Case study CLIENT: Henderson Fabrications INDUSTRY: Manufacturing COMPLETED: September 2013 SUMMARY Rapidly expanding manufacturing business Experienced rolled energy contract leading to uncompetitive high tariffs We identified savings of 14% on electricity fixed for 2 years and 16% saving on a gas contract fixed for a further 3 years ABOUT OUR CLIENT Our client is a successful sheet metal manufacturing business that has seen rapid expansion over the recent years with investments in new premises, new machinery and the latest computer technology. CLIENT REQUIREMENTS As a large energy user the business’ costs had increased significantly and their electricity contract had been rolled by their previous supplier. Having realised this was the situation, our client was keen for BCR Associates to carry out a full review in order to determine if anything could be done to rectify the situation. OUR APPROACH Our dedicated Account Manager gathered all the relevant information regarding contract end dates and consumption patterns, in order to provide a comprehensive review of the situation. We researched the solutions and came up with proposals that would secure a reduction in price going forward with two new fixed price contracts from different suppliers. We managed the entire process on their behalf, all without cost or obligation. T: 0800 048 2928 E: [email protected] © 2013 Business Cost Reduction Associates Ltd Business Cost Reduction Associates Limited. Registered and Postal office: Darwin House, Southernhay Gardens, Exeter EX1 1NP. Company registration: 5537190

Upload: sarah-revell

Post on 25-Jun-2015

20 views

Category:

Business


0 download

DESCRIPTION

BCR Associates has saved millions of pounds for our clients, some of whom operate large machinery, or have vast/multi-site premises leading to high running costs. Our expert consultants work closely with these businesses to improve profit, reduce admin and manage essential spend efficiently

TRANSCRIPT

Page 1: Manufacturer case study

Case study CLIENT: Henderson Fabrications INDUSTRY: Manufacturing COMPLETED: September 2013

SUMMARY

Rapidly expanding

manufacturing business

Experienced rolled energy contract leading

to uncompetitive high tariffs

We identified savings of

14% on electricity fixed for 2 years and 16% saving on a gas contract

fixed for a further 3 years

ABOUT OUR CLIENT

Our client is a successful sheet metal manufacturing

business that has seen rapid expansion over the recent years with investments in

new premises, new machinery and the latest

computer technology.

CLIENT REQUIREMENTS

As a large energy user the business’ costs had increased

significantly and their electricity contract had been rolled by their previous

supplier. Having realised this was the situation, our client

was keen for BCR Associates to carry out a full review in order to determine if

anything could be done to rectify the situation.

OUR APPROACH

Our dedicated Account Manager gathered all the

relevant information regarding contract end dates and consumption patterns, in

order to provide a comprehensive review of the

situation. We researched the solutions and came up with proposals that would secure a

reduction in price going forward with two new fixed

price contracts from different suppliers. We managed the entire process on their behalf,

all without cost or obligation.

T: 0800 048 2928 E: [email protected]

© 2013 Business Cost Reduction Associates Ltd Business Cost Reduction Associates Limited. Registered and Postal office: Darwin House, Southernhay Gardens,

Exeter EX1 1NP. Company registration: 5537190

Page 2: Manufacturer case study

WHAT OUR CUSTOMER SAYS “We have never worked with a company

like BCR Associates before. We were extremely surprised to find that our costs could be reduced by such a significant

amount. We particularly liked the fact that we did not have to do anything, other than provide some bills for BCR

Associates to review. The whole exercise was very easy for us. We will be using BCR Associates to review our Telecoms

when the contracts come round for renewal. We would have no hesitation in

recommending them to another company.

Steve O’Looney, Managing Director

Hendersons Fabrications

THE PROJECT After gathering the relevant

paperwork BCR Associates

carried out a full review and

identified that the electricity

contract was in fact a rolled

contract on very

uncompetitive rates, and

the gas contract costs were

also higher than required

for the size of business.

Our close relationship with

our supply chain allowed us

to secure very competitive

electricity prices 9 months

ahead of the contract

finishing giving an added

benefit of lower prices in a

rising market. Termination

was managed by us to

ensure that the old contract

finished correctly and the

new contract would start

automatically for the client.

THE RESULTS Despite energy prices

continuing to rise in today’s

climate, the expert

knowledge of our specialists

reduced our clients annual

expenditure by £14,000

(14%) on electricity and

£2200 (16%) on gas

fixing prices for up to 3

years forward. In addition

to this, our client did not

have to worry about any

paperwork to manage these

contracts, as all the contract

paperwork and terminations

were handled by BCR

Associates, giving them

more time to focus on

frontline duties.