Repo

rted

Are

a Pl

ante

d (

Ha)

Verif

ied

Area

Pl

ante

d (H

a)

Perc

enta

ge

Surv

ival

%Sp

ecie

sSp

acin

g

Asia

mak

rom

Krok

osua

20

440

.00

34.1

873

.2Of

ram

, Ced

rela

, M

ahog

any

3X3

Nkat

ieso

Krok

osua

Hills

145

30.0

040

.55

60.0

2Ce

drel

la, O

fram

3X3

Adab

okro

mBi

a No

rth10

630

.00

33.7

570

.72

Cedr

ella

, Ofra

m3X

3Su

btot

al10

0.00

100.

0010

8.48

Sefw

i Wia

wso

Kwak

u bo

aSu

hum

a30

.00

128

20.0

08.

3578

.38

Ofra

m, A

sefe

na,

Mah

ogan

y, C

eiba

3X3

Subt

otal

30.0

020

.00

8.35

3X3

Ankw

aaso

Uppe

r Was

saw

Clos

e to

Pilla

r 71

38.0

035

.00

78.0

5Of

ram

, Ced

rela

, M

ahog

any

3X3

Subi

ri Nk

wan

taAn

hwia

so N

orth

Near

BP

122

.00

20.3

579

.85

Ofra

m, C

edre

la, E

dina

m3X

3

Anan

soTa

no S

uraw

Ext

.29

30.0

025

.61

77.6

2Of

ram

, Ced

rela

, As

anfe

na, O

tie3X

3

Subt

otal

100.

0090

.00

80.9

7To

tal

230.

0021

0.00

197.

79

Naku

ngba

guDa

ka30

.00

36.2

775

Teak

3X3

Bim

bila

Kum

bo40

.00

35.7

0Te

ak3X

3Ch

amba

Lam

bo30

.00

30.6

1Te

ak3X

3Ya

borg

uBu

lugu

30.0

029

.65

90Te

ak3X

3Ka

raga

Kara

ga30

.00

33.7

070

Teak

3X3

Subt

otal

160.

0016

0.00

165.

94Li

toLi

to I

30.0

029

.27

75Te

ak3X

3Ol

d Bu

ipe

IOl

d Bu

ipe

I30

.00

30.0

565

Teak

3X3

Old

Buip

e 2

Old

Buip

e 2

10.0

06.

1055

Teak

3X4

Plot

13.

5470

Teak

3X3

Plot

22.

1575

Teak

3X3

Plot

31.

9473

Teak

3X3

Plot

40.

8470

Teak

3X3

Plot

50.

5778

Teak

3X3

Plot

60.

7176

Teak

3X3

Plot

70.

8675

Teak

3X3

Plot

82.

4671

Teak

3X3

Plot

92.

6973

Teak

3X3

Plot

10

1.34

79Te

ak3X

3Pl

ot 1

11.

5275

Teak

3X3

Subt

otal

120.

0010

3.00

84.0

3Ba

nda

Nkw

anta

(A)

60.0

034

.59

81Te

ak3

x 3

Band

a Nk

wan

ta (B

)17

.73

86Te

ak3

x 3

Grup

eKe

nike

ni60

.00

59.2

279

Teak

3 x

3Su

btot

al12

0.00

120.

0011

1.54

160.

00

120.

00

120.

00

100.

00

100.

00

Wes

tern

Juab

oso

Bibi

ani

North

ern

Bole

Yend

i

Buip

e/Da

mon

go

Yera

da

Yaku

mbo

Old

Buip

e II

33.0

0

North

ern

53

Page 54: NATIONAL FOREST PLANTATION DEVELOPMENT PROGRAMME … Annual Report... · The National Forest Plantation Development Programme (NFPDP) ... established plantations handed over to the

54

Regi

onFo

rest

Dis

tric

tFr

inge

Com

mun

ityFo

rest

Res

erve

Targ

etCo

mpa

rtm

ent

Num

ber

Repo

rted

Are

a Pl

ante

d (

Ha)

Verif

ied

Area

Pl

ante

d (H

a)

Perc

enta

ge

Surv

ival

%Sp

ecie

sSp

acin

g

Zorb

orgu

60.0

061

.00

76Te

ak3

x 3

Laba

riga

20.0

020

.02

78Te

ak3

x 3

Cheb

sigu

20.0

020

.25

78Te

ak3

x 3

Subt

otal

100.

0010

0.00

101.

27Bu

kper

i30

.00

31.7

083

Teak

3 x

3Na

mor

i30

.00

40.0

386

Teak

3 x

3Ny

igar

e30

.00

32.0

292

Teak

3 x

3Su

btot

al10

0.00

90.0

010

3.75

TOTA

L60

0.00

573.

0056

6.53

Kass

ana

Tum

u30

.00

29.6

082

Cass

ia, M

ahog

any

3 x

3Ta

nvie

lliCh

ira H

eadw

ater

s30

.00

23.0

063

Cass

ia3

x 3

Subt

otal

60.0

060

.00

52.6

0Su

ke30

.00

30.9

686

Teak

3 x

3Sa

moa

30.0

032

.75

88Te

ak3

x 3

Subt

otal

60.0

060

.00

63.7

1TO

TAL

120.

0012

0.00

116.

31

Sher

igu

(Plo

t A)

30.0

030

.48

95Te

ak, C

assia

, Eu

caly

ptus

, Alb

ezia

, 3

x 3

Kem

bisi

(Plo

t B)

30.0

031

.00

90

Teak

, Cas

sia,

Euca

lypt

us, A

lbez

ia,

Mah

ogan

y, G

mel

ina

3 x

3

Subt

otal

60.0

060

.00

61.4

8Na

vron

goBa

chon

saSi

ssili

Cent

ral

30.0

030

.00

29.8

965

Teak

, Mah

ogan

y3

x 3

Subt

otal

30.0

030

.00

29.8

9Ba

syon

deUp

per T

ame

30.0

034

.63

52Te

ak3

x 3

Kusa

naba

Red

Volta

Eas

t30

.00

31.4

467

Teak

3 x

3Su

btot

al60

.00

60.0

066

.07

150.

0015

0.00

157.

44

Kade

8Ka

jeas

e40

.00

35.0

041

.12

67Te

ak3

x 3

Subt

otal

40.0

035

.00

41.1

227

/ Sun

sum

awu

13.0

013

.43

88W

awa,

Ced

rela

3 x

35/

Mof

ram

26.0

025

.72

87Ce

drel

a, M

ahog

any

3 x

3Su

btot

al60

.00

39.0

039

.15

Som

anya

Ashi

tey

IVVo

lta B

lock

II30

.00

24.0

019

.10

67Te

ak, M

ahog

any

3 x

3Su

btot

al30

.00

24.0

019

.10

Abom

osar

foBu

bu25

.00

17.9

085

Teak

3 x

3Fa

aso/

Ayef

ere

Fah

22.0

018

.00

97Te

ak3

x 3

Subt

otal

60.0

047

.00

35.9

0Pi

llar 1

036

.00

27.8

077

Teak

, Mah

ogan

y3

x 3

Faye

ase

20.0

015

.00

67Te

ak3

x 3

Ahin

kwa

Sout

hern

Sca

rp6.

096.

6075

Teak

3 x

3Su

btot

al60

.00

62.0

949

.40

Pepe

ase

North

ern

Scar

p W

est

30.0

034

.13

87Te

ak3

x 3

Dent

ehAb

isu30

.00

40.0

065

Teak

, Mah

ogan

y3

x 3

Subt

otal

60.0

060

.00

74.1

3TO

TAL

310.

0026

7.09

258.

80

60.0

0

60.0

0

60.0

0

60.0

0

60.0

0

60.0

0

60.0

0

60.0

0

100.

00

100.

00

Law

ra

Uppe

r Eas

t

Bolg

atan

ga

Baw

ku

North

ern

Tam

ale

Wal

ewal

e

Esse

n Ap

am

Wor

obon

g So

uth

East

ern

Oda

Donk

orkr

om

Bego

ro

Mpr

aeso

Sins

angl

egbi

nni

Gam

barg

a Sc

arp

East

Kam

ba

Tank

wid

i

Uppe

r Wes

t

Tum

u

54

Page 55: NATIONAL FOREST PLANTATION DEVELOPMENT PROGRAMME … Annual Report... · The National Forest Plantation Development Programme (NFPDP) ... established plantations handed over to the

55

Regi

onFo

rest

Dis

tric

tFr

inge

Com

mun

ityFo

rest

Res

erve

Targ

etCo

mpa

rtm

ent

Num

ber

Repo

rted

Are

a Pl

ante

d (

Ha)

Verif

ied

Area

Pl

ante

d (H

a)

Perc

enta

ge

Surv

ival

%Sp

ecie

sSp

acin

g

3.40

853

x 3

7.20

153

x 3

4.20

123

x 3

Subt

otal

30.0

014

.00

14.8

0TO

TAL

30.0

014

.00

14.8

0

GRAN

D T

OTA

L3,

000.

002,

835.

202,

857.

61

Euca

lypt

us, N

eem

, Ca

ssia

Tem

aSe

geSe

ge30

.00

14.0

0GT

Acc

ra

55

Page 56: NATIONAL FOREST PLANTATION DEVELOPMENT PROGRAMME … Annual Report... · The National Forest Plantation Development Programme (NFPDP) ... established plantations handed over to the

5646

APPENDIX 3: IMPLEMENTATION ARRANGEMENTS

2013 PLANTATION PROGRAM UNDER THE NATIONAL FOREST PLANTATION DEVELOPMENT PROGRAMME

1.0 PLANTATION ESTABLISHMENT TARGET This year an estimated 3,000 ha of commercial plantations will be established by the Forest Services Division (FSD) within forest reserves using best practice principles (best site, best planting materials, best silviculture). 1.1 ALLOCATION OF PLANTING TARGETS, SITE SELECTION AND LAYOUT A total of 36 forest districts with suitable on-reserve sites have been selected across the country with respective district and regional targets allocated (details attached as Appendix 1). Forest Districts will be expected to select suitable degraded forest reserve compartments. The selected compartments shall be adequately degraded (FR condition score 4 – 6; poor natural regeneration; basal area less than 5m2/ha); have good soils; relatively flat to undulating terrain with good drainage; and fairly easily accessible. Selected sites shall be verified and approved by Regional/RMSC teams. Compartments will be blocked into four approximately 30 ha sub-plots separated by 10-m wide fire rides. 2.0 IMPLEMENTATION ARRANGEMENTS 2.1 RECRUITMENT OF WORKERS AND SUPERVISION Labour will be recruited from forest fringe communities by the respective District Manager (DM). Forest-fringe community members who are willing and able will be hired to perform plantation development tasks. DMs will collaborate with District Assemblies to disseminate information about the program and clearly explain the terms and conditions of engagement. District Assemblies will play a key role in assisting DMs resolve conflicts at the community level especially issues relating to unpaid/outstanding wages from previous year’s work by African Foresters Brigade Ltd., Zoil and Ecotech Services Ltd. Hired Workers will be encouraged to organize themselves into Work Gangs with a leader to undertake short-term specific plantation development activities. Plantation development activities to be undertaken using hired labour will include; Site Preparation (initial land clearing, lopping and debris collection), Peg-cutting and Pegging, Planting of Seedlings, Weeding/Tending of established coupes, Beating Up, Re-planting of failed areas, etc. The members of the Work Gangs would be required to provide the following details to the District Manager for registration: i. Name of Gang Leader as indicated on any nationally accepted identification card [Drivers’ licence,

National Identification Card, Voters Identification Card, NHIS Card] ii. Names of Gang Members as indicated on any nationally accepted identification card as above. iii. Identification numbers on the respective nationally accepted ID cards. iv. Date of Birth v. Sex vi. Community/residential location The Work Gangs will be directly supervised by FSD Range Supervisors (RS) and Forest Guards (FGs) with an Assistant District Manager (ADM) having operational responsibility over the project at the Forest District level. Each plantation block of 30 ha will be supervised by 1 RS assisted by 3 FGs. However, during the peak pegging and planting period, additional staff within the district may be deployed to assist with supervision. Work Gangs will be assigned specific areas which will be surveyed by RS. The execution of the field work will be duly supervised by RS and FGs to ensure conformance to set standards. On completion of assigned tasks, RS will carry out final inspection and fill out an Activity Completion Form (ACF) which shall be duly endorsed by the leader of the Work Gang.

Page 57: NATIONAL FOREST PLANTATION DEVELOPMENT PROGRAMME … Annual Report... · The National Forest Plantation Development Programme (NFPDP) ... established plantations handed over to the

57

47

The ACF will be submitted to the DM. ADM will be tasked to verify and confirm quality and quantity of work completed. Upon satisfaction with work done, ADM will recommend to the DM for payment by endorsing the ACF. Payment of Work Gangs must be made within 7 working days upon submission of ACF by RS. All payments shall be made by cheque. 2.2 PAYMENT SYSTEM Upon receipt of the endorsed ACF by the ADM, DM will seek written authorization from RM prior to payment of certified work done. Copies of the ACFs and accompanying cheques will be submitted to RM at the end of every week. RM shall submit collated copies of ACFs and cheques monthly to FSD-HQ together with the Monthly Plantation Operations Report. Amount for each activity will be calculated by multiplying the quantum of work (i.e. number of hectares) by the standard work rate (i.e. mandays, details attached as Appendix II) and then multiplying the result by the Unit Manday Price of GHC 7.00. To ensure smooth execution of this payment system, based on expected target, amount required per month shall be transferred a month in advance to each District and Region to cover cost of plantation activities, District Office supervision and Regional Office monitoring. 2.3 FOOD CROPPING Hired Workers engaged under the project will be allowed to farm on the land to boost household income. In all cases food crops can only be planted after pegging and should be planted only within planting rows at least 50 cm from planted tree seedlings. The type of food crops and spacing shall be rigorously controlled by the supervisors and ADM to ensure the tree crops are not adversely affected by the food crops. 2.4 SUPPLY OF SEEDLINGS As much as possible, seedlings for the program will be sourced/purchased from community tree nurseries and established private tree nurseries close to planting/established sites (this could be augmented with supplies from District/Regional tree nurseries where applicable). Seedling suppliers will have to deliver seedlings in good condition to designated planting sites. DMs will be expected to identify nurseries within 20 km radius from planting sites. Such nurseries that are willing to supply seedlings to the project will be registered by the DM indicating ownership, location and quantities of various species among others. This information will be verified by RM and submitted to FSD HQ. Joint FSD/MLNR monitoring teams will visit every forest district to confirm reports prior to approval by ED-FSD granting authorization to purchase specified quantities and types of seedlings. The current seedling request and delivery forms shall be used to cover all seedling transactions. The DM will confirm and certify supplies, which shall be commensurate with certified area planted, and submit details of suppliers to the FSD-HQ through respective RM for payment directly to suppliers. No payment shall be made for the supply of inferior planting material (small or overgrown seedlings, over-sized stumps, small tender stumps, etc.) or wildlings, and respective DMs will be held personally liable if such materials are planted within the plantations. Apart from the seedlings required for the 2013 plantation establishment, seedlings shall also be procured for beating up and replanting of the 2010 to 2012 coupes, based on survival surveys conducted, both on and off reserve, in all 46 forest districts. 3.0 MONITORING AND REPORTING Monthly reports will be submitted by DMs through the respective RMs to the FSD-HQ, and these must be accompanied by copies of ACFs and cheques to enable a good comparism of cost versus achievement. There will be continuous and effective field and desk monitoring of all aspects of the program (technical, financial, social, etc.) by teams from the regional, FSD-HQ, Corporate FC and MLNR to ensure that the objectives of the National Forest Plantation Development Programme are achieved in a cost effective manner.

Page 58: NATIONAL FOREST PLANTATION DEVELOPMENT PROGRAMME … Annual Report... · The National Forest Plantation Development Programme (NFPDP) ... established plantations handed over to the

58

APPENDIX 4

2010 2011 2012 2013Bekwai 7.00 - - - 7.00 Juaso 105.10 68.00 40.00 - 213.10 Kumawu 5.00 - 4.00 3.00 12.00 Mampong 45.00 28.00 37.50 - 110.50

Total 162.10 96.00 81.50 3.00 342.60 Sunyani 71.67 16.50 42.50 - 130.67 Kintampo 27.50 44.20 62.84 3.50 138.04 Bechem 32.30 - - - 32.30

Total 131.47 60.70 105.34 3.50 301.01 Yendi 223.07 251.51 428.50 69.61 972.69 Buipe 102.00 124.30 96.45 - 322.75 Walewale 34.50 30.00 19.65 - 84.15 Bole 20.07 51.75 146.90 12.00 230.71 Tamale 41.60 77.00 88.00 27.50 234.10

TOTAL 421.24 534.56 779.50 109.11 1,844.40 Bolga - - - 10.00 10.00 Bawku - - 47.00 30.00 77.00 Navrongo - - - 25.50 25.50

Total - - 47.00 65.50 112.50 Lawra 337.36 74.40 84.50 - 496.26 Tumu 40.00 5.00 32.00 6.00 83.00

Total 377.36 79.40 116.50 6.00 579.26 Ho 20.00 - - 2.70 22.70 Denu 49.90 10.70 12.97 - 73.57

Total 69.90 10.70 12.97 2.70 96.27

Western Juaboso 2.00 - - - 2.00 Total 2.00 - - - 2.00 - GRAND TOTAL 1,164.07 781.36 1,142.81 189.81 3,278.04

TOTAL

SUMMARY OF AREA (Ha) OF EPP SITES BURNT BY WILDFIRES (2010 - 2013)

Ashanti

Upper East

Upper West

Volta

COUPEREGION FOREST

DISTRICT

Northern

Brong Ahafo

Page 59: NATIONAL FOREST PLANTATION DEVELOPMENT PROGRAMME … Annual Report... · The National Forest Plantation Development Programme (NFPDP) ... established plantations handed over to the

59

Ap

pe

nd

ix

5FO

OD

PRO

DUCT

ION

DET

AILS

PER

REG

ION

AN

D DI

STRI

CT (2

011-

2013

)(MT)

REPORTED AREA (Ha)

ESTIMATED PRODUCTION (Mt)

REPORTED AREA (Ha)

ESTIMATED PRODUCTION (Mt)

REPORTED AREA (Ha)

ESTIMATED PRODUCTION (Mt)

REPORTED AREA (Ha)

ESTIMATED PRODUCTION (Mt)

REPORTED AREA (Ha)

ESTIMATED PRODUCTION (Mt)

REPORTED AREA (Ha)

ESTIMATED PRODUCTION (Mt)

REPORTED AREA (Ha)

ESTIMATED PRODUCTION (Mt)

REPORTED AREA (Ha)

ESTIMATED PRODUCTION (Mt)

REPORTED AREA (Ha)

ESTIMATED PRODUCTION (Mt)

REPORTED AREA (Ha)

ESTIMATED PRODUCTION (Mt)

REPORTED AREA (Ha)

ESTIMATED PRODUCTION (Mt)

REPORTED AREA (Ha)

ESTIMATED PRODUCTION (Mt)

REPORTED AREA (Ha)

ESTIMATED PRODUCTION (Mt)

REPORTED AREA (Ha)

ESTIMATED PRODUCTION (Mt)

REPORTED AREA (Ha)

ESTIMATED PRODUCTION (Mt)

REPORTED AREA (Ha)

ESTIMATED PRODUCTION (Mt)

REPORTED AREA (Ha)

ESTIMATED PRODUCTION (Mt)

2010

139

1070

.326

52.2

60

00

00

00

00

00

00

00

00

00

00

00

00

00

00

020

110

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

020

1216

1.2

1241

.24

34.8

69.9

480

00

00

00

00

00

00

00

00

00

00

00

00

00

00

020

1335

269.

50

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

020

100

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

020

110

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

020

1216

9.92

213

08.3

9956

.111

2.76

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

2013

55.0

942

4.19

346

.192

.641

00

35.

10

00

00

00

00

00

00

00

00

00

00

00

00

020

100

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

020

110

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

020

120

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

020

133.

3425

.718

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

TOTA

L56

3.55

243

39.3

516

332

7.61

00

35.

10

00

00

00

00

00

00

00

00

00

00

00

00

020

100

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

020

110

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

020

120

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

020

130

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

020

100

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

020

110

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

020

128.

1695

62.9

0515

1.55

3.11

750

014

.694

24.9

80

00

00

00.

560.

784

1.23

7.99

51.

642

12.3

110

00

00.

567.

728

00

00

00

0.20

49.

1820

130

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

020

100

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

020

110

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

020

120

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

020

1369

.759

537.

1443

2958

.349

00

28.2

0247

.943

00

00

00

00

00

00

00

00

00

00

00

00

00

2010

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

2011

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

2012

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

2013

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

TOTA

L77

.928

560

0.04

9530

.661

.467

00

42.8

9672

.922

00

00

00

0.56

0.78

41.

237.

995

1.64

212

.311

00

00

0.56

7.72

80

00

00

00.

204

9.18

2010

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

2011

00

00

4143

9.11

75.6

5212

8.61

25.1

32.6

30

018

.845

.12

2.01

2.81

40

00

00

00

00

00

00

00

00

020

120

00

014

.315

3.15

50.1

85.1

71.

72.

210

021

.752

.08

25.2

35.2

80

00

00

00

00

00

00

00

00

020

130

00

03

32.1

31.

22.

040

00

01.

43.

360

00

00

00

00

00

00

00

00

00

020

100

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

020

110

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

020

120

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

020

130

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

020

100

00

012

213

06.3

107.

1518

2.15

53.8

670

.01

00

12.5

3020

.829

.12

1.8

11.7

00

00

1.6

03.

244

.16

00

00

00

00

2011

00

00

105.

411

29.3

123.

0720

9.21

72.0

593

.67

00

00

81.3

3911

3.87

4.44

28.8

60

00

00

00

00

00

00

00

020

120

00

092

.15

986.

9311

5.85

196.

9528

.05

36.4

70

00

020

.528

.71.

49.

10

00

00

01.

0514

.49

00

00

00

00

2013

00

00

4.9

52.4

7920

.434

.68

2.9

3.77

00

00

5.8

8.12

00

00

00

00

00

00

00

00

00

2010

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

2011

00

00

1010

7.1

108.

6518

4.71

80.7

104.

90

00

022

.65

31.7

10

00

00

00

00

00

00

00

00

020

120

00

07.

3478

.611

71.1

120.

8762

80.6

00

00

27.5

638

.584

00

00

00

00

00

00

00

00

00

2013

00

00

3.5

37.4

8543

73.1

4052

00

00

1521

00

00

00

00

00

00

00

00

00

2010

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

2011

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

2012

00

00

9.1

97.4

6119

.45

33.0

6518

.123

.53

00

00

2.15

3.01

00

00

00

00

00

00

00

00

00

2013

00

00

6.35

68.0

093.

66.

123.

95.

070

00

03.

154.

410

00

00

00

00

00

00

00

00

0TO

TAL

00

00

419.

144

88.1

739.

2112

56.7

388.

450

4.9

00

54.4

130.

622

6.16

316.

627.

6449

.66

00

00

1.6

04.

2558

.65

00

00

00

00

Nor

ther

n

Tam

ale

Buip

e/Da

mon

go

Yend

i

Wal

ewal

e

Bole

PAW

PAW

Wes

tern

Bibi

ani

Juab

eso

Sefw

i Wia

wso

Cent

ral

Win

neba

Cape

coa

st

Assin

Fos

u

Dunk

wa

CABB

AGE

OKR

OCA

SSAV

AO

NIO

NGA

RDEN

EGG

SW

ATER

MEL

ON

MIL

LET

SORG

HUM

RICE

BEAN

SPE

PPER

TOM

ATO

REGION

FOREST

DISTRICT

COUPE

FOO

D CR

OPS

(ON

-RES

ERVE

+O

FF R

ESER

VE)

PLAN

TAIN

COCO

YAM

YAM

MAI

ZE

Page 60: NATIONAL FOREST PLANTATION DEVELOPMENT PROGRAMME … Annual Report... · The National Forest Plantation Development Programme (NFPDP) ... established plantations handed over to the

60

REPORTED AREA (Ha)

ESTIMATED PRODUCTION (Mt)

REPORTED AREA (Ha)

ESTIMATED PRODUCTION (Mt)

REPORTED AREA (Ha)

ESTIMATED PRODUCTION (Mt)

REPORTED AREA (Ha)

ESTIMATED PRODUCTION (Mt)

REPORTED AREA (Ha)

ESTIMATED PRODUCTION (Mt)

REPORTED AREA (Ha)

ESTIMATED PRODUCTION (Mt)

REPORTED AREA (Ha)

ESTIMATED PRODUCTION (Mt)

REPORTED AREA (Ha)

ESTIMATED PRODUCTION (Mt)

REPORTED AREA (Ha)

ESTIMATED PRODUCTION (Mt)

REPORTED AREA (Ha)

ESTIMATED PRODUCTION (Mt)

REPORTED AREA (Ha)

ESTIMATED PRODUCTION (Mt)

REPORTED AREA (Ha)

ESTIMATED PRODUCTION (Mt)

REPORTED AREA (Ha)

ESTIMATED PRODUCTION (Mt)

REPORTED AREA (Ha)

ESTIMATED PRODUCTION (Mt)

REPORTED AREA (Ha)

ESTIMATED PRODUCTION (Mt)

REPORTED AREA (Ha)

ESTIMATED PRODUCTION (Mt)

REPORTED AREA (Ha)

ESTIMATED PRODUCTION (Mt)

PAW

PAW

CABB

AGE

OKR

OCA

SSAV

AO

NIO

NGA

RDEN

EGG

SW

ATER

MEL

ON

MIL

LET

SORG

HUM

RICE

BEAN

SPE

PPER

TOM

ATO

REGION

FOREST

DISTRICT

COUPE

FOO

D CR

OPS

(ON

-RES

ERVE

+O

FF R

ESER

VE)

PLAN

TAIN

COCO

YAM

YAM

MAI

ZE

2010

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

2011

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

2012

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

2013

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

2010

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

2011

753

.90

00

09.

7816

.626

00

00

00

00

00

00

00

00

00

00

00

00

00

2012

00

00

00

11.6

0619

.73

00

00

00

00

00

00

00

00

00

00

00

00

00

2013

00

00

00

3.46

675.

8934

00

00

00

00

00

00

00

00

00

00

00

00

00

2010

56.2

432.

7414

.128

.421

00

9.8

16.6

60

00

00

00

00

00

00

00

05.

8680

.87

00

00

00

00

2011

36.6

528

2.20

57.

5515

.176

00

13.2

22.4

40

00

00

00

00

00

00

00

01.

7524

.15

00

00

00

00

2012

30.9

275

238.

1418

7.1

14.2

610

05.

3187

9.04

180

00

00

00.

631

0.88

340

00

00

00

03.

182

43.9

10

00

00

00

020

1324

.161

518

6.04

366.

5413

.153

00

6.48

711

.028

00

00

00

00

00

00

00

00

1.95

827

.01

00

00

00

00

2010

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

2011

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

2012

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

2013

25.8

0519

8.69

8521

.242

.556

00

00

00

00

00

0.56

0.78

41.

763

11.4

60

00

00

00

00

00

00

00

020

100

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

020

110

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

020

120

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

020

1339

300.

30

00.

475

5.08

731.

425

2.42

250

00

00

03.

85.

320

02.

8521

.375

00

00

0.95

13.1

10

00

00

00

020

102.

418

.48

1.8

3.61

80

00

00

00

00

00

00

00

00

00

00

00

00

00

00

020

1116

.512

7.05

2754

.27

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

2012

12.5

96.2

530

60.3

00

7.5

12.7

50

00

00

00

00

00

00

00

00

00

00

00

00

020

130

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

0TO

TAL

251.

144

1933

.809

115

231.

760.

475

5.08

7368

.583

116.

590

00

00

04.

991

6.98

741.

763

11.4

62.

8521

.375

00

00

13.7

189.

10

00

00

00

020

100

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

020

1112

2.60

394

4.04

3127

.555

.331

00

29.0

0149

.302

00

00

00

00

00

00

00

00

00

00

00

00

00

2012

157.

8512

15.4

4510

120

3.71

00

70.8

120.

360

00

00

00

00

00

00

00

00

00

00

00

00

020

1355

.752

429.

2904

13.9

28.0

150

00

00

00

00

00

00

00

00

00

00

00

00

00

00

020

100

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

020

1118

7.42

1443

.134

53.9

108.

280

00

00

00

00

00

00

00

00

00

00

00

00

00

00

020

120

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

020

130

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

020

100

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

020

1130

.155

232.

1935

7.16

14.3

8215

.16

162.

3180

.55

136.

942.

32.

990

00

06.

385

8.93

90

00

00

00

00

00

00

00

00

020

1210

.983

.93

00

8.62

292

.342

55.3

4894

.092

00

00

00

5.5

7.7

00

00

00

00

00

00

00

00

00

2013

00

00

17.4

186.

3545

.877

.86

00

00

00

1.8

2.52

00

00

00

00

00

00

00

00

00

2010

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

2011

00

00

00

17.2

3729

.302

00

00

00

00

00

00

00

00

00

00

00

00

00

2012

00

00

3.60

138

.565

265.

3245

1.04

00

00

00

0.9

1.26

106.

769

3.9

00

00

00

00

00

00

00

00

2013

00

00

2.04

521

.920

8.25

354.

020

00

00

01.

0926

1.52

961.

093

7.10

25.

068

38.0

080

00

00

00

00

00

00

020

100

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

020

1169

.509

453

5.22

219.

0518

.196

1.59

117

.04

33.8

9457

.62

00

00

00

3.19

884.

4783

00

00

00

00

00

00

00

00

00

2012

133.

746

1029

.842

14.6

29.4

023.

413

36.5

5315

.022

25.5

370

00

00

00.

5386

0.75

40

07.

371

55.2

830

00

00

00

00

030

.377

60

00

2013

86.3

408

664.

8242

42.1

84.5

5119

.03

203.

840

00

00

00

00

00

00

00

00

00

00

00

00

00

020

100

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

020

110

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

020

120

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

020

135.

167

39.7

859

00

1.03

311

.068

20.6

6835

.136

00

00

00

12.9

1818

.085

2.58

416

.79

2.58

419

.376

00

00

00

00

00

1.03

340

00

2010

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

2011

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

2012

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

2013

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

2010

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

2011

187.

4214

43.1

3453

.910

8.28

00

00

00

00

00

1.76

2.46

432

.95

214.

20

00

00

00

00

00

00

00

0

Asha

nti

Nka

wie

Bekw

ai

Mam

pong

Offi

nso

Juas

o

Kum

awu

New

Edu

bias

e

Bekw

ai

East

ern

Donk

orkr

om

Som

anya

Akim

Oda

Bego

ro

Mpr

aeso

Kade

Page 61: NATIONAL FOREST PLANTATION DEVELOPMENT PROGRAMME … Annual Report... · The National Forest Plantation Development Programme (NFPDP) ... established plantations handed over to the

61

REPORTED AREA (Ha)

ESTIMATED PRODUCTION (Mt)

REPORTED AREA (Ha)

ESTIMATED PRODUCTION (Mt)

REPORTED AREA (Ha)

ESTIMATED PRODUCTION (Mt)

REPORTED AREA (Ha)

ESTIMATED PRODUCTION (Mt)

REPORTED AREA (Ha)

ESTIMATED PRODUCTION (Mt)

REPORTED AREA (Ha)

ESTIMATED PRODUCTION (Mt)

REPORTED AREA (Ha)

ESTIMATED PRODUCTION (Mt)

REPORTED AREA (Ha)

ESTIMATED PRODUCTION (Mt)

REPORTED AREA (Ha)

ESTIMATED PRODUCTION (Mt)

REPORTED AREA (Ha)

ESTIMATED PRODUCTION (Mt)

REPORTED AREA (Ha)

ESTIMATED PRODUCTION (Mt)

REPORTED AREA (Ha)

ESTIMATED PRODUCTION (Mt)

REPORTED AREA (Ha)

ESTIMATED PRODUCTION (Mt)

REPORTED AREA (Ha)

ESTIMATED PRODUCTION (Mt)

REPORTED AREA (Ha)

ESTIMATED PRODUCTION (Mt)

REPORTED AREA (Ha)

ESTIMATED PRODUCTION (Mt)

REPORTED AREA (Ha)

ESTIMATED PRODUCTION (Mt)

PAW

PAW

CABB

AGE

OKR

OCA

SSAV

AO

NIO

NGA

RDEN

EGG

SW

ATER

MEL

ON

MIL

LET

SORG

HUM

RICE

BEAN

SPE

PPER

TOM

ATO

REGION

FOREST

DISTRICT

COUPE

FOO

D CR

OPS

(ON

-RES

ERVE

+O

FF R

ESER

VE)

PLAN

TAIN

COCO

YAM

YAM

MAI

ZE

2012

112.

786

7.79

44.6

89.6

461.

5416

.493

6.78

11.5

260

00

00

05.

838.

162

00

2.75

20.6

250

00

015

.821

80

00

00

00

020

1338

.229

4.14

33.4

67.1

3411

.412

2.09

00

00

00

00

00

00

00

00

00

00

00

00

00

00

TOTA

L11

97.7

692

22.7

7440

180

6.93

84.8

390

8.56

848.

6714

42.7

2.3

2.99

00

00

39.9

2255

.891

143.

493

1.9

17.7

713

3.29

00

00

15.8

218

00

00

31.4

110

00

2010

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

2011

00

2.15

4.32

152.

526

.775

48.9

1583

.156

00

00

00

1.08

51.

5190

00

00

00

00

00

00

00

00

00

2012

1.56

512

.050

50

02.

645

28.3

284.

598

7.81

660

00

00

00.

489

0.68

460

00

00

00

00

00

00

00

00

020

130.

7914

6.09

378

00

2.98

31.9

261

.257

104.

140.

193

0.25

10

00

018

.061

25.2

861.

583

10.2

90

00

00

00

00

00

00

00

020

100

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

020

110

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

020

126.

2748

.279

2.46

4.94

468.

8394

.569

186.

731

7.39

00

00

00

10.2

6114

.365

18.9

412

3.1

3.2

240

00

00

00

00

00

00

020

138

61.6

3.6

7.23

62.

425

.704

95.6

162.

520.

40.

520

00

08

11.2

00

1410

50

00

00

00

00

00

00

020

100

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

020

110

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

020

120

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

020

1325

.662

197.

5974

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

2010

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

2011

00

00

00

34.4

2558

.523

00

00

00

1.6

2.24

00

00

00

00

00

00

00

00

00

2012

3.30

425

.440

81

2.01

00

123.

4320

9.83

00

00

00

1.26

41.

7696

00

00

00

00

00

00

00

00

00

2013

00

00

10.2

110

9.31

93.7

915

9.44

00

00

00

11.4

6416

.049

00

00

00

00

00

00

00

00

00

2010

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

2011

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

2012

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

2013

53.5

541

2.33

532

.164

.581

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

TOTA

L99

.142

476

3.39

6541

.383

.093

29.5

631

6.61

648.

7211

02.8

0.59

30.

771

00

00

52.2

2473

.113

20.5

213

3.4

17.2

129

00

00

00

00

00

00

00

2010

00

00

00

34.2

558

.225

2026

00

00

35.7

550

.05

00

00

00

00

00

00

00

00

00

2011

00

00

00

9.5

16.1

512

2.5

159.

30

00

028

39.2

00

00

00

00

00

00

00

00

00

2012

00

00

00

32.7

0555

.599

79.9

510

3.9

00

00

22.3

531

.29

00

00

00

00

00

00

00

00

00

2013

00

00

00

33.8

1457

.484

18.4

423

.98

00

00

9.22

212

.911

00

00

00

00

00

00

00

00

00

2010

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

2011

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

2012

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

2013

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

2010

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

2011

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

2012

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

2013

00

00

00

19.8

2133

.696

00

00

00

00

00

00

00

00

00

00

00

00

00

TOTA

L0

00

00

013

0.09

221.

1524

0.9

313.

20

00

095

.322

133.

450

00

00

00

00

00

00

00

00

020

100

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

020

110

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

020

120

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

020

130

00

00

00

00

00

00

063

.71

89.1

940

00

00

00

00

00

00

00

00

020

100

00

00

07.

412

.58

22.

60

00

04.

66.

440

00

00

00

00

00

00

00

00

020

110

00

00

072

122.

40

00

00

050

7022

143

00

00

00

00

00

00

00

00

2012

00

00

00

39.2

7966

.774

00

00

00

28.6

9140

.167

00

00

00

00

00

00

00

00

00

2013

00

00

00

00

00

00

00

29.6

41.4

40

00

00

00

00

023

00

00

00

0TO

TAL

00

00

00

118.

6820

1.75

22.

60

00

017

6.6

247.

2422

143

00

00

00

00

230

00

00

00

2010

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

2011

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

2012

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

2013

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

2010

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

2011

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

2012

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

2013

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

TOTA

L0

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

020

100

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

020

110

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

020

120

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

020

130.

53.

850

00

030

.451

.68

00

00

00

00

00

0.5

3.75

00

00

00

00

00

00

00

2010

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

2011

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

2012

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

2013

00

00

00

0.4

0.68

00

00

00

00

00

0.1

0.75

00

00

00

00

00

00

00

2010

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

2011

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

2012

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

2013

00

00

00

2847

.60

00

00

00

00

00

00

00

00

00

00

00

00

0TO

TAL

0.5

3.85

00

00

58.8

99.9

60

00

00

00

00

00.

64.

50

00

00

00

00

00

00

0

Grea

ter A

ccra

Amas

aman

Tem

a

Volta

Jasik

an

Ho

Nkw

anta

Upp

er E

ast

Bolg

atan

ga

Nav

rong

o

Baw

ku

Upp

er W

est

Law

ra

Tum

u

Bron

g Ah

afo

Kint

ampo

Suny

ani

Bech

em

Dorm

aa

Goas

o

Asha

nti

Bekw

ai

Page 62: NATIONAL FOREST PLANTATION DEVELOPMENT PROGRAMME … Annual Report... · The National Forest Plantation Development Programme (NFPDP) ... established plantations handed over to the

62

NOTES

Page 63: NATIONAL FOREST PLANTATION DEVELOPMENT PROGRAMME … Annual Report... · The National Forest Plantation Development Programme (NFPDP) ... established plantations handed over to the

63

Page 64: NATIONAL FOREST PLANTATION DEVELOPMENT PROGRAMME … Annual Report... · The National Forest Plantation Development Programme (NFPDP) ... established plantations handed over to the

64Designed & Printed @ Tel: +233 302 785415/6