8/14/2019 MTLSD Community Forum Jan 14 2009 http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 1/81 Firm Profile 50 Years of Service 70% Registered Architects Ranked 16 th of Top Design Firms in 2005 by Modern Healthcare AIA Healthcare Design Awards 97, 98, 99, 00, 01, 05, 06 75 LEED Accredited Professionals Mt Lebanon High School January 14, 2009

Upload: professormadison

Post on 30-May-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 1/81

Firm Profile

50 Years of Service

70% Registered Architects

Ranked 16th of Top Design Firms in 2005 by Modern Healthcare

AIA Healthcare Design Awards 97, 98, 99, 00, 01, 05, 06

75 LEED Accredited Professionals

Mt Lebanon High School

January 14, 2009

Page 2: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 2/81

Page 3: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 3/81

• Update the community on the status of the

project

• Review the alternatives with updated costestimates

• Discuss financing options

• Obtain community feedback

Goals for this Evening

Page 4: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 4/81

• Fall 2006 - De Jong Study Begins

– School Board begins program and space study with

educational planners, De Jong & Associates

– Educational Specification Team convened-5 meetings

held– 2 Community workshops held

• Winter 2007 - De Jong Final Report Presented to

Community

• Fall 2007- Selection Celli-Flynn Brennan Architectsand Planners (CFB) and OWP/P

Review of Project Activity

Page 5: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 5/81

• Spring 2008 - Update presented prior to Board

Discussion meetings

• Summer 2008 - Community Forum

• Fall 2008 - P.J. Dick hired as ConstructionManager

• Winter 2009

– Design Advisory Team Meeting

– Community Forum

– 3 Neighborhood Meetings

Review of Project Activity

Page 6: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 6/81

• January 20 - Neighborhood Meeting

– Markham Elementary

• January 21 - Neighborhood Meeting

– Howe Elementary

• January 22 - Neighborhood Meeting

– Jefferson Middle School

• January 26 - Special Board Meeting

– Fine Arts Theater-High School

• February 16 - Board Meeting

– High School

Future Meetings

Page 7: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 7/81

Mt Lebanon Space Needs

Page 8: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 8/81

Existing Building: 545,000 Square Feet

DeJong Report: 548,485 Square Feet

- 503,803 High School

- 44,682 District office/Maintenance/Custodial

Space Program

Page 9: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 9/81

Design Team: 440,000 Square Foot Building20,000 SF District Services

420,000 SF High School Building

1,980 Rated Pupil Capacity

Additional Budgeted Areas

Site Buildings (Field House, Maintenance Facilities)

Design Team Space Program

Page 10: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 10/81

• Classroom Clusters Based on Departments

• Classroom Size at 800 SF for Multiple LearningActivities and Technology

• Flexible Spaces for Interdisciplinary Work and ProjectBased Work

• Combination Lecture/Lab space for Science

• Department Offices for Teacher Collaboration

Program Features

Page 11: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 11/81

Ability to Use Technology Anywhere in the Building

Resource Spaces for Learning

Special EducationLanguage Lab

Media

Applied Arts and Business Technology

Social Spaces for Informal Learning

Program Features

Page 12: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 12/81

State of the Art Media/Technology Centers

Complete Arts Program

Maintain Auditorium and TheaterAdequate Support Spaces

Appropriately Sized Spaces

Appropriate Equipment and Systems

Modern Physical Education Areas

Program Features

Page 13: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 13/81

62% of after hours usage is by groups other thanMt Lebanon School District

Potential Community Use AreasGymnasiums

Fitness Track

Fitness Area

Pool

AuditoriumLittle Theater

Technology/Media Center

Community Use Spaces

Page 14: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 14/81

Existing Building Assessment

Page 15: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 15/81

• Multiple buildings at various times since 1928• Square Footage: 545,255 SF

• Building does not support 21st century

teaching & learning

• Organization is Confusing

- No sense of where you are in the school

- No clear circulation which creates longer

travel times & potential

• Security issues

Building Assessment

Page 16: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 16/81

- Lack of day lighting to interior occupiedspaces- MEP/FP (Mechanical ElectricalPlumbing/Fire Protection) equipment has

exceeded it’s life expectancy and iscostly to operate- Building exterior requires maintenance- Significant asbestos containingmaterials

-Life Safety (Fire Alarms, SmokeControl) systems require updating

Building Assessment

Page 17: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 17/81

Page 18: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 18/81

Environment / Sustainable Design

Page 19: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 19/81

• Green Roofs

• Natural Ventilation – Solar Wind Towers

• Wind Turbines

• Day lighting and lighting controls

• Efficient Mechanical and Electrical Systems• Geothermal Heat loop

• Heat Exchange within Mechanical System

• Efficient water use systems, including use of grey water

• Recycled materials / Low VOC materials

• Pervious paving

Possible Sustainability Strategies

Page 20: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 20/81

Teaching and Learning

Page 21: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 21/81

To provide the best education

possible for each and everystudent.

Mission Statement

Page 22: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 22/81

Mt. Lebanon Strategic Plan 2010

Student Learning Targets

Master district technology standards

Master district communication skills

Demonstrate the ability to work cooperatively

Apply problem solving strategiesMaster district reading and comprehension standards

Show responsibility for their own learning

Master district mathematics standards

Apply critical thinking skillsDemonstrate an awareness of current and cultural issues

Page 23: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 23/81

Conceptual Design

Page 24: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 24/81

Alternative Approaches/Phasing

Page 25: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 25/81

Alternative Approach 1Repair Existing Building

Page 26: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 26/81

1

Page 27: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 27/81

1

Page 28: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 28/81

Project Characteristics

• Maintain Existing 545,255 Square Feet-

• Mechanical, Electrical, Plumbing and Fire Protection

Systems Replacement

• Asbestos Abatement

• Code Required Improvements

• Roofing Replacement

• Interior Finishes Due to Other Work

• Minimal Site Repairs

• Minimal Sustainability and Minimal Energy Savings

Alternative Approach 1 – Repair Existing Building

Page 29: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 29/81

Educational Improvements

• No Change in Layout to Support 21st Century

Teaching & Learning

• No Change for Fine & Performing Arts Spaces

• No Change for Physical Education & Athletic

Spaces

• No Change for Classroom Size

• Adapt Existing Spaces to Fit Required Program

Alternative Approach 1 – Repair Existing Building

Page 30: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 30/81

Impact on Students and Staff

• Multiple Construction Phases

• Length of Project 3-5 years• Student Disruption and Displacement

Alternative Approach 1 – Repair Existing Building

Page 31: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 31/81

Alternative Approach 1ARepair Existing Buildings and Re-invent

Building C

Page 32: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 32/81

Page 33: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 33/81

Alternative Approach 1A – Repair Existing Building/Reinvent Building C

DESIGN

LIBRARY

MEDIA / RESOURCE

CAFE

LEARNING STUDIO

LEARNING STUDIO

LEARNING STUDIO

Page 34: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 34/81

Project Characteristics

• Maintain Existing 545,255 Square Feet-

• Mechanical, Electrical, Plumbing and Fire Protection

Systems Replacement

• Asbestos Abatement

• Code Required Improvements

• Roofing Replacement

• New Interior Finishes Throughout Building C

• Minimal Site Repairs

• Minimal Sustainability and some Energy Savings

Alternative Approach 1A – Repair Existing Building/Reinvent Building C

Page 35: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 35/81

Educational Improvements

• Classroom Size at 800 SF in Building C

• Includes some 21st Century Teaching & Learning

Opportunities

– Social Spaces for Informal Learning

– Resource Spaces for Learning

– State of the Art Media/Technology Centers

– Some Flexible Spaces

• No changes to Fine and Performing Arts Spaces• No changes to Physical Education and Athletic

Spaces

Alternative Approach 1A – Repair Existing Building/Reinvent Building C

Page 36: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 36/81

Page 37: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 37/81

Alternative Approach 2Additions and Renovation

Page 38: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 38/81

2

2

Page 39: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 39/81

2 2

2

Page 40: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 40/81

2

2

Page 41: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 41/81

2

2

Page 42: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 42/81

2

2

Page 43: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 43/81

2

2

Page 44: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 44/81

2

Alt ti A h 2 Additi d R ti

Page 45: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 45/81

Project Characteristics

• 440,000 Square Feet- 294,000 SF New (67%)

- 146,000 SF Renovated (33%)

• Renovated Areas Like New

• Site Work Required for Additions

• Phased Demolition and Additions

• Substantial Energy Savings & Sustainability Initiatives

• Significantly Reduced Operations & Maintenance Cost

• Significantly Improved Building Safety & Security

Alternative Approach 2 – Additions and Renovation

Page 46: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 46/81

Alt ti A h 2 Additi d R ti

Page 47: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 47/81

Impact on Students and Staff

• Fewer Construction Phases

• Length of Project 3-4 years• Less Student Disruption and Displacement

• No Modular Classrooms

Alternative Approach 2 – Additions and Renovation

Page 48: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 48/81

Alternative Approach 2ANew Building and Renovate

Performing Arts

Page 49: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 49/81

Page 50: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 50/81

Project Characteristics

• 440,000 Square Feet

• Building B Original Retained for other Uses

• New Building except for Auditorium and Fine Arts

Theater

• Site Work Required for New Buildings

• Phased Demolition and Additions

• Substantial Energy Savings & Sustainability Initiatives

• Significantly Reduced Operations & Maintenance Cost

• State-of-the-Art Building Safety & Security

Alternative Approach 2A – New Building and Renovate Performing Arts

Page 51: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 51/81

Educational Improvements

• Classroom Size at 800 SF

• Includes many 21st Century Teaching & Learning

Opportunities

– Social Spaces for Informal Learning

– Resource Spaces for Learning– State of the Art Media/Technology Centers

– Departmental Classroom Clusters

– Many Flexible Spaces

• Renovated Performing Arts Spaces and New Fine ArtsSpaces

• New Physical Education and Athletic Spaces

Alternative Approach 2A – New Building and Renovate Performing Arts

Page 52: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 52/81

Impact on Students and Staff

• Two Construction Phases

• Length of Project 3-4 years• Minimal Student Disruption and Displacement

• No Modular Classrooms

Alternative Approach 2A – New Building and Renovate Performing Arts

Page 53: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 53/81

Alternative Approach 3New Building

Page 54: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 54/81

3

3

Page 55: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 55/81

3 3

Alternative Approach 3

3

Page 56: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 56/81

Alternative Approach 33

Alternative Approach 3

3

Page 57: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 57/81

Alternative Approach 33

Alternative Approach 3 – New Building

Page 58: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 58/81

Project Characteristics

• 440,000 Square Feet All New

• Building B Original Retained for other Uses

• Rework Entire Site

• Substantial Energy Savings & Sustainability Initiatives

• Significantly Reduced Operations & Maintenance Cost

• Best Community Access to Public Areas

• State-of-the-Art Building Safety & Security

Alternative Approach 3 – New Building

Page 59: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 59/81

Alternative Approach 3 – New Building

Page 60: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 60/81

Impact on Students and Staff

• Two Construction Phases

• Length of Project 3 years• Minimal Student Disruption

• No Modular Classrooms

Alternative Approach 3  New Building

Page 61: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 61/81

Budgets

Architect’s Cost Estimate – July 2008

Page 62: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 62/81

Alternative 1 Alternative 1A Alternative 2 Alternative 3

REPAIR BUILDING REPAIR BUILDING

RE-INVENT BUILDING C

RENOVATION / ADDITIONS

NEW SCHOOL

$79.8M $97.3M $118.7M $131.7M

Estimated Construction cost only. Consultant Fees, Construction

Testing, Furnishing, and Escalations are not included

Architect s Cost Estimate July 2008

Page 63: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 63/81

Construction Manager Cost Estimate – December 2008

Independent budgeting effort

Built up budget based on information provided

• July 22, 2008 Design Team Presentation

• Existing Building Documents and site visits

• Documents of completed projects provided to PJ Dick to

establish quality

• LEED Silver Rating

Page 64: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 64/81

Total Cost Estimate – January 2009

Page 65: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 65/81

1 1A 2 3REPAIR BUILDING REPAIR BUILDING

RE-INVENT BUILDING C

RENOVATION / ADDITIONS

NEW SCHOOL

Complete project costs including contingencies (15%) and soft costs.

Does NOT include state reimbursements (estimated at $15.1 to 16.6

million).

ota Cost st ate Ja ua y 009

$103.2M $123.9M $138.8M $157.9M

2ANEW BLDG

RENOVATE P. ARTS

$156.3M

Page 66: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 66/81

ESTIMATED STATE REIMBURSEMENT TBD TBD $15.1 Million $15.1 Million $16.6 Million  

MT LEBANON DISTRICT COST TBD TBD $123.7 Million $141.2 Million $141.3 Million  

This slide has been updated from the Community Meeting Presentation to reflect that escalation has been included in these budgets 

Page 67: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 67/81

Reduction in Size of Structure

– Size already less than DeJong study

– Further potential impacts on Program

Reduction in Quality

– Life Cycle Costs/Energy Efficiency

– Long Term Maintenance Impacts

– Level/Durability of Finishes

– Reduce LEED© Certification Options

Cost Reduction Decisions

Page 68: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 68/81

ProjectSize

MillageCost

$100,000home

$200,000home

$300,000home

$70 million 2.01 $ 17 $ 34 $ 50

$110 million 2.91 $ 24 $ 49 $ 73

$120 million 3.17 $ 26 $ 53 $ 79

$130 million 3.43 $ 29 $ 57 $ 86

$140 million 3.69 $ 31 $ 62 $ 92

$150 million 3.95 $ 33 $ 66 $ 99

$160 million 4.21 $ 35 $ 70 $ 105

Cost per Month for Homeowners

Page 69: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 69/81

• Bond Issues

– Issuing bonds is the most common way schooldistricts raise funds for school renovations

– Bond Rating is Moody’s Aa2, the highest in

Western PA for school districts

– Bonds take between 45 and 60 days to issue

• Debt Limit

– Act 1 establishes a debt limit for school

districts in Pennsylvania

– Current available debt limit for Mt. Lebanon is

$110 million

Financing Options

Page 70: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 70/81

• Districts are limited to borrowing base

• Electoral debt exempt from borrowing base

calculation

• Electoral debt is debt approved by voters at

election

Debt Act Referendum

Page 71: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 71/81

R f d O i

Page 72: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 72/81

• Debt Act does not allow for multiple questions or

multiple options in the single referendum .

• If referendum fails there is a 5 month moratorium

on any discussions or actions regarding the HighSchool project

• After 5 months, the Board would be able to renew

discussions regarding the High School project

Referendum Options

Range of Options

Page 73: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 73/81

Range of Options

Renovation/Addition

Alternative Approach 2

Repair/Renovation

Alternative Approach 1

New Construction

Alternative Approach 3

Project Costs in 2009 Dollars

$0 $175 to 180 M

Range of Options

Page 74: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 74/81

Range of Options

Renovation/Addition

Alternative Approach 2

Repair/Renovation

Alternative Approach 1

New Construction

Alternative Approach 3

1 1A

3

2 2A

$110 M Threshold

Project Costs in 2009 Dollars

$175 to 180 M$0

As requested this slide will be updated to proportionally represent current budget estimates 

Page 75: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 75/81

Al i A h 1A P d C

Page 76: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 76/81

•Minimize the cons from Alternative 1 and gain educational

improvement in Building C

Alternative Approach 1A – Pros and Cons

Alt ti A h 2 P d C

Page 77: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 77/81

•Significant New Construction

•Existing building areas are renovated “Like New”; therefore,

quality of space is similar to Alternative 3

•All Program area provided and Improved Program

Adjacencies

•Complex Construction Sequencing to maintain adequate

classrooms during construction

Alternative Approach 2 – Pros and Cons

Alt ti A h 2A P d C

Page 78: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 78/81

•As Cost approaches Alternative 3, option is less desirable

Alternative Approach 2A – Pros and Cons

Alt ti A h 3 P d C

Page 79: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 79/81

•Most educational improvement

•Best Program relationships•Building Square Footage is Right-sized and Efficient

•Maximum opportunity for Energy & Operating Cost Savings

•Maximum building life expectancy

•Improved Public Use of Community facilities

•Three story building

•Integrates Universal Design

•Highest First Cost•Temporary Connection between “C” and New Building

Alternative Approach 3 – Pros and Cons

Meeting Objective

Page 80: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 80/81

g j

We need your input on these questions forthe Board to move forward with a decision:• Should Alternative 1, or less work, be considered?

• Given the cost of the Alternatives, should we consider an

Alternative 4 which is $110M by reducing square footage

and the extent of renovation?

• What emphasis do you put on construction phasing relative

to the impact on students?

Page 81: MTLSD Community Forum Jan 14 2009

8/14/2019 MTLSD Community Forum Jan 14 2009

http://slidepdf.com/reader/full/mtlsd-community-forum-jan-14-2009 81/81

Thank You!