…message box ( arial, font size 18 bold) leaders’ online q2 fy14 1 presentation title ( arial,...
TRANSCRIPT
…Message Box ( Arial, Font size 18 Bold)Leaders’ Online Q2 FY14 1
Presentation Title ( Arial, Font size 28 )
Date, Venue, etc..( Arial, Font size 18 )Tata Power - Leader’s Online
Q2 FY14 Performance
…Message Box ( Arial, Font size 18 Bold)Leaders’ Online Q2 FY14 2Leaders’ Online Q2 FY14
SAFETY
…Message Box ( Arial, Font size 18 Bold)Leaders’ Online Q2 FY14 3
SAFETY PERFORMANCE
Measures
Q2
ACTFY14
PLAN FY14
ACT FY13
Safety Training
0.54 0.25 0.52
Lost Time Injury
Frequency Rate
(LTIFR)
0.37 0 0.1
Training Man-days have exceeded the Plan
1 LTI each in Distribution, Jojobera and Gadag.
…Message Box ( Arial, Font size 18 Bold)Leaders’ Online Q2 FY14 4
HIGHLIGHTS
…Message Box ( Arial, Font size 18 Bold)Leaders’ Online Q2 FY14 5
HIGHLIGHTS
Tata Power has been awarded the “Most Respected Company” in the “Power and
Infrastructure Sector” in Business World Awards.
Tata Power has won the “Energize Awards 2012-13” for “Excellence in Power Transmission” and
“Excellence in Power Distribution”
Tata Power has won the “Maharashtra Chamber of Commerce Industry and Agriculture ”
(MACCIA) Award for 2013 in the “Power and Energy Category”.
…Message Box ( Arial, Font size 18 Bold)Leaders’ Online Q2 FY14 6
HIGHLIGHTS
Tata Power’s Trombay Thermal Power Station bags three National Awards at the 14th Annual Excellence in Energy Management Awards
Tata Power wins four awards at the 53rd Association of Business Communicators Awards Nite 2013 held at Mumbai Silver for Enerji Talk the company’s internal magazine in the category for bilingual publicationSilver for Enerji Talk in the category ‘Feature story’ sectionSilver for Tata Power Photo Gallery in the Photo Feature categorySilver for TPDDL’s external newsletter ‘Samachar’ in the Best Newsletter Category
…Message Box ( Arial, Font size 18 Bold)Leaders’ Online Q2 FY14 7
HIGHLIGHTS
Tata Power’s Jojobera QC Team bags the Excellence Award at International Convention for Quality Control Circles, Taipei
Tata Power acquires 39.2 MW wind farm in Gujarat. Thus the total capacity of Tata Power is 8560 MW and the Wind Capacity is 437 MW.
…Message Box ( Arial, Font size 18 Bold)Leaders’ Online Q2 FY14 8
Business Operations Highlights
Q2 FY 14
…Message Box ( Arial, Font size 18 Bold)Leaders’ Online Q2 FY14 9
Generation
Total : Plan - 14102 MUs Actual - 10501 MUs
Q2 FY14 Trombay Jojobera Haldia Hydro Wind Solar Mundra Maithon IEL
Plan 2200 773 228 372 332 0.87 8149 1567 461 Actual 1670 747 223 477 286 0.58 5425 1211 443
PLF (%) Plan 63 82 92 38 40 13 89 68 87 Actual 48 79 90 48 34 9 59 52 84
Plan 92 98 99.5 97 98 99.8 95 74 98 Actual 94 99 100 99.9 98 99.6 86 65 99
Generation
Availability(%)
…Message Box ( Arial, Font size 18 Bold)Leaders’ Online Q2 FY14 10
Generation HighlightsHydro Units have performed better than plan.
Trombay: Unit # 6 has been kept as standby due to high cost of generation and operation of the unit at low PLF in Q1. However, Availability and Heat Rate have been favourable as compared to the target.
Mundra : All operation parameters have not met plan on account of power surrender by Discoms and Forced outages in the quarter. Performance Guarantee tests for turbine, HP/ LP heaters and condenser were successfully conducted for Unit- 30 and Unit- 40.
Jojobera and IEL: Generation for units 1 to 5 has been lower due to low offtake by the consumer. However, Availability, Auxiliary Consumption and Heat Rate have been favourable as compared to the target.
Maithon: Forced outage of Unit # 1 Generator Transformer for a period of two months has resulted in lower Availability, Generation, PLF and higher Auxiliary Consumption. However, Heat Rate has been favourable as compared to the target.
…Message Box ( Arial, Font size 18 Bold)Leaders’ Online Q2 FY14 11
TransmissionFY14 Q2 Mumbai
TransmissionLost Time Incidents 0
Transmission Grid Availability (%)
Plan 99.8Actual 99.84
Overhead Line Faults per 100 Ckt KMs
Plan 1.63Actual 2.55
Transmission grid availability has been better than plan and Norm at 99.84% (Normative: 98%)
There is an increase in overhead line faults mainly on account of transient faults and bird faults
…Message Box ( Arial, Font size 18 Bold)Leaders’ Online Q2 FY14 12
DistributionFY14 Q2 Mumbai
Distribution
Lost Time Incidents 1
Average System Availability Index (ASAI)
Plan 99.95
Actual 99.99
FY14 Q2 Mumbai Distribution
Network Addition (CKt KMs) Plan 84Actual 115Total Network (Ckt KMs) Plan 1864Actual 1893Consumer Substation Added
Plan 10Actual 13
In FY 14 Q2 we added 17,422 welcome consumers taking total number of welcome consumers to 3,80,985 and we have added 2451 direct consumer totaling to 51,070 direct consumers.
Retail sales have grown from 1699 MU in FY13 Q2 to 1718 MU (1.18%) in FY14 Q2
…Message Box ( Arial, Font size 18 Bold)Leaders’ Online Q2 FY14 13
DistributionThe Distribution division has been enhancing power supply Reliability through Technological
interventions for it’s consumers in Mumbai. Some of the key initiatives being undertaken are as
follows;
Old CIS system has been replaced with Customer Relationship Management Software. This provides
complete customer information in a single glance.
Improved condition monitoring techniques have been implemented by installing Thermovision scanning
cameras, Line Resonance Analysis.
Power quality meters and surveillance camers have been installed at all Distribution Substations.
Geographical Information System has been deployed to keep network updated for planning and
providing supply to new consumers. This is also used for capturing location of new meters.
Solar power packs have been installed in DSS to reduce Auxiliary Consumption as a Sustainability
initiative.
4 nos 250 KVA mobile DG set vans have been introduced to restore powersupply during emergencies.
Due to recent tariff order issued by MERC, the tariff of Tata Power is higher than RInfra. This has
led to reverse changeover of consumers to Rinfra from Tata Power.
…Message Box ( Arial, Font size 18 Bold)Leaders’ Online Q2 FY14 14
Sustainability
Q2 FY 14
…Message Box ( Arial, Font size 18 Bold)Leaders’ Online Q2 FY14 15
Care for Environment
- Environment compliance for all operating divisions are being tracked through DISHA System.
- Specific initiatives have been undertaken by Operating Divisions to improve Green Manufacturing Index: Recycling of DM plant effluent, Instaling Sewage treatment plants, Rain and waste water harvesting, Developing green belts at Mundra, Maithon & Jojobera, Energy conservation and efficiency improvement
…Message Box ( Arial, Font size 18 Bold)Leaders’ Online Q2 FY14 16
Care for Employees
Metrics PlanActual (Q1)
Training Coverage (YTD)
20% 42%
Training Mandays per employee
1.25 1.37
TARANG Sessions
4 3TRAINING COVERAGE HAS EXCEEDED THE PLAN
Various training programs are being carried out across locations- Safety, Health & Environment- Behavioral Training or People Development- Power System management – to improve technical acumen- Project Management- Leadership Training3 Tarang Sessions delivered on Electrical ‘Cable Ties’ for on-schedule commissioning of Mundra UMPP units, Industrial Relations – The Japanese way, Electricity Market Structure in Turkey
Greenolution:
Greenolution is used to educate employees on various aspects of resource conservation.Key achievements by employees is also shared across all divisions through .Some of the key initiatives shared are
- Design of unique recovery system from Steam Water Analysing System at Trombay- Use of e-card for wishing colleagues in the festive seasons etc.
CAPABILITY DEVELOPMENT
…Message Box ( Arial, Font size 18 Bold)Leaders’ Online Q2 FY14 17
Care for Customers:
The company has been enhancing power supply Reliability through Technological
interventions for it’s consumers in Mumbai.
11 customers have registered for ‘Walk through Energy Audits’ in H1 of FY 14.
2 Demand Response events were conducted in Q2, wherein 12 MWH load shift
achieved.
A total of 6 Residential customer meets have so far been held in H1 of FY 14.
Safety audits conducted for 10 large places of public congregation and Safety
Inspections for 55 consumers were carried out in Sept ’13.
Tata Power has signed an MoU with Energy Efficiency Services Ltd (EESL) for
energy conservation. This initiative is to implement energy efficiency projects for large
Heating, Ventilation and Air-conditioning (HVAC) consumers and also to promote the
replacement of R22 based chillers with new environment friendly and energy efficient
chillers
…Message Box ( Arial, Font size 18 Bold)Leaders’ Online Q2 FY14 1818
Care for Community
Tata Power had left no stone unturned in helping the affected villagers on account of Cyclone Phailin . Tata Power along with Tata Relief Committee provided emergency power supply for the relief operations and donated over 4500 Solar lanterns for the affected villages.
Tata Power’s Community Relations activities are grouped into 5 major areas of thrust;
1. Augmenting Rural Primary Education System - VIDYA (वि�द्या�)
2. Building and Strengthening Healthcare Facilities – AROGYA (आरो�ग्य) (for Health and Sanitation) and
Swachch Jal ( स्�च्छ जल)(for all Water related)
3. Enhancing Programmes on Livelihood and Employability – SAMRIDDHI (समृ�द्धि�) (for Livelihood) and
DAKSH (दक्ष)(for Employability)
4. Building Social Capital and Infrastructure – SANRACHNA (स�रोचना�)
5. Nurturing Sustainability for Inclusive Growth (including Rural Energy)- AKSHAY (अक्षय)
…Message Box ( Arial, Font size 18 Bold)Leaders’ Online Q2 FY14 1919
Care for Community
The company has partnered with Committee of Resource
Organizations (CORO) for launching an initiative aimed at
empowering women of Chembur area. The objective of this
endeavour is to enhance the leadership qualities and
intervention capacities of women and integrate community
development in Mumbai.
Tata Power along with Tata Power Community Development Trust (TPCDT) has launched the “Swachch
Jal” program which will benefit more than 1000 school children. 40 “Swachch Jal Units” were distributed in
16 schools from Kundli-Shirwata catchment villages under the aegis of this program.
Tata Power has mobilized Women towards better living through Self Help Groups (SHGs) in Gujarat,
wherein,
• Company provides training and capacity building for rural women
• This has enabled financial independence of women
…Message Box ( Arial, Font size 18 Bold)Leaders’ Online Q2 FY14 20
Standalone Financial Performance
…Message Box ( Arial, Font size 18 Bold)Leaders’ Online Q2 FY14 21
Tata Power Standalone at a Glance` Crs
Q2 FY14 Actual
Q2 FY14 ABP
H1 FY14 Actual
H1 FY14 ABP
3404 3906 -502 A Generation MUs 7301 7889 -588 A
598 462 136 A Purchases MUs 1098 916 182 A
3762 4008 -246 A Sales MUs 7898 8127 -229 A
2165 2533 -367 A Operating Income 4597 5182 -585 A
1606 2002 -395 F Operating Exps 3462 4134 -672 F
559 531 28 F Op. Profit before Adjustments 1135 1048 87 F
43 21 22 F Adj. re: MYT Order / ATE Order / Others 210 43 168 F
602 552 50 F Op. Profit after Adjustments 1345 1091 254 F
46 247 -201 A Other Income 226 512 -286 A
649 799 -151 A EBIDTA 1571 1603 -31 A
347 425 -78 A PBT 897 866 30 F
262 311 -49 A PAT 619 634 -15 A
Var over ABP
Var over ABP
PAT is lower in the quarter than plan mainly due to lower dividend from coal companies and higher forex loss
…Message Box ( Arial, Font size 18 Bold)Leaders’ Online Q2 FY14 22
Standalone Generation at a GlanceMU's
Q2 FY14Actual
Q2 FY14 ABP
% Var over ABP
H1 FY14Actual
H1 FY14 ABP
% Var over ABP
1670 2200 -24% Trombay 3943 4594 -14%
478 372 28% Hydro 861 700 23%
2147 2572 -17% Mumbai Operations 4804 5294 -9%
747 773 -3% Jojobera 1496 1551 -4%
286 332 -14% Wind 543 584 -7%
1 1 -33% Solar 2 2 -17%
223 228 -2% Haldia 457 459 0%
1257 1334 -6% Outside MO 2497 2595 -4%
3404 3906 -13% Total 7301 7889 -7%
Generation is lower in the quarter mainly due to shutdown of Unit 6 in Trombay and lower PLF in Poolawadi
…Message Box ( Arial, Font size 18 Bold)Leaders’ Online Q2 FY14 23
SBUwise Operating Profit` Crs
Q2 FY14Actual
Q2 FY14ABP
H1 FY14Actual
H1 FY14ABP
217 233 -7% Generation 519 483 8%
110 96 14% Transmission 211 192 10%
68 67 2% Distribution 144 139 4%
42 19 116% MYT Reversal / Others 207 39 433%
437 416 5% Mumbai Operations 1082 852 27%
65 57 12% Jojobera 127 114 11%
11 (1) -1656% Belgaum (5) (2) 115%
99 111 -11% Wind Farms 191 203 -6%
(0) (2) -75% Lodhivali (1) (4) -74%
20 28 -27% Haldia 45 58 -22%
1 1 -39% Solar 3 3 -13%
195 195 0% Outside Mumbai Operations 361 373 -3%
12 13 -2% SED 15 15 -2%
11 6 98% Services 17 7 135%
23 18 28% Other Business 31 22 42%
(53) (76) -31% Corporate (128) (157) -18%
(38) (56) -33% Head Office (87) (118) -26%
(15) (19) -23% BD/Rep. Ofices/ Others (41) (38) 7%
602 552 9% Total 1345 1091 23%
% Var over ABP
% Var over ABP
…Message Box ( Arial, Font size 18 Bold)Leaders’ Online Q2 FY14 24
Q2 FY14 TPCL Standalone Variance Waterfall
…Message Box ( Arial, Font size 18 Bold)Leaders’ Online Q2 FY14 25
Q2 FY14 Mumbai Operations Operating Profit` Crs
416
- 14 1 23 16 - -
-
437
-
50
100
150
200
250
300
350
400
450
500
ABP Q2 FY 14 Generation Transmission Distribution Others Actual Q2 FY 14
Reversal of rev accrued in Q1 FY 14 on Interest on Entry tax on Fuel offset by higher hydro incentives
Higher Captz in FY 13 than plan and under-spent in O&M Expenses
Higher carrying cost on regulated assets
…Message Box ( Arial, Font size 18 Bold)Leaders’ Online Q2 FY14 26
Q2 FY14 Outside MO Operating Profit
` Crs
195
7 11 - - - 1
--
12 7 1 -
195
-
50
100
150
200
250
ABP Q2 FY 14
Jojobera Belguam Wind Haldia Solar Lodivali Actual Q2 FY 14
Reversal of provision for
doubtful debts
Lower contribution re: lower avg rate realization ( Actual
2.50 per unit Vs ABP 2.91 per unit)
Normative gain on LDO
consumption and higher incentives
Lower generation due to lower wind pattern
in all wind farms
…Message Box ( Arial, Font size 18 Bold)Leaders’ Online Q2 FY14 27
Capex Performance Q1 FY14
` CrsCapex
Capitalization
243
50 56 15
58 26
96
544
249
112 73
21 31 16 11
513
0
100
200
300
400
500
600
Mumbai Gen. Mumbai Trans.
Mumbai Dist. Outside MO Other Business
Corporate Land Tata Power
ABP Actual
2448 54
425 23 20
198216
128
568 18 6 2
434
0
50
100
150
200
250
300
350
400
450
500
Mumbai Gen. Mumbai Trans.
Mumbai Dist. Outside MO Other Business
Corporate Land Tata Power
ABP Actual
…Message Box ( Arial, Font size 18 Bold)Leaders’ Online Q2 FY14 28
Consolidated Financial Performance
…Message Box ( Arial, Font size 18 Bold)Leaders’ Online Q2 FY14 29
Tata Power Consolidated at a Glance
PAT is higher in the quarter mainly due to better operating performance by Tata Power Standalone and CGPL , no impairment provisions which is offset by higher forex loss and lower realisation in the coal companies.
` CrsQ2 FY14
ActualQ2 FY13
Actual
% Var over PY
H1 FY14 H1 FY13 % Var over PY
Operating Income 8765 7700 14% 18104 14954 21%
Operating Exps 6734 6189 9% 14006 12029 16%
Operating Profit 2031 1510 34% 4,098 2925 40%
Other Income (293) 68 -528% (521) 131 -497%
EBIDTA 1738 1579 10% 3578 3056 17%
Finance Cost 803 624 29% 1706 1174 45%
Depreciation 689 542 27% 1340 1048 28%
PBT before Impairment 246 413 -40% 531 834 -36%
Provision for Impairment 0 250 -100% 0 250 -100%
PBT 246 163 51% 531 584 -9%
Tax 125 223 -44% 460 449 3%
PAT before MI & Share of Associates 120 (60) 302% 71 135 -47%
Share of loss of associates for the year 13 5 143% 16 7 147%
Minority interest 58 29 98% 128 80 60%
PAT 75 (84) 189% (40) 62 -164%
…Message Box ( Arial, Font size 18 Bold)Leaders’ Online Q2 FY14 30
Breakup of PAT after Minority Interest ` Crs
Q2 FY14Actual
Q2 FY13Actual
Holding H1 FY 14Actual
H1 FY 13Actual
262 296 Tata Power - Standalone 619 608
(31) (271) CGPL & Coal Group (277) (243)
107 159 Indonesian Coal & Infrastructure 30% 276 292
125 (4) Coal SPVs 100% 216 45
(297) (461) CGPL 100% (846) (626)
(297) (211) Operations (846) (376)
- (250) Financial Impairment - (250)
7 8 Energy Eastern 100% 13 7
28 27 Trust Energy 100% 65 38
71 20 Indian Subsidiaries 166 71
36 21 TPDDL 51% 79 59
9 (31) Maithon 74% 34 (44)
(24) (9) Tata Solar 100% (38) (22)
10 6 TPTCL 100% 22 11
18 16 IEL 74% 34 31
14 14 Powerlinks 51% 28 28
8 3 Others 6 8
(8) (16) JVs (33) (25)
(7) (11) Cennergi 50% (29) (17)
(1) (5) OTP Geothermal 50% (4) (8)
(0) (1) Others (0) (1)
13 5 Associates 16 7
4 (0) Tata Projects Ltd. 48% 9 6
9 5 Panatone Finvest Ltd 40% 7 0
0 - Others 1 0
(231) (118) Eliminations (Net) (530) (355)
75 (84) Total (40) 62
…Message Box ( Arial, Font size 18 Bold)Leaders’ Online Q2 FY14 31
Growth and Business Development
Q2 FY 14
…Message Box ( Arial, Font size 18 Bold)Leaders’ Online Q2 FY14 32
Projects Under Construction: Kalinganagar, Odhisha (CPP1- 3 x 67.5 MW) – Boilers: Steam drum lifting for all the boilers has been completed. Erection of all pressure parts for
Boiler-1 has been completed and the same is in progress for Boilers-2 & 3.– Station Building: Casting of Units-1 & 2 Turbine Generator deck has been completed. – Transformer Yard: Both the Station Transformers have been erected as also Units-1 & 2 Unit Auxiliary
Transformers. – Chimney: Wind-shield concreting has been completed for Chimney-1. Wind-shield concreting is in
progress for Chimney-2 (55.5 M out of 120 M completed as on Q2 FY14).– About 1,000 contract workers are working at site. 4.8 million man-hours of safe working recorded as on
Q2 FY14.
32
Unit-1 Boiler erection in progress Unit-1 Station Building construction
…Message Box ( Arial, Font size 18 Bold)Leaders’ Online Q2 FY14 33
Projects Under ConstructionDagachhu Hydro (2X63 MW)
– HCC (civil works contractor) has completed 99% concreting works of the dam. Overall 100% tunneling
works has been completed.
– All electro-mechanical and hydro-mechanical equipment have been delivered at site. The rotor
assembling for Unit-1 has been completed and installation of balance of plants is under progress. Power
transformers have been erected and installation of Gas Insulated Switchgear equipment has been
completed.
– Erections of gates, stoplogs and desilter have been completed including dry commissioning.
– The project is being pursued to be commissioned around May 2014, before monsoon.
33
Dam Concreting- 99% works completedLowering of Rotor for Unit-I in Power House Cavern
…Message Box ( Arial, Font size 18 Bold)Leaders’ Online Q2 FY14 34
Projects Under Construction
34
Wind - Pethshivpur wind project (49.5 MW)
• Forest stage II clearance has been obtained by Regen.
• Due diligence of site conditions was carried out by Tata Power team and accordingly change order has
been issued.
• Project completion is now targeted by May 2014.
Palaswadi Solar Project, Maharashtra (28.8 MW)
• Acquisition of entire land of 130 acres required for the project has been completed.
• Orders for all the packages have been placed
• Project team & vendors have been mobilized at site & work has been commenced. Scheduled project
completion including phase-II of switchyard is by end March 2014.
Erection of mounting structures and Solar modules is in progress at site
…Message Box ( Arial, Font size 18 Bold)Leaders’ Online Q2 FY14 35
Domestic Projects being pursued Tiruldih, Jharkhand (3*660 MW) – The land acquisition is in progress and cumulatively around 431 acres of land has been registered in the
name of the company (24 acres of land in Q2 FY14). Application for 74 acres of Govt. land (GM) has been made.
– Three land parcels identified for setting up township near plant premises are under scrutiny.– Tata Consulting Engineers (TCE) has been appointed as the consultant for pre engineering studies.– Various survey studies like hydrology survey for water intake point finalization, river high flood level survey
for finalizing plant boundary, hydro-geology survey for rain water/ ground water harvesting and satellite imagery have been completed.
Dugar Hydro, Himachal Pradesh– AF-Consult is undertaking geo-technical investigations and development of Detailed Project Report (DPR).
Application for clearances for land acquisition would be made post finalization of the project layout.– Report on Hydrological studies has been submitted to CEA/ CWC for approval.– Pre-feasibility report for a mini hydro (for construction power) has been submitted to Government of
Himachal Pradesh for allocation.
Dehrand:
Land acquisition: – Private Land: 725 acres of private land has been acquired till date (12 acres in Q2 FY14). Post approval of
High Power Committee, Government of Maharashtra (GoM) for acquisition of balance land (250 acres) under section 32 (5) of Maharashtra Industrial Development (MID) Act, the issuance of notice has commenced from October 24, 2013 with targeted completion in November 2013.
35
…Message Box ( Arial, Font size 18 Bold)Leaders’ Online Q2 FY14 36
Business Development – Domestic : Thermal & Hydro
States of Interest
Gujarat
Thermal (Mundra exp) 1600
Maharashtra
Pumped storage 1320
Thermal (Dehrand) 1600
Himachal Pradesh
Hydro (M&A) 420
Hydro (M&A) 260
Dugar 380
Uttarakhand
Hydro (M&A) 99
Orissa
UMPP 4000
Thermal (TSL) 160
Mandakini coal 1320
Jharkhand
Thermal (Maithon) 1320
Thermal (TSL) 60 + 30
Tubed &Ganeshpur coal 1980
Existing conventional presence
Existing renewable presence
Thermal 10720 MW
Hydro 2100 MW
Tamil Nadu
UMPP 4000
…Message Box ( Arial, Font size 18 Bold)Leaders’ Online Q2 FY14 37
Targe
t
Operational
Under build
Vision Gap
TSL C
aptive
plants
Brownfield
Projec
ts
Greenfield
Projec
ts
Balance
Capaci
ty
Active
Pipeline
0
2000
4000
6000
8000
10000
12000
14000
16000
18000
20000
Business Development – India (Conventional)
Capacity with clear line of sight
Capacity with resource secured *
Hydros (2500 MW)GreenfieldPumped storage, MH – 1320 MW
BidUnder-build HP – 380 MW
M&A Under-build UK, HP – 800 MW
Thermal (~ 11000 MW)GreenfieldDherand , MH – 1600 MW
Bids Orissa UMPP – 4000 MW Tamil Nadu UMPP – 4000 MW Jharkhand Case 2 – 1320 MW
M&A There are stranded assets in the market not considered in the pipeline
18000
8094 203
9703
730
2920
3300
2753 11320
TSL Captive projects (730 MW)Mundra Expansion (1600 MW)Maithon Expansion (1320 MW)
Mandakini EUP (1320 MW)Tubed + Ganeshpur EUP (1920 MW)
* - Resources Secured include land, fuel or PPA
…Message Box ( Arial, Font size 18 Bold)Leaders’ Online Q2 FY14 38
States of Interest
Gujarat
Solar (land 86 acres) 20
Wind (Greenfield) 40
Wind (Turnkey) 130
DDG (M&A) 15 + 15
Solar (M&A) 80
Wind (M&A) 40
Maharashtra
Solar (Greenfield) 30
Wind (turnkey) 200
Wind (Greenfield) 190
DDG 24
Wind (M&A) 94
Rajasthan
Solar (land 213 acres) 50
Solar (M&A) 25
Wind (M&A) 60
Wind (Turnkey) 79
Tamil Nadu
Wind (M&A) 74
Orissa
DDG (Naraj-biomass) 10
Business Development: India Business & Renewables
Karnataka
Wind (Greenfield) 60
Wind (M&A) 63
Wind 950 MW
Solar 200 MW
DDG 70 MW
Delhi
TPDDL Bids (Solar) 20
TPDDL Bids (Wind) 50
JNNSM 750 *
* Assumed a bid of 50 MW
…Message Box ( Arial, Font size 18 Bold)Leaders’ Online Q2 FY14 39
Business Development – India (Renewable)
Target
Operational
Under build
Under deve
lopment
Total Visi
on gap
Wind Visi
on gap
Solar V
ision gap
Geothermal V
ision gap
DDG Vision G
ap0
500
1000
1500
2000
2500
3000
3500
4000
4500
4000
426
294
329
2951
1748
444260
500
Capacity with clear line of sight
Operational Wind (398 MW) Solar (28 MW)
Under BuildDiganchi (28 MW) – SolarVisapur (32 MW) – Wind
Cennergi (234 MW) – Wind
Under Development Sorik Morapi (240 MW) – GeoTPethshivpur (49.5 MW) – Wind
ASW Windfarms (39.2 MW) – WindRooftop Solar (0.069 MW) - Solar
M&A, Turnkey & Greenfield Opportunities of >1000 MW under
evaluation in Maharashtra, MP, Rajasthan, Karnataka and Gujarat.
Land already acquired for 120 MW in Rajasthan, Gujarat and
Maharashtra. M&A of 35 MW in evaluation. TPDDL and JNNSM bids
under progress
Orissa (10 MW) M&A Opportunity (15 MW)
Rooftop Solar (10 MW)
…Message Box ( Arial, Font size 18 Bold)Leaders’ Online Q2 FY14 40
Acquisition of 39.2 MW Windfarm in Gujarat
Project Capacity 39.2 MW
LocationBhatia, Jamnagar district, Gujarat
Original Project Cost Rs.243 Cr (Rs 6.2 Cr/MW)
WTG Manufacturer Wind World India Pvt. Ltd.
Plant Load Factor 21.5% (Average of 2 years of operation)
O&M Agreement Wind World India Pvt. Ltd.
COD of the Project June 2011
Power Purchase 25 year PPA with GUVNL for a tariff of Rs.3.56/ kWh
Land detailsMix of Private, Revenue and Forest Land
CER Registration Registered with UNFCCC
Share Purchase Agreement executed to acquire 100% shares of AES Saurashtra Windfarms Pvt Ltd (ASW) on 8th October, 2013.
ASW is a 100% subsidiary of AES Corporation – a US based utility Company with 40,000 MW of operating capacity
The acquisition will enhance the operational capacity of TPREL to 85.2 MW. TPREL is expected to have 146 MW of Wind & Solar capacity by March 2014
TPREL emerged as a successful bidder in a limited process run by AES.
The transaction is expected to be completed by December
Both parties are currently seeking lender consents for change of ownership.
…Message Box ( Arial, Font size 18 Bold)Leaders’ Online Q2 FY14 41
Opportunities in pipeline
Opportunities being pursued
Interested geographies
USAJV + Coal-
offtake
South AfricaJV + Coal off-take
Business Development – Resources
ColumbiaJV + Coal off-take
Mozambique
RussiaJV + Coal off-take
AustraliaCoal off-take + Acquisition
…Message Box ( Arial, Font size 18 Bold)Leaders’ Online Q2 FY14 42
Indonesia Thermal &
Hydro Plants
Vietnam 1320 MW Thermal
Project
UAE Thermal Plant
UKProcess Gas Based
Cogen Plants
Turkey Hydro & Thermal
Plants / Distribution
Zambia Hydro Project
Opportunities in pipeline
Opportunities being pursued
Projects under implementation
Nigeria Distribution &
Generation Privatization
Myanmar 600 MW Thermal
Project
Southern Africa Power Projects
Business Development - International
Vietnam Thermal & Hydro
Plants
Georgia Hydro Project
South Africa Wind Projects
…Message Box ( Arial, Font size 18 Bold)Leaders’ Online Q2 FY14 43
Business Development - International
234 MW Wind Projects in South Africa and 335 MW Hydro Projects in Georgia
Thermal Projects in Middle East , Vietnam, Myanmar and Hydro Project in Zambia