MINISTER OF ENERGY AND MINREAL RESOURCES REPUBLIC OF INDONESIA MINISTER OF ENERGY AND MINERAL RESOURCES REGULATION NO. 2 YEAR 2010 ON LIST OF ACCELERATED POWER PLANT DEVELOPMENT PROJECTS UTILIZING RENEWABLE ENERGY, COAL, AND GAS AND RELATED TRANSMISSION BY THE GRACE OF GOD ALMIGHTY MINISTER OF ENERGY AND MINERAL RESOURCES Considering: that for the implementation of the stipulation of Paragraph 3 article (3) and Paragraph 6 Article (3) of Presidential Regulation Number 4 Year 2010 concerning the Appointment to PT Perusahaan Listrik Negara (Persero) to Carry Out the Accelerated Development of Electrical Power Generating Plants Using Renewable Energy, Coal, and Gas, it is necessary to promulgate Minister of Energy and Mineral Resources Regulation concerning the List of Accelerated Development of Electrical Power Generating Plant Projects which utilize Renewable Energy, Coal and Gas as well as Related Transmission: Bearing in mind: 1. Law Number 19 Year 2003 concerning the State Own Enterprise (State Gazette of the Republic of Indonesia Year 2003, Number 70, Additional State Gazette of the Republic of Indonesia Number 4297); 2. Law Number 30 Year 2007 on Energy (State Gazette of the Republic of Indonesia Year 2007 Number 96, Additional State Gazette of the Republic of Indonesia No. 4746); 3. Law Number 30 Year 2009 concerning Electrical Power (State Gazette of the Republic of Indonesia Year 2009 Number 133, Additional State Gazette of the Republic of Indonesia Number 5052); 4. Government Regulation Number 10 Year 1989 on Electrical Power Supply and Utilization (State Gazette of the Republic of Indonesia Year 1989 Number 24, Additional Sate Gazette Number 3394) as amended twice, the latest by Government Regulation Number 26 Year 2006 (State Gazette of the Republic of Indonesia Year 2006 Number 56, Additional Sate Gazette of the Republic of Indonesia Number 4628); 5. Presidential Regulation Number 4 Year 2010 dated 8 January 2010 on Appointment to PT Perusahaan Listrik Negara (Persero) to Carry Out the Acceleration of the Development of Power Plants Utilizing Renewable Energy, Coal and Gas; 6. Presidential Decree Number 84/P Year 2009 dated 21 October 2009; 7. Minister of Energy and Mineral Resources Regulation Number 0030 Year 2005 dated 20 July 2005 on Organizations and Procedures of the Department of Energy and Mineral Resources;

Upload: donga

Post on 03-Feb-2018

218 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Minister Energy and Mineral Resources Regulation No 2 · PDF fileMINISTER OF ENERGY AND MINERAL RESOURCES REGULATION NO. 2 YEAR 2010 ON ... PLTU Pangkalan Susu 3/4 Pangkalan Brandan

MINISTER OF ENERGY AND MINREAL RESOURCES REPUBLIC OF INDONESIA

MINISTER OF ENERGY AND MINERAL RESOURCES REGULATION

NO. 2 YEAR 2010

ON

LIST OF ACCELERATED POWER PLANT DEVELOPMENT PROJECTS UTILIZING RENEWABLE ENERGY, COAL, AND GAS AND RELATED

TRANSMISSION

BY THE GRACE OF GOD ALMIGHTY

MINISTER OF ENERGY AND MINERAL RESOURCES

Considering: that for the implementation of the stipulation of Paragraph 3 article (3) and Paragraph 6 Article (3) of Presidential Regulation Number 4 Year 2010 concerning the Appointment to PT Perusahaan Listrik Negara (Persero) to Carry Out the Accelerated Development of Electrical Power Generating Plants Using Renewable Energy, Coal, and Gas, it is necessary to promulgate Minister of Energy and Mineral Resources Regulation concerning the List of Accelerated Development of Electrical Power Generating Plant Projects which utilize Renewable Energy, Coal and Gas as well as Related Transmission:

Bearing in mind: 1. Law Number 19 Year 2003 concerning the State Own Enterprise (State Gazette of

the Republic of Indonesia Year 2003, Number 70, Additional State Gazette of the Republic of Indonesia Number 4297);

2. Law Number 30 Year 2007 on Energy (State Gazette of the Republic of Indonesia Year 2007 Number 96, Additional State Gazette of the Republic of Indonesia No. 4746);

3. Law Number 30 Year 2009 concerning Electrical Power (State Gazette of the Republic of Indonesia Year 2009 Number 133, Additional State Gazette of the Republic of Indonesia Number 5052);

4. Government Regulation Number 10 Year 1989 on Electrical Power Supply and Utilization (State Gazette of the Republic of Indonesia Year 1989 Number 24, Additional Sate Gazette Number 3394) as amended twice, the latest by Government Regulation Number 26 Year 2006 (State Gazette of the Republic of Indonesia Year 2006 Number 56, Additional Sate Gazette of the Republic of Indonesia Number 4628);

5. Presidential Regulation Number 4 Year 2010 dated 8 January 2010 on Appointment to PT Perusahaan Listrik Negara (Persero) to Carry Out the Acceleration of the Development of Power Plants Utilizing Renewable Energy, Coal and Gas;

6. Presidential Decree Number 84/P Year 2009 dated 21 October 2009; 7. Minister of Energy and Mineral Resources Regulation Number 0030 Year 2005 dated

20 July 2005 on Organizations and Procedures of the Department of Energy and Mineral Resources;

Page 2: Minister Energy and Mineral Resources Regulation No 2 · PDF fileMINISTER OF ENERGY AND MINERAL RESOURCES REGULATION NO. 2 YEAR 2010 ON ... PLTU Pangkalan Susu 3/4 Pangkalan Brandan

DECIDES To stipulate MINISTER OF ENERGY AND MINERAL RESOURCES REGULATION ON THE LIST

OF ACCELERATED DEVELOPMENT OF ELECTRICAL POWER GENERATING PLANT PROJECTS UTILIZING RENEWABLE ENERGY, COAL AND GAS AS WELL AS RELATED TRANSMISSION

Paragraph 1

(1) List of projects of electrical power generating plants utilizing renewable energy, coal, and gas which are carried out by PT Perusahaan Listrik Negara (Persero) is as stated in Attachment I of this Minister Regulation. (2) The development of the electrical power generating plants as stipulated in article (1) includes the development of the related transmission as stated in Attachment II of this Minister Regulation.

Paragraph 2 (1) List of projects of electrical power generating plants utilizing renewable energy, coal, and gas which are carried out through the cooperation with private power developers is as stated in Attachment III of this Minister Regulation. (2) The development of the electrical power generating plants as stipulated in article (1) includes the development of the related transmission as stated in Attachment IV of this Minister Regulation.

Paragraph 3 This Minister Regulation is effective the date of its enactment through 31 December 2014.

For public cognizance, ordering the promulgation of this Minister Regulation by its placement in the State Gazette of the Republic of Indonesia.

Stipulated in Jakarta On 27th January 2010 Minister of Energy and Mineral Resources Signed by DARWIN ZAHEDI SALEH

Enacted in Jakarta On 27th January 2010 Minister of Law and Human Right The Republic of Indonesia

Page 3: Minister Energy and Mineral Resources Regulation No 2 · PDF fileMINISTER OF ENERGY AND MINERAL RESOURCES REGULATION NO. 2 YEAR 2010 ON ... PLTU Pangkalan Susu 3/4 Pangkalan Brandan

Signed by Patrialis Akbar State Gazette of the Republic of Indonesia Year 2010 Number 41 (Unofficial translation by PENConsulting)

Page 4: Minister Energy and Mineral Resources Regulation No 2 · PDF fileMINISTER OF ENERGY AND MINERAL RESOURCES REGULATION NO. 2 YEAR 2010 ON ... PLTU Pangkalan Susu 3/4 Pangkalan Brandan

ATTACHMENT I MINISTER OF ENERGY AND MINERAL RESOURCES REGULATION NUMBER : 02 YEAR 2010

DATED : 27 JANUARY 2010

LIST OF ELECTRICAL POWER GENERATION PROJECTS UTILIZING RENEWABLE ENERGY, COAL, AND GAS

TO BE CARRIED OUT BY PT PERUSAHAAN LISTRIK NEGARA (PERSERO)

NO NAME OF POWER GENARATION PROJECT

PROVINCE EST. CAPACITY (MW)

1. PLTP Tangkuban Parahu I West Java 2 x 55

2. PLTP Kamojang 5 and 6 West Java 1 x 40 and 1 x 60

3. PLTP Ijen East Java 2 x 55

4. PLTP Iyang Argopuro East Java 1 x 55

5. PLTP Wilis/Ngebel East Java 3 x 55

6. PLTP Sungai Penuh Jambi 2 x 55

7. PLTP Ululais Bengkulu 2 x 55

8. PLTP Kotamobagu 1 and 2 North Sulawesi 2 x 20

9. PLTP Kotamobagu 3 and 4 North Sulawesi 2 x 20

10. PLTP Sembalun West Nusa Tenggara 2 x 10

11. PLTP Tulehu Maluku 2 x 10

12. PLTA Upper Cisokan West Java 4 x 250

13. PLTA Asahan 3 North Sumatera 2 x 87

14. PLTU Indramayu West Java 1 x 1,000

15. PLTU Pangkalan Susu 3 and 4 North Sumatera 2 x 200

16. PLTU Sampit Central Kalimantan 2 x 25

17. PLTU Kotabaru South Kalimantan 2 x 7

18. PLTU Parit Baru West Kalimantan 2 x 50

19. PLTU Takalar South Sulawesi 2 x 100

20. PLTG Kaltim (Peaking) East Kalimantan 2 x 50

21. PLTGU Muara Tawar Add-on 2, 3 and 4 West Java 1 x 150 and 3 x 350

MINISTER OF ENERGY AND MINERAL RESOURCES Signed by DARWIN ZAHEDY SALEH Note: PLTP - Geothermal Power Plant PLTA - Hydroelectric Power Plant PLTU - Coal Fired Steam Turbine Power Plant PLTG - Gas Turbine Power Plant (Open Cycle) PLTGU - Gas Turbine Power Plant (Combined Cycle)

Page 5: Minister Energy and Mineral Resources Regulation No 2 · PDF fileMINISTER OF ENERGY AND MINERAL RESOURCES REGULATION NO. 2 YEAR 2010 ON ... PLTU Pangkalan Susu 3/4 Pangkalan Brandan

ATTACHMENT II MINISTER OF ENERGY AND MINERAL RESOURCES REGULATION NUMBER : 02 YEAR 2010

DATED : 27 JANUARY 2010

TRANSMISSION PROJECTS RELATED TO POWER GENERATION PROJECTS UTILIZING RENEWABLE ENERGY, COAL, AND GAS

TO BE CARRIED OUT BY PT PERUSAHAAN LISTRIK NEGARA (PERSERO)

TRANSMISSION PROJECT NO

FROM TO

VOLTAGE (KV)

EST. DISTANCE (KM)

1. PLTP Tangkuban Perahu I Bandung North 150 10

2. PLTP Ijen Banyuwangi 150 60

3. PLTP Iyang Argopuro Probolinggo 150 30

4. PLTP Wilis / Ngebel Pacitan 2 150 60

5. PLTP Sungai Penuh Sungai Penuh 150 20

6. PLTP Hululais Pekalongan 150 120

7. PLTP Kotamobagu Otam 150 32

8. PLTP Sembalun GI Pringgabaya 150 60

9. PLTP Tulehu Incomer Waai-Paso 70 40

10. PLTA Asahan 3 Simangkok 150 22

11. PLTU Indramayu Cibatu 500 270

12. PLTU Pangkalan Susu 3/4 Pangkalan Brandan 150 22

13. PLTU Sampit Sampit 150 40

14. Pump Storage Upper Cisokan

Incomer Cibinong - Saguling

500 60

MINISTER OF ENERGY AND MINERAL RESOURCES Signed by DARWIN ZAHEDY SALEH

Page 6: Minister Energy and Mineral Resources Regulation No 2 · PDF fileMINISTER OF ENERGY AND MINERAL RESOURCES REGULATION NO. 2 YEAR 2010 ON ... PLTU Pangkalan Susu 3/4 Pangkalan Brandan

ATTACHMENT III MINISTER OF ENERGY AND MINERAL RESOURCES REGULATION

NUMBER : 02 YEAR 2010 DATED : 27 JANUARY 2010

LIST OF ELECTRICAL POWER GENERATION PROJECTS

UTILIZING RENEWABLE ENERGY, COAL, AND GAS TO BE CARRIED OUT IN COOPERATION WITH PRIVATE POWER DEVELOPERS

NO NAME OF POWER GENARATION PROJECT

PROVINCE EST. CAPACITY (MW)

1. PLTP Rawa Dano Banten 1 x 110

2. PLTP Cibuni West Java 1 x 10

3. PLTP Cisolok – Sukarame West Java 1 x 50

4. PLTP Darajat West Java 2 x 55

5. PLTP Karaha Bodas West Java 1 x 30 and 2 x 55

6. PLTP Patuha West Java 3 x 60

7. PLTP Salak West Java 1 x 40

8. PLTP Tampomas West Java 1 x 45

9. PLTP Tangkuban Perahu II West Java 2 x 30

10. PLTP Wayang Windu West Java 2 x 120

11. PLTP Baturaden Central Java 2 x 110

12. PLTP Dieng Central Java 1 x 55 and 1 x 60

13. PLTP Guci Central Java 1 x 55

14. PLTP Ungaran Central Java 1 x 55

15. PLTP Seulawah Agam Nanggroe Aceh Dars. 1 x 55

16. PLTP Jaboi N. Aceh Darussalam 1 x 7

17. PLTP Sarulla 1 North Sumatera 3 x 110

18. PLTP Sarulla 2 North Sumatera 2 x 55

19. PLTP Sorik Merapi North Sumatera 1 x 55

20. PLTP Muara Laboh West Sumatera 2 x 110

21. PLTP Lumut Balai South Sumatera 4 x 55

22. PLTP Rantau Dadap South Sumatera 2 x 110

23. PLTP Rajabasa Lampung 2 x 110

24. PLTP Ulubelu 3 and 4 Lampung 2 x 55

25. PLTP Lahendong 5 and 6 North Sulawesi 2 x 20

26. PLTP Bora Central Sulawesi 1 x 5

27. PLTP Merana / Masaingi Central Sulawesi 2 x 10

28. PLTP Mangolo South East Sulawesi 2 x 5

Page 7: Minister Energy and Mineral Resources Regulation No 2 · PDF fileMINISTER OF ENERGY AND MINERAL RESOURCES REGULATION NO. 2 YEAR 2010 ON ... PLTU Pangkalan Susu 3/4 Pangkalan Brandan

NO NAME OF POWER GENARATION PROJECT

PROVINCE EST. CAPACITY (MW)

29. PLTP Huu West Nusa Tenggara 2 x 10

30. PLTP Atadei East Nusa Tenggara 2 x 2.5

31. PLTP Sukoria East Nusa Tenggara 2 x 2.5

32. PLTP Jailolo North Maluku 2 x 5

33. PLTP Songa Wayaua North Maluku 1 x 5

34. PLTA Simpang Aur Bengkulu 2 x 6 and 2 x 9

35. PLTU Bali Timur Bali 2 x 100

36. PLTU Madura East java 1 x 400

37. PLTU Sabang N. Aceh Darussalam 2 x 4

38. PLTU Nias North Sumatera 2 x 7

39. PLTU Tanjung Pinang Riau Islands 2 x 15

40. PLTU Tanjung Balai Karimun Riau Islands 2 x 10

41. PLTU Tanjung Batu Riau Islands 2 x 4

42. PLTU Bangka Bangka Belitung 2 x 30

43. PLTU Ketapang West Kalimantan 2 x 10

44. PLTU Petung East Kalimantan 2 x 7

45. PLTU Melak East Kalimantan 2 x 7

46. PLTU Nunukan East Kalimantan 2 x 7

47. PLTU Kaltim East Kalimantan 2 x 100

48. PLTU Putussibau West Kalimantan 2 x 4

49. PLTU Kalsel South Kaimantan 2 x 100

50. PLTU Tahuna North Sulawesi 2 x 4

51. PLTU Moutong Central Sulawesi 2 x 4

52. PLTU Luwuk Central Sulawesi 2 x 10

53. PLTU Mamuju West Sulawesi 2 x 7

54. PLTU Selayar South Sulawesi 2 x 4

55. PLTU Bau-Bau South East Sulawesi 2 x 10

56. PLTU Kendari South East Sulawesi 2 x 25

57. PLTU Kolaka South East Sulawesi 2 x 10

58. PLTU Sumbawa West Nusa Tenggara 2 x 10

59. PLTU Larantuka East Nusa Tenggara 2 x 4

60. PLTU Waingapu East Nusa Tenggara 2 x 4

61. PLTU Tobelo North Maluku 2 x 4

62. PLTU Tidore North Maluku 2 x 7

63. PLTU Tual Maluku 2 x 4

64. PLTU Masohi Maluku 2 x 4

65. PLTU Biak Papua 2 x 7

Page 8: Minister Energy and Mineral Resources Regulation No 2 · PDF fileMINISTER OF ENERGY AND MINERAL RESOURCES REGULATION NO. 2 YEAR 2010 ON ... PLTU Pangkalan Susu 3/4 Pangkalan Brandan

NO NAME OF POWER GENARATION PROJECT

PROVINCE EST. CAPACITY (MW)

66. PLTU Jayapura Papua 2 x 15

67. PLTU Nabire Papua 2 x 7

68. PLTU Merauke Papua 2 x 7

69. PLTU Klalin (Sorong) West Papua 2 x 15

70. PLTU Andai West Papua 2 x7

71. PLTGU Bangkanai Central Kalimantan 1 x 120

72. PLTGU Senoro Central Sulawesi 2 x 120

MINISTER OF ENERGY AND MINERAL RESOURCES Signed by DARWIN ZAHEDY SALEH Note: PLTP - Geothermal Power Plant PLTA - Hydroelectric Power Plant PLTU - Coal Fired Steam Turbine Power Plant PLTG - Gas Turbine Power Plant (Open Cycle) PLTGU - Gas Turbine Power Plant (Combined Cycle)

Page 9: Minister Energy and Mineral Resources Regulation No 2 · PDF fileMINISTER OF ENERGY AND MINERAL RESOURCES REGULATION NO. 2 YEAR 2010 ON ... PLTU Pangkalan Susu 3/4 Pangkalan Brandan

ATTACHMENT IV MINISTER OF ENERGY AND MINERAL RESOURCES REGULATION

NUMBER : 02 YEAR 2010 DATED : 27 JANUARY 2010

TRANSMISSION PROJECTS RELATED TO ELECTRICAL POWER GENERATION

PROJECTS UTILIZING RENEWABLE ENERGY, COAL, AND GAS

TO BE CARRIED OUT IN COOPERATION WITH PRIVATE POWER DEVELOPERS

TRANSMISSION PROJECT NO

FROM TO

VOLTAGE (KV)

EST. DISTANCE (KM)

1. PLTP Rawa Dano Incomer Menes - Asahimas

150 30

2. PLTP Cibuni Incomer Cianjur - Tanggeung

70 50

3. PLTP Cisolok - Sukarame Pelabuhan Ratu 150 60

4. PLTP Karaha Bodas Garut 150 20

5. PLTP Patuha Lagadar 150 70

6. PLTP Tampomas Incomer Racaekek -Cikasungka

150 35

7. PLTP Tangkuban Perahu II PLTP Tangkuban Perahu I

150 5

8. PLTP Baturaden Incomer Rawalo - Kalibakal

150 20

9. PLTP Guci Incomer Kalibakal - Bumiayu

150 40

10. PLTP Ungaran Ungaran 150 40

11. PLTP Seulawah Agam Incomer Sigli – Banda Aceh

150 16

12. PLTP Sorik Merapi Panyabungan 150 46

13. PLTP Muaralaboh Kambang 150 14

14. PLTP Lumut Balai Lahat 150 50

15. PLTP Lumut Balai PLTP Rantau Dadap 150 50

16. PLTP Rajabasa Kalianda 150 40

17. PLTP Ulubelu 3 and 4 PLTP Ulubelu 1 and 2 150 20

18. PLTP Lahendong 5 and 6 Lopana 150 20

19. PLTP Huu Dompu 70 61

20. PLTP Sukoria Ropa 70 30

21. PLTP Jailolo Ternate 70 128

22. PLTA Simapang Aur 1 Musi 150 12

23. PLTA Simapang Aur 2 PLTA Simpang Aur 1 150 12

Page 10: Minister Energy and Mineral Resources Regulation No 2 · PDF fileMINISTER OF ENERGY AND MINERAL RESOURCES REGULATION NO. 2 YEAR 2010 ON ... PLTU Pangkalan Susu 3/4 Pangkalan Brandan

24. PLTU Bali Timur Amlapura 150 40

25. PLTU Madura Sampang 150 20

26. PLTU Kaltim Bontang 150 520

27. PLTU Kalsel Tanjung 150 12

28. PLTU Kendari Kendari 150 30

29. PLTU Kolaka Kolaka 150 20

30. PLTU Sumbawa Labuhan 70 17

31. PLTU Sumbawa Tano 70 96

32. PLTU Jayapura Jayapura 70 90

33. PLTU Klalin (Sorong) Sorong 70 60

34. PLTGU Bangkanai Muara Teweh-Buntok-Tanjung

150 560

35. PLTGU Senoro Tentena 275 360

MINISTER OF ENERGY AND MINERAL RESOURCES Signed by DARWIN ZAHEDY SALEH

Page 11: Minister Energy and Mineral Resources Regulation No 2 · PDF fileMINISTER OF ENERGY AND MINERAL RESOURCES REGULATION NO. 2 YEAR 2010 ON ... PLTU Pangkalan Susu 3/4 Pangkalan Brandan