Apache Corporation - Minimum Required Data in OW for DPITRANSCRIPT
1
Minimum Required Data in OpenWells for DPI reporting.
March 2008
For all boxes within the Apache DPI.exe reporting q ueries to be fulfilled the following data fields wi thin
OpenWells and the Wells information have to be fill ed in. As indicated by their colour yellow this is a minimum data entry requirement across the Apache Corporatio n.
2
DPI Field Report /
Property Window Tab Field Notes
PLANNING Authorized MD Wellbore Properties
Depth MD Auth
PLANNING Working Interest Well Properties General Working Int
OPERATE Progress Daily Operations General Progress Calculated from MD (prev) and MD (current)
OPERATE NPD Daily Operations Time Summary POST WELL Quarter Well Properties Status
PLANNING Exchange Rate Cost Estimate and AFE General Exchange Rate
PLANNING Approved Cost Well Planning General COS $ PLANNING AFE_Total_Depth Well Planning Hole Plan MD Base
OPERATE Actual Depth DDR General MD max
OPERATE Actual Footage Drilled DDR General MD max-min
PLANNING Pacesetter Days Well Planning Hole Plan Pacesetter Days total appears in Total Pacesetter Days
PLANNING AFE Days Well Planning Hole Plan AFE Days total appears in Total AFE Days
OPERATE Actual Days DDR General DFS max PLANNING Pacesetter DHC Well Planning Hole Plan Since target_cost is hidden in Well Planning, this field will not have value
PLANNING AFE DHC Well Planning Hole Plan AFE Cost total appears above, also named AFE Cost (<-- calculated field)
OPERATE DHC Daily Operations Daily Cost Totalled from DDR / Daily Cost PLANNING Contract Type Rig Operation
Properties General Contract Type
POST WELL Rig Release Date Event Properties Associated Rig Operations Rig Release Date
OPERATE NPT % NPD / Actual Days Calculated Field
OPERATE Days/10000' (Actual Days * 10,000) / Actual Footage Drilled Calculated Field
OPERATE Cost/ft ($/ft) DHC / Actual Footage Drilled Calculated Field PLANNING AFE/PS Days (%) AFE Days / Pacesetter Days Calculated Field
OPERATE Act/AFE Days (%) Actual Days / AFE Days Calculated Field
PLANNING Gross AFE/PS (%) AFE DHC / Pacesetter DHC Calculated Field PLANNING Gross Act/AFE (%) DHC / AFE DHC Calculated Field
PLANNING Net AFE ($) Working Interest * AFE DHC Calculated Field
PLANNING Net PS ($) Working Interest * Pacesetter DHC Calculated Field PLANNING Net Cost ($) Working Interest * Approved Cost Calculated Field
OPERATE Net Actuals ($) Working Interest * DHC Calculated Field
3
Authorised MD Right click on the Wellbore and select “Properties” then select the “Depth” tab.
4
Working Interest Right click on the Well and select “Properties” and leave on the “General” tab.
5
Progress Within the Daily Operations Report, under the “General” Section, “Progress” field which is calculated from MD (previous) and MD (current).
6
NPT Within the Daily Operations Report, under the Time Summary section.
7
Quarter Right click the Well and select “Properties then click on “Status” Tab. The DPI report takes the status entries for the quarter.
8
Exchange Rate Found within the Cost and AFE reports “General Information” section in the “Exchange Rate” Field.
9
Approved Cost Found within the Well Planning reports “General” section under the COS $ field.
10
AFE_Total_Depth Found within the Well Planning reports “Hole Plan” section under the MD Base field.
11
Actual Depth Found within the Daily Operations reports “General” section in the MD field. The DPI report compares all and take the max. depth entered.
12
Actual Footage Drilled Found within the Daily Operations reports “General” section in the MD field. The DPI report compares all and takes the max. depth from the Min. depth entered.
13
Pacesetter Days Found within the Well Planning reports “Hole Plan” section in the “Pacesetter Days” field.
14
AFE Days Found within the Well Planning reports “Hole Plan” section in the “AFE Days” field.
15
Actual Days Found within the Daily Operations reports “General” section in the “DFS” field. The DPI report compares all the reports and takes the max.
16
AFE DHC Found within the Well Planning reports “Hole Plan” section in the “AFE Cost” Field. Once each phase is filled in the total “AFE Cost” appears in the green calculated field under the total section above it.
17
DHC (Dry Hole Costs) Found within the Daily Operations reports “Daily Cost” section in the “Daily Cost” Field. The DPI report accumulates the Wells totals from these entries.
18
Contract Type From the OpenWells Contractors tab you can select the drilling contractor and rig operations. Under the “General” tab is the “Contract Type” field.
19
Rig Release Date From the Event Properties option and “Associated Rig Operations tab, the Rig Release” field can be found. This is the only non yellow input field for DPI reporting required.