![Page 1: MEP Offsite Manufacturing Kaizen Panel 12-Labrecque.pdf · Day 1 The first day is spent on a quick review of lean concepts and strategy. A map of A map of the current process is developed](https://reader033.vdocuments.us/reader033/viewer/2022042402/5f11977f46b3c1528525bd9c/html5/thumbnails/1.jpg)
© LEAN CONSTRUCTION
INSTITUTE
CAPTURE AND LEVERAGE THE LEAN ADVANTAGE
CAPTURE AND LEVERAGE THE LEAN ADVANTAGE
MEP Offsite Manufacturing Kaizen
October 2017
Kevin Labrecque, HarperJustin Brockenbrough, HarperStephen Gibson, I.C. Thomasson
![Page 2: MEP Offsite Manufacturing Kaizen Panel 12-Labrecque.pdf · Day 1 The first day is spent on a quick review of lean concepts and strategy. A map of A map of the current process is developed](https://reader033.vdocuments.us/reader033/viewer/2022042402/5f11977f46b3c1528525bd9c/html5/thumbnails/2.jpg)
© LEAN CONSTRUCTION INSTITUTE
CAPTURE AND LEVERAGE THE LEAN ADVANTAGE
Agenda
Harper Offsite Manufacturing History
3D Rack Deep Dive
Next Steps - Manufacturing Kaizen
Who We Are
Closing Thoughts
![Page 3: MEP Offsite Manufacturing Kaizen Panel 12-Labrecque.pdf · Day 1 The first day is spent on a quick review of lean concepts and strategy. A map of A map of the current process is developed](https://reader033.vdocuments.us/reader033/viewer/2022042402/5f11977f46b3c1528525bd9c/html5/thumbnails/3.jpg)
© LEAN CONSTRUCTION INSTITUTE
CAPTURE AND LEVERAGE THE LEAN ADVANTAGE
Agenda
Harper Offsite Manufacturing History
3D Rack Deep Dive
Next Steps - Manufacturing Kaizen
Who We Are
Closing Thoughts
![Page 4: MEP Offsite Manufacturing Kaizen Panel 12-Labrecque.pdf · Day 1 The first day is spent on a quick review of lean concepts and strategy. A map of A map of the current process is developed](https://reader033.vdocuments.us/reader033/viewer/2022042402/5f11977f46b3c1528525bd9c/html5/thumbnails/4.jpg)
© LEAN CONSTRUCTION INSTITUTE
CAPTURE AND LEVERAGE THE LEAN ADVANTAGE
Who We Are
Kevin LabrecqueSenior Vice President
Justin
BrockenbroughFabrication Manager
Stephen Gibson, P.E. CSCP, PMP
Continuous Improvement Project
Manager
![Page 5: MEP Offsite Manufacturing Kaizen Panel 12-Labrecque.pdf · Day 1 The first day is spent on a quick review of lean concepts and strategy. A map of A map of the current process is developed](https://reader033.vdocuments.us/reader033/viewer/2022042402/5f11977f46b3c1528525bd9c/html5/thumbnails/5.jpg)
© LEAN CONSTRUCTION INSTITUTE
CAPTURE AND LEVERAGE THE LEAN ADVANTAGE
Who We AreLimbach - 116 years, DB MEP Firm operating from 14 offices in New England, the Mid-Atlantic,
the Southeast, the Midwest and California.
ICT - 75 years, employee-owned, multidisciplinary engineering consulting firm providing designs
for healthcare, commercial, hospitality, recreation, education, institutional clients.
![Page 6: MEP Offsite Manufacturing Kaizen Panel 12-Labrecque.pdf · Day 1 The first day is spent on a quick review of lean concepts and strategy. A map of A map of the current process is developed](https://reader033.vdocuments.us/reader033/viewer/2022042402/5f11977f46b3c1528525bd9c/html5/thumbnails/6.jpg)
© LEAN CONSTRUCTION INSTITUTE
CAPTURE AND LEVERAGE THE LEAN ADVANTAGE
Agenda
Harper Offsite Manufacturing History
3D Rack Deep Dive
Next Steps - Manufacturing Kaizen
Who We Are
Closing Thoughts
![Page 7: MEP Offsite Manufacturing Kaizen Panel 12-Labrecque.pdf · Day 1 The first day is spent on a quick review of lean concepts and strategy. A map of A map of the current process is developed](https://reader033.vdocuments.us/reader033/viewer/2022042402/5f11977f46b3c1528525bd9c/html5/thumbnails/7.jpg)
© LEAN CONSTRUCTION INSTITUTE
CAPTURE AND LEVERAGE THE LEAN ADVANTAGE
Who We Are
7 7
“Virtually every other major
industry has been automated in
the last 100 years, except
construction. Imagine ordering a
car, and having thousands of parts
delivered to your driveway, from
hundreds of suppliers, for on site
assembly. This happens in
construction everyday.”
Tim McDonaldPresident & CEO of Onion Flatsgb&d, volume 1, issue 1 July/August 2010
![Page 8: MEP Offsite Manufacturing Kaizen Panel 12-Labrecque.pdf · Day 1 The first day is spent on a quick review of lean concepts and strategy. A map of A map of the current process is developed](https://reader033.vdocuments.us/reader033/viewer/2022042402/5f11977f46b3c1528525bd9c/html5/thumbnails/8.jpg)
© LEAN CONSTRUCTION INSTITUTE
CAPTURE AND LEVERAGE THE LEAN ADVANTAGE
Gathering the Facts
MEP Solutions
Lang O’Rourke
NG Bailey
Ormandy
M-Tech
Armstrong Balfour Beatty
Skanska
Heron Tower
Converging Themes
North American Growth
in Prefabricated
Elements
Global Movement Towards
Manufactured
Enabling
Tools
![Page 9: MEP Offsite Manufacturing Kaizen Panel 12-Labrecque.pdf · Day 1 The first day is spent on a quick review of lean concepts and strategy. A map of A map of the current process is developed](https://reader033.vdocuments.us/reader033/viewer/2022042402/5f11977f46b3c1528525bd9c/html5/thumbnails/9.jpg)
© LEAN CONSTRUCTION INSTITUTE
CAPTURE AND LEVERAGE THE LEAN ADVANTAGE
“What’s New is Old”, or is it “What’s Old is New”?
![Page 10: MEP Offsite Manufacturing Kaizen Panel 12-Labrecque.pdf · Day 1 The first day is spent on a quick review of lean concepts and strategy. A map of A map of the current process is developed](https://reader033.vdocuments.us/reader033/viewer/2022042402/5f11977f46b3c1528525bd9c/html5/thumbnails/10.jpg)
© LEAN CONSTRUCTION INSTITUTE
CAPTURE AND LEVERAGE THE LEAN ADVANTAGE
What is Offsite?
Level 1
Sub Assemblies
Level 2
Non-Volumetric
Level 3
Volumetric
Level 4
Modular Building
![Page 11: MEP Offsite Manufacturing Kaizen Panel 12-Labrecque.pdf · Day 1 The first day is spent on a quick review of lean concepts and strategy. A map of A map of the current process is developed](https://reader033.vdocuments.us/reader033/viewer/2022042402/5f11977f46b3c1528525bd9c/html5/thumbnails/11.jpg)
© LEAN CONSTRUCTION INSTITUTE
CAPTURE AND LEVERAGE THE LEAN ADVANTAGE
Agenda
Harper Offsite Manufacturing History
3D Rack Deep Dive
Next Steps - Manufacturing Kaizen
Who We Are
Closing Thoughts
![Page 12: MEP Offsite Manufacturing Kaizen Panel 12-Labrecque.pdf · Day 1 The first day is spent on a quick review of lean concepts and strategy. A map of A map of the current process is developed](https://reader033.vdocuments.us/reader033/viewer/2022042402/5f11977f46b3c1528525bd9c/html5/thumbnails/12.jpg)
© LEAN CONSTRUCTION INSTITUTE
CAPTURE AND LEVERAGE THE LEAN ADVANTAGE
Offsite Manufacturing Experience
Phase 1
Tradition Medical Center
Phase I - 2013
● 190k sf, 82 bed Acute Care Facility
in Port St. Lucie, FL
● Patient floors (3, 4 & 5) corridors
racked
● Fabrication facility 140 miles away
in Sanford
● 80’ of corridor per delivery
● Each floor took < two weeks to
install on site
![Page 13: MEP Offsite Manufacturing Kaizen Panel 12-Labrecque.pdf · Day 1 The first day is spent on a quick review of lean concepts and strategy. A map of A map of the current process is developed](https://reader033.vdocuments.us/reader033/viewer/2022042402/5f11977f46b3c1528525bd9c/html5/thumbnails/13.jpg)
© LEAN CONSTRUCTION INSTITUTE
CAPTURE AND LEVERAGE THE LEAN ADVANTAGE
Offsite Manufacturing Experience
Tradition Medical Center
Phase II – 2016
● Expansion (Floors 6, 7 & 8)
● 50% of overall mechanical systems
prefabricated
● New fabrication facility in Lake Mary
Phase 2
![Page 14: MEP Offsite Manufacturing Kaizen Panel 12-Labrecque.pdf · Day 1 The first day is spent on a quick review of lean concepts and strategy. A map of A map of the current process is developed](https://reader033.vdocuments.us/reader033/viewer/2022042402/5f11977f46b3c1528525bd9c/html5/thumbnails/14.jpg)
© LEAN CONSTRUCTION INSTITUTE
CAPTURE AND LEVERAGE THE LEAN ADVANTAGE
Offsite Manufacturing Process
Step One: Engineering Design
Identify Rack Systems &
Locations
Coordinate Systems then
Fit with Racks
Generate Module
Fabrication Drawings
Step Two: Factory
Assembly
![Page 15: MEP Offsite Manufacturing Kaizen Panel 12-Labrecque.pdf · Day 1 The first day is spent on a quick review of lean concepts and strategy. A map of A map of the current process is developed](https://reader033.vdocuments.us/reader033/viewer/2022042402/5f11977f46b3c1528525bd9c/html5/thumbnails/15.jpg)
© LEAN CONSTRUCTION INSTITUTE
CAPTURE AND LEVERAGE THE LEAN ADVANTAGE
Offsite Manufacturing Process
Step Three: System Install
All Testing: Pressure
Tests
Insulating, Labeling &
Final Inspections
Step Four: Receive at Job
Site
![Page 16: MEP Offsite Manufacturing Kaizen Panel 12-Labrecque.pdf · Day 1 The first day is spent on a quick review of lean concepts and strategy. A map of A map of the current process is developed](https://reader033.vdocuments.us/reader033/viewer/2022042402/5f11977f46b3c1528525bd9c/html5/thumbnails/16.jpg)
© LEAN CONSTRUCTION INSTITUTE
CAPTURE AND LEVERAGE THE LEAN ADVANTAGE
Offsite Manufacturing Process
Step Five: Install at Job Site
● Raised into Place
● Connected to
Hanger Rods
● Connections
Made Between
Racks
Final Product
![Page 17: MEP Offsite Manufacturing Kaizen Panel 12-Labrecque.pdf · Day 1 The first day is spent on a quick review of lean concepts and strategy. A map of A map of the current process is developed](https://reader033.vdocuments.us/reader033/viewer/2022042402/5f11977f46b3c1528525bd9c/html5/thumbnails/17.jpg)
© LEAN CONSTRUCTION INSTITUTE
CAPTURE AND LEVERAGE THE LEAN ADVANTAGE
Lessons Learned - Outcomes
Phase 1
Phase 2
● Optimize systems, then fit the racks
● Intra-module dimensions key, inter-
module over done
● Local inspections brought on board
early - get parties on board early
● Fewer personnel on site, less waste,
safer, faster install
● Ergonomic strike zone in shop
● Quality - 360 degree view of install
● Learning curve – after first few racks,
team was asking “should we
continue”, by the third floor, time
savings were significant
● Schedule Time Savings - with
Optimized Shop Crew
![Page 18: MEP Offsite Manufacturing Kaizen Panel 12-Labrecque.pdf · Day 1 The first day is spent on a quick review of lean concepts and strategy. A map of A map of the current process is developed](https://reader033.vdocuments.us/reader033/viewer/2022042402/5f11977f46b3c1528525bd9c/html5/thumbnails/18.jpg)
© LEAN CONSTRUCTION INSTITUTE
CAPTURE AND LEVERAGE THE LEAN ADVANTAGE
Offsite Innovations & Tools
In Wall Specialty Tools 2D Racks
Multi-Trade 2D Racks
2D Racks Installed
Best Practice
![Page 19: MEP Offsite Manufacturing Kaizen Panel 12-Labrecque.pdf · Day 1 The first day is spent on a quick review of lean concepts and strategy. A map of A map of the current process is developed](https://reader033.vdocuments.us/reader033/viewer/2022042402/5f11977f46b3c1528525bd9c/html5/thumbnails/19.jpg)
© LEAN CONSTRUCTION INSTITUTE
CAPTURE AND LEVERAGE THE LEAN ADVANTAGE
Agenda
Harper Offsite Manufacturing History
3D Rack Deep Dive
Next Steps - Manufacturing Kaizen
Who We Are
Closing Thoughts
![Page 20: MEP Offsite Manufacturing Kaizen Panel 12-Labrecque.pdf · Day 1 The first day is spent on a quick review of lean concepts and strategy. A map of A map of the current process is developed](https://reader033.vdocuments.us/reader033/viewer/2022042402/5f11977f46b3c1528525bd9c/html5/thumbnails/20.jpg)
© LEAN CONSTRUCTION INSTITUTE
CAPTURE AND LEVERAGE THE LEAN ADVANTAGE
The Concept: Production to Mass Customization
20
1903to
Today
![Page 21: MEP Offsite Manufacturing Kaizen Panel 12-Labrecque.pdf · Day 1 The first day is spent on a quick review of lean concepts and strategy. A map of A map of the current process is developed](https://reader033.vdocuments.us/reader033/viewer/2022042402/5f11977f46b3c1528525bd9c/html5/thumbnails/21.jpg)
© LEAN CONSTRUCTION INSTITUTE
CAPTURE AND LEVERAGE THE LEAN ADVANTAGE
The Start: Limbach SoCal Shop Reviews
1200 Sq. Ft.
Opportunities:
• Changed Rack layout – More storage in less floor space
• Opportunities to use AGV’s to move goods to person
• Use vacuum lift system to improve safety and reduce manpower
![Page 22: MEP Offsite Manufacturing Kaizen Panel 12-Labrecque.pdf · Day 1 The first day is spent on a quick review of lean concepts and strategy. A map of A map of the current process is developed](https://reader033.vdocuments.us/reader033/viewer/2022042402/5f11977f46b3c1528525bd9c/html5/thumbnails/22.jpg)
© LEAN CONSTRUCTION INSTITUTE
CAPTURE AND LEVERAGE THE LEAN ADVANTAGE
The Plan: During The Kaizen Event
Day 1 The first day is spent on a quick review of lean concepts and strategy. A map of
the current process is developed to determine the path of parts or raw materials.
Day 2 Training continues. Then team members collect data. Team goals are written
on Day 2 and an opportunity chart is compiled.
Day 3 The opportunity chart is completed, and solutions are developed to key issues.
A floor plan is created. Equipment is moved where necessary to create a better flow.
Day 4 Improvements are finished, and operators are trained on new processes.
Production using the new methods begins. Measurements are again taken.
Day 5 A 5S/visual workplace activity makes sure the workplace is well organized and
tools, cabinets and storage areas are labeled. Standard operating procedures are
updated. A summary report is prepared for upper management. It includes team goals,
floor plan before and after, key results and savings.
![Page 23: MEP Offsite Manufacturing Kaizen Panel 12-Labrecque.pdf · Day 1 The first day is spent on a quick review of lean concepts and strategy. A map of A map of the current process is developed](https://reader033.vdocuments.us/reader033/viewer/2022042402/5f11977f46b3c1528525bd9c/html5/thumbnails/23.jpg)
© LEAN CONSTRUCTION INSTITUTE
CAPTURE AND LEVERAGE THE LEAN ADVANTAGE
The Future: Flexible Manufacturing Near/ On-Site
23
![Page 24: MEP Offsite Manufacturing Kaizen Panel 12-Labrecque.pdf · Day 1 The first day is spent on a quick review of lean concepts and strategy. A map of A map of the current process is developed](https://reader033.vdocuments.us/reader033/viewer/2022042402/5f11977f46b3c1528525bd9c/html5/thumbnails/24.jpg)
© LEAN CONSTRUCTION INSTITUTE
CAPTURE AND LEVERAGE THE LEAN ADVANTAGE
Agenda
Harper Offsite Manufacturing History
3D Rack Deep Dive
Next Steps - Manufacturing Kaizen
Who We Are
Closing Thoughts
![Page 25: MEP Offsite Manufacturing Kaizen Panel 12-Labrecque.pdf · Day 1 The first day is spent on a quick review of lean concepts and strategy. A map of A map of the current process is developed](https://reader033.vdocuments.us/reader033/viewer/2022042402/5f11977f46b3c1528525bd9c/html5/thumbnails/25.jpg)
© LEAN CONSTRUCTION INSTITUTE
CAPTURE AND LEVERAGE THE LEAN ADVANTAGE
Changing The Question
How you phrase the question is important:
• What parts of this project can we prefabricate?
Versus – Starting with the Assumption of 100% Prefabrication and Asking
• What parts of this project won’t we be able to prefabricate?
“What if the dashboard was the duct?”
![Page 26: MEP Offsite Manufacturing Kaizen Panel 12-Labrecque.pdf · Day 1 The first day is spent on a quick review of lean concepts and strategy. A map of A map of the current process is developed](https://reader033.vdocuments.us/reader033/viewer/2022042402/5f11977f46b3c1528525bd9c/html5/thumbnails/26.jpg)
© LEAN CONSTRUCTION INSTITUTE
CAPTURE AND LEVERAGE THE LEAN ADVANTAGE
Rhythm, Meter & Measure
![Page 27: MEP Offsite Manufacturing Kaizen Panel 12-Labrecque.pdf · Day 1 The first day is spent on a quick review of lean concepts and strategy. A map of A map of the current process is developed](https://reader033.vdocuments.us/reader033/viewer/2022042402/5f11977f46b3c1528525bd9c/html5/thumbnails/27.jpg)
© LEAN CONSTRUCTION INSTITUTE
CAPTURE AND LEVERAGE THE LEAN ADVANTAGE
The Tyranny of Common Sense
“Innovation is hard, because it means challenging what we take for granted,
things we think are obvious. The great problem for transformation is the tyranny of
common sense.”
Sir Ken Robinson: Bring on the learning revolution! TED, February 2010
![Page 28: MEP Offsite Manufacturing Kaizen Panel 12-Labrecque.pdf · Day 1 The first day is spent on a quick review of lean concepts and strategy. A map of A map of the current process is developed](https://reader033.vdocuments.us/reader033/viewer/2022042402/5f11977f46b3c1528525bd9c/html5/thumbnails/28.jpg)
© LEAN CONSTRUCTION INSTITUTE
CAPTURE AND LEVERAGE THE LEAN ADVANTAGE
Thank You!
MEP Offsite Manufacturing Kaizen