CLIENT AND ASSOCIATES LTD 13 Par-La-Ville Road, Hamilton HM 11 Phone: (441) 292-1327 Email: [email protected] www.mason.bm M SON IMPORTANT NOTES This seal indicates that Mason and Associates Ltd.(MAL) has had direct or indirect input into specific design elements of the works. As such our company must be afforded the opportunity to inspect the work as it progresses to ensure conformity to the related design details, specifications and notes. If we are not accorded the privilege of inspecting the work on site before it is covered up or otherwise hidden or if variations to the original details are made without written approval by the engineer of record, Mason and Associates Ltd. will assume no responsibility for the works. Client is still required to contact Building Control for inspections. REVISIONS No. DATE BY REVISION PROJECT DETAILS DRAWN BY: CHECKED BY: TITLE JOB No: DATE: REVISION: SHEET No: MAL ENGINEER COMMENTS INSPECTION DATE FORT GEORGE COMMUNICATIONS ENCLOSURE 19 FORT GEORGE HILL TOWN OF ST. GEORGE EXISTING SITE PLAN CKL KJH 14524 AUGUST 21, 2019 S1 EXISTING BURIED CONDUIT (TO BE VERIFIED WITH OWNER) ISSUED FOR CONSTRUCTION Scale: 1/16" = 1'-0" EXISTING SITE PLAN IC SLAB FORT GEORGE FORT GEORGE HILL GOLF COURSE TOWER EXISTING ENCLOSURE AND SLAB NTS ZONE MAP GOVERNMENT OF BERMUDA MINISTRY OF PUBLIC WORKS GENERAL POST OFFICE BUILDING 3RD FLOOR, 56 CHURCH STREET HAMILTON HM12 BERMUDA SITE Scale: 1:2500 LOCATION PLAN 7 Jan 2020

Upload: others

Post on 07-Feb-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

  • CLIENT

    A N D A S S O C I A T E S L T D

    13 Par-La-Ville Road, Hamilton HM 11

    Phone: (441) 292-1327

    Email: [email protected]

    www.mason.bm

    M SON

    IMPORTANT NOTES

    This seal indicates that Mason and Associates

    Ltd.(MAL) has had direct or indirect input into

    specific design elements of the works. As such

    our company must be afforded the opportunity to

    inspect the work as it progresses to ensure

    conformity to the related design details,

    specifications and notes. If we are not accorded

    the privilege of inspecting the work on site before

    it is covered up or otherwise hidden or if variations

    to the original details are made without written

    approval by the engineer of record, Mason and

    Associates Ltd. will assume no responsibility for

    the works. Client is still required to contact

    Building Control for inspections.

    REVISIONS

    No. DATE BY REVISION

    PROJECT DETAILS

    DRAWN BY:

    CHECKED BY:

    TITLE

    JOB No:

    DATE:

    REVISION: SHEET No:

    MAL ENGINEER COMMENTS INSPECTIONDATE

    FORT GEORGE

    COMMUNICATIONS ENCLOSURE

    19 FORT GEORGE HILL

    TOWN OF ST. GEORGE

    EXISTING SITE PLAN

    CKL

    KJH

    14524

    AUGUST 21, 2019

    S1

    EXISTING BURIED

    CONDUIT (TO BE

    VERIFIED WITH OWNER)

    ISSUED FOR

    CONSTRUCTION

    Scale: 1/16" = 1'-0"

    EXISTING SITE PLAN

    IC

    SLAB

    FORT

    GEORGE

    FORT GEORGE HILL

    GOLF

    COURSE

    TOWER

    EXISTING

    ENCLOSURE

    AND SLAB

    NTS

    ZONE MAP

    GOVERNMENT OF BERMUDA

    MINISTRY OF PUBLIC WORKS

    GENERAL POST OFFICE BUILDING

    3RD FLOOR, 56 CHURCH STREET

    HAMILTON HM12

    BERMUDA

    SITE

    Scale: 1:2500

    LOCATION PLAN

    7 Jan 2020

  • 7'-0" HIGH SECURITY FENCE

    (SEE DRAWING S7)

    CLIENT

    A N D A S S O C I A T E S L T D

    13 Par-La-Ville Road, Hamilton HM 11

    Phone: (441) 292-1327

    Email: [email protected]

    www.mason.bm

    M SON

    IMPORTANT NOTES

    This seal indicates that Mason and Associates

    Ltd.(MAL) has had direct or indirect input into

    specific design elements of the works. As such

    our company must be afforded the opportunity to

    inspect the work as it progresses to ensure

    conformity to the related design details,

    specifications and notes. If we are not accorded

    the privilege of inspecting the work on site before

    it is covered up or otherwise hidden or if variations

    to the original details are made without written

    approval by the engineer of record, Mason and

    Associates Ltd. will assume no responsibility for

    the works. Client is still required to contact

    Building Control for inspections.

    REVISIONS

    No. DATE BY REVISION

    PROJECT DETAILS

    DRAWN BY:

    CHECKED BY:

    TITLE

    JOB No:

    DATE:

    REVISION: SHEET No:

    MAL ENGINEER COMMENTS INSPECTIONDATE

    FORT GEORGE

    COMMUNICATIONS ENCLOSURE

    19 FORT GEORGE HILL

    TOWN OF ST. GEORGE

    PROPOSED SITE PLAN

    CKL

    KJH

    14524

    AUGUST 21, 2019

    S2

    ISSUED FOR

    CONSTRUCTION

    Scale: 1/16" = 1'-0"

    PROPOSED SITE PLAN

    IC

    43

    '-9

    "

    17'-3"

    2

    '

    -

    0

    "

    20'-1"

    SLAB

    FORT

    GEORGE

    FORT GEORGE HILL

    GOLF

    COURSE

    TOWER

    NEW 6'-0" WIDE GATE

    GOVERNMENT OF BERMUDA

    MINISTRY OF PUBLIC WORKS

    GENERAL POST OFFICE BUILDING

    3RD FLOOR, 56 CHURCH STREET

    HAMILTON HM12

    BERMUDA

    NEW ENCLOSURE

    AROUND EXISTING

    COMMUNICATIONS

    BUILDING

    5

    '

    -

    1

    1

    "

    1

    7

    '

    -

    1

    0

    "

    7 Jan 2020

  • REMOVE

    EXISTING RAILING

    AS NECESSARY

    EXISTING COMMUNICATIONS BUILDING

    CLIENT

    A N D A S S O C I A T E S L T D

    13 Par-La-Ville Road, Hamilton HM 11

    Phone: (441) 292-1327

    Email: [email protected]

    www.mason.bm

    M SON

    IMPORTANT NOTES

    This seal indicates that Mason and Associates

    Ltd.(MAL) has had direct or indirect input into

    specific design elements of the works. As such

    our company must be afforded the opportunity to

    inspect the work as it progresses to ensure

    conformity to the related design details,

    specifications and notes. If we are not accorded

    the privilege of inspecting the work on site before

    it is covered up or otherwise hidden or if variations

    to the original details are made without written

    approval by the engineer of record, Mason and

    Associates Ltd. will assume no responsibility for

    the works. Client is still required to contact

    Building Control for inspections.

    REVISIONS

    No. DATE BY REVISION

    PROJECT DETAILS

    DRAWN BY:

    CHECKED BY:

    TITLE

    JOB No:

    DATE:

    REVISION: SHEET No:

    MAL ENGINEER COMMENTS INSPECTIONDATE

    FORT GEORGE

    COMMUNICATIONS ENCLOSURE

    19 FORT GEORGE HILL

    TOWN OF ST. GEORGE

    FLOOR AND FOUNDATION PLAN

    CKL

    KJH

    14524

    AUGUST 21, 2019

    S3

    2

    Scale: 1/8" = 1'-0"

    FLOOR PLAN

    ISSUED FOR

    CONSTRUCTION

    IC

    IC

    TOWER

    1'-0"

    3'-0"

    12

    '-0

    "

    17

    '-5

    "

    2'-0

    "

    44'-1"

    2'-0"

    1'-0"

    20

    '-5

    "

    2'-0

    "

    COMPACTED

    GRAVEL

    REMOVE EXISTING BOLLARD

    3'-0"

    5'-1

    0"

    13'-1"

    3

    HEAVY DUTY PVC

    UTILITY DOORS

    L2

    3 No. 48"x96" H

    RUSKIN XP500

    LOUVERS OR

    SIMILAR

    APPROVED

    HURRICANE

    RATED

    LOUVERS

    HEAVY DUTY PVC

    UTILITY DOOR

    L1

    COMPACTED

    GRAVEL

    L1

    4

    1

    1

    Scale: 1/8" = 1'-0"

    FOUNDATION PLAN

    2'-0

    "

    1'-6"

    1'-6"

    1'-6

    "

    2'-0

    "

    16'-0" 6'-0"6'-1"

    23

    IC

    4

    GOVERNMENT OF BERMUDA

    MINISTRY OF PUBLIC WORKS

    GENERAL POST OFFICE BUILDING

    3RD FLOOR, 56 CHURCH STREET

    HAMILTON HM12

    BERMUDA

    L1

    DN

    DN

    4'-1

    "

    3'-7

    "

    7'-4

    "

    7 Jan 2020

  • CLIENT

    A N D A S S O C I A T E S L T D

    13 Par-La-Ville Road, Hamilton HM 11

    Phone: (441) 292-1327

    Email: [email protected]

    www.mason.bm

    M SON

    IMPORTANT NOTES

    This seal indicates that Mason and Associates

    Ltd.(MAL) has had direct or indirect input into

    specific design elements of the works. As such

    our company must be afforded the opportunity to

    inspect the work as it progresses to ensure

    conformity to the related design details,

    specifications and notes. If we are not accorded

    the privilege of inspecting the work on site before

    it is covered up or otherwise hidden or if variations

    to the original details are made without written

    approval by the engineer of record, Mason and

    Associates Ltd. will assume no responsibility for

    the works. Client is still required to contact

    Building Control for inspections.

    REVISIONS

    No. DATE BY REVISION

    PROJECT DETAILS

    DRAWN BY:

    CHECKED BY:

    TITLE

    JOB No:

    DATE:

    REVISION: SHEET No:

    MAL ENGINEER COMMENTS INSPECTIONDATE

    FORT GEORGE

    COMMUNICATIONS ENCLOSURE

    19 FORT GEORGE HILL

    TOWN OF ST. GEORGE

    ROOF PLAN

    CKL

    KJH

    14524

    AUGUST 21, 2019

    S4

    Scale: 1/8" = 1'-0"

    ROOF PLAN

    ISSUED FOR

    CONSTRUCTION

    13'-4"

    3'-9

    "

    1'-0

    "

    6'-7"

    20

    '-1

    1"

    44'-7"

    17

    '-1

    1"

    2%

    IC

    1

    S6

    2

    S6

    3

    S6

    4

    S7

    GOVERNMENT OF BERMUDA

    MINISTRY OF PUBLIC WORKS

    GENERAL POST OFFICE BUILDING

    3RD FLOOR, 56 CHURCH STREET

    HAMILTON HM12

    BERMUDA

    APPLY BERMUDA ROOF GUARD

    ELASTOMERIC ROOF COATING AS PER

    MANUFACTURERS INSTRUCTIONS

    NEW CONC. ROOF

    FORM DECK SPAN

    DECK SPAN

    SHORING DIAGRAM

    BEAM SUPPORTS

    NOTE

    TEMPORARY SUPPORT

    BEAMS AND SHORING TO BE

    DESIGNED BY

    CONTRACTOR'S REGISTERED

    ENGINEER

    3'-0"

    MAX SPAN OF PROPOSED DECK

    UNDER CONSTRUCTION LOADING

    7 Jan 2020

  • CLIENT

    A N D A S S O C I A T E S L T D

    13 Par-La-Ville Road, Hamilton HM 11

    Phone: (441) 292-1327

    Email: [email protected]

    www.mason.bm

    M SON

    IMPORTANT NOTES

    This seal indicates that Mason and Associates

    Ltd.(MAL) has had direct or indirect input into

    specific design elements of the works. As such

    our company must be afforded the opportunity to

    inspect the work as it progresses to ensure

    conformity to the related design details,

    specifications and notes. If we are not accorded

    the privilege of inspecting the work on site before

    it is covered up or otherwise hidden or if variations

    to the original details are made without written

    approval by the engineer of record, Mason and

    Associates Ltd. will assume no responsibility for

    the works. Client is still required to contact

    Building Control for inspections.

    REVISIONS

    No. DATE BY REVISION

    PROJECT DETAILS

    DRAWN BY:

    CHECKED BY:

    TITLE

    JOB No:

    DATE:

    REVISION: SHEET No:

    MAL ENGINEER COMMENTS INSPECTIONDATE

    FORT GEORGE

    COMMUNICATIONS ENCLOSURE

    19 FORT GEORGE HILL

    TOWN OF ST. GEORGE

    ELEVATIONS

    CKL

    KJH

    14524

    AUGUST 21, 2019

    S5

    OPENING FOR

    EXISTING CABLE TRAY

    ISSUED FOR

    CONSTRUCTION

    Scale: 1/8" = 1'-0"

    SOUTH ELEVATION

    Scale: 1/8" = 1'-0"

    NORTH ELEVATION

    Scale: 1/8" = 1'-0"

    EAST ELEVATION

    Scale: 1/8" = 1'-0"

    WEST ELEVATION

    PLASTER AND

    PAINT FINISH

    2%

    11

    '-5

    "

    12'-0"

    11

    '-1

    1"

    2%

    24'-0"

    4'-5

    "

    6'-8

    "

    HEAVY DUTY PVC

    UTILITY DOORS

    HEAVY DUTY PVC

    UTILITY DOOR

    3'-0"

    7'-0

    "

    14

    '-4

    "

    15

    '-9

    "

    12

    '-7

    "

    11

    '-5

    "

    5'-10"

    1'-0

    "

    12

    '-7

    "

    1'-0

    "

    1'-0

    "

    1'-0

    "

    14

    '-4

    "

    GOVERNMENT OF BERMUDA

    MINISTRY OF PUBLIC WORKS

    GENERAL POST OFFICE BUILDING

    3RD FLOOR, 56 CHURCH STREET

    HAMILTON HM12

    BERMUDA

    8'-0

    "

    RUSKIN XP500 LOUVERS

    OR SIMILAR APPROVED

    7'-4"

    7 Jan 2020

  • CLIENT

    A N D A S S O C I A T E S L T D

    13 Par-La-Ville Road, Hamilton HM 11

    Phone: (441) 292-1327

    Email: [email protected]

    www.mason.bm

    M SON

    IMPORTANT NOTES

    This seal indicates that Mason and Associates

    Ltd.(MAL) has had direct or indirect input into

    specific design elements of the works. As such

    our company must be afforded the opportunity to

    inspect the work as it progresses to ensure

    conformity to the related design details,

    specifications and notes. If we are not accorded

    the privilege of inspecting the work on site before

    it is covered up or otherwise hidden or if variations

    to the original details are made without written

    approval by the engineer of record, Mason and

    Associates Ltd. will assume no responsibility for

    the works. Client is still required to contact

    Building Control for inspections.

    REVISIONS

    No. DATE BY REVISION

    PROJECT DETAILS

    DRAWN BY:

    CHECKED BY:

    TITLE

    JOB No:

    DATE:

    REVISION: SHEET No:

    MAL ENGINEER COMMENTS INSPECTIONDATE

    FORT GEORGE

    COMMUNICATIONS ENCLOSURE

    19 FORT GEORGE HILL

    TOWN OF ST. GEORGE

    SECTIONS

    CKL

    KJH

    14524

    AUGUST 21, 2019

    S6

    2

    S4

    SECTION

    Scale: 3/16"=1'-0"

    3

    S7

    ISSUED FOR

    CONSTRUCTION

    L1

    2%

    10

    "

    2'-0

    "

    3"

    DRIP

    EDGE

    2'-0"

    EXISTING ENCLOSURE

    EXISTING

    SLAB AND

    WALLS

    COMPACTED GRAVEL

    12" CONC. MASONRY

    PLASTER

    AND PAINT

    FINISH

    2

    S3

    1

    S4

    SECTION

    Scale: 3/16"=1'-0"

    1

    S3

    10

    "

    MARCORE TYPE 'HF' 20 GA

    HEAVY DUTY FORM DECK

    1

    S7

    L2

    1'-0

    "

    2'-0"

    2

    S7

    1'-0

    "

    2'-0"

    12" CONC.

    BLOCK

    3

    S4

    SECTION

    Scale: 3/16"=1'-0"

    3

    S3

    4

    S7

    11

    '-5

    "

    5

    S7

    2%

    1'-0

    "

    2'-0"

    1'-0

    "

    2'-0"

    15

    '-5

    "

    2'-0"

    3"

    12" FILLED

    CONC.

    BLOCK

    3"

    2'-0

    "

    2'-0"

    10

    "

    COMPACTED GRAVEL

    T16 @ 16" C/C

    GOVERNMENT OF BERMUDA

    MINISTRY OF PUBLIC WORKS

    GENERAL POST OFFICE BUILDING

    3RD FLOOR, 56 CHURCH STREET

    HAMILTON HM12

    BERMUDA

    4'-5

    "

    8'-0

    "

    12" FILLED

    CONC. BLOCK

    3"

    3"

    5'-8

    "

    EXISTING ENCLOSURE

    EXISTING

    SLAB AND

    WALLS

    7 Jan 2020

  • CLIENT

    A N D A S S O C I A T E S L T D

    13 Par-La-Ville Road, Hamilton HM 11

    Phone: (441) 292-1327

    Email: [email protected]

    www.mason.bm

    M SON

    IMPORTANT NOTES

    This seal indicates that Mason and Associates

    Ltd.(MAL) has had direct or indirect input into

    specific design elements of the works. As such

    our company must be afforded the opportunity to

    inspect the work as it progresses to ensure

    conformity to the related design details,

    specifications and notes. If we are not accorded

    the privilege of inspecting the work on site before

    it is covered up or otherwise hidden or if variations

    to the original details are made without written

    approval by the engineer of record, Mason and

    Associates Ltd. will assume no responsibility for

    the works. Client is still required to contact

    Building Control for inspections.

    REVISIONS

    No. DATE BY REVISION

    PROJECT DETAILS

    DRAWN BY:

    CHECKED BY:

    TITLE

    JOB No:

    DATE:

    REVISION: SHEET No:

    MAL ENGINEER COMMENTS INSPECTIONDATE

    FORT GEORGE

    COMMUNICATIONS ENCLOSURE

    19 FORT GEORGE HILL

    TOWN OF ST. GEORGE

    SECTIONS AND DETAILS

    CKL

    KJH

    14524

    AUGUST 21, 2019

    S7

    ISSUED FOR

    CONSTRUCTION

    L1

    DRIP

    EDGE

    T16 @ 16" C/C

    COMPACTED

    GRAVEL4

    S4

    SECTION

    Scale: 3/16"=1'-0"

    4

    S3

    1

    S6

    DETAIL

    Scale: 3/8"=1'-0"

    10

    "

    3"

    T12 @ 6" C/C

    T12 @10" C/C

    T16 @ 6" C/C

    2

    S6

    FOOTING DETAIL

    Scale: 3/8"=1'-0"

    1'-0

    "

    2'-0"

    12" FILLED

    CONC. BLOCK

    T10 @12" C/C

    3-T16

    3

    S6

    DETAIL

    Scale: 1/2"=1'-0"

    10

    "

    T12 @ 6" C/C

    T16 @ 6" C/C

    T12 @10" C/C

    4

    S6

    DETAIL

    Scale: 3/8"=1'-0"

    DRIP EDGE

    10

    "

    3"

    MARCORE TYPE

    'HF' 20 GA FORM DECK

    T16 @ 16" C/C

    T12 @6" C/C

    T16 @6" C/C

    T12 @10" C/C

    5

    S6

    DETAIL

    Scale: 1/2"=1'-0"

    12" FILLED

    CONC. BLOCK

    EXISTING SLAB

    8"

    T16 @16" C/C

    GROUT REBAR

    INTO SLAB W/ HILTI

    HY200 EPOXY

    40'-11"

    10

    "

    2'-0"

    MARCORE TYPE

    'HF' 20 GA FORM DECK

    10" FILLED CONC. BLOCK

    EXISTING STEPS

    1'-0

    "

    1'-6"

    15

    '-6

    "

    12" FILLED CONC. BLOCK

    GOVERNMENT OF BERMUDA

    MINISTRY OF PUBLIC WORKS

    GENERAL POST OFFICE BUILDING

    3RD FLOOR, 56 CHURCH STREET

    HAMILTON HM12

    BERMUDA

    6'-8

    "

    3

    S7

    2'-0"

    7'-0

    "

    1'-8"

    6'-0

    "

    8'-0

    "

    2'-0"

    NTS

    FENCE DETAIL

    TERMINAL

    POST

    FENCE FABRIC

    GALVANIZED STEEL 2"

    MESH 7'-0" HIGH

    10'-0"

    MAX.

    TOP RAIL

    TERMINAL

    POST

    BRACE

    BOTTOM

    TENSION

    WIRE

    GROUND

    SURFACE

    AUGERED OR

    DRILLED HOLE

    CONCRETE

    FILLED (TYP.)

    AUGERED OR

    DRILLED HOLE

    CONCRETE

    FILLED (TYP.)

    POST

    (INTERMEDIATE)

    3"

    11

    '-7

    "

    7 Jan 2020

  • CLIENT

    A N D A S S O C I A T E S L T D

    13 Par-La-Ville Road, Hamilton HM 11

    Phone: (441) 292-1327

    Email: [email protected]

    www.mason.bm

    M SON

    IMPORTANT NOTES

    This seal indicates that Mason and Associates

    Ltd.(MAL) has had direct or indirect input into

    specific design elements of the works. As such

    our company must be afforded the opportunity to

    inspect the work as it progresses to ensure

    conformity to the related design details,

    specifications and notes. If we are not accorded

    the privilege of inspecting the work on site before

    it is covered up or otherwise hidden or if variations

    to the original details are made without written

    approval by the engineer of record, Mason and

    Associates Ltd. will assume no responsibility for

    the works. Client is still required to contact

    Building Control for inspections.

    REVISIONS

    No. DATE BY REVISION

    PROJECT DETAILS

    DRAWN BY:

    CHECKED BY:

    TITLE

    JOB No:

    DATE:

    REVISION: SHEET No:

    MAL ENGINEER COMMENTS INSPECTIONDATE

    FORT GEORGE

    COMMUNICATIONS ENCLOSURE

    19 FORT GEORGE HILL

    TOWN OF ST. GEORGE

    NOTES

    CKL

    KJH

    14524

    AUGUST 21, 2019

    S8

    ISSUED FOR

    CONSTRUCTION

    GOVERNMENT OF BERMUDA

    MINISTRY OF PUBLIC WORKS

    GENERAL POST OFFICE BUILDING

    3RD FLOOR, 56 CHURCH STREET

    HAMILTON HM12

    BERMUDA

    GENERAL NOTES1. THESE NOTES APPLY TO ALL DRAWINGS AND ARE TO BE

    READ IN CONJUNCTION WITH THE SPECIFICATIONS ANDCONTRACT DOCUMENTS.

    2. WHERE A DISCREPANCY EXISTS BETWEEN THE DRAWINGSAND SPECIFICATIONS IT SHALL BE BOUGHT TO THEENGINEER'S ATTENTION.

    3. DO NOT SCALE THE DRAWINGS. IF CRITICAL DIMENSIONSARE OMITTED THE ENGINEER WILL PROVIDE UPONREQUEST.

    4. ALL DETAILS AND ARRANGEMENTS OF EXISTINGCONDITIONS, DIMENSIONS AND DETAILS ARE TO BE FIELDVERIFIED BY THE CONTRACTOR PRIOR TO CONSTRUCTION.CONFLICTS AND DISCREPANCIES ARE TO BE BOUGHT TOTHE ENGINEER'S ATTENTION.

    5. CONTRACTOR TO MAKE GOOD ANY DAMAGES CAUSED TOTHE SITE RESULTING FROM THE WORKS, REPAIRING TOMATCH EXISTING OR AS APPROVED BY THE OWNER.

    6. CONTRACTOR SHALL SUBMIT A WORK PLAN ON REQUEST.7. THE CONTRACTOR SHALL SUPPLY ALL NECESSARY

    MATERIALS, EQUIPMENT AND LABOR TO COMPLETE THEWORK, UNLESS OTHERWISE INDICATED.

    8. THE DRAWINGS AND SPECIFICATIONS HAVE BEENDEVELOPED IN ACCORDANCE WITH APPLICABLE BUILDINGCODES, LATEST APPROVED EDITION.

    9. THE OWNER'S REPRESENTATIVE SHALL BE GIVEN AMINIMUM OF 24 HOURS NOTICE PRIOR TO ANYINSPECTIONS OF THE WORK. NO WORK SHALL BE COVEREDUP UNTIL SUCH TIME AS THE OWNER'S REPRESENTATIVEHAS APPROVED THE WORK.

    10. THE CONTRACTOR SHALL ARRANGE AND COORDINATE IN ATIMELY MANNER ALL NECESSARY INSPECTIONS BYREGULATORY AGENCIES.

    11. THE CONTRACTOR SHALL PROVIDE COMPETENTSUPERVISORY STAFF AT ALL TIMES DURING THE WORK.TRADESMEN ARE TO BE SKILLED AND QUALIFIED FOR THETASKS ASSIGNED.

    12. CONTRACTOR SHALL PROVIDE ALL SAFETY EQUIPMENTAND GEAR TO CONFORM TO THE NATIONAL HEALTH &SAFETY REGULATIONS APPLICABLE TO BERMUDA.

    13. THE CONTRACTOR SHALL COORDINATE ALL SUB TRADESAND SUPPLIES AND DELIVERIES TO THE SITE AND SHALL BERESPONSIBLE FOR THEIR SAFE KEEPING ONCE ON SITE.

    14. CONTRACTOR SHALL VERIFY ALL SITE CONDITIONS ANDFAMILIARIZE HIMSELF WITH THE SCOPE OF WORK.

    15. CONFINE ALL BUILDING OPERATIONS TO THE IMMEDIATEJOB SITE KEEPING SIDEWALKS CLEAR AND UNOBSTRUCTEDAT ALL TIMES. JOB SITE SHALL BE KEPT FREE OFACCUMULATED DEBRIS AND TRASH. ALL CONSTRUCTIONDEBRIS SHALL BE DISPOSED OF PROMPTLY IN APPROVEDDUMP SITES.

    16. AT THE COMPLETION OF THE WORK ALL EQUIPMENT,WASTE MATERIAL AND DEBRIS SHALL BE COMPLETELYREMOVED FROM THE SITE AND THE AREA MADE GOOD.

    17. WITHOUT COST TO THE OWNER THE CONTRACTOR SHALLPROMPTLY CORRECT ANY DEFICIENCIES OR DEFECTS INWORKMANSHIP AND CONTINUE TO DO SO THROUGHOUTTHE CONTRACTED MAINTENANCE PERIOD.

    18. WITHIN REASON THE OWNER SHALL SUPPLY ALL WATERAND ELECTRICITY TO THE CONTRACTOR DURING THEWORK ON SITE.

    19. UNLESS OTHERWISE INSTRUCTED ALL MATERIALSEXCAVATED OR REMOVED FROM THE BUILDING AND NOTUTILIZED ELSEWHERE ON THE SITE SHALL BE REMOVED

    FROM THE SITE AND DISPOSED OF IN APPROVED DUMPSITES.

    20. IF APPLICABLE, OWNER SUPPLIED ITEMS ARE NOTED IN THECONTRACT DOCUMENTS. THE CONTRACTOR ACCEPTSRESPONSIBILITY FOR THE SAFE KEEPING OF ALL OWNERSSUPPLIED MATERIALS AS DELIVERED TO THE SITE.CONTRACTOR SHALL IMMEDIATELY INSPECT ANDINVENTORY ALL OWNER SUPPLIED ITEMS AND BRING ANYDISCREPANCIES OF DAMAGE TO THE OWNER'S ATTENTIONIMMEDIATELY.

    A. SITE PREPARATION1. THE CONTRACTOR SHALL PROVIDE THE PROTECTION

    NECESSARY TO PREVENT DAMAGE TO EXISTINGPROPERTIES, AND SHALL PROTECT EXISTING TREES ANDVEGETATION WHICH ARE TO REMAIN.

    2. THE CONTRACTOR SHALL NOT PERFORM ANY CLEARINGOPERATIONS UNTIL RECEIPT OF SPECIFIC INSTRUCTION INWRITING TO PROCEED, FROM THE ENGINEER. TREES ORSHRUBS OUTSIDE THE EXCAVATIONS OR ELSEWHEREWHICH ARE TO REMAIN SHALL BE PROTECTED FROMINJURY DURING CONSTRUCTION OPERATIONS.

    3. THE AREAS AFFECTED BY THE WORKS SHALL BE CLEAREDOF ALL EXISTING STRUCTURES, FENCES, WALLS, DEBRIS, OROTHER GARBAGE AS DIRECTED BY THE ENGINEER

    4. THE CONTRACTOR SHALL REMOVE TREE, SHRUBS, GRASSAND OTHER VEGETATION, OR OBSTRUCTIONS INTERFERINGWITH THE INSTALLATION OF NEW CONSTRUCTION, TO BEDEPOSITED ON SITE OR AS SPECIFICALLY INDICATED.REMOVAL INCLUDES DIGGING OUT STUMPS AND ROOTSCOMPLETELY AND BACKFILLING WITH APPROVEDMATERIAL AND COMPACTING TO THE SAME DENSITY ASTHAT OF THE SURROUNDING SOIL.

    5. IN ALL CASES, TOPSOIL SHALL BE DEPOSITED ON SITE FORRE-USE ON SITE WHERE DIRECTED; SURPLUS TOPSOILSHALL REMAIN THE PROPERTY OF THE OWNER AND BESTOCKPILED SO AS TO DRAIN SURFACE WATER FREELY ANDSHALL BE COVERED TO PREVENT WIND-BLOWN DUST.

    6. THE CONTRACTOR SHALL REMOVE HEAVY GROWTHS OFGRASS FROM AREAS BEFORE STRIPPING.

    7. ALL MATERIALS ARISING FROM SITE CLEARANCE(EXCLUDING TOPSOIL) WHICH IS SURPLUS TO ORUNSUITABLE FOR USE IN THE WORKS SHALL BE DISPOSEDOF BY THE CONTRACTOR TO APPROVED TIPPING AREAS ORAS DIRECTED BY THE ENGINEER.

    8. THE CONTRACTOR SHALL EXERCISE DUE CARE ANDATTENTION DURING EXCAVATION IN PROXIMITY TOMARKED UTILITIES. SHOULD MARKED UTILITIES BEDAMAGED DURING EXCAVATION THE CONTRACTOR SHALLMAKE GOOD REPIARS TO THE SATISFACTION OF THEOWNER AND UTILITY COMPANY AT THE CONTRACTORSEXPENSE.

    9. THE CONTRACTOR SHALL PROVIDE A MINIMUM OF48-HOURS NOTICE TO THE ENGINEER AND MUST RECEIVEWRITTEN NOTICE TO PROCEED BEFORE INTERRUPTING ANYUTILITY. WRITTEN NOTICE CAN BE IN THE FORM OF ANELECTRONIC MAIL.

    B. FOUNDATIONS1. ALL FOOTING AND FOUNDATIONS TO BEAR ON

    UNDISTURBED SOUND ROCK. BEARING MATERIAL IS TOREMAIN UNDISTURBED. WHERE THE PRESENCE OF ROCK ISEXPECTED BUT NOT DETECTED. THE STRUCTURALENGINEER SHALL BE RETAINED TO PROVIDE ALTERNATIVE

    DETAILS.2. ALL SHORING, SHEETING, AND DEWATERING SHALL BE THE

    RESPONSIBILITY OF THE CONTRACTOR.3. THE CONTRACTOR SHALL TAKE PRECAUTIONS TO PROTECT

    ALL EXISTING STRUCTURES, CURBS, STREETS ETC... FROMDAMAGE BY CONSTRUCTION EQUIPMENT.

    4. THE CONTRACTOR SHALL NOT DISPOSE OF ANY LIQUIDS,SLURRY, SPOILS OR CHEMICALS ON SITE EXCEPT ASDIRECTED BY THE OWNERS REPRESENTATIVE ANDAPPROVED BY THE DEPARTMENT OF ENVIRONMENT OROTHER AGENCIES HAVING JURIDICTION.

    C. CONCRETE1. ALL CONCRETE WORK SHALL CONFORM TO ACI 301 (LATEST

    EDITION). SPECIFICATION FOR STRUCTURAL CONCRETE FORBUILDINGS OR APPROVED EQUIVALENT STANDARD.

    2. CEMENT: ASTM C150: TYPE 1 - CAN3-A23.1, TYPE 103. AGGREGATES: ASTM C33 NORMAL WEIGHT.4. STRUCTURAL CONCRETE SHALL ACHIEVE A MINIMUM

    CYLINDER COMPRESSIVE STRENGTH AT 28 DAYS ASFOLLOWS UNLESS NOTED OTHERWISE.

    5. CONCRETE COVER TO REBARS SHALL BE AS FOLLOW,UNLESS NOTED OTHERWISE:

    6. UNLESS NOTED OTHERWISE NO ADDITIVES TO BE USEDWITHOUT THE PRIOR APPROVAL OF THE ENGINEER. NOWATER SHALL BE ADDED TO THE MIX ON SITE WITHOUTTHE PRIOR APPROVAL OF THE ENGINEER.

    7. EXPERIENCED PERSONNEL SHALL MECHANICALLY VIBRATEALL STRUCTURAL CONCRETE IN THE APPROVED MANNER.THE CONTRACTOR SHALL HAVE AT LEAST TWO FULLYOPERATIONAL POKER VIBRATORS ON SITE DURINGCONCRETE PLACEMENT.

    8. ALL FORMWORK, SHORING AND RESHORING SHALL BEDESIGNED BY THE CONTRACTOR'S REGISTERED ENGINEER.

    9. FOUNDATION WALLS, SLABS, BEAMS AND GIRDERS SHALLNOT HAVE JOINTS IN A HORIZONTAL PLANE UNLESSSHOWN OTHERWISE.

    A. SLABS ON GRADE, BASEMENTSLAB, FORMED SLAB, BASEMENT WALLS, PIERS,COLUMNS, FORMED BEAMS

    3000 PSI

    B. SLAB ON METAL DECK 3000 PSIC. FOOTINGS 3000 PSID. MISCELLANEOUS FILL / BLOCK FILL 2000 PSI

    A. CONCRETE CAST AGAINST ANDPERMANENTLY EXPOSED TO EARTH.FOUNDATIONS, RETAINING WALLS

    3"

    B. CONCRETE EXPOSED TOWEATHER

    2"

    C. CONCRETE NOT EXPOSED TOWEATHER OR IN CONTACT WITHGROUND. SLABS, WALLS, BEAMS,COLUMNS

    1 1/2"

    7 Jan 2020

  • CLIENT

    A N D A S S O C I A T E S L T D

    13 Par-La-Ville Road, Hamilton HM 11

    Phone: (441) 292-1327

    Email: [email protected]

    www.mason.bm

    M SON

    IMPORTANT NOTES

    This seal indicates that Mason and Associates

    Ltd.(MAL) has had direct or indirect input into

    specific design elements of the works. As such

    our company must be afforded the opportunity to

    inspect the work as it progresses to ensure

    conformity to the related design details,

    specifications and notes. If we are not accorded

    the privilege of inspecting the work on site before

    it is covered up or otherwise hidden or if variations

    to the original details are made without written

    approval by the engineer of record, Mason and

    Associates Ltd. will assume no responsibility for

    the works. Client is still required to contact

    Building Control for inspections.

    REVISIONS

    No. DATE BY REVISION

    PROJECT DETAILS

    DRAWN BY:

    CHECKED BY:

    TITLE

    JOB No:

    DATE:

    REVISION: SHEET No:

    MAL ENGINEER COMMENTS INSPECTIONDATE

    FORT GEORGE

    COMMUNICATIONS ENCLOSURE

    19 FORT GEORGE HILL

    TOWN OF ST. GEORGE

    NOTES AND SCHEDULES

    CKL

    KJH

    14524

    AUGUST 21, 2019

    S9

    ISSUED FOR

    CONSTRUCTION

    LINTEL SCHEDULE

    TYPE DIAGRAM SIZE REINFORCING STEEL

    L1 12" W x 10" D

    2-T16 BOT

    2-T10 TOP

    T6 @ 5" C/C

    L2 12" W x 14" D

    3-T20 BOT

    2-T12 TOP

    T8 @ 6" C/C

    CONCRETE FINISH SCHEDULELOCATION SURFACE QUALITY

    ALL FACES BELOWGROUND

    ROUGHFORMED

    As cast concrete texture imparted by form-facing material withtie holes and defects repaired and patched. Remove fins andother projections.

    ALL EXPOSED FACESABOVE GROUND

    SMOOTHFORMED

    As-cast concrete texture imparted by form-facing material,arranged in an orderly and symmettrical manner with aminimum of seams. Repair and patch tie holes and defects.Remove fins and other projections.

    MISCELLANEOUSUNFORMEDSURFACES

    ALL FORMED

    At tops of walls, horizontal offsets and similar unformedsurfaces adjacent to formed surfaces, strike off smooth andfinish with a texture matching adjacent formed surface.Continue final surface treatment of formed surfaces uniformlyacross adjacent unformed surfaces, unless otherwise indicated.

    GOVERNMENT OF BERMUDA

    MINISTRY OF PUBLIC WORKS

    GENERAL POST OFFICE BUILDING

    3RD FLOOR, 56 CHURCH STREET

    HAMILTON HM12

    BERMUDA

    D. STEEL DECKING

    1. INSTALLATION OF THE STEEL DECK SHALL BE IN ACCORDANCE WITHTHE MANUFACTURER'S SPECIFICATION.

    2. STEEL DECKING SHALL COMPLY WITH ASTM-A-446, GRADE C, OREQUAL, HAVING A MINIMUM YIELD STRENGTH OF 40,000 PSI.DECKING SHALL BE GALVANIZED TO ASTM-A-525, CLASS G60 TO G90.

    3. THE CONTRACTOR SHALL ENSURE THAT CONSTRUCTION LOADS ONTHE STEEL DECKING DO NOT EXCEED THE YIELD STRENGTH OF THEDECK BOTH BEFORE AND AFTER CONCRETE PLACEMENT.

    E. REINFORCING STEEL1. ALL STEEL REBARS SHALL BE GALVANIZED WITH A MINIMUM YIELD

    STRESS OF 60,000 PSI UNLESS NOTED OTHERWISE.2. UNLESS NOTED OTHERWISE MINIMUM ALLOWABLE LAP LENGTHS

    TO REBARS SHALL BE:

    3. LOCATION OF AL LAPS SHALL BE SHOWN ON REINFORCEMENT STEELSHOP DRAWINGS AND SHALL BE APPROVED BY THE STRUCTURALENGINEER.

    4. REBAR SHALL CONFORM TO ASTM-767 GRADE 60 GALV. WELDEDWIRE FABRIC (MESH) SHALL CONFORM TO ASTM-A-185.

    5. REBAR AT ENDS OF CONCRETE LINTELS, STAIRS PAD FOOTING,BEAMS AND SLABS ARE TO HAVE STANDARD BENDS. ANY REBAR,WHICH IS CUT, AND BENT ON SITE SHALL HAVE TWO APPLICATIONSOF A RICH PAINT APPLIED TO THE ENDS AND DAMAGEDAREAS TO THE APPROVAL OF THE ENGINEER.

    6. NO WELDING OF REINFORCING SHALL BE PERMITTED UNLESSSPECIFICALLY CALLED FOR OR APPROVED BY THE STRUCTURALENGINEER.

    F. MASONRY1. THE AVERAGE COMPRESSIVE STRENGTH OF MASONRY UNITS SHALL

    BE 2000 PSI BASED ON THE NET AREA OF THE BLOCK CELL. MASONRYUNITS SHALL CONFORM TO ASTM C90. ALL BLOCKWORK SHALL BELAYED IN RUNNING BOND U.N.O.

    2. MORTAR SHALL BE 'TYPE S' IN ACCORDANCE WITH ASTM C270.3. GROUT FOR MASONRY UNITS SHALL BE 2000 PSI CONCRETE WITH

    4. ALL CELLS TO BE FILLED ARE TO BE KEPT CLEAR OF OBSTRUCTIONS.ALL CELLS CONTAINING VERTICAL REINFORCING SHALL BE FILLED.CELLS BELOW BEARING BEAMS SHALL BE SOLID FILLED. CELLS ARETO BE SOLID FILLED TO FULL HEIGHT U.N.O.

    5. FILLED BLOCK WALLS SHALL BE CONSTRUCTED IN A MAXIMUM OFFIVE COURSE LIFTS. CONCRETE FILL TO STOP AT HALF-HEIGHT OFFIFTH COURSE. PRIOR TO INFILLING, CORES SHALL BE CLEANED OUTOF ALL DEBRIS AND MORTAR FINS. ENSURE ADEQUATE LAP LENGTHOF VERTICAL REINFORCING IS OBTAINED PRIOR TO FILLING BLOCKS.

    6. MINIMUM BEARING OF REINFORCED CONCRETE LINTELS AND

    7. ALL LAP SPLICES IN BLOCKWORK REINFORCING SHALL BE AS NOTEDIN REINFORCING STEEL.

    8. BLOCKWALLS BUTTING UP TO CONCRETE PIERS OR COLUMNENCASEMENTS SHALL BE TOOTHED EVERY 2ND COURSE WITH 8' KEYINTO BLOCKWORK WALL

    G. LOADING1. WIND LOAD - ASCE 7, RISK CATEGORY IV EXPOSURE CATEGORY D2.3.

    T6 12"T8 15"

    T10 18"T12 24"T16 32"T20 40"T25 60"

    WIRE MESH 12"

    1/8

    "

    GA

    P

    6"

    MIN.

    6"

    MIN.

    HILTI HIT-RE 500-SD W/ HAS

    (3 1/2" MIN. EMBED.) FLAT

    WASHER: 5/8"

    NUT NYLOCK: 5/8" STD ZC

    LOUVER REF

    NTS

    LOUVER DETAILS

    WATERSTOP REF

    HEX BOLT 1/4-20 x 1 1/2" LG ZC

    WASHER FLAT: 1/4" ZC

    NUT NYLOCK: 1/4 - 20 ZC

    CONCRETE

    2" x 3" x 1/4" THK x 8" LONG

    A36 HDG ATTACHMENT ANGLE

    FACTORY INSTALLED

    1/8"

    GAP

    1/8

    "

    GA

    P

    S.S.D.

    (MAX. 48")

    S.S.D.

    (MAX. 48")

    WATERSTOP REF

    2" x 3" x 1/4" THK

    x 8" LONG

    A36 HDG ATTACHMENT

    ANGLE FACTORY

    INSTALLED

    CONCRETE

    1/8

    "

    GA

    P

    THREADED ROD 6" LG,

    (3 1/2" MIN. EMBED.)

    FLAT WASHER: 5/8"

    NUT NYLOCK: 5/8" STD ZC

    HEX BOLT 1/4-20 x

    1 1/2" LG ZC

    WASHER FLAT: 1/4" ZC

    NUT NYLOCK: 1/4 - 20 ZC

    LOUVER REF

    1/8

    "

    GA

    P