east naples mine modifications to
TRANSCRIPT
C:\Users\TerryCole\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\MWZ6OPY1\TIS for Ph 1 2 Revisions (180618).docx
EAST NAPLES MINE
MODIFICATIONS TO
COMMERCIAL EXCAVATION PERMITS
Phase 1 (Permit No. 59.814 – 1) and Phase 2 (Permit No. 59.814 – 2)
HM File 1997.044
TRAFFIC IMPACT ANALYSIS
JUNE 2018
PREPARED FOR:
COLLIER COUNTY GROWTH MANAGEMENT DIVISION
2800 NORTH HORSESHOE DRIVE
NAPLES, FL 34104
PREPARED BY:
950 ENCORE WAY
NAPLES, FL 34110
W. Terry Cole, P.E. #42347
C:\Users\TerryCole\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\MWZ6OPY1\TIS for Ph 1 2 Revisions (180618).docx
TABLE OF CONTENTS 1.0 GENERAL PROJECT INFORMATION ................................................................................................... 3
2.0 TRIP CALCULATIONS .......................................................................................................................... 3
3.0 SIGNIFICANCE ON IMPACTED LINKS ................................................................................................. 4
4.0 EXISTING ROAD CONDITIONS ........................................................................................................... 5
5.0 HAULING ROUTE MAP....................................................................................................................... 5
6.0 EXISTING CONDITION PHOTOS ......................................................................................................... 6
C:\Users\TerryCole\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\MWZ6OPY1\TIS for Ph 1 2 Revisions (180618).docx
1.0 GENERAL PROJECT INFORMATION
1.1 LOCATION, EXISTING CONDITIONS & PROPOSED PERMIT MODIFICATIONS
The East Naples Mine is comprised of Phase 1 (Permit No. 59.814 – 1) and Phase 2 (Permit No. 59.814 – 2) which are located in parts of Sections 21 and 22, T49 South, R 27 East. Mining began in Phase 1 in 2003 and continues. Mining has not commenced in Phase 2 yet.
Since Phases 1 and 2 have the same ownership, it is proposed that the shared boundary between the two phases be excavated. Setbacks from the wetlands in the northeast and southeast corners of Phase 1 will remain as required. The depth of excavation in the respective Phases will remain as previously permitted for each phase – for Phase 1 see Section F on drawing 936-13 and for Phase 2 see Section E on drawing 4459-8.
2.0 TRIP CALCULATIONS
2.1 ESTIMATION OF TOTAL TRIP COUNT
Approximate volume to be excavated in Phase 1 (Tract 21) = 284,085 CY Approximate volume to be excavated in Phase 2 (Tract 15) = 506,337 CY
Volume moved per truck per trip = 18 CY
𝑇𝑜𝑡𝑎𝑙 𝑇𝑟𝑖𝑝𝑠 𝑅𝑒𝑞𝑢𝑖𝑟𝑒𝑑 𝑖𝑛 𝑃ℎ𝑎𝑠𝑒 1 =284, 085 𝐶𝑌
18 𝐶𝑌𝑇𝑟𝑖𝑝𝑠
= 15,783 𝑇𝑟𝑖𝑝𝑠
𝑇𝑜𝑡𝑎𝑙 𝑇𝑟𝑖𝑝𝑠 𝑅𝑒𝑞𝑢𝑖𝑟𝑒𝑑 𝑖𝑛 𝑃ℎ𝑎𝑠𝑒 2 =506,337 𝐶𝑌
18 𝐶𝑌𝑇𝑟𝑖𝑝𝑠
= 28,130 𝑇𝑟𝑖𝑝𝑠
2.2 ESTIMATION OF ADDITIONAL TRIP DAYS
The hauling is limited to the historic average annual daily round trip generation rate =
156 𝑇𝑟𝑖𝑝𝑠𝐷𝑎𝑦
𝑃ℎ𝑎𝑠𝑒 1 = 15,783 𝑇𝑟𝑖𝑝𝑠 𝑅𝑒𝑞𝑢𝑖𝑟𝑒𝑑
156 𝑇𝑟𝑖𝑝𝑠𝐷𝑎𝑦≈ 102 𝑑𝑎𝑦𝑠
C:\Users\TerryCole\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\MWZ6OPY1\TIS for Ph 1 2 Revisions (180618).docx
𝑃ℎ𝑎𝑠𝑒 2 = 28,130 𝑇𝑟𝑖𝑝𝑠 𝑅𝑒𝑞𝑢𝑖𝑟𝑒𝑑
156 𝑇𝑟𝑖𝑝𝑠𝐷𝑎𝑦≈ 180 𝑑𝑎𝑦𝑠
Phase 1 & 2 = 102 days + 180 days = 282 days
282 days/5 days/week = 56.4 weeks = 14 months
3.0 SIGNIFICANCE ON IMPACTED LINKS
3.1 AFFECTED LINKS
The haul route includes (1) – 5th Street to Golden Gate Boulevard, (2) – Golden Gate Boulevard from Collier Boulevard to DeSoto Boulevard, (3) Collier Boulevard from Vanderbilt Beach Road to Pine Ridge Road, and (4) - Wilson Boulevard from Golden Gate Boulevard to Immokalee Road.
The estimated 14 months of hauling will contribute approximately 156 average daily trips with trip distributions as shown on the attached Haul Road Map.
3.2 TEMPORARY IMPACT TO AFFECTED LINKS
Information provided in Attachment “F” of the Collier County 2017 Annual Update and Inventory Report was used to analyze the impact of the trips on the affected links.
The estimated trips attributed to the hauling operation will contribute less than 1% of total peak-hour peak-direction volume for each affected link. These trips are already part of the existing
Road From To
2017 Peak HourPeak DirVolume
Peak HourPeak DirService Volume
V/CLOS
Collier Boulevard Vanderbilt Beach Road Golden Gate Boulevard 1220 3000 40.7% BCollier Boulevard Golden Gate Boulevard Pine Ridge Road 1904 3000 63.5% CWilson Boulevard Golden Gate Boulevard Immokalee Road 320 900 35.6% BGolden Gate Boulevard Collier Boulevard Wilson Boulevard 1600 2300 69.6% C
Golden Gate Boulevard Wilson Boulevard 18th Street 1102 2300 47.9% B
Golden Gate Boulevard 18th Street Everglades Boulevard 1102 1010 109.1% FGolden Gate Boulevard Everglades Boulevard DeSoto Boulevard 223 1000 22.3% B
Peak-Hour Peak-Direction Volume per 2017 AUIR
C:\Users\TerryCole\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\MWZ6OPY1\TIS for Ph 1 2 Revisions (180618).docx
traffic volumes. The proposed excavation removal will not have a significant or adverse impact on the surrounding road network.
4.0 EXISTING ROAD CONDITIONS
4.1 OVERVIEW
An examination of the Collier County portion of the haul route was performed on June 12, 2018. The general condition the roadways is good. There are no significant defects in asphalt, curbs, striping or drainage structures to report. The roadway system was observed to have normal wear and tear including chipped curb, weathered thermos-plastic striping and minor asphalt defects. A Collier County FY2018 Capacity Enhancement Project states that Golden Gate Boulevard will be under construction from Wilson Boulevard to DeSoto Boulevard. At present time, Golden Gate Boulevard from Wilson Boulevard to 18th Street has been expanded to a 4-lane road. Also, a Collier County FY2018 Capacity Enhancement Project has Collier Boulevard, from Golden Gate Boulevard to Green Boulevard expanding into a 6-lane road. As of June 2018, all construction along Collier Boulevard has been completed. If necessary, the mine owner will conduct a review of existing roadway infrastructure with Road Maintenance to determine any concerns due to hauling of excavation material. This review will identify any areas of concern. Criteria to be considered include:
1. Current pavement rating; 2. Field review/survey; 3. Current scheduled repairs; 4. Repairs to reduce the likelihood of accelerated damage under the proposed haul trips.
5.0 HAULING ROUTE MAP
See the attached map which shows the general % and # of round trips for various roadway segments.
C:\Users\TerryCole\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\MWZ6OPY1\TIS for Ph 1 2 Revisions (180618).docx
6.0 EXISTING CONDITION PHOTOS 6.1 GOLDEN GATE BOULEVARD AND 5TH STREET INTERSECTION
C:\Users\TerryCole\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\MWZ6OPY1\TIS for Ph 1 2 Revisions (180618).docx
6.2 GOLDEN GATE BOULEVARD AND COLLIER BOULEVARD INTERSECTION
6.3 VANDERBILT BEACH ROAD AND COLLIER BOULEVARD INTERSECTION
C:\Users\TerryCole\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\MWZ6OPY1\TIS for Ph 1 2 Revisions (180618).docx
6.4 COLLIER BOULEVARD AND PINE RIDGE ROAD INTERSECTION
C:\Users\TerryCole\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\MWZ6OPY1\TIS for Ph 1 2 Revisions (180618).docx
6.5 GOLDEN GATE BOULEVARD AND WILSON BOULEVARD INTERSECTION
C:\Users\TerryCole\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\MWZ6OPY1\TIS for Ph 1 2 Revisions (180618).docx
6.6 GOLDEN GATE BOULEVARD AND EVERGLADES BOULEVARD INTERSECTION
6.7 GOLDEN GATE BOULEVARD AND DESOTO BOULEVARD INTERSECTION