![Page 1: MiC Adoption in Government Pilot Projectcic.hk/files/page/10307/20181106_0935_ASD.pdf · 2018. 12. 27. · I nnovative C onstruction at A rchSD Pak Shing Kok Disciplined Services](https://reader035.vdocuments.us/reader035/viewer/2022071011/5fc9af1d913bac69a41754bf/html5/thumbnails/1.jpg)
Innovative Construction at ArchSD
Pak Shing Kok Disciplined Services Quarters
MiC Adoption in Government Pilot Project
Michael LI, Architectural Services Department6 November 2018
“B2B” Event on MiC in HK, CIC
![Page 2: MiC Adoption in Government Pilot Projectcic.hk/files/page/10307/20181106_0935_ASD.pdf · 2018. 12. 27. · I nnovative C onstruction at A rchSD Pak Shing Kok Disciplined Services](https://reader035.vdocuments.us/reader035/viewer/2022071011/5fc9af1d913bac69a41754bf/html5/thumbnails/2.jpg)
Policy Address & Budget
Policy Address 2017:
Adoption of:
“113. The construction industry has been facing the challenges of highconstruction costs and labour shortage in recent years. Hence, the Government isproactively promoting the adoption of technology and innovative constructionmethods to improve productivity and cost-effectiveness. …….”
Policy Address 2018 & Budget 2018-2019:
$1 billion Construction Innovation and Technology Fund to encourage wideradoption of innovative technologies such as BIM, steel reinforcing bar productsand Modular Integrated Construction (MiC)The Government will take lead in piloting MiC in public projects
2
![Page 3: MiC Adoption in Government Pilot Projectcic.hk/files/page/10307/20181106_0935_ASD.pdf · 2018. 12. 27. · I nnovative C onstruction at A rchSD Pak Shing Kok Disciplined Services](https://reader035.vdocuments.us/reader035/viewer/2022071011/5fc9af1d913bac69a41754bf/html5/thumbnails/3.jpg)
Construction industry in Recent Years
Challenges of high construction costs
Labour shortage
Adoption of technology and innovative construction methods
Improve productivity and effectiveness
3
Policy Address & Budget
![Page 4: MiC Adoption in Government Pilot Projectcic.hk/files/page/10307/20181106_0935_ASD.pdf · 2018. 12. 27. · I nnovative C onstruction at A rchSD Pak Shing Kok Disciplined Services](https://reader035.vdocuments.us/reader035/viewer/2022071011/5fc9af1d913bac69a41754bf/html5/thumbnails/4.jpg)
4
Innovative Construction at ArchSD
![Page 5: MiC Adoption in Government Pilot Projectcic.hk/files/page/10307/20181106_0935_ASD.pdf · 2018. 12. 27. · I nnovative C onstruction at A rchSD Pak Shing Kok Disciplined Services](https://reader035.vdocuments.us/reader035/viewer/2022071011/5fc9af1d913bac69a41754bf/html5/thumbnails/5.jpg)
Innovative Construction ArchSD| Focus Group on Innovative Construction
Innovative Construction Focus Group (InnoC FG)
Focus Group on Innovative ConstructionMeeting with industry stakeholders
InnoCFG
Structural Engineer
Quantity Surveyor
Building Maintenance
Surveyor
Building Services Engineer
Architect
5
![Page 6: MiC Adoption in Government Pilot Projectcic.hk/files/page/10307/20181106_0935_ASD.pdf · 2018. 12. 27. · I nnovative C onstruction at A rchSD Pak Shing Kok Disciplined Services](https://reader035.vdocuments.us/reader035/viewer/2022071011/5fc9af1d913bac69a41754bf/html5/thumbnails/6.jpg)
Self Service Library Station at Sai Wan HoInnovative Construction ArchSD | Minor Works Project
Prefabrication
6
• Major components prefabricated and pre-finished in Mainland factory
• Completion date : 09/2017
![Page 7: MiC Adoption in Government Pilot Projectcic.hk/files/page/10307/20181106_0935_ASD.pdf · 2018. 12. 27. · I nnovative C onstruction at A rchSD Pak Shing Kok Disciplined Services](https://reader035.vdocuments.us/reader035/viewer/2022071011/5fc9af1d913bac69a41754bf/html5/thumbnails/7.jpg)
Mediation Centre at Sham Shui PoInnovative Construction ArchSD | Minor Works Project
3S Concept
7
• Standardised module• Dry construction e.g. acoustic dry wall - minimizes wastage • Steel structure construction
• Completion date : 01/2018
![Page 8: MiC Adoption in Government Pilot Projectcic.hk/files/page/10307/20181106_0935_ASD.pdf · 2018. 12. 27. · I nnovative C onstruction at A rchSD Pak Shing Kok Disciplined Services](https://reader035.vdocuments.us/reader035/viewer/2022071011/5fc9af1d913bac69a41754bf/html5/thumbnails/8.jpg)
Pavilion at Kai TakInnovative Construction ArchSD| Minor Works Project
Transformer
8
• Convertible in Form • Portable in Location
• Completion date : 03/2018
![Page 9: MiC Adoption in Government Pilot Projectcic.hk/files/page/10307/20181106_0935_ASD.pdf · 2018. 12. 27. · I nnovative C onstruction at A rchSD Pak Shing Kok Disciplined Services](https://reader035.vdocuments.us/reader035/viewer/2022071011/5fc9af1d913bac69a41754bf/html5/thumbnails/9.jpg)
Staff Quarters at Kwun TongInnovative Construction ArchSD| Capital works
9
• Over 3000 precast elements• Off site prefabrication
• Completion date : 2019
Precast elements
![Page 10: MiC Adoption in Government Pilot Projectcic.hk/files/page/10307/20181106_0935_ASD.pdf · 2018. 12. 27. · I nnovative C onstruction at A rchSD Pak Shing Kok Disciplined Services](https://reader035.vdocuments.us/reader035/viewer/2022071011/5fc9af1d913bac69a41754bf/html5/thumbnails/10.jpg)
10
What’s Next?
![Page 11: MiC Adoption in Government Pilot Projectcic.hk/files/page/10307/20181106_0935_ASD.pdf · 2018. 12. 27. · I nnovative C onstruction at A rchSD Pak Shing Kok Disciplined Services](https://reader035.vdocuments.us/reader035/viewer/2022071011/5fc9af1d913bac69a41754bf/html5/thumbnails/11.jpg)
11
ODULAR INTEGRATED CONSTRUCTION
Innovative Construction
![Page 12: MiC Adoption in Government Pilot Projectcic.hk/files/page/10307/20181106_0935_ASD.pdf · 2018. 12. 27. · I nnovative C onstruction at A rchSD Pak Shing Kok Disciplined Services](https://reader035.vdocuments.us/reader035/viewer/2022071011/5fc9af1d913bac69a41754bf/html5/thumbnails/12.jpg)
12
What is Modular Integrated Construction (MiC)?
Free-standing volumetric modules
Complete with finishes, fixtures, fittings etc.
Manufactured off-site
Transported to site for installation
Modular Integrated Construction
![Page 13: MiC Adoption in Government Pilot Projectcic.hk/files/page/10307/20181106_0935_ASD.pdf · 2018. 12. 27. · I nnovative C onstruction at A rchSD Pak Shing Kok Disciplined Services](https://reader035.vdocuments.us/reader035/viewer/2022071011/5fc9af1d913bac69a41754bf/html5/thumbnails/13.jpg)
The Benefit of MiC
Improve site safety and reduce accident
Improve quality
Improve efficiency and shorten construction period
Reduce construction waste
Reduce worker demand and increase effectiveness
Improve working environment to attract younger generation
13
Modular Integrated Construction
![Page 14: MiC Adoption in Government Pilot Projectcic.hk/files/page/10307/20181106_0935_ASD.pdf · 2018. 12. 27. · I nnovative C onstruction at A rchSD Pak Shing Kok Disciplined Services](https://reader035.vdocuments.us/reader035/viewer/2022071011/5fc9af1d913bac69a41754bf/html5/thumbnails/14.jpg)
14
iC - Pak Shing Kok
Disciplined Services Quarters
![Page 15: MiC Adoption in Government Pilot Projectcic.hk/files/page/10307/20181106_0935_ASD.pdf · 2018. 12. 27. · I nnovative C onstruction at A rchSD Pak Shing Kok Disciplined Services](https://reader035.vdocuments.us/reader035/viewer/2022071011/5fc9af1d913bac69a41754bf/html5/thumbnails/15.jpg)
15
Disciplined Services Quarters at Pak Shing KokMiC Scope of Work | D&B Project
Site Area : 1.24 ha
Location : Area 106, Pak Shing Kok, Tseung Kwan O
Scope of Works1. Quarters for FSD : 648 Grade “H” 3-Bedroom (50 sq. m.) units2. Car park : 101 private car parks3. Loading/Unloading Bay : 54. Ancillary Facilities : Management office
Multi-purpose roomOutdoor children and landscaped area
Under Development
![Page 16: MiC Adoption in Government Pilot Projectcic.hk/files/page/10307/20181106_0935_ASD.pdf · 2018. 12. 27. · I nnovative C onstruction at A rchSD Pak Shing Kok Disciplined Services](https://reader035.vdocuments.us/reader035/viewer/2022071011/5fc9af1d913bac69a41754bf/html5/thumbnails/16.jpg)
Innovative Construction
Construction industry in the Future?
Automation, AI
Free from transportation limitation
Robotics
16
Vision Think Out of Box?
“Nothing great will ever be achieved without great men, and men are great only if they are determined to be so” – Charles de Gaulle
“It always seems impossible until it's done” – Nelson Mandela
![Page 17: MiC Adoption in Government Pilot Projectcic.hk/files/page/10307/20181106_0935_ASD.pdf · 2018. 12. 27. · I nnovative C onstruction at A rchSD Pak Shing Kok Disciplined Services](https://reader035.vdocuments.us/reader035/viewer/2022071011/5fc9af1d913bac69a41754bf/html5/thumbnails/17.jpg)
Innovative Construction at ArchSD
Pak Shing Kok Disciplined Services Quarters
MiC Adoption in Government Pilot Project“B2B” Event on MiC in HK, CIC
Thank You