mic adoption in government pilot projectcic.hk/files/page/10307/20181106_0935_asd.pdf · 2018. 12....

17
Innovative Construction at ArchSD Pak Shing Kok Disciplined Services Quarters MiC Adoption in Government Pilot Project Michael LI, Architectural Services Department 6 November 2018 “B2B” Event on MiC in HK, CIC

Upload: others

Post on 21-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MiC Adoption in Government Pilot Projectcic.hk/files/page/10307/20181106_0935_ASD.pdf · 2018. 12. 27. · I nnovative C onstruction at A rchSD Pak Shing Kok Disciplined Services

Innovative Construction at ArchSD

Pak Shing Kok Disciplined Services Quarters

MiC Adoption in Government Pilot Project

Michael LI, Architectural Services Department6 November 2018

“B2B” Event on MiC in HK, CIC

Page 2: MiC Adoption in Government Pilot Projectcic.hk/files/page/10307/20181106_0935_ASD.pdf · 2018. 12. 27. · I nnovative C onstruction at A rchSD Pak Shing Kok Disciplined Services

Policy Address & Budget

Policy Address 2017:

Adoption of:

“113. The construction industry has been facing the challenges of highconstruction costs and labour shortage in recent years. Hence, the Government isproactively promoting the adoption of technology and innovative constructionmethods to improve productivity and cost-effectiveness. …….”

Policy Address 2018 & Budget 2018-2019:

$1 billion Construction Innovation and Technology Fund to encourage wideradoption of innovative technologies such as BIM, steel reinforcing bar productsand Modular Integrated Construction (MiC)The Government will take lead in piloting MiC in public projects

2

Page 3: MiC Adoption in Government Pilot Projectcic.hk/files/page/10307/20181106_0935_ASD.pdf · 2018. 12. 27. · I nnovative C onstruction at A rchSD Pak Shing Kok Disciplined Services

Construction industry in Recent Years

Challenges of high construction costs

Labour shortage

Adoption of technology and innovative construction methods

Improve productivity and effectiveness

3

Policy Address & Budget

Page 4: MiC Adoption in Government Pilot Projectcic.hk/files/page/10307/20181106_0935_ASD.pdf · 2018. 12. 27. · I nnovative C onstruction at A rchSD Pak Shing Kok Disciplined Services

4

Innovative Construction at ArchSD

Page 5: MiC Adoption in Government Pilot Projectcic.hk/files/page/10307/20181106_0935_ASD.pdf · 2018. 12. 27. · I nnovative C onstruction at A rchSD Pak Shing Kok Disciplined Services

Innovative Construction ArchSD| Focus Group on Innovative Construction

Innovative Construction Focus Group (InnoC FG)

Focus Group on Innovative ConstructionMeeting with industry stakeholders

InnoCFG

Structural Engineer

Quantity Surveyor

Building Maintenance

Surveyor

Building Services Engineer

Architect

5

Page 6: MiC Adoption in Government Pilot Projectcic.hk/files/page/10307/20181106_0935_ASD.pdf · 2018. 12. 27. · I nnovative C onstruction at A rchSD Pak Shing Kok Disciplined Services

Self Service Library Station at Sai Wan HoInnovative Construction ArchSD | Minor Works Project

Prefabrication

6

• Major components prefabricated and pre-finished in Mainland factory

• Completion date : 09/2017

Page 7: MiC Adoption in Government Pilot Projectcic.hk/files/page/10307/20181106_0935_ASD.pdf · 2018. 12. 27. · I nnovative C onstruction at A rchSD Pak Shing Kok Disciplined Services

Mediation Centre at Sham Shui PoInnovative Construction ArchSD | Minor Works Project

3S Concept

7

• Standardised module• Dry construction e.g. acoustic dry wall - minimizes wastage • Steel structure construction

• Completion date : 01/2018

Page 8: MiC Adoption in Government Pilot Projectcic.hk/files/page/10307/20181106_0935_ASD.pdf · 2018. 12. 27. · I nnovative C onstruction at A rchSD Pak Shing Kok Disciplined Services

Pavilion at Kai TakInnovative Construction ArchSD| Minor Works Project

Transformer

8

• Convertible in Form • Portable in Location

• Completion date : 03/2018

Page 9: MiC Adoption in Government Pilot Projectcic.hk/files/page/10307/20181106_0935_ASD.pdf · 2018. 12. 27. · I nnovative C onstruction at A rchSD Pak Shing Kok Disciplined Services

Staff Quarters at Kwun TongInnovative Construction ArchSD| Capital works

9

• Over 3000 precast elements• Off site prefabrication

• Completion date : 2019

Precast elements

Page 10: MiC Adoption in Government Pilot Projectcic.hk/files/page/10307/20181106_0935_ASD.pdf · 2018. 12. 27. · I nnovative C onstruction at A rchSD Pak Shing Kok Disciplined Services

10

What’s Next?

Page 11: MiC Adoption in Government Pilot Projectcic.hk/files/page/10307/20181106_0935_ASD.pdf · 2018. 12. 27. · I nnovative C onstruction at A rchSD Pak Shing Kok Disciplined Services

11

ODULAR INTEGRATED CONSTRUCTION

Innovative Construction

Page 12: MiC Adoption in Government Pilot Projectcic.hk/files/page/10307/20181106_0935_ASD.pdf · 2018. 12. 27. · I nnovative C onstruction at A rchSD Pak Shing Kok Disciplined Services

12

What is Modular Integrated Construction (MiC)?

Free-standing volumetric modules

Complete with finishes, fixtures, fittings etc.

Manufactured off-site

Transported to site for installation

Modular Integrated Construction

Page 13: MiC Adoption in Government Pilot Projectcic.hk/files/page/10307/20181106_0935_ASD.pdf · 2018. 12. 27. · I nnovative C onstruction at A rchSD Pak Shing Kok Disciplined Services

The Benefit of MiC

Improve site safety and reduce accident

Improve quality

Improve efficiency and shorten construction period

Reduce construction waste

Reduce worker demand and increase effectiveness

Improve working environment to attract younger generation

13

Modular Integrated Construction

Page 14: MiC Adoption in Government Pilot Projectcic.hk/files/page/10307/20181106_0935_ASD.pdf · 2018. 12. 27. · I nnovative C onstruction at A rchSD Pak Shing Kok Disciplined Services

14

iC - Pak Shing Kok

Disciplined Services Quarters

Page 15: MiC Adoption in Government Pilot Projectcic.hk/files/page/10307/20181106_0935_ASD.pdf · 2018. 12. 27. · I nnovative C onstruction at A rchSD Pak Shing Kok Disciplined Services

15

Disciplined Services Quarters at Pak Shing KokMiC Scope of Work | D&B Project

Site Area : 1.24 ha

Location : Area 106, Pak Shing Kok, Tseung Kwan O

Scope of Works1. Quarters for FSD : 648 Grade “H” 3-Bedroom (50 sq. m.) units2. Car park : 101 private car parks3. Loading/Unloading Bay : 54. Ancillary Facilities : Management office

Multi-purpose roomOutdoor children and landscaped area

Under Development

Page 16: MiC Adoption in Government Pilot Projectcic.hk/files/page/10307/20181106_0935_ASD.pdf · 2018. 12. 27. · I nnovative C onstruction at A rchSD Pak Shing Kok Disciplined Services

Innovative Construction

Construction industry in the Future?

Automation, AI

Free from transportation limitation

Robotics

16

Vision Think Out of Box?

“Nothing great will ever be achieved without great men, and men are great only if they are determined to be so” – Charles de Gaulle

“It always seems impossible until it's done” – Nelson Mandela

Page 17: MiC Adoption in Government Pilot Projectcic.hk/files/page/10307/20181106_0935_ASD.pdf · 2018. 12. 27. · I nnovative C onstruction at A rchSD Pak Shing Kok Disciplined Services

Innovative Construction at ArchSD

Pak Shing Kok Disciplined Services Quarters

MiC Adoption in Government Pilot Project“B2B” Event on MiC in HK, CIC

Thank You