LIST OF CODES AND STANDARDS MODEL CODE EDITIONS EFFECTIVE JANUARY 1, 2017
2016 CA BUILDING CODE
2016 CA ELECTRICAL CODE
2016 CA MECHANICAL CODE
2016 CA PLUMBING CODE
2016 CA FIRE CODE
2016 CA BUILDING ENERGY CODE
2016 CA BUILDING GREEN BUILDING STANDARDS
All mechanical, plumbing and electrical components shall be anchored and installedper the details on the dsa approved construction documents. Where no detail isindicated, the following components shall be anchored or braced to meet the forceand displacements prescribed in the 2016 CBC, sections 1616A.1.18 through 1616A.1.26 and ASCE 7-10 chapter 13, 26 and 30.
1. All permanent equipment and components2. TEMPORARY OR MOVABLE EQUIPMENT THAT IS PERMANENTLY
ATTACHED (e.g. HARD WIRED) TO THE BUILDING UTILITY SERVICESSUCH AS ELECTRICITY, GAS OR WATER
3. MOVABLE EQUIPMENT WHICH IS STATIONED IN ONE PLACE FOR MORETHAN 8 HOURS AND HEAVIER THAN 400 POUNDS OR HAS A CENTER OFMASS LOCATED 4 FEET OR MORE ABOVE THE ADJACENT FLOOR ORROOF LEVEL THAT DIRECTLY SUPPORT THE COMPONENT AREREQUIRED TO BE ANCHORED WITH TEMPORARY ATTACHMENTS
THE FOLLOWING MECHANICAL AND ELECTRICAL COMPONENTS SHALL BE POSITIVELYATTACHED TO THE STRUCTURE, BUT THE ATTACHEMENT NEED NOT BE DETAILED ONTHE PLANS. THESE COMPONENTS SHALL HAVE FLEXIBLE CONNECTIONS PROVIDEDBETWEEN THE COMPONENT AND ASSOCIATED DUCTWORK, PIPING AND CONDUIT.
A. COMPONENTS WEIGHING LESS THAN 400 POUNDS AND HAVE ACENTER OF MASS LOCATED 4 FEET OR LESS ABOVE THE ADJACENTFLOOR OR ROOF LEVEL THAT DIRECTLY SUPPORT THE COMPONENT
B. COMPONENTS WEIGHING LESS THAN 20 POUNDS, OR IN THE CASE OFDISTRIBUTED SYSTEMS, LESS THAN 5 POUNDS PER FOOT, WHICH ARESUSPENDED FROM A ROOF OR FLOOR OR HUNG FROM A WALL
FOR THOSE ELEMENTS THAT DO NOT REQUIRE DETAILS ON THE APPROVEDDRAWINGS, THE INSTALLATION SHALL BE SUBJECT TO THE APPROVAL OF THE DESIGNPROFESSIONAL IN GENERAL RESPONSIBLE CHARGE OR STRUCTURAL ENGINEERDELEGATED RESPONSIBILITY AND THE DSA DISTRICT STRUCTURAL ENGINEER. THEPROJECT INSPECTOR WILL VERIFY THAT ALL COMPONENTS AND EQUIPMENT HAVEBEEN ANCHORED IN ACCORDANCE WITH ABOVE REQUIREMENTS
PIPING, DUCTWORK, AND ELECTRICAL DISTRIBUTION SYSTEM BRACING NOTE
PIPING, DUCTWORK AND ELECTRICAL DISTRIBUTION SYSTEMS SHALL BE BRACEDTO COMPLY WITH THE FORCES AND DISPLACEMENTS PRESCRIBED IN ASCE 7-10SECTION 13.3.6.5.6, 13.6.7, 13.6.8 AND 2016 CBC SECTIONS 1616A.1.24, 1616A.1.25 AND 1616A.1.26
THE METHOD OF SHOWING BRACING AND ATTACHMENTS TO THE STRUCTURE FOR THEIDENTIFIED DISTRIBUTION SYSTEM ARE AS NOTED BELOW. WHEN BRACING ANDATTACHMENTS ARE BASED ON A PREAPPROVED INSTALLATION GUIDE (E.G. SMACNA OROSHPD OPM), COPIES OF THE BRACING SYSTEM INSTALLATION GUIDE OR MANUAL SHALLBE AVAILABLE ON THE JOBSITE PRIOR TO THE START OF AND DURING THE HANGING ANDBRACING OF THE DISTRIBUTION SYSTEMS. THE STRUCTURAL ENGINEER OF RECORDSHALL VERIFY THE ADEQUACY OF THE STRUCTURE TO SUPPORT THE HANGER AND BRACELOADS.
MEP Component Anchorage Notes: List of Codes Legend & Abbreviations
Mechanical Scope of Work
1
EF
EQUIPMENT NO.
EQUIPMENT TYPE
SHEET NO.
DETAIL NO.EQUIPMENTTAG M4.01
1TAGDETAIL
CONNECT TO NEW
GALLONS PER MINUTE
ABOVE FINISHED FLOOR
CALIFORNIA MECHANICAL CODE
MFR
GPM
IE
DN
(E)
MANUFACTURER
INVERT ELEVATION
DOWN
EXISTING
CMC
CTN
CLG
AFF
BF
AP
CEILING
BELOW FLOOR
ACCESS PANEL
POINT OF CONNECTION
UNLESS OTHERWISE NOTED
TYP
U.O.N.
SS STAINLESS STEEL
TYPICAL
POC
N.T.S.
NRCC
NOT TO SCALE
FC FLOW CONTROL
RADIUS ELBOW IN DUCT, R=W
VOLUME DAMPER IN DUCT
SQUARE ELBOW IN DUCT WITH TURNING VANES
FIRST FIGURE IS WIDTH, SECOND FIGURE IS DEPTHRECTANGULAR DUCT WITH NET INSIDE DIMENSION SHOWN,
ROUND DUCT WITH NET INSIDE DIMENSIONS SHOWN
SHOWN, FIRST FIGURE IS WIDTH, SECOND FIGURE IS DEPTH
24 x 12
24 x 12
24 x 12
24 x 12
12"Ø
WR
12"Ø
E.S.P. EXTERNAL STATIC PRESSURE
EQUIPMENT TO BE REMOVED
WORK SHALL COMPLY WITH STATE & LOCAL CODES1
PROVIDE LABOR, MATERIALS, TOOLS, APPURTENANCES & EQUIPMENT REQUIRED TO FURNISH & INSTALLCOMPLETE & OPERATIONAL MECHANICAL SYSTEMS SHOWN
2
DUCTWORK & PIPING SHALL BE SEISMICALLY BRACED & SUPPORTED PER CBC CHAPTER 16A, SEE MEPANCHORAGE NOTES
3
INSTALLATION INSTRUCTIONS FOR LISTED EQUIPMENT SHALL BE MADE AVAILABLE TO INSPECTOR OF RECORD ATTIME OF INSPECTION
4
PROVIDE CUTTING & PATCHING AS REQUIRED FOR INSTALLATION OF NEW WORK. PATCHING SHALL MATCHADJACENT FINISH, COLOR & MATERIAL TO SATISFACTION OF SCHOOL DISTRICT
5
6 CONTRACTOR TO FIELD VERIFY LOCATION OF ALL MECHANICAL UTILITY POINTS OF CONNECTION & REQUIREMENTSPRIOR TO STARTING CONSTRUCTION
7 PROVIDE UL LISTED FIRESTOP SYSTEMS FOR ALL DUCTWORK & PIPING PENETRATIONS THROUGH RATED FLOORS,WALLS AND ROOF
8 "REMOVE" INDICATES REMOVAL OF FIXTURES INCLUDING ASSOCIATED DUCTWORK, PIPING, HANGERS,INSULATION, WIRING, SUPPORTS, ETC. REMOVE BRANCH PIPING BACK TO WITHIN 6" OF ACTIVE MAIN & CAP ORCONNECT TO NEW WORK
9 REFER TO ARCHITECTURAL DRAWINGS FOR LOCATIONS OF RATED WALL, FLOOR AND CEILING ASSEMBLIES
DF DUCT FURNACE
DSA DIVISION OF THE STATE ARCHITECT
MEOR MECHANICAL ENGINEER OF RECORD
(N) NEW
NCRA NON-RESIDENTIAL CERTIFICATE
OF ACCEPTANCE
NON-RESIDENTIAL CERTIFICATE
OF COMPLIANCE
CONNECT TO EXISTING ( )CTE
DH DUCT HEATER
General Notes
10 CONTRACTOR SHALL STOP WORK AND ALERT THE GENERAL CONTRACTOR IMMEDIATELY IF ANY WORK UNDERTHIS SECTION DISRUPTS ASBESTOS AND/OR LEAD-CONTAINING MATERIALS. REFER TO SECTION "HAZARDOUSMATERIAL CONDITIONS" FOR LOCATIONS OF HAZARDOUS MATERIALS AT THE SITE.
SHEET NUMBER SHEET TITLE
M0.0 MECHANICAL LEGEND & ABBREVAITIONS
M1.0 MECHANICAL SCHEDULES AND DETAILS
Mechanical Drawing Index
Remove rooftop heating and ventilating units, ductwork, piping andsupports.Install new rooftop heating and ventilating units, ductwork, piping andsupports. New equipment of similar size, capacity and weight as existing.
11 CONTRACTOR SHALL PROVIDE SCALED SHOP DRAWINGS OF ROOFTOP DUCTWORK FOR REVIEW PRIOR TOINSTALLATION.
M2.0 MECHANICAL ROOF DEMOLITION PLAN
M2.1 MECHANICAL ROOF PLAN
DUCTWORK MATERIAL : STEEL DUCTS: GALVANIZED SHEET STEEL, LOCK-FORMING QUALITY.SEALANT: UL LISTED, NON-HARDENING, WATER-RESISTANT, FIRE-RESISTIVE, USED ALONE ORWITH TAPE.
DUCTWORK CONSTRUCTION: FABRICATE AND SUPPORT IN ACCORDANCE WITH SMACNA HVACDUCT CONSTRUCTION STANDARDS. CONSTRUCT T'S, BENDS AND ELBOWS WITH RADIUS OF1-1/2 TIMES WIDTH OF DUCT ON CENTER LINE. INCREASE DUCT SIZES GRADUALLY, NOTEXCEEDING 30 DEGREES DIVERGENCE AND 45 DEGREE CONVERGENCE. RECTANGULAR DUCTLONGITUDINAL SEAMS SHALL BE PITTSBURGH LOCK. TRANSVERSE JOINTS SHALL BE DRIVE SLIPSEALED WITH CANVAS AND ADHESIVE, OR DUCTMATE . DUCT AND PLENUM JOINTS AND FIELDFORMED SEAMS SHALL BE SEALED FOR AIR AND WATER TIGHTNESS. TAPE SHALL BE OF 6 OZ.CANVAS SATURATED WITH ARABOL OR DUCTMATE ENVIROSEAL UL181 DUCT SEALANT WITHOUTTAPE. TAPE OR SEALANT SHALL BE EXTENDED A MINIMUM OF ONE INCH BEYOND JOINT OR SEAMOPENINGS. SEAL DUCTWORK ACCORDING TO SMACNA TABLE 1-2, SEAL CLASS B. DUCT SIZESSHOWN ARE CLEAR INTERNAL DIMENSIONS. PITCH TOP OF RECTANGULAR DUCT SO THATWATER DOES NOT POND.
DUCTWORK LINER: OWENS CORNING QUIET-R ROTARY DUCT LINER, R-8 RIGID, RESIN BONDEDFIBROUS GLASS BLANKETS OR BOARD WITH FLAME RETARDANT VEIL FACED AIRSTREAMSURFACE, COMPLY WITH ASTM C916 AND ADHERE DUCT LINER TO SHEET METAL WITH 90%COVERAGE OF ADHESIVE, SECURE DUCT LINER WITH METAL FASTENERS, EITHER WELD-SECUREDOR IMPACT DRIVEN, SPACING PER SMACNA HVAC DUCT CONSTRUCTION STANDARDS FORVELOCITY LESS THAN 2500 FT/MIN.
GAS PIPING MATERIAL: SCHEDULE 40 GALVANIZED STEEL PIPE, ANSI B125.2 WITH 150 PSIGALVANIZED MALLEABLE IRON THREADED FITTINGS ANSI B16.3; VALVES: APOLLO MODEL94A BRASS, 2-PIECE, FULL PORT BALL VALVE WITH CSA, UL AND FM APPROVALS
MECHANICAL PIPING (MP), MECHANICAL DUCTS (MD), PLUMBING PIPING (PP), ELECTRICALDISTRIBUTION SYSTEMS (E):
MP MD PP E OPTION 1: DETAILED ON THE APPROVED DRAWINGSWITH PROJECT SPECIFIC NOTES AND DETAILS
MP MD PP E OPTION 2: SHALL COMPLY WITH THE APPLICABLEOSHPD PRE-APPROVAL (OPM#) ___________________
MP MD PP E OPTION 3: SHALL COMPLY WITH THE SMACNA SEISMICRESTRAINT MANUAL, OSHPD EDITION (2009),INCLUDING ANY ADDENDA. FASTENERS AND OTHERATTACHMENTS NOT SPECIFICALLY IDENTIFIED IN THESMACNA SEISMIC RESTRAINT MANUAL OSHPD EDITION,ARE DETAILED ON THE APPROVED DRAWINGS WITHPROJECT SPECIFIC NOTES AND DETAILS. THE DETAILSSHALL ACCOUNT FOR THE APPLICABLE SEISMICHAZARD LEVEL ______ AND CONNECTION LEVEL _____FOR THE PROJECT CONDITIONS
AND GENERAL NOTES
M0.1and Notes
LegendMechanical
1/8"=1'
168N 4
Santa CruzHigh School
Roof Mechanical
Santa Cruz High School415 Walnut AvenueSanta Cruz, CA 95060
MARK EDWARDBARTOSC-24138
LI C
E N S E D A R C H I T ECT
REN . 0 3 - 3 1 - 1 9
ST AT E O F CA L I FORNI A
133 Mission StreetSuite 100Santa Cruz, CA 95069
Santa Cruz CitySchools
Bid Set 5/1/2019
Unit Replacement
BA 17-008.12
TAG MFR MODEL
HEATING AND VENTILATING UNIT SCHEDULE
T.S.P.CFM VOLTS PHASE HP REMARKS(LBS)WEIGHT
1RPBL-400 8,650 1.6" 3 7.5 1160208
NOTES:
1 MOUNT NEW H&V UNIT ON EXISTING ROOF PLATFORM, PROVIDE NEW 16" HIGH ROOF CURB, NEW DISCONNECT,FILTER RACK WITH 2" DISPOSABLE MERV 8 PLEATED MEDIA FILTERS
ELECTRICAL DATASERVICE
REZNORHV-1
SUPPLY
2 PROVIDE DUCT MOUNTED SMOKE DETECTOR IN SUPPLY DUCT WIRED TO SHUT DOWN UNIT UPON ACTIVATIONPER 2016 CMC 608.0 AUTOMATIC SHUTOFFS
2
IRON STRAP; BOLTSTRAP TO STRUT
12"
2" WIDE x 1/8" THICKHOT-DIPPED GALV.
(E) ROOF
DUCTWORK
COOPER B-LINE MODEL DB_DS DUCT SUPPORT SYSTEM, OR APPROVED EQUAL
DURA-BLOKBASE (TYP.)
RISER CHANNEL(SH STYLE)1-5/8"x1-5/8"12 GA. ELECTRO-PLATED STEEL(TYP.)
PIPE CLAMP (TYP.)
NON-INSULATED PIPE (TYP.)
INSULATED PIPE (TYP.)
(E) ROOFCOOPER B-LINE MODEL DB PIPE SUPPORT SYSTEM, OR APPROVED EQUAL
DURA-BLOKBASE (TYP.)
WIDTH AS REQ'D
EXISTING H&V UNIT SCHEDULE
TAG MFR MODEL HP VOLTS PH. WEIGHTINPUT (MBH)HEATING
HV-1 STERLING QVPV250 32085 2900 LBS.250
OUTPUT (MBH)HEATING
200
REMARKS
HV-2 32085 2900 LBS.200 160
HV-3 32087.5 2900 LBS.350 280
HV-4 32087.5 2900 LBS.350 280
3
(MBH)HEATING INPUT
400
(MBH)HEATING OUTPUT
320
4
PROVIDE NEW WALL MOUNTED PROGRAMMABLE THERMOSTAT AND CO2 SENSOR WITH LOCKING PROTECTIVECOVER, MOUNT WITH TOP OF BOX AT +48" ABOVE FLOOR, LOCATION IN GYM PER ARCHITECT
HV-2
GYMHV-3 N-W
3
GYMHV-4 S-W
REMOVE AND REPLACE
REMOVE AND REPLACE
REMOVE AND REPLACE
REMOVE AND REPLACE
PROVIDE DEMAND CONTROL VENTILATION (DCV) CONTROLS PER 2016 TITLE 24 SECTION 120.1.4: DCV SHALLMAINTAIN CO2 CONCENTRATION LESS THAN OR EQUAL TO 600 PPM PLUS THE OSA CO2 CONCENTRATION(ASSUMED TO BE 400 PPM). WHEN THE SYSTEM IS OPERATING DURING REGULAR SCHOOL HOURS, THECONTROLS SHALL MAINTAIN MINIMUM OSA AIR QUANTITY (PER THIS SCHEDULE), IF THE CO2 CONCENTRATION INTHE ROOM EXCEEDS 1000 PPM, THEN THE CONTROLS SHALL MODULATE OPEN THE OUTSIDE AIR DAMPER ANDMODULATE CLOSED THE RETURN AIR DAMPER UNTIL THE CO2 CONCENTRATION FALLS BELOW 1000 PPM.
DETAIL - PIPE SUPPORT ON ROOF
DETAIL - RECTANGULAR DUCT SUPPORT ON ROOF
DETAIL - HEATING AND VENTILATING UNIT MOUNTING ON (E) ROOF PLATFORM
CANFAB PART NO.6000-CBHC UNITHOLD DOWN
SEAL ROOF WATER TIGHT ALL AROUND
AROUND AT (E) PLATFORM(E) CANT STRIP - ALL
HEATING AND VENTILATING UNIT
ATTACH TO UNITWITH (8) #10 x 1/2"TEK SCREWS
MINIMUM 1 ON EACH SHORT SIDE & MIN. 2 ON LONG SIDE
ATTACH ROOF CURB TO (E) ROOFPLATFORM WITH 3/8"Ø LAG BOLTS
NTS 3
NTS 2
NTS 1
GYMN-E
GYMS-E RPBL-400 8,650 1.6" 3 7.5 1160208REZNOR 400 320
RPBL-400 11,010 2.2" 3 15 1310208REZNOR 400 320
RPBL-400 11,010 2.2" 3 15 1310208REZNOR 400 320
4
1 2 3 4
1 2 3 4
1 2 3 4
STERLING QVPV200
STERLING QVPV350
STERLING QVPV350
(E) ROOF PLATFORM
PLAN DIMENSIONS
6'-2" x 12'-2"
6'-2" x 12'-2"
8'-0" x 12'-2"
8'-0" x 12'-2"
(TYP.)
16" HIGH ROOF CURBSIZED TO FIT H&V UNIT
FLASH & COUNTER FLASH, SEAL AT ROOF CURB
CFM
660
MIN.
660
830
830
OSA
M0.2and DetailsSchedules
Mechanical
1/8"=1'
168N 4
Santa CruzHigh School
Roof Mechanical
Santa Cruz High School415 Walnut AvenueSanta Cruz, CA 95060
MARK EDWARDBARTOSC-24138
LI C
E N S E D A R C H I T ECT
REN . 0 3 - 3 1 - 1 9
ST AT E O F CA L I FORNI A
133 Mission StreetSuite 100Santa Cruz, CA 95069
Santa Cruz CitySchools
Bid Set 5/1/2019
Unit Replacement
BA 17-008.12
1HV1
GG
GG
GG
GG
1HV3
1HV2
1HV4
4 4444
4 4444
44
2 2 2
2 2 2
2
2
2
23
3
3
5
5
5
5
Remove H&V unit on roof platform1
SHEET NOTES:
Remove ductwork on roof, including roof supports2
Remove gas piping on roof, including roof supports and valves3
Duct down through roof to remain, connect to new work4
Relief air ventilator to remain5
Prior to the start of construction, read and record the air flow at each diffuser and grille, and ateach H&V unit, including outside air quantity. Provide type written report to Owner perSpecifications Section 23 05 93.
1
GENERAL NOTES:
M2.0Roof Plan
DemolitionMechanical
Mechanical Demolition Roof PlanSCALE: 1/8"=1'-0" 1
1/8"=1'
168N 4
Santa CruzHigh School
Roof Mechanical
Santa Cruz High School415 Walnut AvenueSanta Cruz, CA 95060
MARK EDWARDBARTOSC-24138
LI C
E N S E D A R C H I T ECT
REN . 0 3 - 3 1 - 1 9
ST AT E O F CA L I FORNI A
133 Mission StreetSuite 100Santa Cruz, CA 95069
Santa Cruz CitySchools
Bid Set 5/1/2019
Unit Replacement
BA 17-008.12
1HV1
GG
GG
GG
GG
1HV3
1HV21
HV4
36"x14" 36"x22" 36"x14"
36"x14" 36"x22" 36"x14" 36"x22" 36"x16"
36"x22" 36"x16"
OSA
OSA
OSAOSA
4
4
4
4
3
33
3
2 2 2 2 2
2 2 2 2 2
5
5
5
5
6
7 7
77
Flexible duct connector (typ.)
48"x22"
16"x22"32"x22"
48"x22"
16"x22"32"x22"
8
8
8
8
(E) Roof platform, see arch. dwgs
(E) Roof platform, see arch. dwgs
(E) Roof platform, see arch. dwgs
(E) Roof platform, see arch. dwgs
Install new H&V unit on corner of the existing roof curb, see detail 3/M0.2 and arch. dwgs; eitherconnect to existing electrical power or provide new electrical power, as required; connect to newgas piping, provide UL listed flexible gas connector listed for outdoor installation
1
SHEET NOTES:
Connect to existing 32"Ø supply duct down to gym below; provide manual volume damper; sealair and water tight
2
Connect to existing 84"x18" return air duct up from gym; provide motorized damper with 120 vpower; seal air and water tight
3
Existing relief air ventilator to remain4
Gas shut off valve, UL Listed for gas service; Apollo model 94A5
At the conclusion of construction, read, adjust, balance and record the air flow at each diffuserand grille, and at each H&V unit, including outside air quantity. Provide type written report toOwner per Specifications Section 23 05 93.
1
GENERAL NOTES:
Galvanized gas piping on roof, support per detail 1/M0.2; same size as existing piping6
Internally insulated ductwork on roof, support per detail 2/M0.2; clear inside dimensions noted7
52"x18" Outside air intake with motorized damper with 120 v power, 45 degree intake with galv.birdscreen over opening; balance to minimum cfm shown in schedule
8
M2.1Roof Plan
Mechanical
Mechanical Roof PlanSCALE: 1/8"=1'-0" 1
1/8"=1'
168N 4
Santa CruzHigh School
Roof Mechanical
Santa Cruz High School415 Walnut AvenueSanta Cruz, CA 95060
MARK EDWARDBARTOSC-24138
LI C
E N S E D A R C H I T ECT
REN . 0 3 - 3 1 - 1 9
ST AT E OF CA L I FORN I A
133 Mission StreetSuite 100Santa Cruz, CA 95069
Santa Cruz CitySchools
Bid Set 5/1/2019
Unit Replacement
BA 17-008.12