MMWEC modifications to FCMPI Gary Will Massachusetts Municipal Wholesale Electric Company

Upload: wray

Post on 13-Jan-2016

27 views

Category:

Documents


0 download

DESCRIPTION

MMWEC modifications to FCMPI. Gary Will Massachusetts Municipal Wholesale Electric Company. E liminate non-performance penalties when due to a loss of transmission. When the generation resource is ready and able to provide energy but cannot: loss of production is beyond generators control - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: MMWEC modifications to FCMPI

MMWEC modifications to FCMPIGary Will

Massachusetts Municipal Wholesale Electric Company

Page 2: MMWEC modifications to FCMPI

Eliminate non-performance penalties when due to a loss of transmission

When the generation resource is ready and able to provide energy but cannot:•loss of production is beyond generators control•there is no basis to penalize the resource– the penalty cannot serve to encourage the generation

resource owner to make different arrangements

•the generator already suffers lost opportunity– pointless and presents a risk that cannot be hedged

Page 3: MMWEC modifications to FCMPI

Eliminate non-performance penalties when on a planned outage.

A power generating plant may not be able to deliver energy or reserves when on a planned outage:•ISO New England Operating Procedure No. 5– Generator and Dispatchable Asset Related

Demand Maintenance and Outage Scheduling (OP-5)

•already accounted for in establishing ICR

Page 4: MMWEC modifications to FCMPI

Elimination of provisions of FCMPI from applying to the NYPA contracts• Import Capacity Resources associated with the

NYPA contracts listed in Section III.13.1.3.3(c) • power deliveries to New England from NYPA’s

Niagara and St. Lawrence hydro-projects• Federal Preference Power– mandated by federal law – required under 50-year, FERC-approved licenses

• predate both the FCM and SMD

Page 5: MMWEC modifications to FCMPI

NYPA contracts (cont.)

Entity MW Contract End Date Connecticut 13.2 8/31/2025 Massachusetts 53.3 8/31/2025 Rhode Island 2.3 8/31/2025 Vermont 15.3 8/31/2025 Total 84.1

Power flowing from NYPA contracts to New England entities

NYPA imports are unique• firm capacity• almost perfectly-available due to the reliability of the

underlying hydroelectric facilities• scheduled power at multiple interconnection points• NYPA contractual replacement-energy obligations

Page 6: MMWEC modifications to FCMPI

NYPA contracts (cont.)

FERC’s Jan. 8, 2008 Forward Capacity Market Rules Order•different treatment of these contracts for FCM purposes is not unduly discriminatory– ISO urged for different treatment and FERC

agreed– special treatment under the FCM rules needed "in

order to better recognize the rights of certain existing long-term import capacity contracts."

Page 7: MMWEC modifications to FCMPI

NYPA contracts (cont.)“FCM Competitive Import Requirements”•requires capacity importers to submit energy offers at competitive prices •subject capacity importers to penalties for failing to comply with “FCM” participation requirements•included an exemption for Existing Import Capacity Resources associated with Specific Long-Term Contracts•accepted by FERC Order issued May 20, 2010,

– In approving the revisions, the Commission stated that it “finds that the reformed penalty structure on the whole will provide a more meaningful incentive for capacity importers to deliver energy when they are requested to do so.”

Page 8: MMWEC modifications to FCMPI

Elimination of provisions of FCMPI from applying to Intermittent Resources

• Qualified Capacity is currently based on the median summer and winter reliability hours averaged over a five year period (Market Rule 1, Section 13.1.2.2.2.1 (a)-(d) and 13.1.2.2.2.2)– significantly reduction from nameplate rating

• Shortage Event hours added to the total reliability hours during the respective summer and winter periods– Serve as a Performance Incentive potentially reducing the

capacity payments further• ICR calculation and other practices and planning

procedures already take into account the intermittent nature of these resources

Page 9: MMWEC modifications to FCMPI

III.13.7.2.5 Capacity Performance Payment Rate.

Page 10: MMWEC modifications to FCMPI

Questions?