Department of \ ET CONT A, Rj . Richland Operations tftce CENYER P.O. Box 550 Richland, Washington 99352 '86 APR -8 P3:29 MAR i 9 Addressees MINUTES OF QUARTERLY MEETING BETWEEN THE BASALT WASTE ISOLATION PROJECT (BWIP), THE STATE OF WASHINGTON, AND THE AFFECTED INDIAN TRIBES Transmitted for your information and perusal are the meeting minutes of the quarterly meeting of the BWIP, the State of Washington, and the affected Indian Tribes that transpired on January 22 and 23, 1986. Enclosed are: o An attendees list o Copies of viewgraphs presented by BWIP (including the agenda) o Questions and answers evoked by the BWIP presentations o The presentation of the Confederated Tribes of the Umatilla Indian Reservation o The presentation of the Nez Perce Tribe o Notes of the EWA presentation for the Yakima Indian Nation o Notes of the GEOTRANS presentation for the Yakima Indian Nation o Notes of the State of Washington's Department of Ecology presentation o The presentation from the Washington Institute of Public Policy. If you have any comments on the enclosed information, please contact Max Powell (509-376-5267) or Jim Mecca (509-376-5038) of my staff. 8605090056 6360319 Very truly yours, PDR WASTE R . z e A 0. L. Olson, Director BWI:MLP Basalt Waste Isolation Division Enclo@ W Pject -- / Docket No. LPDRiI?6 Z Reto W z23-SS5 V b;m n- g=~4:Af/ i4r, kW4 /715

Upload: others

Post on 06-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

Department of \ ET CONTA, Rj . Richland Operations tftce CENYER

P.O. Box 550Richland, Washington 99352

'86 APR -8 P3:29

MAR i 9

Addressees

MINUTES OF QUARTERLY MEETING BETWEEN THE BASALT WASTE ISOLATION PROJECT(BWIP), THE STATE OF WASHINGTON, AND THE AFFECTED INDIAN TRIBES

Transmitted for your information and perusal are the meeting minutes of thequarterly meeting of the BWIP, the State of Washington, and the affectedIndian Tribes that transpired on January 22 and 23, 1986. Enclosed are:

o An attendees list

o Copies of viewgraphs presented by BWIP (including the agenda)

o Questions and answers evoked by the BWIP presentations

o The presentation of the Confederated Tribes of the Umatilla IndianReservation

o The presentation of the Nez Perce Tribe

o Notes of the EWA presentation for the Yakima Indian Nation

o Notes of the GEOTRANS presentation for the Yakima Indian Nation

o Notes of the State of Washington's Department of Ecologypresentation

o The presentation from the Washington Institute of Public Policy.

If you have any comments on the enclosed information, please contactMax Powell (509-376-5267) or Jim Mecca (509-376-5038) of my staff.

8605090056 6360319 Very truly yours,PDR WASTE R . z e A

0. L. Olson, DirectorBWI:MLP Basalt Waste Isolation Division

Enclo@ W Pject -- /Docket No.

LPDRiI?6 Z

Reto W z23-SS5 V b;m n-g=~4:Af/ i4r, kW4

/715

Page 2: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

QUARTERLY MEETING ATTENDANCE

January 22-23, 1986

Name

0. L. OlsonJ. E. MeccaM. L. PowellB. W. HurleyK. Michael ThompsonSteve StraitFred N. McDonaldEllen Cuywood

Steve HartWilliam H. BurkeDaniel HesterCarl L. SampsonPhil BrownClarice BarnesPeter RamatowskiRon Halfmoon

Glen LneLisa L. AugustGeorges V. Abi-GhanemM. J. FurmanA. G. LassilaH. E. LefevreBill BrewerMarta Wilder

~'Jack FassettDale LandonPhilip LongTony KneppMichael B. ArndtMax E. PowerStephen RudelA. M. TallmanTerry Husseman

Affiliation Telephone Number

Department of Energy-Richland OperationsDepartment of Energy-Richland OperationsDepartment of Energy-Richland OperationsDepartment of Energy-Richland OperationsDepartment of Energy-Richland OperationsRockwell Hanford Operations/BWIPRockwell Hanford Operations/BWIPWSIPP

OfficeOfficeOfficeOfficeOffice

CERTCTUI RCTUIRCTUIRCERTCTUI RCTUIRNez Perce

CERT for Nez Perce/CTUIRGeoTrans/Yakima Indian NatiohEWA/Yakima Indian NationDepartment of Energy-Richland Operations OfficeDepartment of Energy-Richland Operations OfficeNuclear Regulatory Commission/Geotechnical BranchState of WashingtonState of WashingtonRockwell Hanford Operatlons/BWIPRockwell Hanford Operations/BWIPRockwell Hanford Operations/BWIPDepartment of Energy-Richland Operations OfficeRockwell Hanford Operatlons/BWIPWashington State Institute for Public PolicyRockwell Hanford Operations/BWIPRockwell Hanford Operations/BWIPWashington State Department of Ecology

(509) 376-7334(509) 376-5038(509) 376-5267(509) 376-7059(509) 376-6421(509) 373-4226(509) 376-8556(206) 866-6000Ext. 643

(303) 832-6600(503) 276-3018(503) 276-3165(503) 276-3165(303) 832-6600(503) 276-3018(503) 276-3018(208) 843-2253Ext. 386

(303) 832-6600(703) 435-4400(612) 332-0000(509) 376-7062(509) 376-6158(301) 427-4532(206) 459-6676(206) 459-6695(509) 376-6211(509) 376-6258(509) 376-6246(509) 376-4934(509) 376-7133(206) 866-6000(509) 376-2721(509) 376-8712(206) 459-6670

Page 3: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

QUARTERLY MEETING BETWEEN THEBASALT WASTE ISOLATION PROJECT,

THE STATE OF WASHINGTON,THE YAI(IMA INDIAN NATION,

THE NEZ PERCE TRIBE, ANDTHE CONFEDERATED TRIBES OF

THE UMATILLA INDIAN RESERVATION

JANUARY 22 AND 23,1986

N 3 %2

Page 4: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

AGENDA

JANUARY 22,1986

8:30

8:40

INTRODUCTORY REMARKS M. L POWELL/J. E. MECCA

GEOSCIENCE AND TECHNOLOGY

CURRENT ACTIVITIES- GEOLOGY- GEOMECHANICS- HYDROLOGY- GEOCHEMISTRY- IN SITU TEST PLANNING

BWIP TOPICAL PRESENTATIONS/DISCUSSIONS- THREE DIMENSIONAL STRATIGRAPHIC

AND STRUCTURAL (GEOMETRIC) MODEL- LARGE-SCALE HYDRAULIC STRESS TEST

PLANNING STATUS- PERFORMANCE ASSESSMENT STRATEGY

D. DAHLEM/B. HURLEY

S. PRICEK. KIMS. STRAITM. FURMANM. ARNDT

D. LANDON

M. THOMPSONT. KNEPP

12:001.00

2:002:45

LUNCH- LICENSING/ENVIRONMENTAL/SAFETY

REGULATORY AND INSTITUTIONALACTIVITIES- BUSINESS MANAGEMENTACTIVITIES

QUALITY ASSURANCE- QA REQUIREMENTS FOR SITE

CHARACTERIZATION- STATUS OF BWIP QA PROGRAM

IMPLEMENTATION

J. E. MECCAE. HIGGINS

P. SAGET

3:15 ENGINEERING AND CONSTRUCTION B. NICOLL- ORGANIZATION OF ENGINEERING ACTIVITIES- OVERVIEW OF THE EXPLORATORY SHAFT AND

REPOSITORY PROGRAMS- STATUS OF EXPLORATORY SHAFT AND

REPOSITORY PROGRAMS- ACTIVITIES ANTICIPATED FOR THE NEXT

QUARTER- OVERVIEW OF REPOSITORY

Page 5: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

AGENDA

JANUARY 23, 1986

- PROGRAM STATUS

9:00 - UMATILLA

9:45 - NEZPERCE

10:30 - BREAK

10:45 - YAKIMA

11:30 - LUNCH

1:00 - STATE OF WASHINGTON (DOE)

1:45 - STATE OF WASHINGTON (LEGISLATURE)

Page 6: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

GEOLOGY ACTIVITIES

SUE PRICE, MANAGER,GEOSCIENCES GROUP

ROCKWELL HANFORD OPERATIONS

$S640 7.Gemoogy1

Page 7: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

GEOLOGICCHARACTERIZATION

STRATIGRAPHY GEQLOGIC INTEGRATION

* SUBBASALT * GEOMETRIC FRAMEWORK* BASALT a "DYNAMIC" MODEL* INTERBEDS DEVELOPMENT* SUPRABASALT * INPUT TO DESIGN.* THICKNESS VARIATIONS PERFORMANCE* MODEL DEVELOPMENT ASSESSMENT

INTRALOW STRUCTURE

* TYPES* DISTRIBUTION* MODEL DEVELOPMENT

FRACTURECHARACTERIZATION

TECTONICS

* STRUCTURAL GEOLOGY* PAST AND PRESENT

DEFORMATION* SEISMOLOGY* TECTONIC MODEL

EVALUATION/DEVELOPMENT

GEOMORPHOLOGY

* SURFICIAL GEOLOGY

* SURFICIAL PROCESSES

* EROSIONAL INCISIONPOTENTIAL

* FREQUENCY* DIMENSIONS* INFILLING* MODEL DEVELOPMENT

ROCK CHEMISTRY

* PRIMARY/SECONDARYMINERALOGY OF BASALT

* MINERALOGY OFINTERBEDS

* MINERALOGY OF ALTEREDBASALT

* MINERALOGY OF FAULTINFILLING MATERIALS

* MODEL DEVELOPMENT

ECONOMIC GEOLOGY* MINERAL RESOURCE

OCCURRENCE

* COMPARATIVE VALUEESTIMATION

* INADVERTANT INTRUSIONPOTENTIAL

Page 8: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

r

GEOLOGY ACTIVITIES(SEPTEMBER 1985 - JANUARY 1986)

* STRATIGRAPHY- DEVELOPED PRELIMINARY STRATIGRAPHY OF BOREHOLES RRL-17 AND DC-23W- COMPLETED PUBLICATION ON FRENCHMAN SPRINGS BASALT CORRELATION

* INTRAFLOW STRUCTURE AND FRACTURE CHARACTERIZATION- INTRAFLOW STRUCTURE

-- COMPLETED FIELD DATA COLLECTION, EAST SIDE OF SENTINEL GAP-- CONDUCTED BOREHOLE OPTIMIZATION STUDY IN SUPPORT OF

ENGINEERING DESIGN- FRACTURE CHARACTERIZATION

-- COMPLETED REPORT ON PRIMARY FRACTURE WIDTHS AND INFILLINGS-- COMPLETED NORCUS-FUNDED THESIS ON PRIMARY FRACTURE

ORIENTATION AND SPACINGCOMPLETED REPORT ON PRIMARYFRACTURE CHARACTERISTICS OF THECOHASSETT FLOW

PSWS-057-Gey2

Page 9: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

GEOLOGY ACTIVITIES(SEPTEMBER 1985 - JANUARY 1986)

(CONT.)

* ROCK CHEMISTRY- COMPLETED STATUS REPORT ON SECONDARY MINERALS IN FLOW TOPS

(SD-BWI-TI-302)- CONTINUED STUDIES ON PETROGRAPHY OF GRANDE RONDE FLOW TOPS- INITIATED STUDIES ON PETROGRAPHY OF INTERBEDS

* TECTONICS- CONDUCTED FIELD MAPPING IN SNIVELY BASIN AND VANTAGE AREA- SAMPLED TECTONIC BRECCIA IN CORE AND VANTAGE AREA FOR

COMPOSITIONAL ANALYSIS- INITIATED PREPARATION OF REPORT ON SEISMIC REFLECTION AND

REFRACTION TESTING- CONTINUED WORK ON UPPER COLD CREEK SYNCLINE HYDROLOGIC BARRIER

- ANALYZED GRAVITY AND MAGNETIC DATA-- COMPLETED REPORT FOR VERTICAL SEISMIC PROFILING IN

BOREHOLES D-27 AND -28

-- LOCATED TWO ALDITIONAL BOREHOLES-- LOCATED MAGNETOTELLURIC SITES

S86- 2O7i-eology]

Page 10: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

GEOLOGY ACTIVITIES(SEPTEMBER 1985 - JANUARY 1986)

(CONT.)

* TECTONICS (CONT.)- COMPILED SEDIMENT ANALYTICAL DATA- COMPLETED PUBLICATION ON LATE CENOZOIC STRATIGRAPHY AND TECTONIC

EVOLUTION WITHIN A SUBSIDING BASIN- PROCESSED BACKLOG OF SEISMIC EVENT LOCATIONS AND MAGNITUDES- INITIATED STUDY TO ASSESS POTENTIAL FOR IRRIGATION-INDUCED SEISMICITY- DEVELOPED PRELIMINARY SEISMIC DATA FOR SITE CHARACTERIZATION PLAN

(SCP) ENGINEERING DESIGN

* ECONOMIC GEOLOGY- COMPLETED INTERIM REPORT ON STRATIGRAPHY AND HYDROCARBON

POTENTIAL (SD-BWI-TI-265)- COMPLETED REPORT ON EXPLORATION'ACTIVITIES, OCTOBER 1984 THROUGH

SEPTEMBER 1985

PsB6-2057Geology4

Page 11: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

GEOLOGY ACTIVITIES(SEPTEMBER 1985 - JANUARY 1986)

(CONT.)

* GEOLOGIC INTEGRATION- ADDRESSED ENVIRONMENTAL ASSESSMENT REVIEW COMMENTS- CONTINUED PLANNING EFFORTS

-- CONTINUED FORMULATION OF SCP AND SCIENCE PLANS-- PROVIDED INPUT TO EXPLORATORY SHAFT PROGRAM PLANNING

- COMPLETED DEVELOPMENT OF PRELIMINARY STRATIGRAPHIC ANDSTRUCTURAL MODEL

- PROVIDED SUPPORT TO HYDROLOGIC MODELING ACTIVITIES- PROVIDED SUPPORT TO SCP ENGINEERING DESIGN

flS62O-Geology5

Page 12: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

00-

IMPORTANT BASALT WASTE ISOLATION PROJECT EVENTS

FOURTH QUARTER, 1985

o ENVIRONMENTAL ASSESSMENT

- FINAL REVIEW

- RECONCILIATION'

- COMMENT RESPONSES

o HIGH LEVEL TECHNICAL REVIEWS

- WITH NRC ON LARGE SCALE HYDRAULIC STRESS TEST

- WITH USGS AND NRC ON GEOCHEMISTRY

- WITH NRC ON EXPLORATORY SHAFT DESIGN

- WITH NRC AS PARTICIPANT IN OCRWM SEISMIC-TECTONIC POSITION DEVELOPMENT- STATE OF WASHINGTON LEGISLATIVE REVIEW OF PROGRAM

o SITE CHARACTERIZATION PLAN - DEVELOPMENT OF STRATEGY TO ADDRESS ISSUES

o PROGRAM PLANNING LOGIC DEVELOPMENT

o BWI QUALITY ASSURANCE PROGRAM

Page 13: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

QUARTERLY MEETINGWITH STATE AND INDIAN NATIONS

MAJOR ACTIVITIESIN GEOMECHANICS AREA(1ST QUARTER, FY 86)

JANUARY 22 & 23, 1986KUNSOO KIM

Page 14: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

GEOMECHANICS

(1) LONG TERM PLANNING

(2) TESTING AND CHARACTERIZATION

(3) TEST METHOD AND INSTRUMENTATION DEVELOPMENT

(4) NUMERICAL MODELING AND ANALYSIS

(6) INPUT TO REPOSITORY DESIGN ACTIVITY

Page 15: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

(1) LONG TERM PLANNING

A) EXPLORATORY SHAFT TEST PLAN

*TEST DESIGN REQUIREMENT DOCUMENTS (IN PREPARATION)*FACILITY OPERATING PLAN (COMPLETED)*PREPARATION FOR AN NRC WORKSHOP (IN PROGRESS)

B) SITE CHARACTERIZATION PLAN*CHAPTER 2 GEOENGINEERING (READY FOR EXTERNAL REVIEW)

*CHAPTER 8.3.2. REPOSITORY PROGRAM (IN PREPARATION)

C) GEOMECHANICS SCIENCE PLANo(IN PREPARATION)

Page 16: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

r

(2) TESTING AND CHARACTERIZATION

(A) LABORATORY TEST

*ESTABLISHED LAB THERMAL PROPERTY TESTING CAPABILITY*INITIATED THERMAL CONDUCTIVITY, EXPANSIVITY,AND SPECIFIC HEAT TESTS

(B) FIELD TEST

*COMPLETED AND RELEASED THE BLOCK TEST FINAL REPORT

*REVISED AND RELEASED THE IN SITU STRESS REPORT*NSTF HEATER TESTS REPORT IN FINAL STAGE OF PREPARATION

*COMPLETED SHOTCRETING TUNNEL 1 AT THE NSTFAND ASSOCIATED SHOTORETE TESTS

*RECEIVED APPROVAL ON ADDITIONAL HYDROFRACTURINGTESTS AND THE ASSOCIATED INVESTIGATIONS

Page 17: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

(3) TEST METHOD AND INSTRUMENTATIONDEVELOPMENT.

(A) COMPLETED TEST DESIGN REQUIREMENT FOR.eTHERMAL CONDUCTIVITY PROBEeFLAT JACK TEST&PLATE BEARING TEST*MINE-BY TEST

(B) COMPLETED CONCEPTUAL DESIGNS FOR*THERMAL CONDUCTIVITY PROBEaMINE-BY TEST*CHAIN SAW LOT CUTTER

(C) OTHER DEVELOPMENT ACTIVITY

'FLAT JACK (POLYMER FLAT JACK)*MPBX WITH GRAPHITE RODSoDEFLECTOMETER

Page 18: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

(4) NUMERICAL MODELING AND ANALYSIS

(A) NUMERICAL CODE ACQUISITION, INSTALLATION, AND TESTING

*COMPLETED, ABACUS

(B) CODE VERIFICATION AND BENCHMARKING

*COMPLETED. ADINA

(C) REVISION OF GEOMECHANICS DATA BASE

* COMPLETED

Page 19: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

(5) INPUT TO REPOSITORY DESIGN ACTIVITIES

(A) CONSENSUS WORKSHOP ON GEOENGINEERING DESIGN PARAMETERS

*PROCEEDINGS COMPLETED AND RELEASED

(B) INITIATED IMPLEMENTATION OF WORKSHOP RECOMMENDATIONS

*COLLABORATING WITH ENGINEERING DESIGN ANDDEVELOPMENT DEPARTMENT TO INITIATE A STUDY FOR ANIMPROVED UNDERGROUND DESIGN ANALYSIS METHODTO SUPPORT THE ADVANCED CONCEPTUAL DESIGN

I .

Page 20: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

HYDROLOGIC UPDATE

S. R. STRAIT

JANUARY 22, 1986

I

Page 21: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

PURPOSE

PROVIDE AN OVERVIEW OF HYDROLOGIC ACTIVITIES OVER THE

LAST QUARTER OF 1985.

- BASELINE MONITORING

- LARGE-SCALE HYDRAULIC TESTING

- REGIONAL HYDROLOGY

Page 22: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

I

BWIP IIYDROGEOLOGY PROGRAML6.

HYDROLOGICCHARACTERIZATION

41

I .- I r- __ -I~~

PHYSICALI HYDROGEOLOGY I I CHEMICALHYDROGEOLOGY l DATA BASE

'MANAGEMENT .I. . .~~~~~~~~~~~~~~~~I If1:

REGIONALFLOWSYSTEM

- BOUNDARYCONDITIONFORPERFORMANCESCALE MODELS

I-SITE-SPECIFICPARAMETERSIDENTIFICATION

- SUPPORT TOFLOWINTERPRETATIONS

- TRANSPORTPARAMETERS

- RETRIEVABILITY

- TRACEABILITY

- CORRELATIONS

- PERFORMANCEPARAMETERS

Page 23: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

BASELINE MONITORING

- CONTINUING TO MONITOR WATER LEVELS AND DOWNHOLE

PRESSURE AT DC-19, -20, -22i AND RRL-2

- TELEMETRY OF PRESSURE DATA FROM WELLSITES

- INSTALLED PIEZOMETERS AT DC-2.3W IN WANAPUM BASALT

- ISSUED HEADCO (RHO-BW-ST-71P) --

- INSTALLED WESTBAY SYSTEM IN RRL-14

- MONITORING 34 WELLS AS PART OF HANFORD SITE MONITORINGNETWORK

- DATA BASE EFFICIENCY IMPROVED BY NEW NAS COMPUTER

Page 24: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

I

i

R25E R26E

-I

I

Y

I

II

II

I

i------I

f De-12 IIi

IIIIII

- - - - - - -t- - - - - -

~ Il II

II …------

I

'.

0-

III

I

IIIIIII

a-

-I I

_ ---- -…0

iiII

I aII!---- 1- - -I III II

I II I

I II I

0

McGEEa

IIIIF _ I

UL-~~~~~~J I ~ ,

__- __ 4 ------_I---- __L

v.

I

R ROUTE I A I-4 b

a a~I *II

A I

I II I

-4 -----I A1

II II

I IAI I I

I III II

I I~~- - - 4- -

II

rU],

S

200 E

----- t-----

-Ia

Ll_ ,

ROUTE 4 SOUTH

tE N C REFERENCEI REPOSITORY A 'I LOCATION I IA-! _ _ _ _ _ _, _ _-_-L - - - _- - - - - - - - - - -

* BOREHOLE LOCATION

O I MILEI 2I I I

O 1 2KILOMETERS

I I I

I I II I I

I II I I

I- t- -I--I I I

I i

2K8512-2

i

Page 25: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

PIEZOMETER FACILITIES

DC-19, DC-20, AND DC-22

BASAL RINGOLDRATTLESNAKE RIDGE INTERBEDMABTON INTERBEDPRIEST RAPIDS FLOW ToPSENTINAL GAP FLOW ToPGINKGO FLOW ToPROCKY COULEE FLOW ToPCOHASSETT FLOW ToPUMTANUM FLOW ToP

RRL-2C

ROCKY COULEE FLOW ToPROCKY COULEE INTERIORCOHASSETT FLOW ToPCOHASSETT INTERIORGRANDE RONDE #5 FLOW ToPGRANDE RONDE #5 INTERIOR

DC-23W

PRIEST RAPIDS FLOW ToPSENTINAL GAP FLOW ToPGINKGO FLOW ToP

MULTILEVEL PACKERS

RRL-14

ROCKY COULEE FLOW ToPCOHASSETT FLOW ToPCOHASSETT VESICULAR ZONEGRANDE RONDE #5 FLOW ToPUMTANUM FLOW ToP

Page 26: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

BOREHOLEs D-19 HYDROGEOLOGIC UNITs SADDLE NTWRNRPUK'GRRNDE RONDE

LOCRTIONi HFORD SITE DATUM ELEVRTIONs MEAN SEA LEVEL

ADJUSTED TO CONSTANT ATMOSPHERIC PRESSURE OF 14.34? PSI

460

450

460

450

440

0

LiL.

U.

440

430

UIL

420

410

400

-j

L

-J

410

400

390 390Apr May Jun Jul Aug Sp Oct Nov Dcc Jan Feb Mar pr May Jun Jul Aug Sup Oct Nov

1984 195MONTHS

HYDROGRRPH PRODUCED BYProgtam wIYIT Rov 4.7 FILEs XtSHRUS

.. ..

Page 27: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

BOREHOLEs DC-22C HYDROGEOLOGIC UNITs GRRNDE RONDE & HAIRAPUM

LOCRTION: H 448,600 E 2204,160 DATUM ELEVATION: HERN SEA LEVEL

ADJUSTED TO CONSTANT TMOSPHERIC PRESSURE OF 14.347 PSI

469 409" 45 I - PRIEST RRPIDS INTERFLOW ZONE 40.5

2 - SENTINEL GRP FLOW TOP408 3 - GINKGO LOW TOP 406

4 - ROCKY COULEE FLOW TOP407.5 5 - COHRSSETT FLOW TOP 407.547 - 6 - UMTINUM FLOW TOP 407

406.5 _ 406.5

- 46406 406

495.5 405.5L. L~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~A

- 405 06 4404.5 _ 404.5

X 404 404

403.5 403.5

403 403

4054 -405

462 * 5 462.5~~~~~~~~~~~~~~~ ci 402 492 d461.5 3461.5

401 2 401

400.5 400.5

460 400

3S9.5 PRESSURE PROBE CLIBRRTION ACTIVITIES 399.5

339 393Jun Jul Aug Sep Oct ov Iec Jan Fb Mar pr May Jun Jul Aug Sep Oct Nov Dec Jan

1984 1S8SMONTHS

HYDROGRRPH PRODUCED BYPream SIYCRT Rev 4.7 FtLCs tIMPS *I

Page 28: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

BOREHOLEs DC-19C HYDROGEOLOGIC UNIT: GRANDE RONDE WftJAPUM

LOCRTIONs N 433,933 E 2225,012 DRTUM ELEVATION: MEAN SEA LEVEL

ADJUSTED TO A CONSTANT ATMOSPHERIC PRESSURE OF 14.347 PSI

407 407

406.5 1 - PRIEST RAPIDS INT'RFLOW ZONE 406.52 - SENTINEL GRP FLOW TOP

406 ,I 3 - GINKGO FLOW TOP 406405.5 4 - ROCKY COULEE FLOW TOP 405.5

S - COHRSSETT LOW TOP405 6 - UMTANUM FLOW TOP 405

404.5 404.5

84. 4 f f 3 ,^ -04 14 1723414403.5 H l 403.5

- 403 2C 20 403.

4 402.5 402.5 J

402 402 r401.5 401.5

*- 461 401 -

400.5 4 02. 5

400 4900

399.5 359.5

39S 399

398.5 398.5

398 398

397.5 PRESSURE PROBE CLIBRRTION ACTIVITIES 397.5397 a , a , a -- I a I a a I a & ' a | a - -- - 'a 397

Jun Jul Rug Sp Oct Nov Dec Jan Fab ar Apr May Jun Jul Aug Sep Oct Nov Doc Jan1 984 1985

MONTHSHYDROGRAPH PRODUCED BY

Program hHYOAT Rev 4.7 FILEa XIS PS

Page 29: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

HOREHOLEs DC-ZQC BOREOLEa DC20C HYKIROGEOLOGtC UNITs GRANDE RONDE WRN11PUH

LOCRTION H 1.884 E 2.215.268 DATUM ELEVATIO:2 tEHERN SER LEVEL

ADJUSTED TO A CONSTONT ATMOSPHERIC PRESSURE OF 14.34? PSI

498 498

407.5 407.5

407 47

406.5 _6 ' S

496 406

10.5 _ 403 S5403~~~~~~~~~~~~~~~~~~

_05 405

i 403 403

Z 402.5 402.5o 402 310e

401.5 101.5 Zi

d lo _ _400.5 t - PRIEST RPIDS INTERFLOW ZONE 400.5

2 - SENTINEL CAP FLOW TOP100 3 - GINKGO FLOW TOP 4Og

* 4 - ROCKY COULEE FLOW TOP333.5 , - COHASSETT FLOT TOP 3 9.5

33 6 - 1TONUM FLOW TOP 333

338.5 33a.5

338 I _ 338Jun Jul mug Srp Oct Nov ne Jan Fb Mat Alpr ay Jun Jul ug gep ct Nov Dec Jan

£384 38MIONTHS

HYDROGRAPH FRODUCED BYrrur Uftgsl Re'. 1.7 mXts =W'RIS

Page 30: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

REV 0

2K8410-1.1

FIGURE 1..Nefi;ork

Location Map of the Hanford Site MonitoringBoreholes and the DC-19, OC-20 and C-22

Piezomneter Facilities.* - : a t!~~~~~~~~~~~ .~ , . .... . -

8

Page 31: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

MiONITORING ORIZONSHANFORD SITE MONITORING NETWORK

UNCONFINEDPRIEST RAPIDS

INTERFLOWMABTON INTERBED

25-7032-7032-7243-8849-7950-85

DC-16BDB-9DH-8BDB-13DB-7DB-4

0'BRIANFORDENYEARTDB-12DB-14DC-16CDB-1DB-i1

WANAPUMGINKGOFLOW TOP

DDH-3

ROCKY COULEEFLOW TOP GRANDE RONDE

DB-2DB-15DC-1MCGEE

RRL-6BRRL-2ADC-41/5MCGEE

DC-7/8DC-12DC-15DC-1DC-2

Page 32: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

LARGE-SCALE HYDRAULIC TESTING

- PREPARED A DRAFT TEST PLAN

- CONDUCTING A READINESS REVIEW

- PROCURING EQUIPMENT

REGIONAL HYDROLOGY

- PREPARED A DRAFT PLAN

Page 33: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

/la v -t Fi

BWIP GEOCHEMISTRYPROGRAM

ENGINEEREDBARRIERS

DEPARTMENT

I

. SITEDEPARTMENT

_~~~ l

..v

NEAR-FIELDGEOCHEMISTRY

I

HYDROCHEMISTRY I

I

ROCKCHEMISTRY

_ .

i

Page 34: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

I

I IHYDROCHEMISTRY ROCK CHEMISTRY

-

I9� U

I IREGIONAL

HYDROCHEMISTRY/CONCEPTUAL GROUND-

WATER FLOW

AGEDATING

1.� H N -

1 I IIPRIMARY

MINERALOGYOF BASALT

MINERALOGYOFINTERBEDS

I

FIELD-SCALESORPTION

MEASUREMENTS

________________ 1 ____________ I 0

GEOCIIEMICALMODELING

SECONDARYMINERALOGY

OF BASALT

MINERALOGY OFALTERED BASALT

i .

MINERALOGY OFFAULT IN-FILLING

MATERIALS

Page 35: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

TNEAR-FIELD

GEOCHEMISTRY

I____________________________ - I � - 'V �

I I I I.

HYDROTHERMALTESTING

SORPTIONMEASUREMENTS

GEOCHEMICALMODELING

_ _ _ _ _ _ _ _ _ I .RADIATION J

EFFECTSNATURAL ANALOG

STUDIES 1i

Page 36: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

6 E C 11 E I S T R Y

INTERACTIONS

DECEMBER - WORKING MEETING WITH TlE U. S. GEOLOGICAL SURVEYTO DISCUSS STRATEGIES AND INTERPRETATIONS OF SITE HYDROCHEMISTRY

Page 37: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

A'

AGENDADOE-RL/USGS Meeting on Site HydrochemistryBasalt Waste Isolation Project

Date: December 10-11, 1985Place: Richland, Washington

Purpose: Discuss WIP Site Subsystem hydrochemistry program status andplans with USGS technical staff.December 0, 1985

8:00 USGS/DOE Administrative Meeting (Federal Bldg3 D.H. Dahlem* d * -r _

8:30 Introductory Remarks

8:40 USGS Introductions

8:50 Hydrochemlstry Program Overview

I. Geologic Setting

9:05 Geologic Setting

II. Hydrochemistry Related to Groundwater FlowRealonal Hydrochemistry

9:30 Regional Hydrochemistry Related to ConceptualGroundwater Fl w Models10:30 Break

Site Geochemistry

10:45 BWIP Data Base Overview11:15 Borehole Development Studies11:45 Lunch

1:00 Secondary Minerals in Groundwater Flow Zones2:00 Rock/Water Interactions

2:45 Break

3:00 Geochemical Modeling Strategy3:45 Conceptual Groundwater Flow Models5:00 Review and Questions

5:30 Adjourn

M.. rurmar

D.H. DahlenN.J. Funna

USGS

R.M. Smith

I

I

K.R. Fecht

G.S. Socon

T.o.

V. G.

D.G.

T.O.

G.C.

T.O.

Early

Johnson

Horton

Early

Sol omon

Early

Page 38: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

December 11, 1985

8:00 Groundwater Age Dating/Travel Time

Uper Cold Creek Valley Groundwater Flow Model

8:45 Hydrochemi stry

9:15 Groundwater Age Dating/Travel Time

9:45 Break

III. Radionuclide Migration Studies

10:00 Overview

10:10 Laboratory Sorption Studies

Field Based Studies

11 :10 Redox

12:10 Lunch

1:30 U-Th Disequilibrium

2:30 Field Tracer lYests

3:30 Break

3:45 Review and Questions

4:30 Adjourn

4:30 USGS Caucus

V.G. Johnson

T.0. Early

V.6. Johnson

R.M. Smith

R.M Sith

T.0. Early

V.G.

E. I.

Johnson

Wallick

R.M. Smi th

Page 39: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

ACCOMPLISHMENTS

o COMPLETED FIRST MILESTONE-REPORT ON UNIVERSITY OF COLORADO CONTRACT FORmDETERMINING TE REVERSIBILITY OF OXIDATION - REDUCTION REACTIONS IN

GROUNDWATER"

o COMPLETED REPORT ON TEMPLE UNIVERSITY CONTRACT ENTITLED COMPARISON OF

THE HYDROTHERMAL STABILITY OF UTANUM AND COHASSETT BASALTSH

o RELEASED DOCUMENTS ON:

- "ANALYSIS OF SOLIDS FROM NITIAL 2000C 30 PA HYDROTHERMAL TESTS WITH

'FULLY RADIOACTIVE' WASTE GLASS AND SPENT FUEL"

- "EXAMINATION OF SOLIDS FROM 2000C HYDROTHERMAL TESTS WITH SPENT FUEL"I

- NEFFECT OF ALPHA AND GAM RADIATION ON TE HEAR-FIELD CEMISTRY AND

GEOCHEMISTRY OF 1IIGH-LEVEL WASTE PACKAGES"

Page 40: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

0 .

ACCOMPLISHlENTS (CONT I NUED)

o COMPLETED DRAFT DOCUMENTS:

- GEOCHEMICAL-MODELING STRATEGIES FOR THE SITE

- STRATEGIES FOR BOREHOLE LOCATION AND SAMPLING REQUIREMENT FOR HYDROCHEMISTRY

- STRATEGY FOR FIELD REACTIVE TRACER TEST

- STRATEGY FOR THE STUDY OF HYDROCHEMISTRY OF SULFUR AND CARBON IN THECOLUMBIA RIVER BASALTS

- SECONDARY MINERALS IN THE ROCKY COULEE AND COHASSETT FLOW TOPS

o INITIATED A CONTRACT WITH PORTLAND STATE UNIVERSITY TO STUDY THE MINERALOGY ANDGEOCHEMISTRY OF YDROTHERMALLY ALTERED FLOW TOPS IN THE GRANDE RONDE BASALT ASAN ANALOG OF ELEMENT MOBILITY IN THE REPOSITORY ENVIRONMENT IN BASALT

Page 41: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

AGE-DATING GROUNDWATER

.

Page 42: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

r

IN SITU TEST PLANNING(EXPLORATORY SHAFT TESTING)

MICHAEL ARNDT, EXPLORATORY SHAFTRESEARCH PROGRAM MANAGER,

RESEARCH DEPARTMENT

ROCKWELL HANFORD OPERATIONS

ruiSt A 9is.1

Page 43: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

PURPOSE

o SITE CHARACTERIZATION

o SITE SUITABILITY- CONSTRUCTIBILITY CONSIDERATIONS

- ISOLATION CONSIDERATIONS

nus asps 91X

Page 44: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

CURRENT ACTIVITIES

NRC/DOE/BWIP WORKSHOPBWIP ISSUES AND CONCERNS

EXPLORATORY SHAFT TESTING PROGRAMSTRATEGIESDATA SUFFICIENCY (PERFORMANCE ASSESMENT)DATA APPLICATION

TEST DEVELOPMENT AND DESIGNGEOLOGY

GEOHYDROLOGY

GEOMECHANICS

GEOPHYSICS

re. .w l . .

Page 45: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

SCOPE OF EXPLORATORY SHAFTPROGRAM

(TWO-PHASED PROGRAM)

* PHASE I- SHAFT- PORTHOLES- SHAFT STATION

o PHASE 11- SECOND SHAFT- MAIN AND TEST DRIFTS- GEOHYDROLOGIC TEST AREAS- GEOMECHANICS TEST AREAS

MM~h. untAiot.$

Page 46: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

THREE-DIMENSIONAL STRATIGRAPHICAND STRUCTURAL (GEOMETRIC) MODEL

DALE LANDON, SENIOR GEOLOGIST,HOST ROCK STUDIES UNIT

ROCKWELL HANFORD OPERATIONS

PS86-2057-3*D1

Page 47: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

PRELIMINARY STRATIGRAPHIC ANDSTRUCTURAL MODEL OF THE REFERENCE

REPOSITORY LOCATIONHANFORD SITE, WASHINGTON

* PURPOSE

* MODEL SCOPE

* DATA SOURCES

0 METI'ODOLOGY

* METHODOLOGY ADVANTAGES

* METHODOLOGY LIMITATIONS

0 MODEL RESULTS

o CONCLUSIONS

fl8-057.3 D2

Page 48: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

PURPOSE OF MODEL

* MODEL PROVIDES A THREE-DIMENSIONAL REPRESENTATION OFTHE STRATIGRAPHY AND STRUCTURE OF THE REFERENCEREPOSITORY LOCATION

* MODEL PROVIDES A STRATIGRAPHIC AND STRUCTURALFRAMEWORK FOR USE IN GEOLOGIC, HYDROLOGIC,PERFORMANCE ASSESSMENT, AND ENGINEERING STUDIES

0 MODEL SERVES AS A PREDICTIVE TOOL FOR FUTURE BOREHOLELOCATIONS

Page 49: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

Figure I* Location Map or the Modeled Area, feerence Repoitory Location,and the Sanford Sit.

Page 50: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

LOCATION MAP

4t7~~~~~~~REFERENCE EPOITORY LOCTINd / I / t

AR Wlt-28 At-3 s

200 WEST AREA

W L14 wr47 W?4

3St2 /~~~~~~~~~

---- 377 ----- 20D0 4doo;1 r

ARL.411- ~~~~~~~~F6

21-78~~~~~~~~~~~~~~

C

Page 51: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

DATA SOURCES

* BOREHOLE, OUTCROP, AND GEOPHYSICAL DATA (USED TOCONSTRUCT HAND-CONTOURED TOP OF BASALT MAP)

e BOREHOLE DATA FROM THROUGHOUT THE PASCO BASIN (USEDTO CONSTRUCT UNIT ISOPACH MAPS)

PS86-2057 -D4

Page 52: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

METHODOLOGY

* GRID SUBTRACTION TECHNIQUE

* COMPUTER SOFTWARE (INTERACTIVE SURFACEMODELING (ISM) BY DYNAMIC GRAPHICS, INC.)

* CONSTRUCTION OF SURFACES- HAND-CONTOURED TOP OF BASALT MAP DIGITIZED- ISOPACH MAP GRID FILES CONSTRUCTED FROM PASCO

BASIN WIDE DATA FILES- SUBGRIDS OF ISOPACH GRID FILES SUBTRACTED FROM THE

NEXT OVERLYING SURFACE- GRID FILES CONTOURED AND PLOTTED

- CROSS SECTIONS AND BLOCK DIAGRAMS PRODUCED

PS86-2057-34D5

Page 53: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

* 0 * * * 0 0 * 0 0 0 0 0 0 0 0

GADMUMIN

9 so-110ww

Als

Hypothetical Cross Section showing the Contoured Top of Basalt Surface.

Page 54: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

METHODOLOGY ADVANTAGES

o TECHNIQUE PRODUCES A MORE PRECISE AND REPRODUCIBLEREPRESENTATION OF THE ELEVATIONS AND THICKNESSESBETWEEN DATA POINTS

* TECHNIQUE PROVIDES THE ABILITY TO EASILY UPDATE MODELAS NEW DATA ARE OBTAINED

o TECHNIQUE PROVIDES ABILITY TO PRODUCE MAPS, CROSSSECTIONS, AND BLOCK DIAGRAMS AT ANY SCALE AND FROMANY VIEWPOINT

PS86-2D57-1 D6

Page 55: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

M ETHODOLOGY LIMITATIONS

* EXPERT JUDGEMENT NOT READILY INTRODUCED AT EACHSTRUCTURAL SURFACE

* TOP OF BASALT MAY NOT BE A TRUE STRUCTURAL SURFACE,BUT MAY HAVE SOME EROSIONAL VARIATION

11B6-2057-*3Do

Page 56: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

MODEL RESULTS

* THIRTY-EIGHT (38) STRUCTURAL SURFACES- FIVE (5) PERSPECTIVE BLOCK DIAGRAMS- ELEVEN ( 1) CROSS SECTIONS

* UNDERLYING SURFACES GENERALLY CONFORM TO THE SAMESTRUCTURAL TRENDS AS THE TOP OF BASALT SURFACE

* CHANGE IN TREND OF CONTOURS AT EASTERN LAYOUTBOUNDARY

* STRUCTURAL DIP BECOMES STEEPER WITH DEPTH IN THEEASTERN REFERENCE REPOSITORY LOCATION, PROBABLY DUETO LACK OF DATA IN AREA

tS16-2057-34De

Page 57: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

LAYOUT BOUNDARYRRL I

Dc-ISl

R RLKIL

ra--A NORTHSOUTH RRL.X

I0

gm .200-b

.a0a

.______ _______ ____ _ SUPRADASALT SEDIMENTS

SAOLE MOUNTAINS BASALT0

WANAPUM BASALT

£ _ _ ~~CoHABSSTT FLM=OW,

UC

10000 20000C.FEET

RRL LAYOUTBOUNDARY I

fRRL-2

RRL

NORTHEASTSOUTHWEST RRL4 DC-20

0L

u r

F

- .. _ . .

RIIPRAPASAI T AinsuiNTi~~~~.-

SADDLE MOUNTAINS BASALT

WANAPUM BASALT

= =S SmAD~~lT =OW' '' -~~- C O H A S S E T T ~ - _ __AS A L

1000 20000 JOOOD FFFEET

NO VERTICAL EXAGGERATION

Page 58: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

PRELIMINARY STRATIGRAPHIC AND STRUCTURALMODEL OF THE REFERENCE REPOSITORY LOCATION

HANFORD SITE, WASHINGTON

REFERENCE REPOSITORY,.0 LOCATION

Page 59: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

TOP OF BASALT

I

Page 60: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

II

TOP OF THE COIfASSET FLOW

i

Page 61: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

CONCLUSIONS

THE MODEL:* PROVIDES A THREE-DIMENSIONAL REPRESENTATION OF THE

GEOLOGIC FRAMEWORK OF THE REFERENCE REPOSITORYLOCATION BASED ON AVAILABLE DATA

* CAN BE USED FOR INPUT TO GEOLOGIC, HYDROLOGIC,PERFORMANCE ASSESSMENT, AND DESIGN ACTIVITIES

* CAN BE USED TO PREDICT THE STRATIGRAPHY IN NEWBOREHOLES

* CAN BE READILY UPDATED AS NEW BOREHOLEINFORMATION BECOME AVAILABLE

PS86-2057-3D9

Page 62: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

LARGE-SCALE HYDRAULIC STRESS TESTPLANNING STATUS

MIKE THOMPSON, HYDROLOGIST,GEOSCIENCE AND TECHNOLOGY BRANCH

U.S. DEPARTMENT OF ENERGY-RICHLAND

PS6zo74ten Tait I

Page 63: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

U.S. DEPARTMENT OF ENERGY/U.S. NUCLEAR REGULATORY

COMMISSION MEETING(DECEMBER 9 AND 10, 1985)

U.S. NUCLEAR REGULATORY COMMISSION (NRC) OBSERVATIONSPERTINENT TO TESTING PLANS:

* ASPECTS OF TESTING PROGRAM ARE NOT CONSISTENT WITH STP.1.1

0 U.S. DEPARTMENT OF ENERGY (DOE) HYDROLOGIC CHARACTERIZATIONSTRATEGY IS DIFFERENT, ALTHOUGH NOT NECESSARILY LESS VALID, DOENEEDS TO DOCUMENT STRATEGY

* THE NRC CANNOT ASSESS PRUDENCE OF INITIATION OF TESTS WITHOUTVIEWING OVERALL STRATEGY

PS86-2057-Stress t}

Page 64: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

I

NEAR-TERM HYDROLOGY ACTIVITIES

1. INSTALL ADDITIONAL MONITORING FACILITIES* DC-23GRo DC-24GR* DC-24W* DC-25C

2. ASSESS BENEFITS OF CONTRACTING SECOND DRILL RIG FORADDITIONAL FACILITIES* FOUR ADDITIONAL FACILITIES (DC-26 THROUGH -29)

3. FINISH CORING RRL-1 7 AND INSTALL GR-5 PIEZOMETER

4. DRILL AND TEST DC-18 (HYDROCHEMISTRY/GEOLOGY/HYDROLOGY)

5. FINISH LHS TEST PLAN FOR ROCKY COULEE TEST

6. PROCEED WITH QUALITY ASSURANCE PLAN AND READINESSREVIEW FOR ROCKY COULEE TEST

7. DOCUMENT HYDROLOGY CHARACTERIZATION STRATEGY

8. REEVALUATE LHS TEST STARTING DATE

PSS6-2GS7-St5sbe %IJ

Page 65: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

K00"

kyj

K

Page 66: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

1985 19g86

OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DECV V t r V V S * - - . - r - - -

CORE AND TESTDC-1 8

CORE RRL-17

DRILL DC-23GR

DRILL DC-24GR

DRILL DC-24W

DRILL DC-25C

INSTALLPIEZOMETERS

DRILL OPTIONALWELLS DC-26C,DC-27C

I DC-Is I

I RRL-17____ I- - ." -

DC-23GR I

D24GR

DC-24V

I46

DC-25C I-

24GR 24W

I DC-26C DC-2 C I* - 1

I- - - - - - - - - - - - - - - - n S - S - I - S - - -

CURRENT DRILLINd SCHEDULE WITH OPTION(CONTINGENCY PLANNING IF LHS TEST DELAYED)

P58G.2057-Str" 7Y-.

Page 67: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

1985

OCT NOV

1986DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

CORE AND TESTDC-18

CORE RRL-17

DRILL DC-23GR

DRILL DC-24GR

DRILL DC-24W

DRILL DC-25C

INSTALLPIEZOMETERS

DRILL OPTIONALWELLS DC-26C,DC-27C

DRILL NEWCONTRACT WELLS

I DC-18 Im-4�4 - .I�I �4 - .5-4-a - .1�4

I RRL-17. | .

DC-23GR -a

II DC-24GR

1 23GR

DC-24WI {

24GR |124WI

I DC-26C DC-27C I_- q

I IDC-28C DC-29C

I I

PROPOSED DRILLING SCHEDULE WITH OPTION AND SECOND ROTARY RIG(CONTINGENCY PLANNING IF LHS TEST DELAYED)

Pz,-K-r

Page 68: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

READINESS REVIEW

1. SYSTEMATIC APPROACH TO DETERMINE STATUS OF ANACTIVITY

2. PROVIDES TO MANAGEMENT VISIBLE OBJECTIVE AND WELL-ORGANIZED EVIDENCE, DEMONSTRATING THE READINESS FORINITIATION OF AN ACTIVITY

3. PROVIDES FOR AN INDEPENDENT, THOROUGH FINAL REVIEWPRIOR TO ACTIVITY AUTHORIZATION

4. PROVIDES FOR A MECHANISM TO IDENTIFY DEFICIENCIES THATCOULD RESULT IN DELAYS

MG862095-Stl us Tcatf

Page 69: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

PRIMARY GOALS OF LARGE-SCALEHYDRAULIC STRESS TEST

READINESS REVIEW

1. ASSURE DOE-RL THiMT DATA GENERATED FROM LHS TESTINGARE SUITABLE FOR FUTURE LICENSING PURPOSESa. TECHNICALLY SOUND

b. QUALITY ASSURANCE

2. ASSURE DOE-RL THAT ALL NECESSARY ACTIVITIES AND ACTIONSHAVE BEEN SATISFACTORILY COMPLETED PRIOR TOAUTHORIZATION TO PROCEED

3. TAILOR RR PLAN FOR GEOHYDROLOGIC INVESTIGATION; MOSTRR EXPERIENCE IS FOR PROCESSES AND FACILITIES

PU6-2057 Stress Tes7

Page 70: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

U.S. DEPARTMENT OF ENERGY-RICHLAND READINESS REVIEW

PLAN PROVIDES1. DEFINITION OF ORGANIZATION AND FUNCTIONAL

RESPONSIBILITIES, OBJECTIVES, AND DETAILEDINSTRUCTIONS FOR CONDUCT OF RR

2. DOE-RL STARTUP APPROVAL FOR LHS TEST

3. DOE-RL READINESS REVIEW TEAM

4. DOE-RL ASSURANCE OF READINESS BY AUDIT OF SELECTEDELEMENTS OF CONTRACTOR RR AND BY DIRECTCONCURRENT OBSERVATION OF CONTRACTOR RR ACTIVITIES

5. DOE-RL REVIEW COORDINATOR TO ACT AS LIAISONBETWEEN DOE-RL AND CONTRACTOR

6. AUDITABLE RECORD OF DOE-RL READINESS ACTIVITIES

STATUS: SECOND DRAFT IS BEING WRITTEN

PS86-2057-Stues Tests

Page 71: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

IMPORTANT BASALT WASTE ISOLATIONPROJECT EVENTS

(FOURTH QUARTER, 1985)

* ENVIRONMENTAL ASSESSMENT- FINAL REVIEW- RECONCILIATION- COMMENT RESPONSES

* HIGH-LEVEL TECHNICAL REVIEWS- WITH NRC ON LARGE-SCALE HYDRAULIC STRESS TEST- WITH USGS AND NRC ON GEOCHEMISTRY- WITH NRC ON EXPLORATORY SHAFT DESIGN- WITH NRC AS PARTICIPANT IN OCRWM SEISMIC-TECTONIC

POSITION DEVELOPMENT- STATE OF WASHINGTON LEGISLATIVE REVIEW OF PROGRAM

pS66-ZOS7-stress lt9

Page 72: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

IMPORTANT BASALT WASTE ISOLATIONPROJECT EVENTS

(FOURTH QUARTER, 1985) (CONT.)

o SITE CHARACTERIZATION PLAN - DEVELOPMENTOF STRATEGY TO ADDRESS ISSUES

a PROGRAM PLANNING LOGIC DEVELOPMENTo BASALT WASTE ISOLATION PROJECT QUALITY

ASSURANCE PROGRAM

PSE6-2057Stgess Test 10

Page 73: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

PERFORMANCE ASSESSMENT

TONY I(NEPP, HYDROLOGIST (MODELING),GEOSCIENCES

TECHNOLOGY BRANCH

U.S. DEPARTMENT OF ENERGY - RICHLAND

rtII.ox nn A I

Page 74: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

OUTLINE

WHAT IS PERFORMANCE ASSESSMENT?

WHO DOES IT?

4OW DOES IT FIT INTO TH4E BASALT WASTEISOLATION PROJECT (BWIP)?

STRATEGIES? WHY NOW?

rant1. 1u.1r e:!.

Page 75: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

PERFORMANCE ASSESSMENT

DEFINITION:THE PROCESS OF DETERMINING HOW WELL THE VARIOUSFEATURES OF THE SITE AND REPOSITORY PERFORM ASCOMPARED TO THE APPLICABLE REGULATIONS (10 CFR 60) ANDSTANDARDS (40 CFR 191)

g'.4.*)fr,S1]

Page 76: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

MAJOR PERFORMANCE ASSESSMENTFUNCTIONS

o ANALYSIS OF THE BWIP SAFETY AND ISOLATIONFEATURES TO SHOW COMPLIANCE

0 GUIDE TESTING PROGRAM- STRATEGY DEVELOPMENT (PERFORMANCE ALLOCATION)

P'.0 -1010 4-.. I

Page 77: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

PERFORMANCE ASSESSMENT CRITERIA

POSTCLOSUREo LIMIT CUMULATIVE RADIONUCLIDE RELEASE TO ThE

ACCESSIBLE ENVIRONMENT TO LESS THAN THEU.S. ENVIRONMENTAL PROTECTION AGENCY (EPA) LIMITS(40 CFR 191)

3 ENSURE A TRAVEL TIME OF GREATER THAN 1,000 YEARSFROM THE EDGE OF THE REPOSITORY TO THE ACCESSIBLEENVIRONMENT (10 CFR 60)

o ENSURE RADIONUCLIDE RELEASE FROM THE ENGINEEREDBARRIER SYSTEM (EBS) OF LESS TH4AN ONE PART IN100,000 PER YEAR OF T-IE 1,000-YEAR INVENTORY(10 CFR 60)

o MAINTAIN CONTAINMENT WITHIN THE EBS FOR 1,000 YEARS(10 CFR 60)

MeX~ ther

Page 78: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

PERFORMANCE ASSESSMENT CRITERIA- (CONT.)

PRECLOSUREo MAINTAIN PUBLIC SAFETY (10 CFR 60) (RELEASES LESS THAN

500 mrem)e MAINTAIN OPERATOR SAFETY (10 CFR 20) (MHISA)

Page 79: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

OVERVIEW OF ISSUE ANDSTRATEGY SETTING

FEDERALREGULATIONSAND CRITERIA

KEY ISSUES

SYSTEM DESCRIPTION - ISSUES

GOAL ANDINDICATION

OFCONFIDENCE

SETTING

TE

PERFORMANCEGOAL

I- _

STRATEGIES

l

RATIONALERESOLUTION

CRITERIA

INFORMATION NEEDS(PARAMETERS)

SITECHARACTERIZATIONPLAN (2,000 PAGES)

ST GOAL(INTEGRATION)

'9TESTING STRATEGIES

I

INVESTIGATIONS

STUDIES

TESTS AND PROCURESI

TESTS AND PROCEDURES

ANALYSIS OF RESULTS --

Page 80: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

KEY POINTS

o TEST PROGRAM IS ISSUE-ORIENTED, PERFORMANCE-DRIVEN

a ISSUES DERIVED FROM REGULATIONS AND SITE CONDITIONS

a ABILITY TO TRACK A REQUIREMENT FROM REGULATIONS TOTEST

o PERFORMANCE GOALS (NUMERIC AND NONNUMERIC) SET FOREACH COMPONENT OF A BARRIER SYSTEM (INDICATION OFCONFIDENCE)

o TEST GOALS SET FORTHE RESULTS OF MOSTTESTS

Page 81: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

PERFORIVIANCE ALLOCATION

*' TO PERMIT THE U.S. NUCLEAR REGULATORY COMMISSION (NRC)AND OTHERS TO DETERMINE IF PLANNED TESTING WILLADEQUATELY SUPPORT LICENSING

* FOR EACH REGULATORY REQUIREMENT:- PRIMARY AND SECONDARY BARRIERS USED IN LICENSING

- A LEVEL OF PERFORMANCE (GOAL) FOR EACH

- AN INDICATION OF CONFIDENCE FOR THE GOAL

* FOR MOSTTESTS:- A TESTING GOAL- AN INDICATION OF CONFIDENCE

1,%11- X0,, I. .

Page 82: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

INFORMATION IN A STRATEGY

o ISSUE

o BACKGROUND

e APPROACH TO RESOLUTION- ALLOCATIONS (WHAT BARRIERS AND HOW SURE?)- AREAS OF TESTING

o INTERACTIONS WITH OTHER GROUPS

o RESOLUTION CRITERIA (HOW MUCI- IS ENOUGH?)- TESTING- INTERNAL AND EXTERNAL PEER REVIEW

e SCHEDULE

0 RESOURCES (TIME AND MONEY)

rsul. saAll)I -. d

Page 83: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

SUMMARY

* THE BWIP PROGRAM IS ISSUE-ORIENTED, PERFORMANCE-DRIVEN

* PERFORMANCE ASSESSMENT ANSWERS ("HOW TO" AND "HOWWELL")

* RAPID DEVELOPMENT - CHANGES

* STRATEGY STATEMENTS WILL BE AN IMPORTANT ELEMENT OFPROGRAM REVIEW

PS86-2OS14AI I

Page 84: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

INFORMATION IN A TESTING STRATEGY

a ISSUE

o BACKGROUND

a TESTING RATIONALE (STRATEGY)

v DESCRIPTIONS- TYPES- INFORMATION ACQUIRED

- DOCUMENTATION

o SUFFICIENCY CRITERIA

0 SCHEDULE (SEQUENCE AND DURATION)

a SCALE

e DATA ANALYSES

a DATA APPLICATION

VNIII.-n,.il *.- II

Page 85: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

E L E C T R O N I C

B U L L E T I N

B A R D

January 22, 1986

Page 86: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

OBJECTIVE

AN ELECTRONIC BULLETIN BOARD FOR ACCESS BY THE

AFFECTED INDIAN TRIBES AND STATES TO INCLUDE:

* SCHEDULE OF MEEnNGS

* NRC

M DOE

* COMMUNICAMONS.ISTINGS

* BWIP ACTIVMES LISTING

* LISTING OF DATA AVAILABILITY

Page 87: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

TEMPORARY SYSTEM

* DISCUSSION HELD WITH CRYSTALUNE OFFICE ABOUT

THEIR SYSTEM

* INSTALLATION OF TELEPHONE UNES AND MODEMS

fi ACCESS CODES ASSIGNED

* TRAINING

* ON-LINE BY APRIL 1986

Page 88: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

PERMANENT SYSTEM

* NO INTERRUPTION OF SERVICE

* MEETING TO BE SCHEDULED WITH HEADQUARTERS TO

* FINALIZE GUIDELINES

* FINALIZE CONFIGURATION

* SCHEDULE IMPLEMENTATMON

* INVESTIGATE HARDWARE SYSTEMS AND ACCESS

* USE OF CURRENT ONSITE COMPUTER

* USE OF NEV COMPUTER

* *USE OF COMMERCIAL SERVICE

* INFORMATION RESOURCE MANAGEMENT PLAN IN

PREPARATION

Page 89: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

ACCESS PROCEDURE

* LOAD TEMINAL EMULATOR

* ACCESS DEFENDER SYSTEM (NOT SHOWN IN DEMO)

* CALL IN

* ANSWER RETURN CALL

* SELFCT DESIRED INFORMATION

Page 90: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

HARDWARE I SOFTWARE NEEDED FOR ACCESS

(LETTER WILL BE SENT PROVIDING DETAILS INCLUDINGFUNDING INFORMATION)

* IBM PC

* TEMINAL EMULAMON PACKAGE

9 T MTEPHONE

Page 91: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

t

BASALT WASTE ISOLATION PROJECT

Key Activities Before Issuanceof the Site Characterization Plan

PRESENTATION TOQUARTERLY MEETING OF STATES AND TRIBES

by

Jim Mecca

Page 92: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

BASALT WASTE ISOLATION PROJECTENGINEERING

REPOSITORY:* CONTINUE CONCEPTUAL DESIGN STUDIES

* CONTINUE SEALS DEVELOPMENT

* CONTINUE CODE DEVELOPMENT FOR TESTING HIGH IN-SITU ROCKSTRESSES

EXPLORATORY SHAFT:* CONTINUE DETAILED DESIGN

° CONTINUE DEVELOPMENT OF EQUIPMENT AT THE NEAR-SURFACETEST FACILITYt TO BE USED FOR TESTING AT-DEPTH

* ISSUE TEST PLAN (4/86)

Page 93: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

BASALT WASTE ISOLATION PROJECTREGULATORY AND INSTITUTIONAL ACTIVITIES

. CONTINUE INTERACTIONS WITH THE:

- STATE OF WASHINGTON

- AFFECTED INDIAN TRIBES

- STATE OF OREGON

- LOCAL GOVERNMENTS (CITIES, COUNTIES, ETC.)

- THE PUBLIC

-OTHERS 'I

* CONTINUE TECHNICAL EXCHANGE:- U.S. NUCLEAR REGULATORY COMMISSION ,

- U.S. GEOLOGICAL SURVEY

- U.S. BUREAU OF MINES- MINE SAFETY & HEALTH ADMINISTRATION

- NATIONAL ACADEMY OF SCIENCE

- ACRS - ADVISORY COMMITTEE ON REACTOR SAFEGUARDS

- TECHNICAL REVIEW GROUP

Page 94: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

BASALT WASTE ISOLATION PROJECTSITE EVALUATIONS

* CONTINUE SITE TECTONIC/SEISMIC MONITORING

* INITIATE LARGE-SCALE PUMP TESTS (2/86)

* CONTINUE COREHOLE/BOREHOLE DRILLING & TESTING

* CONTINUE WASTE PACKAGE/BASALT/WATER INTERACTIONTESTING

Page 95: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

BASALT WASTE ISOLATION PROJECT'

WASTE PACKAGE

* CONTINUE HOT CELL TESTING OF WASTE/ROCK/WATERINTERACTIONS

* CONTINUE WASTE PACKAGE ADVANCED CONCEPTUALDESIGN

* CONTINUE LABORATORY TESTING:

- WASTE PACKAGE MATERIALS

- WASTE PACKAGE BACKFILL

Page 96: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

BASALT WASTE ISOLATION PROJECTSYSTEMS

* CONTINUE DEVELOPMENT OF PERFORMANCEASSESSMENTS CODES AND PERFORMANCE ANALYSIS

* CONTINUE DATA MANAGEMENT-AND DOCUMENTDISTRIBUTION

Page 97: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

BASALT WASTE ISOLATION PROJECTPROJECT MANAGEMENT

° CONTINUE DEVELOPMENT OF QA PROCEDURES ANDIMPLEMENT

* CONTINUE PROJECT BUSINESS MANAGEMENT SYSTEMUPGRADE

I

Page 98: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

BASALT WASTE ISOLATION PROJECT

SITE, ENGINEERED BARRIERS, ANDGEOMECHANICS DEPARTMENT ACTIVITIES (CONT)

ACTIVITIES DATE REV.*

SOLUTION CHEMISTRY LABORATORY (CONTINUED)

* METHODS DEVELOPMENT FOR MEASUREMENT OF DISSOLVEDHYDROGEN (H2) IN AQUEOUS SAMPLES FROM AUTOCLAVES IN THENON-RADIOACTIVE HYDROTHERMAL LABORATORY

* ANALYZE SOLUTIONS FROM EXPERIMENTS ON SORPTIONPHENOMENA OF FLOW TOP MATERIALS BEING DONE AT PNL

M ICR CHARACTERIZATION (SOLIDS) LABORATORY

SCANNING TRANSMISSION ELECTRON MICROSCOPE -

* ANALYSIS OF FLOW-THROUGH RUN PRODUCTS* ANALYSIS OF DICKSON AUTOCLAVE RUN PRODUCTS* INITIATE CORING OF RRL-17* INITIATE DRILLING OF DC-18* INITIATE ROTARY DRILLING OF DC-24* CONDUCT GEOLOGIC FIELD MAPPING

X-RAY DIFFRACTOMETER -

* ANALYSIS OF McCOY CANYON, UMTANUM AND HIGH-Mg FLOW TOPS

* ANALYSIS OF FLOW-THROUGH RUN PRODUCTS* ANALYSIS OF DICKSON AUTOCLAVE RUN PRODUCTS* ANALYSIS OF FAULT GOUGE'* ANALYSIS OF SEDIMENTARY INTERBED MINERALS* ANALYSIS OF CORROSION WATER SURFACE COATINGS

ELECTRON MIC"OPROBE-

* ANALYSIS OF ROCKY COULEE FLOW TOPS* ANALYSIS OF DICKSON AUTOCLAVE RUN PRODUCTS* ANALYSIS OF OXIDE MINERALS IN ROCKY COULEE/COHASSET FLOW

TOPS ,.I

ONGOING

ONGOING 11ONGOINGONGOING12/02-31/8512/11/85-09/30/8612/09185-01/108611/08-20/85

11

COMPLETEONGOINGONGOINGCOMPLETESEPTEMBER 1986ONGOING

COMPLETEONGOING

COMPLETE-

RADIOACTIVE HYDROTHERMAL LABORATORY

* BASALT AND SYNTHETIC GROUNDWATER TESTS IN FLOW-THROUGH AUTOCLAVE

* RADIONUCLIDE-DOPED SIMULATED SAVANNAH RIVER PLANTDEFENSE GLASS + BASALT AND SYNTHETIC GROUNDWATER

* EXPERIMENTS USING FULLY RADIOACTIVE WASTE FORMS IN THEPRESENCE OF VARIOUS WASTE PACKAGE COMPONENTS (METAL,BARRIERS, AND/OR BASALT)

* EXPERIMENTS ON THE BEHAVIOR OF SPECIFIC RADIONUCLIDES,INTRODUCED INDIVIDUALLY WITH GROUNDWATER, IN THEPRESENCE OF PACKING MATEBIAL AT LOW TEMPERATURES

ONGOING

ONGOING

APRIL 1986

: ONGOING

Page 99: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

BASALT WASTE ISOLATION PROJECT

SITE, ENGINEERED BARRIERS, ANDGEOMECHANICS DEPARTMENT ACTIVITIES (CONT)

ACTIVITIES DATE REV.-

NON-RADIOACTIVE HYDROTHERMAL LABORATORY

* HYDROTHERMAL TESTS ON BASALT + BENTONITE + GROUNDWATER* LONG-TERM HYDROTHERMAL TESTS (1-5 YEARS) ON BASALT +

GROUNDWATER* DETERMINE THE SOLUBILITY OF SELENIUM UNDER HYDROTHERMAL

CONDITIONS SIMULATING THE NEAR-FIELD ENVIRONMENT• EVALUATE REDOX CONDITIONS IN A HYDROTHERMAL EXPERIMENT

SIMULATING A NEAR-FIELD ENVIRONMENT• DEHYDRATION EXPERIMENTS

WASTE PACKAGE PACKING INVESTIGATORY TESTING

ONGOING

ONGOING

ONGOING

ONGOINGONGOING

* UNIAXIAL COMPRESSION* BRAZILLIAN TENSION* DIFIECT SHEAR* 4POINT FLEXURE* DENSITY

CONCRETE TESTING LABORATORY

50 TESTS.. 50 TESTS

50 TESTS40 TESTS

100 TESTS

COMPLETECOMPLETECOMPLETECOMPLETECOMPLETE

* PREFABRICATED PACKING TESTING - DEVELOPMENTAL* NEAR-SURFACE TESTING FACILITY REMEDIAL SHOTCRETE

BACKFILL TESTING LABORATORY

* HYDRAULIC CONDUCTIVITY TESTS* START SWELLING, PRESSURE PERMEAMETER AND TRIAXIAL TESTS* STARTED (2) LONG-TERM FLOW THROUGH PERMEAMETER TESTS

GEOMECHANICS TESTING AT NEAR-SURFACE TEST FACILITY

* OVERCORING DEVELOPMENTAL TESTING WITH CSIRO TRIAXIALCELL

* DEVELOPMENT TESTING OF A PROTOTYPE THERMALCONDUCTIVITY PROBE

ROCK MECHANICS LABORATORY

* THERMAL CONDUCTIVITY/THERMAL EXPANSION DEVELOPMENTTESTING

COMPLETEONGOING

ONGOINGONGOINGONGOING I 11

BEGIN 12/85

BEGIN 12/85 I 11

11/85-01/86 I 11

' CHANGES IN THIS SCHEDULE FROM THAT LAST ISSUED ARE INDICATED BY A REVISION BAR ANDREVISION NUMBER. ITEMS WILL REMAIN ON LISTING FOR A TWO MONTH PERIOD AFTER COMPLETION.

Page 100: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

BASALT WASTE ISOLATION PROJECT

SITE, ENGINEERED BARRIERS,AND GEOMECHANICS DEPARTMENT ACTIVITIES

ACTIVITIES DATE REV."

SITE

* DRILL DC-236R ENTRY HOLE* TEST CASING SHOE IN RRL-28* INSTALL PIEZOMETERS IN DC-23W* INSTALL WESTBAY PACKER IN RRL-14* GROUNDWATER MONITORING OF BOREHOLES DC-I9, DC-20, DC-=

AND RRL-14M MONITORIG OF OTHER BOREHOLES

* ELECTRONMICROPROBE ANALYSIS OF FLOW TOP SAMPLESe Y-RAY DIFFRACTION ANALYSIS OF FLOW TOP SAMPLES* MODELING GRAVITY, MAGNETIC DATA* COLLECTION OF MAGNETIC AND GRAVITY DATA- SEISMIC SURVEILLANCE AND DATA ANALYSISM LAB STUDIES ON SORPTION AND CHEMICAL DISSOLUTION

DRILL DC-23W* COLLECITON OF PALEOMAGNETIC SAMPLES* DRILL DC-426R ENTRY HOLE

SOLUTION CHEMISTRY LABORATORY

* 'DEVELOP METHOD FOR ROCK ANALYSIS USING ICP-AES* UPGRADE ANION ANALYSIS ON ION CHROMOTOGRAPHY* DEVELOP METHOD FOR ANLAYSIS OF GROUNDWATER TRACER

USING HPLC* SUPPORT TO SITE DEPARTMENT DATA BASE DEVELOPMENT* DEVELOPMENT OF METHODS FOR ANALYSIS USING AA* PROCEDURE DEVELOPMENT* ANALYSIS OF AQUEOUS SOLUTION SAMPLES FROM

HYDROTHERMAL TESTING AND GROUNDWATER SAMPLING* FIELD AND FIELD ANALYSES OF WATER FROM LOCAL SPRINGS,

UNCONFINED AQUIFER AND OTHER TEST HORIZONS* STUDY OF KINETIC OF DECOMPOSmON OF HYDROGEN PEROXIDE

WITH BASALT UNDER VARIOUS CONDITIONS USING UV-VISIBLESPECTROPHOTOMETRY

* DEVELOP METHOD FOR ANALYSIS OF FIXED GASES IN WATERSAMPLES BY GAS CHROMATOGRAPHY

* DEVELOP IMPROVED METHODS FOR CHEMICAL SPECIATIONMEASUREMENTS OF ARSENIC AND SELENIUM FOR USE IN ANALYSISOF HYDROTHERMAL SAMPLES

* DEVELOPMENT AND INITIATION OF IMPROVED METHODS OFRECORDS RETENTION

* SUPPORT GROUNDWATER TRACER ANALYSIS AND GROUNDWATERSAMPLING DURING LARGE-SCALE TESTING

* ANALYSES OF SELENIUM SPECIES IN CONJUNCTION WITHSELENIUM SOLUBILITY STUDIES WITH NON-RADIOACTIVEHYDROTHERMAL TESTING TEAM

* ANALYSES OF MINERALS AND CLAYS BY ICP-AES* ANALYSES OF HALIDES IN BASALT/METHODS DEVELOPMENTv PROVIDE ANALYSES OF DISSOLVED GASES, IRON SPECIES, AND

DISSOLVED OXYGEN ON REQUEST FOR HYDROCHEMISTRY GROUP

11/25-27/85DELETE11/04-15/85COMPLETE

DAILY - .WEEKLYONGOINGONGOINGONGOINGONGOINGONGOINGDAILYCOMPLETECOMPLETE11/18-22/85

I

I

11

11

COMPLETECOMPLETE 11

COMPLETEONGOINGONGOINGONGOING

ONGOING

ONGOING

ONGOING

COMPLETE

.11

COMPLETE

ONGOING

BEGIN 02/86

ONGOING- ONGOINGI ONGOING

11

ONGOING

Page 101: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

POSSIBLE LOG

ISSUEFINAL

EA4/86

DOE --NOMINATION/

RECOMMENDATION _OF SITES 4/86

IC PROGRAMgW,*

* .. Iq'. : w-'.'

PRESIDENTIAL HOLIAPPROYAL * 'I j EISFOR SITE i. ,SCOPII

RECOMMENDATION ' .' ;,HEARll6/86 S;@1-8/r6

f-~~~~~~~~~ - P-R-

, . _ ~~. _ g>R_

FINALIZF,- et k PO

AND INITIATE~- UPDIPROGRAM

,. i -

.5 , * . . '

PRESIDENTIAL;~.' ',;{4 ;;H.L

... .

S. *. !

.5 '�*

* S*.� A

.D

INGING

-II

8*0

ISSUE SITECHARACTERIZATION

& OTHER PLANSDOCUMENTATION 12/86

0.

HOLDSCP

HEARING4/86

1.-.I

I

)DICaRAMATES'6..4

i*i N.

Page 102: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

QUALITY ASSURANCE REQUIREMENTSFOR SITE CHARACTERIZATION

PIERRE SAGET, ACTING CHIEF, QUALITYASSURANCE BRANCH

U.S. DEPARTMENT OF ENERGY- RICHLAND

Page 103: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

BWIPQUALITY ASSURANCE (QA) PROGRAM

° QA REQUIREMENTS FOR SITE CHARACTERIZATION

a STATUS OF BWIP QA PROGRAM IMPLEMENTATION

Page 104: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

THE BWIP IS COMMITTED TO PROVIDING A "FULLY QUALIFIED"

QA PROGRAM PRIOR TO ISSUANCE OF THE SITE

CHARACTERIZATION PLAN (SCP).

Page 105: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

a

QA REQUIREMENT DOCUMENTS

* 10 CFR 60, PART G'I

* 10 CFR 50, APPENDIX B

* ANSI/ASME NQA-1-1983 "QUALITY ASSURANCEPROGRAM REQUIREMENTS FOR NUCLEARFACILITIES"

* NRC REVIEW PLAN: QUALITY ASSURANCEPROGRAMS FOR SITE CHARACTERIZATION OFHIGH-LEVEL NUCLEAR WASTE REPOSITORIES

* DOE/HQ QA PLANS AND REQUIREMENTSDOCUMENTS

BWIP QUALITYASSURANCE

~ REQUIREMENTSDOCUMENT(BOARD)

* DOE ORDERS

Page 106: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

BQARD

° COMBINES BASE REQUIREMENTS INTO A SINGLEDOCUMENT

° INSURES CONSISTENT IMPLEMENTATION OFREQUIREMENTS AMONG PROJECT PARTICIPANTS

° PROVIDES BASIS FOR "FULLY QUALIFIED" QA PROGRAM

° USES 18 CRITERIA FORMAT

Page 107: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

: a

KEY ACTIVITIES OF PARTICIPANTS QA PROGRAMS

e BOARD ISSUANCE

° QA PLANS

* IMPLEMENTING PROCEDURES

° PERSONNEL TRAINING

° VERIFICATION PROGRAMS (AUDIT/SURVEILLANCE)

* READINESS REVIEWS

o Q-LIST/GRADED QA

° SITE CHARACTERIZATION PLAN (SCP) ISSUANCE

Page 108: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

I

PROGRAM LOGICSCP

ISSUANCEv

QA PLANS

QA PROCEDURES

TRAINING

BWIP VERIFICATIONPROGRAM

DOE/HO VALIDATIONAUDIT Co

NRC VALIDATIONAUDIT

AUDIT FINDINGSRESOLUTION

Page 109: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

do

BQARD ISSUANCE

o BOARD1986

ISSUED TO ALL PROJECT PARTICIPANTS IN JANUARY

° PROJECT PARTICIPANTS GENERATING BOARDIMPLEMENTATION PLANS

Page 110: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

QA PLANS

* QA PLANS FOR ALL PROJECT PARTICIPANTS ARE CURRENTLYAPPROVED

* QA PLANS ARE BEING REVIEWED AGAINST BOARD TO ASSESSNEEDS FOR REVISION

Page 111: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

IMPLEMENTING PROCEDURES

° PROJECT PARTICIPANTS IMPLEMENTING PROCEDURES ARENEARING COMPLETION

* PROCEDURES TO BE REVIEWED AGAINST BOARDREQUIREMENTS TO ASSESS NEEDS FOR FURTHER REVISION

* PROCEDURES TO BE AUDITED FOR ACCEPTABILITY OFIMPLEMENTATION BY SEPTEMBER 30,1986

Page 112: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

PERSONNEL TRAINING

e PROJECT PARTICIPANTS DEVELOPING AND IMPLEMENTINGTRAINING PROGRAMS

° ALL TRAINING PROGRAMS TO BE AUDITED FORACCEPTABILITY PRIOR TO SEPTEMBER 30,1986

- TRAINING PLANS

- TRAINING STANDARDS

- TRAINING RECORDS

Page 113: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

VERIFICATION PROGRAM

° DOE/RL AUDIT/SURVEILLANCE PLANS IN DRAFT

° ROCKWELL AUDIT/SURVEILLANCE PLANS BEING APPROVED

° PROJECT PARTICIPANTS GENERATING AN INTEGRATED QAVERIFICATION PLAN/PROGRAM

* DOE/HQ AND NRC AUDITS PRIOR TO ISSUANCE OF SCP

-

Page 114: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

READINESS REVIEWS

* SYSTEMATIC APPROACH FOR DETERMINING THE STATUSOF A FACILITY, PROCESS, SYSTEM, OR ACTIVITY

* READINESS REVIEWS CURRENTLY IDENTIFIED FOR THEFOLLOWING BWIP ACTIVITIES:

- START OF LARGE HYDROLOGIC STRESS (LHS) TEST

- START OF EXPLORATORY SHAFT (ES) DRILLING

Page 115: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

0-LIST° METHODOLOGY FOR GENERATING THE LIST OF

STRUCTURES, SYSTEMS, COMPONENTS AND ACTIVITIESIMPORTANT TO SAFETY OR WASTE ISOLATION

* DOE/HQ DIRECTIONS ON METHODOLOGY DUE BY END OFJANUARY

GRADED QAo SELECTIVE APPLICATION OF QA REQUIREMENTS ON THE

ITEM OR ACTIVITY TO BE PERFORMED, CONSISTENT WITHTHE EXTENT OF THEIR IMPORTANCE TO SAFETY, WASTEISOLATION, AND THE ACHIEVEMENT OF PROGRAMSUCCESS

* 3-LEVEL APPROACH

* DOE/HQ DIRECTIONS ON DETAILED APPLICATION DUE BYEND OF JANUARY

Page 116: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

SITE CHARACTERIZATION PLAN (SCP) ISSUANCE

° SCP ISSUANCE BEING DELAYED. DATE OF ISSUANCE BEINGASSESSED

* PROJECT PARTICIPANTS DIRECTING EFFORTS TO HAVE"FULLY QUALIFIED" QA PROGRAMS IN PLACE BY SEPTEMBER30, 1986. DOE AND NRC ASSESSMENTS TO FOLLOW

Page 117: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

ENGINEERING AND CONSTRUCTION -OVERVIEW OF ACTIVITIES AND

PROGRAMS

BRUCE NICOLL, ACTING CHIEF,ENGINEERING AND CONSTRUCTION BRANCH

U.S. DEPARTMENT OF ENERGY- RICHLAND

pser vs? c arj

Page 118: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

ENGINEERING AND CONSTRUCTION TEAM

|U.S. DEPARTMENT|OF ENERGY l

RAYMOND KAISERENGINEERS INC./

MORRISON- -- ROCKWELL PARSONSKNUDSEN HANFORD O BRINCKERHOFF

OPERATIONS QUADE &DOUGLAS, INC.

Pf8in 2051-1agU

Page 119: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

U.S. DEPARTMENT OF ENERGY ENGINEERING ANDCONSTRUCTION ORGANIZATION

U.S. DEPARTMENT OF ENERGYBASALT WASTE ISOLATION PROJECT

IENGINEERING AND

CONSTRUCTIONBRANCH

I 7I I I

EXPLORATORYSHAFT DESIGN REPOSITORY

AND DESIGNCONSTRUCTION

GEOMECHANICSAND SUPPORT

FACILITIES

ISYSTEMS

PS36-ID5 71 Ag I

Page 120: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

4~~~~ii ~-i E~~~~ - ~~~~~~~~~~~~~4~~~~~~-aY. ~ ~ ~ ~ ~ ~ ~ ~ ~~d

FIGURE 2-1. Surface Faclittes of the NWRB.

Page 121: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

REPOSITORY DESIGN SCHEDULE

I I I 1 1- 1. 1 1 1 1 LA

SCP CONCEPTUAL DESIGN V| I MAYJULY JULY 19911985 1986

ADVANCED CONCEPTUAL DESIGN

1986 1988LICENSE APPLICATION DESIGN

JUNE MAY1988 1990

FINAL PROCUREMENT ANDCONSTRUCTION

l IMAY AUGUST1 990 1993

PISKO20S44 8 C4

Page 122: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

MAJOR REPOSITORY DOCUMENTSCOMPLETED BY BWIP

APRIL 1983

JULYJULYMAY

198419841984

JUNE 1984

JUNE 1984

JANUARY 1985

DECEMBER 1985

CONCEPTUAL SYSTEM DESIGN DESCRIPTION,NUCLEAR WASTE REPOSITORY IN BASALTTWO-PHASE FEASIBILITY STUDYENGINEERING STUDY NO. 5, SHAFT OPTIMIZATIONENGINEERING STUDY NO.6, TUNNELOPTIMIZATIONENGINEERING STUDY NO. 7, WASTEEMPLACEMENT OPTIMIZATIONENGINEERING STUDY NO. 8, IN SITUINSTRUMENTATIONENGINEERING STUDY 9, UNDERGROUNDREPOSITORY LAYOUTENGINEERING STUDY 12, INTEGRATEDMRS/REPOSITORY COMPARATIVE STUDY

S5G.-057 4 9CS

Page 123: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

MAJOR ACTIVITIES FORFIRST HALF OF 1986

o COMPLETE SITE CHARACTERIZATION PLAN -CONCEPTUAL DESIGN

e ONGOING ACTIVITIES- PREPARATIONS FOR START OF ADVANCED CONCEPTUAL

DESIGN IN MAY- DEVELOPMENT OF SITE-SPECIFIC RETRIEVABILITY POSITION

PAPER- INITIATE A STUDY ON ROD CONSOLIDATION IN CONCERT

WITH DOE-HQ AND OTHER REPOSITORY SITES

Page 124: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

VASALT WAATC ISOL&TICGa PRO0JECTCKILGRATORV ShAFT

MMMI owed ~ ~ SUFC IS I

CLIV. *~~ taawV. too

7

cAAIow l.s t aup.06 f.w MA .

- -. _ SCSI "S.@

"MASIa veep

SUSSURFA CS CCA VA liON

Page 125: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

EXPLORATORY SHAFT - UNDERGROUND ARRANGEMENT(2 StiAFTS)

ES I

4. .500FT.

E_ _ __ _ __ _ __SUMP_ MAIN DRIFT

MECIIAIJICSI DRIFTI I

306 FT. * MINE BYa8 FT TES

ES 2

PA84 1220-2

Page 126: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

I

EXPLORATORY SHAFT

-, I I I I I - . I , I . -I I IDESIGN OF EXPLORATORYSHAFT FACILITIES

JULY JULY1986 1987

READINESS REVIEW

APRIL'IAAY1987 1987

CONSTRUCT FIRST SHAFT

MAY JULY1987 1989

CONSTRUCT UNDERGROUND WORKINGS

MAY FEBRUARY1989 1990

CONSTRUCT SECOND SHAFT

FEBRUARY SEPTEMBER1988 1989

TESTING

JI' JULY APRIL1989 1991

Page 127: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

EXPLORATORY SHAFT STATUS

ACTIVITIES COMPLETED0 DEFINITIVE DESIGN FOR PHASE I

* MAIN HOIST PROCUREMENT

0 SHAFT LINER FOR FIRST SHAFT

* SITE WORK

0 ONE-HUNDRED-FOOT STARTER HOLE

* DRILL RIG ON SITE

r9 l I We~f

Page 128: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

MAJOR EXPLORATORY SHAFT GOALSFOR FIRST QUARTER OF 1986

0 COMPLETE CONCEPTUAL DESIGN FOR PHASE 11(JANUARY 1986)

0 COMPLETE DESIGN OF HIGHWAY 240 ACCESSROAD (FEBRUARY 1986)

PnS6-2D57-t S

Page 129: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

ipi

a

fNO

1 - ftt. ,4 WA J $.o

*-- .. 'O 4*of-... "*i MJ,

Cs= *.*' W.V 0----. A- .oI. ".O

. 044 ~Ot.fZpoj .")

U

i

113715**4�S 040 404f 0404 4 IM1*� OS ApnI'.r*g 0*10 4' n?.na 14.a.d�Aag us., s t v�.ou�.j

A Ad's 4*71* -. Wroen. V*A*Ifh,..0. Ufl-, :Am..� .t ..n.� *.* JjjflhIVjSflfl.IA :t

* **a .ore..,� .w. onv* �o1LI .4154 �. 400 �d 14*41.4 k&.SMVIy IRE.

F

!b;\) I- -~w°.

K.

I

-ICI

'I

I &St Welt

II I .?

i

-t #1414)'

. '

C

( 11

.3a

9

/

12I

I'I

631

I- +, 1I

_..._ __ - M.Si~ W ateEi

4 '_ riPI£LIMMARN'

,._ - _ . CK .M.

_ -_ieA<^ > eZ,:.sr l wr_Is!'- IL

tl*. E1:U .Io

!!!Ntft _j_ .igi _.-_.

__ .S

___ _

_ I

I 6 - .- ns ......wI- ww *t *IA.LII o . WW

A

I _IC-31Tfll fAP

(-(' -.&i &5.tIp V~~

I i I a iiJ-,~ I~ N - £ n ~ c w ~hI I I

Page 130: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

. V..r

13 l I is I to I I a * I . 1 -S a 4 1 a I a I I__ __ _

I1a

IW IAM S.4E

A"4 -PISoy'. Nr~t.- - ..

I*-4*1-Y f..x*..I Ii. I I

_ ___ I .. __ ffIf- a I._ 1i, _. I _E Il.| E = _!t_- *--'!- -S --- ^

p

"

11K-

DI

.. z .

I * - ,...u cia~~~~~~.. nt!

FII8 -..-- = -.Q [ 4&) jI-SiS_ -l

. _ 4- a. _ _

- A&~~~~~~~~~~~ 'O.A

MISS '*- ftrcWACAPf- IbS.A, I I5'7 D r. iI

4 E z~e1m dAj.i ~R'

! t ~ HAr sf E4 ,>11 1tN=

64..F TI40 tdA 4.J .._ =. . ~~~~~~: ..k_

._h _M. _ ,_ C.AI*VEAI M (,.:_..: : ----- - - --- *4 {a~~~~~~~~flS _. 8.5. . A ., M...... ,VI. rsI _ .U

*4 *sAA ~ rn *s* JI -*. *I~f_- .eg._; ._l ga_. *- u ,s @t

bins .....sn , 5l *Z5 CMC4 154 A*f AAS. H

fi I %.t

_. I

I._ _

._s__n ,--T

I _L 1._.L1_.. L '

CS_ rSI4MA-to" AWSM w*,tAM pug*

T..-.__T_ .

Ayt-F W ft

VIN"S1)23rB [

Sf

SAI .hl hr. S 8 AA.aeleeC EUIA

S SA,6"

top e y S.eva.ovc

ED E tAn7r

£85 AN-if r r66*4 as 1

a.sas

1W.6 WyA W.C&w

* *b~rJOI 5A4* .=Ar* IMcrsk0.FW 600AD,11*1

4 WANCOMAJ$0,.NAWMAIASOCII - O~ef

lve~uw ,. =tZ.j A"u C#.tASVI MW^W"5 M"

* .AMtE_ A4 I.

It 40w VoWER

S W,""

a .u AwAMo 3.8.

| AW CFMI SrAME

|S. t AV09A SFArMV

,W-AMVV( R1S5A4L

151544L8ItNWAWI"

rjjgp#rr &*%o8.58.54At

ciu- rar-

r

I

X isU . . I I j _ : I ''' 1

1.nI I - I 1 I I I / I I'A

4 .

I F,.LLIr 1 ..II- _FFj IIg~j:,l-L ~ I - g A,_ = = I

o

a

cC

'AW IA.

I I I N a

J1i4ALI 2i~aL~~ .~PAYAPS, OAb

I I Sa

__ ____~ ~ ~ ~ ~ ~ ~ 5-,

SIC4f'E'd-

AO:

I'i.e.

dwr#" ._,, &,, ... S a4 a," .

,... sa .. a.b. .W f *884 SI55.*5tCsr_ CSt D. I taw~~5485- .,_5. _, a.... * ,.

=.Sv 8.*? D-C ..".rS f 5 ** . -.. #

ada V.649 * * -"rrr F _r ~ r

AS Okb .I rafAlta --

Owito /ioux

ow- svub U9,st rk-ric 48^

IIuwAC SVPORI FAClMOS

r5A&C R

*aIvs 0.40-C S.,, .51-3-

- 1 - - ----- - : --- * - * I- - I _ w

is l 12 1 is 10 9 I 8 I I I es a I a 4 I a I X I S

Page 131: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

a -4

sli-1 I -I.t

D~ --

as wl + -0 SA

I ow- d-u-- --- . Z- L 4 .- w

W 8164 0p t $4- -.,, - I - -C _, _. _ _ _ - - . & I*

5UAP I ( [ t[f :

At *N*.Ca ii* a~ di *kbl* -s 5 g. . doea5 *b.1 v 1 4A ~ln4 .£. 4*4 SWO5ew &-W *Il*

Nv -M. _., .aid

AP CO l S

m* _ " . ..... , ,..ioati 5_._1 SB_ Mv,

*"8 *-tc% 2-- t,-'i

,or" L.** tfloDN Om5 O t- s

a £. soompowi V .4. Mor.& vt* £ W P I W ' 5 5 . 5 . 5 5 f i * ' £ 5

am " MGG . L Wd A ?t* w tAt Rvt N6tOXIMI*0605555 M45*34 A1 5. 5355 ZKasB ££4T5 f4 Gi 5

__ _ i I mW lw- l

.- r.- --i -IIWi LtI I i ;___,_ I _ _

5. A, MO o 0- 5 "f£,ht11o.'-t (.'jM

f-tpo

Page 132: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

is I 12 I of I t I s I a

a~~~ - -" - -- -" ' - -it -

b _ __ ~--_--_----r66 -- - -

-~~~~1

If .- ".tAt

l b~~~~y-~

-1 I-

-1

41I.--I- i 11

IN. I !fa

M411111113164:61illi iiJLLL -IL l ii ,, L ,,5i.L4i.LU-lLILL lUJ-Ll.LLULLL' |T7 i ILSt nmnsTn-rrrmamantirrn-a e r| nmna r I[:a: nam-sTrrisn-n-T-T nTrsTr-rn

,UIN' II*{A~ll~ll~llkl~t~ll*¢ttle Lo I I

7. rrn iTnn n nl rn mrnt l- a ne nra n'ln i' iis zn l l n- n n n lrrrTrlrrrXrl rnrattrrilnT rn ,r~]~

_ _ 5.LILLl 1.5.AU-~ . * . ~ _m~ .. II.amm sm am a ms. aj au -sui m .a._ - aJs , _ _~ur ...........JJ .......... .LL... ___I* iiii au-rn11111 run un-i ririm u-ams-s i-rirn- rue Ia i~m~ ii'ijj'Piaiiu-. ri11 m ruin n ii eTITtT I virninirs n, ir

W. Weis Ttifell . OIL- - - - ° - .:

J1 '1,,/L X X = , { t D ,i,,"tll _ _ _, I"

'.5 . ... -- .- sj. 5ti --- -1i1

:::. -~~~~~~~~~~~~~~~~~ eI. kI

9

Li

C

Iq

r.>4

a

1,...eFpl

.I P:, A . 6 ir'l92iM

!," t.-4, W. "*^^e.i #adI

'PKN. "ANMEMslref *rprAO!V§,

A... " ! 9f-.

is 1 12 i if i __ I

Page 133: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

=-

Iirc S ,aw a,r beast Or .

'WIAXdl(|l Dt~rl

=a $Ca ' ' ''T

mm 4g FR~~~~~~~5IELlraJN-AW !4~~~~~~~~~~~~~~~~~~0 D(S4 AE/V_ .IGIIW IV

Page 134: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

4~~~~~~~~~~~

o~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

. ...... . . ... ...... i 4Ap~~~~ lei~---

~~~~"' 4~ ~~~~~~~~~.

02 is a 4 3~.4Mb ~ 4 St

Page 135: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

-a.9

I s 0n - .4

.tin u-

4U B...As i it.I so-N * Av.&#

I... -* -9",.. _ _-

1 , ,:X__

- fW- wa- -

I .

WS." - -1A. P5* I

PrAU T LUAFT 5TAT0*4 Ct1.101 e

ov".*_ ,-~."-- -_

..I

Atcyla*J

_ .e. _ .

jbw/il"

AJlooll

Page 136: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

AVAILABLE GEOCHEMISTRY REPORTS

REFERENCED IN QUARTERLY BRIEFING TO THE AFFECTED INDIAN TRIBESAND THE STATE OF WASHINGTON OF 1/22-23/86

These reports can be obtained through:Jo LudwickRockweTl Hanford CompanyAttention: WIPP. 0. Box 800Richland, Washington, 99352

Jo Ludwick's phone number s (509) 376-5385. Other reference reports will bemade available as soon as they have gone through the editing process.

- Effect of Alpha and Gamma Radiation on the Near-Field Chemistry andGeochemistry of High-Level Waste Packages, RHO-ByW-SA-406 P.,December 1985.

- Examination of Solids from 200OC, Hydrothermal Tests with Spent Fuel.SD-BWI-TI-283, September 1985.

- Analysis of Solids from Initial 200 C, 3MPa Hydrothermal Tests with"Fully-Radioactive-Waste Glass and Spent Fuel. SD-BWI-TI-278,September 1985.

- Determining the Reversibility of Oxidation-Reduction Reactions inGroundwater. SD-BWI,-TI-309, December 1985.

Page 137: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

QUESTIONS RAISED OFBASALT WASTE ISOLATION PROJECT

/AFTER PRESENTATIONS ON QUARTERLY MEETING WITH THESTATE OF WASHINGTON AND THE AFFECTED INDIAN TRIBES

January 22-23, 1986

1. State of Washington: Is the Basalt Waste Isolation Project (BWIP) following upon the latest data showing the premeablilty of bentonite to be temperaturesensitive?

Response: Yes, BWIP is giving the study due consideration.

2. State of Washington: We would like to see a draft of the Site CharacterizationPlan (SCP) before it comes out for the 120-day review. This would facilitateour review and comment process.

Response: The WIP should be able to accommodate you. The size and format ofthe SCP should be set by mid-February 1986, after which time some decisions canbe made.

3. State of Washington and affected Indian tribes: We want to see more communica-tion with BWIP on upcoming activities that significantly contribute to therelease of reports.

Response: Department of Energy-Richland Operations Office (DOE-RL) will keepyou informed on a regular basis, as we currently do with ongoing activities.We will look into further identification of which activities might generatedata and subsequent reports.

4. Consultants to the affected Indian tribes: We would like access to theelectronic bulletin board from our home offices instead of being forced to goto our client's office.

Response: The OE-RL will discuss this with the parties and come to a decisionas to which consultants, if any, can be accommodated.

S. State of Washington: Will the State be able to input documents and lists ofissues into the electronic bulletin board memory?

Response This is under serious consideration. It would be nice to seecorrespondence sent from the State to Department of Energy-Headquarters (DOE-HQ) put into the system, because DOE-RL does not always see it. The DOE-RLwill be sending a letter out on use and interface with the bulletin board. Inthe meantime, please make comments on the system that we will be setting up,including any suggestions for input to the file system that might work.

6. Yakima representative: How is the -List to be issued?

Response: The release format has not yet been established; Department ofEnergy (DOE) will take the action to respond.

Page 138: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

7. State of Washington and affected Indian tribes: Regarding research testingdirected by affected states and Indian tribes, do the programs have to meet DOEQuality Assurance (QA) requirements?

Response: At least some would; those that do not (if they dealt with criticaldata collection) would have to be repeated by DOE or be of limited use.Consequently, if the data is important, then the test could not be done withouta proper QA program acceptable to DOE and reviewers like the Nuclear RegulatoryCommission (NRC).

8. State of Washington: Will trains be used for most of the waste hauling to theBWIP repository?

Response: It has not yet been decided, but it appears that it is most likely.Currently, most transportation analysis is handled through the DOE-HQ group.

9. State of Washington: Regarding the Exploratory Shaft test shaft. is it truethat it will be drilled at a rate of approximately 15 feet per day?

Response: Yes, 15 feet per day is the projection based upon our drillingexperience.

10. State of Washington: Are the costs of constructing the repository, transportingthe waste, and handling the waste to be split in some manner between thecommerical and defense programs?

Response: This still must be worked out. The impact of the defense waste onthe overall cost is not currently seen as a large fraction.

11. State of Washington: Who will decide that the hydrologic baseline is complete?

Response: We cannot answer that today, but DOE will accept comments from theState and NRC on such programs. In the end. it will be the NRC who will haveto approve the construction permit.

12. Nez Perce representative: Do your Waste Package people integrate their designwith your Repository Design people?

Response: Yes, the biggest input that they have is on the heat generated bywaste packages.

13. Nez Perce representative: Are you assuming a 5 or 10 year old fuel basis?

Response: We are taking both cases into account. Assuming the MonitoredRetrievable Storage (MRS) is completed. we might get some 5 year old fueltoward the end of the program.

Page 139: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

STAq -US. - Rs oR r

I9VC.LEAQ WAS-FL W6eAM

t T L 5oCWOCULTueAL CPIACTEQ TtC S

vALLE Sq STE/h6

-

3-

or

7.

10 W

PRIAR TIbAL CJCERk

Tl{L ?k0&RAPA RPOS

I MPKEM~4TATIOJ 5T RAT

?ko~s e--r r

?P&06PAMY MA-tAird9 MAAA)

PRo6RA Acomp w # T

PU6LJ I O4N'AT/OAJ

C r C AR EE A'klT

, F sco Pe

,6y

I A TSK,. ECTV PwS5

rt v(n S

Page 140: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

I-

C 4rtt ag-

~~t acok 1eA La.f UAWUE $yX7vS

m.w--

(rom pre hsion' +I Ve 5 4h rouih presevi,"I

V? 4A4GUAc ES

-I' (0 F:$H CO,46 Om PrT OA/

t INTGre- TletSA4oF Fisw E at s

6ficoo 6 ar y2L I* / MSa

CcOMMOK -s J

CLuK "ON ticZw4~ 4 AE 1,04

e C EtST(A J /91 SONtv; AtWSI OQIv \0 V E~ w C-4ki

.i

%*,ZeEN COMPLUt f6t'rivtoI e , C.TiKA ̂

/A41 Rf V'S

S� 4 L G 4 C,J t0I C L)A)EMPLO9 M fiWT

1 \Po.TtANc; t& lop-Fric9 .U69 0NT I V&/

Page 141: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

?RIMAARY TROBAL CONSCGENSRE~GADI& ES) I a:

Fi S4E RIES

curTru PE

T3S poTAT/OA)

Page 142: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

3 _ PURPOSE AND SCOPE

COMPREHENSIVE PROGRAM PLAN

UMATILLA NUCLEAR WASTE PROGRAM

() ESTABLISH MAJOR PROJECTS AND ACTIVITIES DURING SITE

CHARACTERIZATION AND SELECTION PHASE

@ DETERMINE POLICY AND TECHNICAL OBJECTIVES

@ SET FORTH PRIORTI FOR PROJECU AND ACTIVITIES

QD DETERMINE TREBAL AND OTHER RESOURCES (PERSONNEL, EQUIPMENT,

FUNDING, ETC.) REQUIRED FOR PROGRAM IMPLEMENTATION

.@ PROVIDE GUIDANCE IN PREPARATION OF SPECIFIC PROJECT PLANS,

FISCAL YEAR PLANS, AND GRANT PROPOSALS

C9 IDENTIFY KEY MILESTONES AND DECISION POINTS

AID TRIBAL LEADERS IN POLICY PLANNING AND DECISION-MAKING

Page 143: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

IMPLEMENTATION STRATEGY:

CTUIR NUCLEAR WASTE PROGRAM

() ADOPT AN ACTIVE ANTICIPATORY MODE (AS COMPARED WiTH A

PASSIVE, REACTIVE APPROACH) WHICH IDENTIFIES NEED FOR SPECIFIC

TRIBAL PROJECTS AND ESTABLISHES COOPERATIVE PARTICIPATION IN

FEDERAL PLANNING

i) ESTABLISH TRIBAL PROGRAM PLANNING AND MANAGEMENT

STRUCTURE WITH INVOLVEMENT AT:

- POLICY LEVEL (BOARD OF TRUSTEES)

- PROGRAM REVIEW 6 PLANNING (OVERSIGHT COMMITTEE)

- PROGRAM STAFF AND DEPARTMENT SUPPORT

Q ACQUIRE AND MAINTAIN TECHNICAL AND PROFESSIONAL SUPPORT AS

NECESSARY VIA CONTRACTORS (CERT, ETC.)

@) SEEK OPTIMUM USE OF EXISTING TRIBAL PERSONNEL

CARRY OUT AN EFFECTIVE TRIBAL/PUBLIC INFORMATION PROGRAM

(3) IMPLEMENT PROJECTS ORIENTED TO BOTH TRIBAL AND FEDERAL

NEEDS FOR INFORMATION AND EVALUATION

ORIENTED TOWARD SITE SELECTION DECISION

Page 144: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

S1

PROJECT

Code

'06-01-00

0601-1

06-01-02

06-01-03

A - Management and Administration

B - Management Training and Education Seminars

C - Program Plan

I

06-02-00

06-03-00

06-04-00

06-04-01

06-04-02

06-04-03

06-04-04

06-04-05

06-04-06

06-05-00

06-06-00

ACTrITZES LEADZNG TO C & C AREE

P.VIDW D CUOO

MaCIM0ING, ANALYSIS' AND STUIES

A - Tribal Plan for Environmental Impact Assess-ment

B - Tribal Plan for Socio-econoamic and CulturalImpact Assessment

C - Preliminary Risk Assessment MethodologyDevelopment

D - System Study on MRS

E - Participation in EIS Scoping PNocess andSite Characterization Monitoring andMitigation Planning

F - Cn-Site Coordination etc.

TRIBAL PUBLIC INFORMATION

COORDINATICN OF INTRGOVERNMENTAL ACTIVITIES

I

FY '6 130b&Er 9l O O2dp 666

Page 145: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

PROGRAM MANAGEMENT

O PROGRESS REPORTING TO BOT AND DOE - MSR QUARTERLY REPORTS

* BRIEFINGS AND EDUCATIONAL SEMINARS

i OVERVIEW OF NUCLEAR WASTE llANAGEMENT TECHNOLOGIES

- GEa.GIc REPOSTOCIES- INTMEM SAGE- MONrTuED RETmEVAaE STMAGE- TRAwNuP Am LoGwncs

* ENVIRONMENTAL HEALTH, AND SOCIO-CULTURAL IMPLICATIONS OF NUCLEARWASTE MANAGEMENT STRATEGIES

- RADIATION PROTECTION M EASURES (NATLRAL AND ENGINEERED E Em OCCUPATiONPL ANDPUQIC HEALH FRTECTIVE SYSTEMS, FEDELSTANDARDS, MONrrNG, ETC.)

- PaTEN ON-srEAND OFP-sE E MISSIO s aRADbNuaEs Ams Om PaLrANTS- EwNM ENrL EFCs oN PuBiC HEA-p AN THE EwNM Ea- IMPACT MITIGAnON MEASURES

* GOVERNMENTAL RESPONSBMITIES UNDER THE NUCLEAR WASTE POLICY ACT

- U.S. DEPARTENT cFENSGY (ED4 AGENDY)- U.S. NuuEm REGLATay COM moN I Laum )- U.S. DEPARM ENFcTRAwazrATnaN- 0 ERFEDe(EPA, DFIIAN AFAIR)- AFFECTED INl TRIBES AN STATES- REVIEW AN Dc SI eCNCE AND MANAGE M ENToF TuBALFEDEwL COOPERATvE

ACTIVITIES DUrm M= NWPA PRoGRAM PHSES- REVIEW MADR PAM MLESTONES- OftER MAR EEMErs CF THE N WPA A THEIR SIGNIFCANCE IN RANNNG AND

MANAGING TRdBL Nu.R WASTE PRORA MS UNDER THE NWPA

Page 146: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

7- fCCoMPLISH IA-TS¶R 1 L WA5T& 6 a AM

py 'us' * TRIBE 4ePD CERT

O C C. ,v

v eA P6RA

ANAL ys&' or'A7IOA

(5Is sO S

Mt pLAWt

* MISS16AJ PkAAJ

* E6TEC Hf ICA9 jelejooaT

FY I? t * NlP N41e

* POaLIC .' {M ftPR MA TI DA

* be DA? SEAAINAP TO DCATEL " OAeb IW 8 (A s E 5

0rh Be opp(c Ai4.64NA b DEPARVEJT ,*gar S

Page 147: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

- O68E CTIVESTRIBAL PUBLIC INFORMON PROGRAM

TO PROVIDE TIMELY INFORMATION TO TRIBAL MEMBERS AND RESIDENTSCONCERNING BWIP

MAINTAINING AREFERENCEITRY AND EIIIT DO TOM ATTHE CTUIR HEADQUARTERS WHICH IS ACCESSIBLE TO TRIBAL RESIDENTSON A CONTINUOUS BASIS

e CONTINUE TO ACQUIRE AND MAINTAIN PERTINENT TECHNICAL PROGRAMMIM A-UL OTHER I TTRATI1RE PREPARED BY THE CTUIR, DOE ANDOTHER FEDERAL AGENCIES, AND OTHER ORGANIZATIONS, PARTICULARLYMATERIALS SUITABLE FOR DISSEMINATION TO LAY TRIBAL RESIDENTS

PBEARE AND DIS M TO TRBAL MEMBERS AND OTHER RESIDENTSTECHNICAL BRIEFS.'STATUS REPORTS, PROJECT SUMMARY INFORMATION,e£1,RDEM DOE AND OTHER IIBIERAlL IN A FORM READILY UNDER-STANDABLE BY LAY TRIBAL MEMBERS. THIS WILL INCLUDE ISSUANCE OFPERIOD NEWSLETTERS, ARTICLES IN NEWSPAPERS AND OTHER PRINTEDMEDIA, AND/OR BROCHURES, PAMPHLETS, TEC.

* CONDUC12ECIAL PURl IC INEOR 7M1OFFMT-I AT APPROPRIATEINTERVALS TO FOSTER UNDERSTANDING OF THE BWIP AND THE CTUIRPARTICIPATION PROGRAMS AND TO TRAIN TRIBAL MEMBERSIN EFFECTIVEPUBLIC PARTICIPATION TECHNIQUES

e QeAR E VIDEOTAPES FOR REGIONAL TELEVISION BROADCASTS, SLIDEPRESENTATIONS. FILM STRIPS. AND/OR OTHER AUDHO-RIAl Ull

a' PAReflL12IE LPUBUC INFORMATION CONFERENCES. REGIONAL RADIOAND T.V. BROADCASTS, AND OTHER PRDERTAU-l1BCTNFORMAIONELSPONSORED BY OTHER ORGANIZATIONS

Page 148: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

POSLBCo TfROv4RAoT%/ P0ePQCUR§Ets' FY2cTlvrt

tdlus+ro.xed 44e( on BU)IP otd4t;b&I nvokv1 evito d*AIVereS +04vibal heo,14h nsle+er

* 3- wrF'cI setie S rneWS meleuSe$delivered .or O&ctI +r'Ibolrevie u

* oar4 f r* b- nh.Al j new5te~erorvsrtng r ti +boa wask eof ;cvw;

ce* 4wrc V /6ervaozb

pre pLsj0eepitA" X4 +r

' rLA'.)t w 4f +bloA eJGc44+ovd¢ph, on ee'Aets fov'Sm$esrt o,.d STp '4

Page 149: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

CONSULTAiON AND PALGREMENT

* CONTINUE NEGOTIATIONS TOWARD DEVELOPING A C&C AGREEMENT ASAUTHORIZED UNDER SECTION 117 OF THE NUCLEAR WASTE POLICY ACT

* PROVIDE A FORMAL MECHANISM TO RESOLVE DIFFERENCES AND FORTRIBAL PARTICIP#.[ION

o RESEARCH LE6IMA1VE BACKGROUND AND INTENTPERTAINING TOLEGAL RIGHTS OF TRIBE IN THE NWPA

o DEVELOP LEGAL PORTION AND ISSUE ANALYZS

o PREPARE DRAFT C&C AGREEMENTS AND RELATED DOCUMENTATION INSUPPORT OF NWOC

* BRIEF NWOC AND PROGRAM STAFF TO EXPLORE AND DEFINE LEGALAND PROGRAMMATIC ISSUES

Page 150: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

NEZ PERCE TREATY'JUNE 11. 1855

FEB 26 1986

TRIBAL EXECUTIVE COMMITTEEBox 30. #LAPWAI. IDAHO (208) 843-2253

February 19, 1986

Mr. Max Powell, Operations AdministratorBasalt Waste Isolation Project OfficeRichland Operations OfficeDOEP.O. Box 550Richland, Wa 99352

Dear Mr. Powell:

Per your request I -am sending you a copy of the materialwhich I used in NP-NWPA presentation on January 23, 1986 atRivershore when the Affected Tribes were providing a reportto your office and other grantees in attendance.

Enclosed are Summary Sheets entitled

- Fiscal Year 1985 - NP-N0WPA Program Highlights

- Fiscal Year 1986 - Highlights

- Scoping Studies for Tribal Nuclear Waste Program

- Affected Tribes Ceded Lands

- Candidate Sites for The First Geologic Repository

- Regions Under Consideration for The SecondGeologic Repository

I did not have prepared remarks or written narrative asI spoke extemporaneously. Hope that this material is whatyou requested.

Sincerely,

Ronald T. Halfmoon, Manager

RTH:ceg

Encls.

Page 151: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

NEZ PERCE TRIBE - N.W.P.A. PROGRAM

HIGEEIGHTS - FECAL YEAR 1985

* ESTABLIH TRIBAL PROGRAM ORGANZATION AND STAFF

)NAL* CONDUCT SCOPING STUDY

* INlTIATE PUBLIC INFORMATION PROGRAM

lREVIEW AND COMMENTS ON DRAFT EIRONMENTAL ASESSMENT

(DEA) FOR HANFORD CANDIDATE SrrE AND

CREATE TRIBAL NUCLEAR WASTE BOARD TO PREPARE FOR

NEGOTIATIONS TOWARD A 3C & C" AGREEMENT

* ACQUIRE TECHNICAL AND LEGAL CONTRACTUAL SERVICES TO

SUPPORT TRIBAL PROGRAM STAFF

* INITIATE LONG-RANGE PROGRAM PLANNING

rER-

Page 152: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

AFFECTED TRIBES CEDED LANDS

Page 153: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

t-^ !,~~~~~~~~~~~~~nw et -- _I > / _ '\\W De f

9** ~~~~~~~ ~~~4av .-. I I DAK~~~~~~~~~~MOTH6 OTA

/ _ -a^

¢S. -R$#t \>t*

me.. 6W ~ ~ .aw..r

tl s_~ I - - ANS ASO1T

G -,H~~~w- F // I

ft i ! i .S

t~~~t-6>~~~a M. 7 - L m <..".

ft \ c 3 z i421" saw =,' / __

C V ,.,.,. '

CALIFORNIA ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ SL

. . ' a

j 1aft an ' '

* Not Including Louisiana CAIDIDATE STS

, a '*XA Mi Mlslssippl site$

J~~~~~~~ : ~~~~~~~CAND>IDATE SlTES3FOR THE FIRST

GEOLOGIC REPOSITORY*

S. _.,**. .. - ,B.. C -0 Of Emera Rewmv Tr_ __

_________ ________ ________ ________ ________ ________ ________ ________ ____ or M- UN..' "Ram *

Page 154: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

NOTES OF THE EWA'S PRESENTATION(CONSULTANTS TO THE YAKIMA INDIAN NATION)

by Georges Abi-hanem

Objectives of Earth, Water, Air (EWA):

o Examine data

o Investigate scientific procedures

o Evaluate design and development

o Interface

Scope of Work:

o Geochemistry

o Exploratory Shaft Test Facility (ESTF)

o Engineered Barrier System

o Repository Design

Geochemistrv:

o Sampling and analytical techniques

o Sorption

o Solubility

o Computer modeling

o Secondary mineral phases

o Geochemistry sealing potential

o Transport mechanisms

ESTF:

o Construction

o Test plans; looking at data and level of detail required

Engineered Barrier System:

o Design and Performance Assessment

Repository Design:

o Rock characteristics

o Conceptual models/computer codes (ANSYS, UDEC, ADINA, etc.)

Page 155: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

o Subsurface layout

Waste Packages:

o Waste form

o Cansiters

o Packing and backfill materials (elastic deformation, etc.)

o Performance Assessment

Seismic/Tectonic Investigation:

o Review structural and tectonic models

o Geophysical data/methods assessment

o Geodetic data

o Seismic data

Structural Features of the Colubmia Plateau:

o Yakima Fold Belt

o tectonic models: regional and local scale

o Issues in modeling: degree of basement involvement, relation between foldingand faulting, etc.

Geophysical Surveys:

o Borehole logging

o Seismic deflection

Seismicity:

o Historical

o Recent: deep and shallow (swarms) events

Discussion:

The EWA has generated a series of reports that can be obtained from Russel Jim ofthe Yakima Indian Nation.

Page 156: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

NOTES OF GEOTRANS' PRESENTATION(CONSULTANTS TO THE YAKIMA INDIAN NATION)

by Lisa August

Role - Technical Assistance

Tasks:

o Bibliographic and hydrogeologic databases

o Hydrochemistry review

o Attendance at important events

o Observation of important work

Objectives - Review of Activities (Environmental Assessment, etc.)

Bibliocraphic Database:

o Track documents requested and received

o Over 700 documents

o Obtain documents from Basalt Waste Isolation Project

Hydroceoloaic Database:

o Work in progress

o Purpose: organize data and indicate data deficiencies

o Database in four different types of files

o (Have not yet evaluated the quality of data)

Problems Identified: Significant Features Associated with the Cohassett Flow:

o We expect the vesicular zone in the flow to be a migration pathway. There isan inconsistency with the conductivity data collected from DC-19. Afteranalyzing the date and reports, we have determined the dense interior to be 49-feet thick.

o An unnamed flow between the Cohassett and the Rocky Coulee flow ends in aterminal zone. This is expected to result n a vertical pathway.

Problems Identified During Review of Hydrochemical Data:

o Data from certain well samples was averaged, instead of reporting ranges.

Page 157: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

Meetings:

o Attended the seismic/tectonic meeting on December 3-4, 1985

o Attended the Quality Assurance meeting on December 4-5, 1985

o Attended the Large-Scale Hydraulic Stress test meeting on Decmeber 9-10, 1985

o Want to observe the multiple well hydraulic test

Page 158: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

NOTES OF THE STATE OF WASHINGTON'S DEPARTMENT OF ECOLOGY PRESENTATION

by Terry Husseman and Marta Wilder

Observations and Focus:

o The preliminary determination of site suitability should be done after sitecharacterization.

o The affected states need to participate in the ranking of sites.

o The Department of Energy (DOE) should be site neutral and take steps toeliminate public perceptions of bias.

o The DOE needs to include all affected states throughout the process so that inthe end, the chosen state cannot claim unfair bias.

o The liability issues (strict liability, full compensation, and holding statesblameless) has brought the Consultation and Cooperation negotiations to astandstill. If transportation of nuclear wastes is safe, then the federalgovernment should take over liability responsibilities.

Projects:

o Trying to get funding to review the Environmental Impact Statement, as itrelates to the siting process.

o The State is pushing to get a health effects study on Hanford; wants it to be ajoint effort with the affected tribes.

o Will get funding to study soecioeconomic effects through the State; eventuallypublic hearings to be held in the Tr-Cities and Spokane.

o Will continue to work on transportation issues, such as emergency response withKurt Eschels.

Staffing Plan:

o Contingent upon Hanford being chosen as one of the sites for sitecharacterization.

o To include expertice in geology, hydrology (computer modeling), radiationhealth physics, and public involvement staff.

o Will hire onsite representative to inform State technical staff of upcomingevents.

Discussion

o The State would like better communication with Basalt Waste Isolation Project(BWIP). It, therefore, applauds the proposed electronic bulletin board.

Page 159: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

Public Involvement Program (Marta Wilder):

o A bi-monthly newsletter is published with a circulation of 9,000.

o Slide shows on the State program are available.

o The State has a techncial library.

o A 2-year public Outreach Program Plan is being developed.

o May be conducting opinion surveys of the general public and of publicofficials.

o The Umatilla's asked if Marta has approached the CBS 60 Minutes TB show. Shereplied that they've thought about it, but haven't done so.

o Channel 9 out of Seattle will probably be doing a documentary on BWIP.

Page 160: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

C,"f 1 n lops

WASHINGTON STATE INSTITUTE FOR PUBLIC POLICY

TIe Evereen State College Olympia, Washington 98505 Tlephone (206) 866000. ext. 63R0

Science and Technology ext. 6454

February 4, 1986

Mr. Jim MeccaBasalt Waste Isolation Project (BWIP)U. S. Department of EnergyRichland Operations OfficePost Office Box 550Richland, Washington 99352

Dear Jim:

Enclosed is the outline for my presentationand 23, 1985 BWIP meeting with grantees. I'veI hope will help attendees' understanding.exchange information with other grantees.

on our program at the January 22also included some graphics thatWe appreciate the opportunity to

Sincerely,

Max S. wer, Principal InvestigatorScience and Technology Project

MP/kmc86-13

cc: Legislative Members, Nuclear Waste BoardRuss LidmanTerry Husseman

Enclosure

Page 161: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

1986 Washington Legislative Grant Program

Washington State Institute for Public Policy

Presented at Richland, WashingtonJanuary 23, 1986

ObJective

Build toward an informed Notice of Disapproval (116(b)) decision.

Major Activities

1) Develop an information base among all legislators.

-- must overcome:

- short-term focus

- member, leadership turnover

- conflicting demands on legislator time

-- Support legislators in their roles as community opinion leaders.

- help them respond out of knowledge and confidence, not ignorance

-- Make information easily accessible; digest and condense.

- newsletters

- information reports

- clippings

- regional briefings

2) Develop a record (institutional memory) as to how the legislature deals withthe repository issue over several years--provide continuity.

3) Provide special support to 8 legislative members of the Nuclear Waste Boardand to House and Senate Energy and Utilities Committees, who have jurisdic-tion.

-- Committee briefings.

-- Additional information (e.g. reports of meetings, summaries of mile-stone documents).

-- Travel and involvement with other states (e.g. USDOE quarterlymeetings, NCSL).

Page 162: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

4) Provide independent policy analysis.

-- Can identify strategic issues, take long-tern view, since legislatureneedn't respond to each milestone document.

-- Examples:

- Draft EA ranking methodology

- proposed study on risk of economic loss

5) Contact and involve academic and technical resources.

-- Develop peer review panels to independently assess State's work.

-- Seek out special resource people for specific projects (e.g. potentialeconomic loss).

6) Coordinate activities with Nuclear Waste Board, other states, Tribes.

Bottom line: An informed legislature thatdefend it either to Congress or the folksindependent, technically competent policylegislature.

can make a credible decision andback home. A staff capable ofreview that is acceptable to the

The attached graphics show the legislative role under NWPA,-the legislature'srelation to the Nuclear Waste Board, and the sources of information. TheNuclear Waste Board is advisory to the Governor and the Legislature. The 8legislative members are ex officio and non-voting.

MP/kmc86-13a

Page 163: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

I

The Legislative Role

A . ins;I7 HeL Asia j Ho

BE s8S3|

*.l

I"I,*N

, _ |

V?'S a

t-Consultation and cooperation agreemento-Information requestt-Notice of disapproval

Page 164: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

I

How the NuclearWaste Board Works

mmm�����M I=

Page 165: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any

How the LegislatureFinds Out

19

N Jill I ii a

umuumumu MEMO-

A_ Il\4.

&S aE

'I- 'IN

fOftft��.00or mo

Page 166: Minutes of Quarterly Meeting Between the Basalt Waste Isolation … · 2012-11-19 · presentation o The presentation from the Washington Institute of Public Policy. If you have any