  • 8/3/2019 MRP and MPS System Map

    1/10

    ACTION SHEET: Production Scheduler & Job Creator

    Item No Requirement for

    4 weeks 6 weeks 8 weeks 10 weeks

    MASTER Machine Shop Routing

    Stock No

    Opn # M/C # Opn Time/pc

    1 2

    3

    4

    REPORT: Machine Shop Scheduler

    Item No Qty Opn # M/C #

    (Date - Shift - Hou

    INPUT Machine/Resource Availability

    SettingTime

    Time forMBS

    From Invmodule

  • 8/3/2019 MRP and MPS System Map

    2/10

    M/C #

    1 1/1.5/2 0%

    2 2.5/3 to

    3 100% ACTION SHEET:

    4 M/c No: .

    Date Shift

    ShiftAvailable

    Break-down %

    Auto-Scheduling will be done where first itemrequired will be scheduled first, then next, etc.

    Wherever there is conflict, it will be highlighted.

    In such case, Scheduler can either re-schedulemanually or change inputs and run the MRP again,or ignore and let the highlighted area remain.

  • 8/3/2019 MRP and MPS System Map

    3/10

    MRP & MPS System

    Stock Minimum Requisition

    In Hand WIP Batch Qty

    ACTION SHEET:

    Item No Re

    6 weeks

    Shifts Reqd Date Reqd

    rs)

    VOUCHERS:Job Require

    Item No Quantity

    ntory

    From Inventory/Prodn module From MBS Master

    /Routing Master (asapplicable)

    The default qty to be shown or , whichever is highershould be an option to chanamount.

    Must be equal to SettingTIme = (MBS x OpnTime/pc)

    Can be either Machinenumber or Machine GroupNo.

    In Shfits & HoursMust equal:Setting + Qty x Opn Time

    May have provision for contingency of___ %

    To be rounded up to next hour

  • 8/3/2019 MRP and MPS System Map

    4/10

    Resource Scheduler (Auto) (Auto)

    Sl No Item Op # Qty Item No Quantity

    (Auto) (Auto)

    Item No Quantity

    (Auto) (Auto)

    Upon acceptance of the Schedule, the same will be confirmed and pri

    for ____ # of days, as defined. 1 sheet for each machine. This shall b

    given to Production Department

  • 8/3/2019 MRP and MPS System Map

    5/10

    MapOm

    INPUT SHEET Production Plan for Week # ____ to _____

    Machine Type Machine No

    7/8/2011

    OUTPUT Item Requirement Report

    Item No. Type Date Required For M/c No

    FS

    BL

    FA FC

    BL

    (to be made available in Excel also for analysis purpose)

    Purchase Scheduler & Indentor for BG Items

    quirement for Stock Minimum Indent

    10 weeks 14 weeks In Hand Pending PO Order Qty Amount

    Individual Indents. Only similar

    items grouped together in one indent

    ment Card (for Material Issue)

    Date ofDismantling

    Theconalreweegive

    Date of dismantling tdue to difference in p

    From Inventorymodule From purchase

    module

    From BOM/Item Master(as applicable)

    should be:- Stock inBatch. Theree the

  • 8/3/2019 MRP and MPS System Map

    6/10

    ACTION SHEET: Purchase Scheduler & Indentor for

    Item No Requirement for

    6 weeks 10 weeks 14 weeks In Hand

    ted

    e

  • 8/3/2019 MRP and MPS System Map

    7/10

    MASTER Bill of Materials MASTER Assembly Routing

    Machine Type Machine Type

    Qty Seq

    FC 1 Structural

    ... MC ... FC

    ... FC ... FC

    ... MC FA

    FA . FS 2 Carriage

    BL . FS

    . BL . BL

    . BL

    FS 3

    BL

    .. BL ..

    VOUCHERS: Indent for Material

    Item No Quantity Rationale Reqd by

    (Auto) (Auto) (Auto)

    Item No Quantity Rationale Reqd by

    (Auto) (Auto) (Auto)

    Item No Quantity Rationale Reqd by

    Sub Assy/Stock No.

    Sub Assy/Stock No.

    Time beforeDismantling

    plan will be from 7 weeks from present date to 14/16 weeks, as perenience. For earlier machines, it is assumed that MRP is run

    ady at an earlier date. (Reason To start production on time, 4ks machining & planning time + 3 weeks assembly time to ben)

    be considered and not depsatchacking for export/local machines

    The default qty to be shown should be: or , whichever is higher.There should be an option to change the amount.

    Note: Pending PO not considered as it is assumed that will be forcurrent machine (less than 7 weeks)

    To be provided by default:If MOQ quantity selected, twrite "MOQ"If MRP recommended qtyselected, then to write "pefor 7-14 weeks"If custom quantity provideuser to fill this blank.

    This will be in both BIN Caand Purchase UOM

  • 8/3/2019 MRP and MPS System Map

    8/10

    (Auto) (Auto) (Auto)

    Raw Materials

    Stock Minimum Indent

    Pending PO Order Qty Amount

    The default qty to be shown should be:

    or , whichever is higher. There shouldbe an option to change the amount.

  • 8/3/2019 MRP and MPS System Map

    9/10

    hen to

    MRP

    , then

    rd UOM

  • 8/3/2019 MRP and MPS System Map

    10/10