mba500 innerbelt bridge_2003

16
MBA 500 NE Ohio Case Study by: Kayvin Robertson Matt Bowman Melanie Chellman Jeffers John Bacha

Upload: bowmatt

Post on 18-Jul-2015

42 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Mba500 innerbelt bridge_2003

MBA 500 NE Ohio Case Study by:

Kayvin RobertsonMatt BowmanMelanie Chellman JeffersJohn Bacha

Page 2: Mba500 innerbelt bridge_2003

Executive Summary

What is the Innerbelt study?

Why should you care?

Page 3: Mba500 innerbelt bridge_2003

Project Background

Project planning began in 1999

2007 ODOT inspection call

131,000

Page 4: Mba500 innerbelt bridge_2003

Key Players

Ohio Department of Transportation

City of Cleveland Business Community Commuters

Page 5: Mba500 innerbelt bridge_2003

Critical Events

I-35 collapse Aging bridge with

finite life span Three C’s Need for interstate

commerce

Page 6: Mba500 innerbelt bridge_2003

Where do things stand today?

15 days behind Westbound bridge set

to open Fall 2013 Eastbound bridge work

set to start 2014 Eastbound bridge

completion set for 2016

Page 7: Mba500 innerbelt bridge_2003

Legal/Political Impact

ARRA of 2009 (stimulus) Battle over funds ODOT in $1.6B budget hole Kasich vs. Jackson

Page 8: Mba500 innerbelt bridge_2003

Fiscal/Economic Impact

• Westbound Bridge - $287.4M

• Eastbound Bridge - $317M

• No federal/ODOT funds until 2016

• 5 more sections of “Innerbelt Plan”

• Known operating costs $13.3M to 2013

• 5-year fix = $65M• 10-year fix > $89M• Total rehab ~ $200M• Estimated congestion costs =

$100M/year• Modeled savings benefits of

$15.6B

Page 9: Mba500 innerbelt bridge_2003

Social/Environmental Impact

Decrease sewage overflow & runoff

Green bulkheads Sustainability plan Peregrine falcons

Page 10: Mba500 innerbelt bridge_2003

Opposition & Controversy

Politics Schedule Payment Fundraising

Page 11: Mba500 innerbelt bridge_2003

Final Thoughts

Page 12: Mba500 innerbelt bridge_2003

Questions?

Page 13: Mba500 innerbelt bridge_2003

Sources Gluck, P. (2012, October 2). Personal interview. Krohn, B. "Inner Belt Bridge Lanes to Reopen, but Not to Trucks Going

East." The Plain Dealer. N.p., 11 Aug. 2009. Web. 13 Oct. 2012. <http://blog.cleveland.com/metro/2009/08/inner_belt_bridge_lanes_to_reo.html>.

ODOT. "Innerbelt Bridge Lanes/Ramps Reopened Today." Ohio Department of Transportation. N.p., 25 Nov. 2009. Web. 13 Oct. 2012. <http://www.dot.state.oh.us/districts/D12/Deputy%20Director/News/Pages/InnerbeltBridgeLanesRampsReopenedToday.aspx>.

Breckenridge, Tom. "Inner Belt Bridge Construction Begins as Massive Supports Are Hammered into Bedrock." The Plain Dealer. N.p., 30 Mar. 2011. Web. 13 Oct. 2012. <http://blog.cleveland.com/metro/2011/03/inner_belt_bridge_construction_3.html>.

Page 14: Mba500 innerbelt bridge_2003

Sources TSA. "Highway Motor Carrier Branch." Transportation Security

Administration. N.p., 12 Oct. 2012. Web. 13 Oct. 2012. <http://www.tsa.gov/stakeholders/highway-motor-carrier-branch>.

Breckenridge, Tom. "New Inner Belt Bridge Is 15 Days behind Schedule, with Dicier Weather on the Way." The Plain Dealer. N.p., 3 Oct. 2012. Web. 13 Oct. 2012. <http://www.cleveland.com/metro/index.ssf/2012/10/new_inner_belt_bridge_is_15_da.html>.

Palmer, Michael Cooper And Griff. "Cities Lose Out On Road Funds From Stimulus." The New York Times. The New York Times, 09 July 2009. Web. 13 Oct. 2012. <http://www.nytimes.com/2009/07/09/us/09projects.html?_r=0>.

Page 15: Mba500 innerbelt bridge_2003

Sources "Recovery.gov - Track the Money." Recipient Projects. N.p., 19 Sept.

2012. Web. 13 Oct. 2012. <http://www.recovery.gov/Transparency/RecoveryData/Pages/RecipientReportedDataMap.aspx?stateCode=OH>.

"Kasich Announces Innovative Funding Plan for Innerbelt Bridge in Cleveland." Ohio Department of Transportation. N.p., 23 Aug. 2012. Web. 13 Oct. 2012. <http://www.dot.state.oh.us/news/Pages/Kasich-Announces-Innovative-Funding-Plan-for-Innerbelt-Bridge-in-Cleveland.aspx>.

Breckenridge, Tom. "Gov. John Kasich, ODOT Have Plan to Keep Cleveland's Second Inner Belt Bridge on Track." The Plain Dealer. N.p., 24 Apr. 2012. Web. 13 Oct. 2012. <http://www.cleveland.com/open/index.ssf/2012/08/ohio_has_plan_to_build_clevela.html>.

Page 16: Mba500 innerbelt bridge_2003

Sources "ODOT - Innerbelt Bridge Project." Ohio Department of Transportation.

N.p., n.d. Web. 13 Oct. 2012. <http://www.dot.state.oh.us/projects/ClevelandUrbanCoreProjects/Innerbelt/InnerbeltBridge/Pages/default.aspx>.