OFFSITE CONSTRUCTIONPART THREE

[email protected] Cited-Richard Ogden – Chairman Buildoffsitehtt://www.construction-productivity.co.uk

Page 2: 082 Offsite Construction (4)

Size of offsite industry

£2-6 billionup to 6% of

total UK construction

market

growing at 25% a year

insitu construction (94% market

share)

Page 3: 082 Offsite Construction (4)

Is offsite manufacturing new?

It is not new Timber frame housing

Industrial Revolution –

railway terminals,Crystal Palace

Post war reconstruction – System housingdriven by acute

housing shortages

Page 4: 082 Offsite Construction (4)

OFFSITE CONSTRUCTIONModular assembly typeconstruction – sections

ofthe steel frame wereprefabricated offsite,transported into the

city andlifted into position

Empire State Building (1930)

Page 5: 082 Offsite Construction (4)

OFFSITE CONSTRUCTION

381 metres 102 storeys

high• Took 1 year and 45 days to complete

A big issue today-

sustainability

Page 6: 082 Offsite Construction (4)

What are the main Barriers?

Barriers

Mostly small

companies

limited resources

Lack of knowledge

No effective industry

coordination

Fragmented

Page 7: 082 Offsite Construction (4)

OFFSITE CONSTRUCTION

An assumption that offsite solutions :

1- have failed in the past2- are mostly housing

- are inevitably more expensive than

traditional

Page 8: 082 Offsite Construction (4)

OFFSITE CONSTRUCTION

• Few exemplars

• Limited experience of offsite

- among industry professional

- no much exposure at universities.

Page 9: 082 Offsite Construction (4)

Offering unmatched benefits:

Page 10: 082 Offsite Construction (4)

OFFSITE CONSTRUCTIONAppropriate to both new build

and refurb

A clear business driver- Investment to support expansion

Page 11: 082 Offsite Construction (4)

OFFSITE CONSTRUCTION

- Step change in performance and value-Global warning and a demand for

sustainable construction

Demand for MMC by the public and private sectors

Page 12: 082 Offsite Construction (4)

Traditional construction could not meet needs such as:

- Price certainty- Quality (snag

free)

-90% complete offsite

- Reliable completion times

Page 13: 082 Offsite Construction (4)

Other benefits are:-Benchmark

-Benchmarking- Knowledge

transfer

Supply chain-No contract

(PPC2000-TPC 2005)

Continuous improvement by working

Cost reductionDefect free product

100% customer satisfaction

Page 14: 082 Offsite Construction (4)

What is buildoffsite?

Page 15: 082 Offsite Construction (4)

What is buildoffsite?

Page 16: 082 Offsite Construction (4)

Focus areas

Page 17: 082 Offsite Construction (4)

What has buildoffsite done?

Page 18: 082 Offsite Construction (4)

OFFSITE CONSTRUCTION

Page 19: 082 Offsite Construction (4)

OFFSITE CONSTRUCTION

•Raising awareness

•Technical issues

•Problem solving

Page 20: 082 Offsite Construction (4)

OFFSITE CONSTRUCTION

•Cross industry innovation

•Raising profile of offsite

•Offsite is not a “skunk works”

Page 21: 082 Offsite Construction (4)

OFFSITE CONSTRUCTION

•Share best practice

•To grow market share

•Offsite construction and MMC

Page 22: 082 Offsite Construction (4)

Bathroom pod, Britspace / Badekabiner

£2k-£22k• All shapes and sizes• Off the shelf

Page 23: 082 Offsite Construction (4)

Tallis Lock House, Bryden Wood

• Private client• Volumetric• 6 units in 3 days• One off (mass customisation)• Traditional solution. £320k-£450k• Budget 250m2 = £250,000• Cost neutral

Page 24: 082 Offsite Construction (4)

Gatwick Pier 6, BAA / ARUP / Laing O’Rourke

Offsite overnight• 2,700 tonnes• 200m long• 65% of BAA work offsite

Page 25: 082 Offsite Construction (4)

Murray Grove, Yorkon / Cartwright Pickard Peabody Trust 1999 30 apartments 5 floors Volumetric light gauged galvinised seal Architectural awards 28 weeks earlier No brick no scaffolding 80% solution

Page 26: 082 Offsite Construction (4)

OFFSITE CONSTRUCTION

Page 27: 082 Offsite Construction (4)

AHL Houses, Barratt / Terrapin • Hybrid (concrete, steel, timber) • 2/3 storey factory made • 400 units a year • First year’s utility bills free!

Page 28: 082 Offsite Construction (4)

Mount Vernon Cancer Treatment, NHS / RAD First in Europe Second in world £21 million 17 months off 3 year programme 42 units 2 storeys Fully fitted

Page 29: 082 Offsite Construction (4)

OFFSITE CONSTRUCTION mm tolerances 5 new treatment rooms Fitted in 2 weeks Made in Canada Relocatable (sustainable) Depreciated as equipment

Page 30: 082 Offsite Construction (4)

Hardman Boulevard, ManchesterRBS / NGB / Loughborough University

• 60,000 sq m office • M+E taken offsite • - 8.6% cost reduction • Build offsite case study

Page 31: 082 Offsite Construction (4)

150,000 ft lab facilities, GSK / Bryden Wood • 30 new facilities world wide • 4 in the UK • 36 months to 3 months • NEWWAY / IKEA • 9 basic components

Page 32: 082 Offsite Construction (4)

Flagship store, B&Q / Black Architecture 200,000 sq ft 2 floors of retail Car parking on ground floor 3 storeys Solar Geo thermal £25 million scheme Section 106 housing Centre town location

Page 33: 082 Offsite Construction (4)

T5 Heathrow Control Tower, BAA / ARUP / Siemens /AMEC

Busiest international airport in the world

£4.2 billion project Positioned overnight £50m Radio controlled 50 tonnes 87m high Foster design

Page 34: 082 Offsite Construction (4)

17 storey high rise, Caledonian / BerkeleyParagon Project, Brentford, London

Hot rolled steel frame Concrete centre core Tallest modular structure in Europe 1,060 units for 1000 students and key workers 5 buildings 20 months on site 1 year saved Champion £200 million turnover Steel / timber

Page 35: 082 Offsite Construction (4)

Nuclear plant

12 units Supply 22% of UK energy 10 decommissioned 2 closed down 2012 25 years to 10 years 10 replacements required Can offsite deliver Faster, safer Toshiba AP800 / AP1000

Page 36: 082 Offsite Construction (4)

Classroom DFES, Diespeker GRP, Future Systems, Bailey

London Borough of Richmond Design led No boxes £350,000 Mass customised 1 of 12 classrooms BSF for DFES

Page 37: 082 Offsite Construction (4)

Honda Formula 1

11,000 components Rebuild every 2 weeks Micro mm 75% changed £260 million budget per annum Project integrator

Page 38: 082 Offsite Construction (4)

Experience of transporting larger loads on the highway(highway logistics)

Installation

Photo shows a first floor module being positioned.

Page 39: 082 Offsite Construction (4)

OFFSITE CONSTRUCTION