1 2/16 /97 sb ...\14 21 -90 8\pavm .cd r 0 1/14 /04 jd g ...\m m t\pavm .cdr T H E M M T W A S C O N S T R U C T E D C L O S E TO T H E W A T E R F R O N T, IN A N A R E A W H IC H H A D B E E N R E C L A IM E D FROM S A N F R A N C IS C O B A Y IN T H E L A T E 1800s. E m barcadero F e r r y B uild ing P a rk P laza M arket Mission H ow ard Folsom H a rrison T h e E m barcadero E m barcadero S teuart Spear Freem ont B eale B A R T EMBARCADERO S TA TIO N S A N F R A N C IS O BAY B art Tu n n els E le va te d Roadway TRANSBAY TER M IN A L 1848 S horeline P ro ject A lignm ent

Upload: xaria

Post on 16-Jan-2016

46 views

Category:

Documents


0 download

DESCRIPTION

- PowerPoint PPT Presentation

TRANSCRIPT

Page 1: MuniMetro Turnaround

12/16/97 sb ...\1421-908\pavm .cdr01/14/04 jdg ...\m m t\pavm .cdr

THE MMT WAS CONSTRUCTED CLOSE TO THE WATERFRONT, IN AN AREA W HICH HAD BEEN RECLAIMED FROM

SAN FRANCISCO BAY IN THE LATE 1800s.

1848Shoreline

Em barcadero

Fer

ryB

uild

ingPark P laza

M arket

M ission

H ow ard

Folsom

Harrison

Th

e E

mb

arcad

ero

Em

ba

rcadero

Ste

uart

Spe

ar

Fre

emo

nt

Bea

le

BART EMBARCADEROSTATION

SA

N

FR

AN

CIS

O

BA

Y

BartTunnels

E levated R oadw ay

TRANSBAYTERMINAL

1848Shoreline

ProjectAlignment

Page 2: MuniMetro Turnaround

FILL0

25

50

75

100

120

150

175

200

0 20

Feet

536 MISSION ST.

De

pth

, Fee

t

OLD SEA WALL

BAY MUD

GREY SAND

BROW N SAND (COLMA)

OLD BAY CLAY

GREY SAND

GREEN/GREY SAND

BAY MUD

FILL

GREENISH

GRAY SAND

ALLUVIUM/COLLUVIUM

FRANCISCAN ROCK

FRANCISCAN ROCK

OLD SEA WALL

A/C

0

25

50

75

100

120

150

175

200

Dep

th, F

eet

537 538 539 540 541

P219 P243 B-2 P267 P287 B-3 P318 P343 B-4

A/C

EXCAVATIONS AND TUNNELING W ERE SUCCESSFULLY COMPLETED IN VERY DIFFICULT GROUND CONDITIONS INCLUDING LOOSE FILLS, THE OLD ROCKFILL SEAWALL AND THE

SOFT BAY MUD, UP TO 100 FEET THICK

12/17/97 sb ...\1421-908\scsabm e.ai01/14/04 jdg ...\m m t\scsabm e.cdr

HORIZONTAL DISTANCE, STATIONS, SOUTH OF MISSION STREET

Page 3: MuniMetro Turnaround

MEASUREMENTS W ITH ELECTROLYTIC LEVEL (EL) BEAMS SHOW EDCHANGES IN TUNNEL DEFORMATIONS AS THE MMT TUNNELS ADVANCED

ABOVE THE BART TUNNELS. THE MMT WAS ONE OF THE FIRST AND LARGESTAPPLICATIONS OF EL BEAMS FOR SETTLEMENT MONITORING IN THE U.S.

STATIONING ALONG BART NORTH TUNNEL

52500-0.05

0.00

0.05

0.10

VE

RT

ICA

L M

OV

EM

EN

T (

IN.)

0 .15

0.20

0.25

0.30

52550 52600 52650 52700 52750 52800

01/14/04 jdg ...\m m t\vm bnt.cdr

02/20/95 - STA 526+20

02/22/95 - STA 526+12

02/24/95 - STA 526+00

02/25/95 - STA 525+90

02/26/95 - STA 525+80

02/27/95 - STA 525+80

02/27/95 - STA 525+66

03/01/95 - STA 525+49

03/02/95 - STA 525+36

STA 525+90

STA 526+20

STA 525+60

Page 4: MuniMetro Turnaround

AN IMPORTANT CHALLENGE WAS TO CONTROL DEFORMATIONS CAUSED BY THE DEEPEXCAVATIONS TO AVOID DAMAGE OF IMPORTANT, SETTLEMENT-SENSITIVE, ADJACENT BUILDINGS.

THE DESIGN TEAM DESIGNED THE SHORING SYSTEM CONSISTING OF STIFF SLURRY WALLS,PENETRATING DEEP BELOW EXCAVATION, AND CLOSELY SPACED BRACING.

DE

PT

H B

EL

OW

GR

OU

ND

SU

RFA

CE

, FE

ET

BAY MUD

FILL

MARINE SAND

20

0

40

60

80

100

120

140

+140 +120 +100 +80 +60 +40 +20 0 -20 -40 -60

HORIZONTAL DISTANCE FROM WEST SPTC WALL, FEET

-80 -100 -120 -140

EXISTINGBUILDING I-24 I-23

BASEMENT

INC

LIN

OM

ET

ER

INC

LIN

OM

ET

ER

36 FT.

12 FT.A

12/16/97 1421-908\ibeaeb3.cdr01/14/04 jdg ..\m m t\ibeaeb3.cdr

OLDSEA WALL

CONCRETESPTCWALLS

STEELSOLDIERPILES(SPACED 12 FT ON CENTER)

Page 5: MuniMetro Turnaround

12/16/97 sb 1421-908\ e idtsa1.cdr01/14/04 jdg m m t\e idtsa1.cdr

(b) AREA BETW EEN MISSION AND HOWARD STREETS -IN FRONT OF EXISTING BUILDINGS

(INCLINOMETER CL-30)(a) TEST SECTION - INCLINOMETER CL-17

A HEAVILY INSTRUMENTED TEST SECTION PROVIDED CONFIRMATION OF THE PREDICTIONSOF GROUND DEFORMATIONS. COMPREHENSIVE INSTRUMENTATION WAS ALSO PROVIDED TO

MONITOR DEFORMATIONS IN FRONT OF THE EXISTING BUILDINGS.

LATERAL DEFORMATIONS, INCHESD

EP

TH

BE

LO

W G

RO

UN

D S

UR

FAC

E, F

EE

T0 +0.5

(0.3)

-0.5 +1.0 +1.5 +2.0

AWAY FROM EXCAVATION

TOWARDS THE EXCAVATION

40

20

0

60

80

100

120

140

160

+2.5LATERAL DEFORMATIONS, INCHES

0 +0.5-0.5 +1.0 +1.5 +2.0

AWAY FROMEXCAVATION

TOWARDS THE EXCAVATION

40

20

0

60

80

100

120

140

160

+2.5

ESTIMATED DEFORMATIONPROFILE

(DESIGN CRITERIAREPORT 1989)

INCLINOMETER CL-18d = 19 FT.

5.5

16.5

28

9/21

(2.1)

(2.3)

ESTIMATED DEFORMATIONPROFILE

(DESIGN CRITERIAREPORT, 1989)

8/9

7/15

6/17

6/9/94

7/7/94

8/3/94

8/25/94

A

B

C3/3/95

2/1/95

10/19/94

10/14/94

1/25/95

A5.5 FT

(0.20)

(1.6)

16.5 FT

27 FT

35.5

B

C2/17/955/2/95

3/27/95

125

SYMBOL DATEDEPTH

FTCONSTRUCTION

STAGEAFTER LEVEL A

BRACING INSTALLEDLEVEL B BRACING

INSTALLEDLEVEL C BRACING

INSTALLED

FINAL EXCAVATION

BASE SLAB POUREDLEVEL C REMOVED

COMPLETEDSTRUCTURE

6/21/94 7.5

19.5

30.5

42

42

38

7/15/94

8/14/94

8/25/94

10/4/94

9/28/9510/23/95

SYMBOL DATEDEPTHFEET

CONSTRUCTIONSTAGE

LEVEL A BRACINGINSTALLED

LEVEL B BRACINGINSTALLED

LEVEL C BRACINGINSTALLED

FINAL EXCAVATIONTO SUBGRADE

BASE SLAB POUREDLEVELS C AND B REMOVED

STRUCTURE ANDBACKFILL COMPLETED

10/20/94 8

18.5

29

35.5

35.5

32.5

2/7/95

3/6/95

3/27/95

5/15/95

9/25/95

A

B

C

CL

-17

CL

-30

SOLDIER

PILE

SPTC

WALLX

X X

X

Page 6: MuniMetro Turnaround

0 10 20 30 40 50 60 70 80 90 1000

0.5

1.0

1.5

2.0

2.5

Line 23, station 535+5042ft. Deep Excavation

Line 22, Station 535+0042 ft. Deep Excavation

Estimated distribution ofSettlem ents at Ground Level

(D&M Design Criteria Report, 1989)

Note: Settlements x

x

x

x

x

Distance From Excavation, Feet

Su

rfac

e S

ett

lem

ents

, In

ches

(a) GROUND SURFACE SETTLEMENTS IN THE TEST SECTION AREA,NORTH OF THE ADJACENT BUILDINGS

2.3 In.

12/17/97 sb 1421-908\fig6 .cdr01/14/04 jdg ...m m t\gsscom p.cdr

0

0.5

1.0

1.5

2.0

2.5

3.0

Distance From Excavation, Feet

Su

rfac

e S

ettl

em

ents

, In

che

s

(b) GROUND SURFACE SETTLEMENTS IN FRONT OF ADJACENT BUILDINGS

0 11010 20 30 40 50 60 70 80 90 100

Estimated Ground SettlementsDesign Criteria Report, 1989

Settlem ents Affectedby Vibrations

x

x

x

x

EXCAVATION DEPTH: 34-36 FEET

GROUND SURFACE SETTLEMENTS W ERECOMPARED W ITH ESTIMATES MADE DURING THE

DESIGN PHASE OF THE PROJECT TO VERIFY THATTHE EXCAVATIONS PERFORMED AS EXPECTED

Page 7: MuniMetro Turnaround
Page 8: MuniMetro Turnaround
Page 9: MuniMetro Turnaround

11/4/99 sv ..\8712-043\ascem etric\m m tM .cdr01/14/04 jdg ..\m m t\m m tM .cdr

1848Shoreline

Em barcaderoPark Plaza

Fer

ryB

uild

ing

M arket

M ission

H ow ard

Folsom

Harrison

Em

barcadero

Steuart

Spear

Freem

ont

Beale S

AN

F

RA

NC

ISC

O

BA

Y

BartTunnels

Elevated Road way

TRANSBAYTERMINAL

ProjectAlignment

BART EMBARCADEROSTATION

SEGMENT STRUCTUREAB

BC

CDDE

TUNNELS

BOX STRUCTURE

U-WALLSURFACE

C

D

E

Scale in Meters

0 150 300

TunnelAccessShaft

OldSeawall

TestSection

Page 10: MuniMetro Turnaround

Dep

th, M

eter

sD

epth

, Meters

B-1

537 538 539

P240 P261 P284 P296 P320

FILL

BAY MUD

GREY SAND

OLD BAY CLAY

COLMASAND DENSE

GREEN/GREY SAND

COLLUVIUM

FRANCISCAN ROCK

ALLUVIUM/COLLUVIUM

0

20

10

30

40

50

60

70

30 60 90

11/11/99 sv ..\8712-043\ascem etric\cs.cdr01/14/04 jdg ..\asce\cs.cdr

Figure 2

Horizontal Distance, Meters

Horizontal Distance, Stations

EXCAVATIONSUBGRADE

BAY MUD

GREY SAND(MARINE)

10 5 50 10 15

Horizontal Distance From West Sptc Wall, Meters

20 25 30 35

5

0

10

15

20

25

35

40

45

FILLA

B

C

(a) LONGITUDINAL PROFILE (PARTIAL) (b) TRANSVERSE SECTION

OLDSEA WALL

Page 11: MuniMetro Turnaround

11/3/99 sv ..\8712-043\ascem etric \shspM .cdr01/14/04 jdg ..\asce\shspM .cdr

0 00 25 50 75 100 125

5 5

10 10

15 15

20 20

30 30

25 25

35 35

40 40

Dep

th B

elo

w G

rou

nd

Lev

el,

Fee

t

In SituVertical EffectiveStress, vo

Best Estimate ofMaximum PastPressure, vm ax

Vertical Effective Stresses, and , kPa vmax vo

0 25 50 75 100 125

Extension

Compression

Undrained Shear Strength, Su, kPa

GREY

SAND

BAY

MUD

Direct Simple Shear and Field VaneSU =0.23x x (OCR) ~0.22xDDS vo vm ax 0.85

Su/ v = 0.18

Su/ v = 0.30

Figure 3

CorrectedVane Shear

Tests

= 0.90

Page 12: MuniMetro Turnaround

1.8

1.6

1.4

1.2

1.0

FAC

TO

R O

F S

AF

ET

Y

3 6 9 12 150

SLURRY WALL PENETRATION BELOW EXCAVATION, D, (m)

cNc + 2S (D/B)u

H+q

B

H

D

13 M Deep Excavation

11 M Deep Excavation

11/4/99 sv ..\8712-043\ascem etric \srbsaM .cdr01/14/04 jdg ..\asce\srbsaM .cdr Figure 4

Fs =

Page 13: MuniMetro Turnaround

11/3/99 sv ..\8712-043\ascem etric\bsm ldM .cdr01/14/04 jdg ..\asce\bsm ldM .cdr

2.00

2.25

1.75

1.50

1.25

1.0030 6 9 12 15

2.0

2.5

1.5

1.0

0.5

030 6 9 12 15

IND

EX

FA

CT

OR

OF

SA

FE

TY,

F. S

.

EXCAVATION DEPTH, METERS EXCAVATION DEPTH, METERS

MA

XIM

UM

LA

TE

RA

L D

EF

OR

MA

TIO

N (

hm

x) IN

CH

ES

(a) BASE STABILITY (b) MAXIMUM LATERAL DEFORMATIONS

3.0

S=750(Test Section)

S = 1500(South of Mission)

s

Figure 5

Page 14: MuniMetro Turnaround

11/4/99 sv ..\8712-043\ascem etric \ldcbM .cdr01/14/04 jdg ..\asce\ldcbM .cdr

LATERAL DEFORMATIONS, mm

(b) DEFORMATIONS PARALLEL TO THE WALL

-10 -5 0 +5 +10

NORTH SOUTH

LATERAL DEFORMATIONS, mm

(a) DEFORMATIONS TRANSVERSE TO THE WALL ALIGNMENT

DE

PT

H B

EL

OW

GR

OU

ND

SU

RFA

CE

, ME

TE

RS

DE

PT

H B

EL

OW

GR

OU

ND

SU

RFA

CE

, ME

TE

RS

-30-35-40 -25 -20 -15 -10 0 +5-5

10 10

5 5

0 0

15 15

20 20

25 25

30 30

35 35

135

66

40 40

45 45

50 50

AWAY FROM EXCAVATION (W EST)

SO

LD

IER

PIL

ES

PT

C W

AL

L

CONSTR.SEQUENCE

AFTER CONSTRUCTIONOF PANEL P69

AFTER CONSTRUCTIONOF PANEL P71

AFTER CONSTRUCTIONOF PANEL P75

29 23 17 8 4

AFTER CONSTRUCTIONOF PANEL P73

AFTER INSTALLATIONOF SOLDIER PILES

AND PANELS NORTHOF W684/5/94

Figure 6

Page 15: MuniMetro Turnaround

35

30

15

20

25

10

5

0

0 3 6 9 12 15 18 21 24 27

40

45

MA

XIM

UM

LA

TE

RA

L D

ISP

LA

CE

ME

NT,

, m

m

HORIZONTAL DISTANCE FROM SPTC WALL, METERS

11/3/99 sv ..\8712-043\ascem etric\ldcbcM .cdr01/14/04 jdg ...\asce\ldcbcM .cdr

I

INCLINOMETER

TYPICALPROFILES

SPTCWALL

Figure 7

h

h

INCLINOMETERSBETW EEN

SOLDIER PILES

Page 16: MuniMetro Turnaround

INSTALLATIONOF SPTC WALLS

INACTIVEPILE

DRIVING

INACTIVE

P-10

P-9

Time After Piezometer Installation, Days

CH

AN

GE

IN P

OR

E P

RE

SS

UR

E, M

ET

ER

S H

O

2.7 M1

MS

PT

C

WA

LL

+6

+5

+3

+4

+2

0

-2

-1

+1

-30 25 50 75 100 125 150 175 200 225 250 275 300 325 350

11/3/99 sv ..\8712-043\ascem etric \pm is2M .cdr01/14/03 jdg ..\asce\pm is2M .cdr

Figure 8

2

Page 17: MuniMetro Turnaround

762

mm

S

TE

EL

CA

SIN

GC

OM

BIN

AT

ION

406

mm

/356

mm

AU

GE

R H

OL

E

BA

CK

FIL

LE

D

HO

LE

457

mm

SQ

UA

RE

CO

NC

RE

TE

PIL

E CO

NC

RE

TE

WA

LL

CL-20

CL-21

Figure 9

686

mm

AU

GE

R H

OL

E

-20-30 -10 0 +10

Lateral Deformations, mmD

ep

th B

elow

Gro

un

d S

urfa

ce, Meters

762

mm

CA

SIN

G

WF

SE

CT

ION

OF

SO

LD

IER

PIL

E1

PIL

E E

VE

RY

3.7

M

FILL

BAYMUD

MARINE SAND

COLMA SAND

OLD BAY CLAY

11/3/99 sv ..\8712-043\ascem etric\eom opM .cdr01/14/04 jdg ...\asce\eom om pM .cdr

0 0

15 15

10 10

5 5

20 20

25 25

30 30

35 35

40 40

45 45

50 50

-10 0 +10 +20

Lateral Deformations, mmD

epth

Bel

ow

Gro

un

d S

urf

ace

, Met

ers

CL-17

CL-18

(a) EFFECTS OF DEEP PREDRILLING (b) INSTALLATION PROCEDURE

(c) EFFECTS OF SHALLOW PREDRILLING

(1) Deep Predrilling (2) Shallow Predrilling

Page 18: MuniMetro Turnaround

11/3/99 sv ..\8712-043\ascem etric\ldcbpdM .cdr01/14/04 jdg ...\asce\ldcbpdM .cdr

MA

XIM

UM

LA

TE

RA

L D

EF

OR

MA

TIO

NS

, mm

HORIZONTAL DISTANCE FROM EXCAVATION, METERS

+10

+15

+20

+5

0

-10

-5

-15

-20

0 3 6 9 12 15 18 21

AW

AY

FR

OM

E

XC

AV

AT

ION

TO

WA

RD

S T

HE

E

XC

AV

AT

ION

ST

EE

L S

OL

DIE

R P

ILE

457

mm

AU

GE

R H

OL

E

457

mm

SQ

UA

RE

CO

NC

RE

TE

PIL

E

CO

NC

RE

TE

WA

LL

41 M

20 M

(+) (-)

12.2 M

27.5 M

I

m ax

SPTCWALL

PILES

m ax

Figure 10

PROBABLETRENDS

PROBABLETRENDS

Page 19: MuniMetro Turnaround

11/3/99 sv ..\8712-043\ascem etric\ecsaiM .cdr01/14/04 jdg

DE

PT

H B

EL

OW

GR

OU

ND

SU

RFA

CE

, ME

TE

RS

0

0 6 1 2 1 8 2 4

F E N C E

3 0 3 6 4 2

- 0 . 5 CL

-17

S-7

P-7

S-8

S-9

S-1

0

S-1

1

CL

-18

CL

-33

CL

-34

-2.1

-5.3

-13.6

7.6 M

PRESUMED ZONEOF MOVEMENTS

41 M

35 M

45.7 M

SPTC WALL(0.9 M THICK)

SOLDIER PILES(W 920 x 313

EVERY 3.66 M)

5

10

15

20

25

30

35

45

40

50

H =

13.

1 M

-8.5

FILL

BAYMUD

GREYSAND

COLMASAND

OLD BAY CLAY(OBC)

DISTANCE FROM EXCAVATION WALL, METERS

BUS TURNOUT AREA

7.6 M

7.6 M

1.52 M

Figure 11

11

Page 20: MuniMetro Turnaround

11/4/99 sv ..\8712-043\ascem etric\e idtsaM .cdr01/14/03 jdg

(b) DEFORMATIONS MEASURED 5.8 M BEHIND THE WALL

(a) DEFORMATIONS MEASURED 0.9 M BEHIND THE WALL

LATERAL DEFORMATIONS, mmD

EP

TH

BE

LO

W G

RO

UN

D S

UR

FAC

E, M

ET

ER

S0 +10-10 +20 +30 +40

AWAY FROM EXCAVATION

TOWARDS THE EXCAVATION

15 15

10 10

5 5

20 20

0 0

25 25

30 30

35 35

40 40

45 45

50 50

+50 +60LATERAL DEFORMATIONS, mm

0 +10-10 +20 +30 +40 +50

AWAY FROM EXCAVATION

TOWARDS THE EXCAVATION

+60

SP

TC

WA

LL

SO

LD

IER

PIL

E

AFTER LEVEL BBRACING

7/15/94

AFTER LEVEL BBRACING

AFTER LEVEL CBRACING

AFTER FINALEXCAVATION

AFTER SLAB POUR;REMOVED LEVEL B

BRACING

AFTER STRUCTURECOMPLETION

AFTER LEVEL CBRACING

8/14/94

AFTER FINALEXCAVATION

8/25/94

AFTER SLAB POURREMOVAL LEVEL C

10/4/94

AFTER REMOVAL OFLEVEL B STRUT

AFTER COMPLETION OFSTRUCTURE

9/28/95 AND 10/23/95

INCLINOMETER CL-17d = 0.9 M

INCLINOMETER CL-18d = 5.8 M

6/9/94

7/7

8/3

8/259/21

8/9

7/15

6/17 A

B

C

9/21

8/9

7/15

6/17 A

B

C

Figure 12

PREDICTEDPROFILE

Page 21: MuniMetro Turnaround

AVERAGE EFFECTIVE STRESS, P = ½( + ) 1 3

SH

EA

R S

TR

ES

S,

= ½

( -

)

13

EX

TE

NS

ION

CO

MP

RE

SS

ION

(F.S.) =i

11/8 /99 sv ..\8712-043\ascem etric\cesM .cdr01/14/04 jdg Figure 13

X

Ko-LINE

NegativeExcessPorePressures

AB

TotalStress Path(T-Uo)S.P.

A-B: DISSIPATIONOF NEGATIVE EXCESS

PORE PRESSURESAT END OF EXCAVATION

u

(Su) = ( ff)t t ( ff) = i (Su) i

FAILURE ENVELOPEIN EXTENSIONK -LINEFE

A'

B'

O

Su i

(F.S.) =t

(Su)t

EffectiveStress Path

Page 22: MuniMetro Turnaround

50 50

60 60

40 40

20 20

30 30

10 10

0 030 6 9 12 15

EXCAVATION DEPTH, METERS

MA

XIM

UM

LA

TE

RA

L D

EF

LE

CT

ION

(mm

)

30 6 9 12 15

EXCAVATION DEPTH, METERS

MA

XIM

UM

LA

TE

RA

L D

EF

LE

CT

ION

(mm

)

4/95

4/95

8/94

8/94

6/94

9/94

SYMBOLSYMBOL INCLNOM.NO.

INCLNOM.NO.

CL-17CL-20

6.16.1

0.910.91

DISTANCEm

DISTANCEm

CL-18CL-21 9/94

4/95

9/94

8/94

7/946/94

4/95

9/94

7/94

11/3 /99 sv ..\8712-043\ascem etric\ldvedM .cdr01/14/04 jdg

Figure 14

a

ab

b

NOTATION CONDITION

a

b

CREEP DEFORMATION

DELAY IN BASE SLABCONSTRUCTION

a

aa = CREEP FORMATIONS

Page 23: MuniMetro Turnaround

43.5M

37.2M

31.4M

11/8/99 sv ..\8712-043\ascem etric\idcbM .cdr01/14/04 jdg

LATERAL DEFORMATIONS, m m

(b) INCREMENTAL DEFORMATIONS CAUSED BY PILE DRIVING

-15 -10 -5 0 +5 +10 +15 +20

AWAY FROMEXCAVATION

TOWARDS THEEXCAVATION

LATERAL DEFORMATIONS, m m

(a) DEFORM ATIONS CAUSED BY CONSTRUCTION OF SPTC WALLS

DE

PT

H B

EL

OW

GR

OU

ND

SU

RF

AC

E,

ME

TE

RS

-20

GW T

-25-30 -15 -10 -5 0 +5 +10 +15

AWAY FROM EXCAVATION TOWARDS THE EXCAVATION

43.5 M

37.2 M

31.4 M

5.5 M

CONSTR.SEQUENCE

RANGE OFPILE TIPS

457 mm CONCRETE

PR

ED

RIL

LIN

G40

6 m

m A

UG

ER

762 mm O.D.

STEEL CASING

10

5

0

15

20

25

30

35

40

45

50

W 920 x 313

5.5M

41 M

20 M

AFTER CONSTRUCTIONOF PANEL NO. P33

3/18/94

AFTER CONSTRUCTIONOF PANEL NO. P35

3/7/94

AFTER INSTALLATIONOF SOLDIER PILES

AND PANEL NO. P313/6/94

AFTER EXCAVATIONOF PANEL NO. P37

3/9/94

AFTER CONSTRUCTIONOF PANEL NO. P37

3/14/97

16 mm

Figure 15

6.4 mm

Page 24: MuniMetro Turnaround

11/8/99 sv ..\8712-043\ascem etric\m ldtM .cdr01/14/04 jdg

LATERAL DEFORMATIONS, m m LATERAL DEFORMATIONS, m m

(a) Lateral Deformations During Excavation

DE

PT

H B

EL

OW

GR

OU

ND

SU

RF

AC

E, M

(b) Total Lateral Deform ations( Wall, Pile Driving and Excavation)SPTC

-10 -10-20-30-400 0+10 +10+20 +20+30 +30+50+40 +40 +50 +60

10

5

0

15

20

25

30

35

40

45

50

10

5

0

15

20

25

30

35

40

45

50

SO

LD

IER

PIL

ES

PT

C W

AL

L

AWAY FROM EXCAVATION

AWAY FROM EXCAVATION

TOWARDS THE EXCAVATION

TOWARDS THE EXCAVATION

6/17 6/17/94

7/15

9/21/94

8/9 8/9-8/19/94

BASE SLAB

6/09/ 6/09/

7/7/ 7/7/94

8/3/94

8/23/94

A A

B B

C C

Excavation Level A

After Construction of SPTC Wall, 3/18/94

Excavation Level B

After Excavation to Level B (5.8 M), 7/8/94

After Level B Bracing, 7/15/94

After Excavation for Level C (9.4 M) 8/4/94

After Pile Driving, 4/26/94

Periodic, 9/1/94

After Bracing Level C, 8/14/94

Periodic, 9/7/94

After Excavation Level C, 8/4/94

Excavation Completed (12.8 M), 8/25/94

Final Excavation, 8/25/94

After Base Slab Construction, 9/27/94

After Base Slab Construction, 9/27/94

SYM.

SYM.

Figure 16

7/15/94

AFTER SPTCWALL CONSTRUCTION

AFTER PILEDRIVING

AFTER BASE SLABCONSTRUCTION

9/21

8/3/94

PREDICTEDPROFILE

Page 25: MuniMetro Turnaround

11/4/99 sv ..\8712-043\ascem etric\scetsaM .cdr01/14/04 jdg

0 3 6 9 12 15 18 21 24 27 30

0

20

10

30

50

40

60

70

Line 23, Station 535+5013.1 M Deep Excavation

Line 22, Station 535+0013.1 M Deep Excavation

Estimated Distribution ofSettlem ents at Ground Level

D&M Design Criteria Report, 1989

x

x

x

x

x

Distance From Excavation, Meters

Su

rfac

e S

ettl

emen

ts, m

m

58 mm

Figure 17

Page 26: MuniMetro Turnaround

CL-28

CL-29CL-27

CL-26S-06R

P-10P-09 S-06

Sheet PilesCL-25CL-24

CL-23

CL-22

537+00538+00

60 62 64 66 68 7074 76 78 80 82 88 90 92 94 96 108 110 112 114

7460 62 64 66 68 70 76 78 80 82 88 90 92 94 96 108 110 112 114

AudiffredBldg.

113-115Steuart

JewishCommunityFederation

SteuartPlace

"North"

SteuartPlace

"South"

GriffonHotel Y.M.C.A.

10 200

Steuart Street

P-09

CL-24

S-05

KEY

Approxim ate Location of Inclinometer

Approxim ate Location of Piezom eter

Approxim ate Location of Subsurface Settlem ent

Mis

sio

n S

tree

t

N

Embarcadero

539+00 540+00

TR

TM

TL

S-05

11/3/99 sv ..\8712-043\ascem etric\ipM .cdr01/14/04 jdg

Figure 18

Meters

Page 27: MuniMetro Turnaround

LATERAL DEFORMATIONS, m m LATERAL DEFORMATIONS, m m

(a) LATERAL DEFORMATIONS DURING EXCAVATION11/8/99 sv ..\8712-043\ascem etric\ldm M .cdr01/14/04 jdg

DE

PT

H B

EL

OW

GR

OU

ND

SU

RF

AC

E,

M

(b) TOTAL LATERAL DEFORMATIONSFROM VARIOUS CONSTRUCTION ACTIVITIES

-10 -30-40-500 -20 -10+10 0+20 +10+30 +20+40 +50 +30 +40 +50

5

0

15

20

25

30

35

40

45

50

SO

LD

IER

PIL

ES

PT

C W

AL

L

AWAY FROMEXCAVATION

AWAY FROM EXCAVATIONTOWARDS THEEXCAVATION

TOWARDS THE EXCAVATION

10

5

0

15

20

25

30

35

40

45

50

10

A A1.52 M 1.52 M

4.57 M 4.57 M

7.92 M 7.92 M

11.0 MSG

SG

B B

C C

9/27/94 9/27/94

10/25/94 10/25/94

11/30/94 11/30/94

1/18/95 1/18/95

W 920x313

Excavation For Level A Bracing, 10/3/94

Excavation for and Installation ofLevel C, 12/7/94Excavation Complete Slab Poured,1/19/95

Excavation for and Installation ofLevel B, 10/27/94

Removal of Struts at Levels B & C,2/20/95

SYM.

After Construction of SPTC Walls, 5/10/94

After Excavation to Level B; Two Levelsof Struts Installed, 10/27/94After Excavation to Level C, 12/7/94

After Pile Driving, 8/5/94

Base Slab Constructed Levels C & BRemoved, 2/20/95

Excavation Completed, 1/19/95

SYM. ACTIVITYACTIVITY

38 mm

ESTIMATED FINALDEFORMATION

PROFILE

6 mm

Figure 19

AFTER SPTC WALLCONSTRUCTION

AFTERPILE DRIVING

AFTEREXCAVATION

END OFCONSTRUCTION

11.0 M

Page 28: MuniMetro Turnaround

11/4/99 sv ..\8712-043\ascem etric\m lda2M .cdr01/14/04 jdg

30

25

20

15

10

5

0

30

25

20

15

10

5

030 6 9 12 15 30 6 9 12 15

ALL INCLINOMETERSARE 0.9-1.2 M FROMTHE SPTC WALL

NOTE:

EXCESSIVECANTILEVER

DEFLECTIONS

NOTATION

a

b

CONDITION

CREEP DEFORMATIONDEFORMATION CHANGE

DURING BOXCONSTRUCTION AND

BACKFILL

EXCESSIVECANTILEVERMOVEMENT

EFFECTS OFCROSSLOT

WALL

SYMBOL INCLUDINGNUMBER

CL-23

CL-26

CL-28

CL-30

CL-31

SYMBOLINCLUDING

NUMBERDISTANCEd, METERS

CL-22 7.92

CL-24 6.1

CL-25 7.62

CL-27 6.21

CL-29 6.21

SPTCWALLIN

CL

INO

ME

TE

R L

d

MA

XIM

UM

LA

TE

RA

L D

EF

OR

MA

TIO

NS

(mm

)

MA

XIM

UM

LA

TE

RA

L D

EF

OR

MA

TIO

NS

(mm

)

EXCAVATION DEPTH, H, METERS EXCAVATION DEPTH, H, METERS

b a

a

b

Figure 20

Page 29: MuniMetro Turnaround

-10 -100 0+10 +10+20 +20+30 +30+40 +40+50 +50+60 +60+70

10

5

15

20

25

30

35

40

45

50

10

5

15

20

25

30

35

40

45

50

SETTLEMENT, m m

Estimated GroundSettlements: Design Criteria Report, 1989

x

SETTLEMENT, m m

FILL

BAY MUD

GREY SAND

OLD BAY

CLAY

Symbol

Symbol

Date

Date

9/9/94

5/12/94

After Install. of

After Install. ofSoldier Piles

SPTC Walls

After Excavation

After SPTC Walls& Pile Driving

for Level A

After Excavation

After Excavationfor Level A

for Level B

After Excavation

After Excavationfor Level B

for Level C

After Full

After Excavationfor Level C

Excavation 11 M

After Construc.

Full Excavation11 MAfter Construc.of Base Slab of Base Slab

Activity

Activity

10/07/94

9/9/94

11/09/94

10/1/94

12/28/94

11/9/94

2/28/95

12/14/94

3/22/95

1/11/95

3/2/95 &3/22/95

xx

x x

Estimated Ground Settlements: Design Criteria Report, 1989

x

11/4/99 sv ..\8712-043\ascem etric\c l24-27M .cdr01/14/04 jdg Figure 21

(a) CL-24; At 113-115 STUEART (b) CL-27 at STUEART PLACE

DE

PT

H B

EL

OW

GR

OU

ND

SU

RFA

CE

, M

DE

PT

H B

EL

OW

GR

OU

ND

SU

RFA

CE

, M

Page 30: MuniMetro Turnaround

11/4/99 sv ..\8712-043\ascem etric\gssM .cdr01/14/04 jdg

0

10

20

30

40

50

60

70

80

Distance From Excavation, Meters

Su

rfac

e S

ettl

emen

ts, m

m

0 333 6 9 12 15 18 21 24 27 30

Estimated Ground SettlementsDesign Criteria Report, 1989

x

x

x

EXCAVATION DEPTH: 10.4 - 11 M

Figure 22

Page 31: MuniMetro Turnaround

11/4/99 sv ..\8712-043\ascem etric \bscbeM .cdr01/14/04 jdg

BU

ILD

ING

SE

TT

LE

ME

NT,

mm

HORIZONTAL DISTANCE FROM EXCAVATION, M HORIZONTAL DISTANCE FROM EXCAVATION, M

0 0

0

5 5

5 5

10 10

10 10

15 15

15 15

20 20

20 20

0 05 510 1015 1520 2025 2530 3035 3540 40

BU

ILD

ING

SE

TT

LE

ME

NT,

mm

BU

ILD

ING

SE

TT

LE

ME

NT,

mm

HORIZONTAL DISTANCE FROM EXCAVATION, M HORIZONTAL DISTANCE FROM EXCAVATION, M

0 05 510 1015 1520 2025 2530 3035 3540 40

BU

ILD

ING

SE

TT

LE

ME

NT,

mm

0

10/5/94

10/7/94

10/7/94 10/5/94

4/4/955/23/95

7/9/96

11/9/94

1/11/95

3/9/955/22/95

7/8/96

11/9/94

3/9/955/22/95

7/8/96

1/12/95

4/4/954/23/95

7/9/96

113-115 STEUART STREET2 STORIES CONCRETE FR.

SINGLE BASEMENTW OOD PILES

STEUART PLACE NORTH6 STORIES, SINGLE

BASEMENTW OOD PILES

JEW ISH COMMUNITYFEDERATION BUILDING

7 STORIES / ONE BASEMENT12 IN. CONCRETE PILES

STEUART PLACE SOUTH5 STORIES, SINGLE

BASEMENTW OOD PILES

Figure 23