Task Force Corridors of Interest
![Page 3: Local Investment Team (LIT) Corridor Tours: Powell Boulevard To… · Powell Boulevard (Central Portion) (82nd Ave to 174th Ave) 2 of 3 Powell Blvd 82 nd e 174 th e I-205 Powell Butte](https://reader034.vdocuments.us/reader034/viewer/2022042318/5f07111f7e708231d41b2317/html5/thumbnails/3.jpg)
3
Local Investment Team –Multnomah County
![Page 4: Local Investment Team (LIT) Corridor Tours: Powell Boulevard To… · Powell Boulevard (Central Portion) (82nd Ave to 174th Ave) 2 of 3 Powell Blvd 82 nd e 174 th e I-205 Powell Butte](https://reader034.vdocuments.us/reader034/viewer/2022042318/5f07111f7e708231d41b2317/html5/thumbnails/4.jpg)
4
Powell Boulevard
![Page 5: Local Investment Team (LIT) Corridor Tours: Powell Boulevard To… · Powell Boulevard (Central Portion) (82nd Ave to 174th Ave) 2 of 3 Powell Blvd 82 nd e 174 th e I-205 Powell Butte](https://reader034.vdocuments.us/reader034/viewer/2022042318/5f07111f7e708231d41b2317/html5/thumbnails/5.jpg)
5
Presentation Outline
• Corridor overview
• Regional, local, safety
• Projects/opportunities
• Tour follow-up
![Page 6: Local Investment Team (LIT) Corridor Tours: Powell Boulevard To… · Powell Boulevard (Central Portion) (82nd Ave to 174th Ave) 2 of 3 Powell Blvd 82 nd e 174 th e I-205 Powell Butte](https://reader034.vdocuments.us/reader034/viewer/2022042318/5f07111f7e708231d41b2317/html5/thumbnails/6.jpg)
6
Powell Boulevard(Willamette River to Burnside Rd)
I-84
Powell BlvdGresham
I-205
Downtown Portland
![Page 7: Local Investment Team (LIT) Corridor Tours: Powell Boulevard To… · Powell Boulevard (Central Portion) (82nd Ave to 174th Ave) 2 of 3 Powell Blvd 82 nd e 174 th e I-205 Powell Butte](https://reader034.vdocuments.us/reader034/viewer/2022042318/5f07111f7e708231d41b2317/html5/thumbnails/7.jpg)
7
Regional Role:
• Links west side to east county for all modes including freight
• Connects historically underserved communities
• TriMet identifies Powell as a key corridor to increase ridership including eventual High Capacity Transit (HCT)
![Page 8: Local Investment Team (LIT) Corridor Tours: Powell Boulevard To… · Powell Boulevard (Central Portion) (82nd Ave to 174th Ave) 2 of 3 Powell Blvd 82 nd e 174 th e I-205 Powell Butte](https://reader034.vdocuments.us/reader034/viewer/2022042318/5f07111f7e708231d41b2317/html5/thumbnails/8.jpg)
8
Local Role:
• Main street for numerous formal and informal commercial centers
• Provides access to and between numerous community areas
• Provides local access and circulation to residential and commercial areas
• Transit access to a diverse range of communities
![Page 9: Local Investment Team (LIT) Corridor Tours: Powell Boulevard To… · Powell Boulevard (Central Portion) (82nd Ave to 174th Ave) 2 of 3 Powell Blvd 82 nd e 174 th e I-205 Powell Butte](https://reader034.vdocuments.us/reader034/viewer/2022042318/5f07111f7e708231d41b2317/html5/thumbnails/9.jpg)
9
2007 – 2016 data- 18 Fatalities including 12 walking and 1 biking
- 15 in Portland (10 walk)
- 3 in Gresham (2 walk/1 bike)
- 117 Serious injuries including 21 walking and 15 biking
– 83 in Portland (14 walk/10 bike)
– 34 in Gresham (7 walk/5 bike)
Safety:SE Powell
River – 122nd 205
NORTH
122nd - Burnside
![Page 10: Local Investment Team (LIT) Corridor Tours: Powell Boulevard To… · Powell Boulevard (Central Portion) (82nd Ave to 174th Ave) 2 of 3 Powell Blvd 82 nd e 174 th e I-205 Powell Butte](https://reader034.vdocuments.us/reader034/viewer/2022042318/5f07111f7e708231d41b2317/html5/thumbnails/10.jpg)
10
Presentation Outline
• Corridor overview
• Regional, local, safety
• Projects/opportunities
• Tour follow-up
![Page 11: Local Investment Team (LIT) Corridor Tours: Powell Boulevard To… · Powell Boulevard (Central Portion) (82nd Ave to 174th Ave) 2 of 3 Powell Blvd 82 nd e 174 th e I-205 Powell Butte](https://reader034.vdocuments.us/reader034/viewer/2022042318/5f07111f7e708231d41b2317/html5/thumbnails/11.jpg)
11
• Inner Powell: signal and crossing improvements for pedestrians and bikes, median island with trees, redesign select intersections for ped/bike safety and stormwater treatments
• Outer Powell: widen to 3-4 lanes with sidewalks, buffered bike lanes, improve safety and access to transit
• Gresham: improve intersections with 182nd and Eastman, adding turn lanes and supporting transit. Eliminate left turns at intersection with Burnside
• RTP Transit Strategy, High Capacity Transit (HCT) Plan
Regional Transportation Plan (RTP) Projects
![Page 12: Local Investment Team (LIT) Corridor Tours: Powell Boulevard To… · Powell Boulevard (Central Portion) (82nd Ave to 174th Ave) 2 of 3 Powell Blvd 82 nd e 174 th e I-205 Powell Butte](https://reader034.vdocuments.us/reader034/viewer/2022042318/5f07111f7e708231d41b2317/html5/thumbnails/12.jpg)
12
Current Local Opportunities: Gresham
• Added N/S left turn lanes at intersection with 182nd/Highland
• Added northbound lane at Hogan
• Two-way bikeway on north side of Powell from Main to 1st $3M
$6-8M
$3-5M
![Page 13: Local Investment Team (LIT) Corridor Tours: Powell Boulevard To… · Powell Boulevard (Central Portion) (82nd Ave to 174th Ave) 2 of 3 Powell Blvd 82 nd e 174 th e I-205 Powell Butte](https://reader034.vdocuments.us/reader034/viewer/2022042318/5f07111f7e708231d41b2317/html5/thumbnails/13.jpg)
13
Bidirectional Bike Lane Example
![Page 14: Local Investment Team (LIT) Corridor Tours: Powell Boulevard To… · Powell Boulevard (Central Portion) (82nd Ave to 174th Ave) 2 of 3 Powell Blvd 82 nd e 174 th e I-205 Powell Butte](https://reader034.vdocuments.us/reader034/viewer/2022042318/5f07111f7e708231d41b2317/html5/thumbnails/14.jpg)
14
Current Local Opportunities: Outer Powell
• Funded project: adding center turn lane, sidewalks, bicycle facilities, and drainage
• Construction for 122nd Ave – 136th Ave will be complete in 2020
• Phase 2 (99th –174th Ave) will continue these improvements
• Corridor will transfer to PBOT
upon completion
$110M
(funded)
![Page 15: Local Investment Team (LIT) Corridor Tours: Powell Boulevard To… · Powell Boulevard (Central Portion) (82nd Ave to 174th Ave) 2 of 3 Powell Blvd 82 nd e 174 th e I-205 Powell Butte](https://reader034.vdocuments.us/reader034/viewer/2022042318/5f07111f7e708231d41b2317/html5/thumbnails/15.jpg)
15
• Ongoing: ODOT state of good repair study (ADA improvements, utilities, signals, pavement quality, crossings) for SE 9th Ave–SE 99th Ave
• Funded: Improved neighborhood access to transit (crossings at 47th, 57th, 61st, 79th)
• Completed: Safety and crossings at 21st, 24th, 26th, 28th, 31st, 34th, and 36th
Current Local Opportunities: Inner Powell
tbd
$2M
(funded)
$4M
(completed)
![Page 16: Local Investment Team (LIT) Corridor Tours: Powell Boulevard To… · Powell Boulevard (Central Portion) (82nd Ave to 174th Ave) 2 of 3 Powell Blvd 82 nd e 174 th e I-205 Powell Butte](https://reader034.vdocuments.us/reader034/viewer/2022042318/5f07111f7e708231d41b2317/html5/thumbnails/16.jpg)
16
Current Local Opportunities: Transit
• Inner Powell
• Minor transit enhancements were studied on Inner Powell and found to be expensive and ineffective
• Powell-Division BRT project concluded that an effective project could not be done without elevating or tunneling in Inner Powell
• Too much traffic, space is too constrained
![Page 17: Local Investment Team (LIT) Corridor Tours: Powell Boulevard To… · Powell Boulevard (Central Portion) (82nd Ave to 174th Ave) 2 of 3 Powell Blvd 82 nd e 174 th e I-205 Powell Butte](https://reader034.vdocuments.us/reader034/viewer/2022042318/5f07111f7e708231d41b2317/html5/thumbnails/17.jpg)
17
Transit – Requires Major Investment
• A large investment is needed to serve Inner Powell
• high ridership potential for LRT or BRT
• Constrained environment requires elevated or tunnel
• Planning needed to identify mode, terminus, design, environmental impact study (EIS): $15M
A major investment would be needed to work on Inner Powell.
![Page 18: Local Investment Team (LIT) Corridor Tours: Powell Boulevard To… · Powell Boulevard (Central Portion) (82nd Ave to 174th Ave) 2 of 3 Powell Blvd 82 nd e 174 th e I-205 Powell Butte](https://reader034.vdocuments.us/reader034/viewer/2022042318/5f07111f7e708231d41b2317/html5/thumbnails/18.jpg)
18
• Rectangular rapid-flash beacon (RRFB)
Pedestrian Crossing Treatments
1 of 3
![Page 19: Local Investment Team (LIT) Corridor Tours: Powell Boulevard To… · Powell Boulevard (Central Portion) (82nd Ave to 174th Ave) 2 of 3 Powell Blvd 82 nd e 174 th e I-205 Powell Butte](https://reader034.vdocuments.us/reader034/viewer/2022042318/5f07111f7e708231d41b2317/html5/thumbnails/19.jpg)
19
• Pedestrian hybrid beacon (PHB)
Pedestrian Crossing Treatments
2 of 3
![Page 20: Local Investment Team (LIT) Corridor Tours: Powell Boulevard To… · Powell Boulevard (Central Portion) (82nd Ave to 174th Ave) 2 of 3 Powell Blvd 82 nd e 174 th e I-205 Powell Butte](https://reader034.vdocuments.us/reader034/viewer/2022042318/5f07111f7e708231d41b2317/html5/thumbnails/20.jpg)
20
• Half-signal or midblock signal
Pedestrian Crossing Treatments
3 of 3
![Page 21: Local Investment Team (LIT) Corridor Tours: Powell Boulevard To… · Powell Boulevard (Central Portion) (82nd Ave to 174th Ave) 2 of 3 Powell Blvd 82 nd e 174 th e I-205 Powell Butte](https://reader034.vdocuments.us/reader034/viewer/2022042318/5f07111f7e708231d41b2317/html5/thumbnails/21.jpg)
22
Powell Boulevard (Western Portion)(Willamette River to 82nd Ave)
1 of 3
Powell Blvd
Ross Island Bridge
82n
dA
ve
Cleveland High School
Crossings
State of Good Repair & HCT opportunity
Crossings
![Page 22: Local Investment Team (LIT) Corridor Tours: Powell Boulevard To… · Powell Boulevard (Central Portion) (82nd Ave to 174th Ave) 2 of 3 Powell Blvd 82 nd e 174 th e I-205 Powell Butte](https://reader034.vdocuments.us/reader034/viewer/2022042318/5f07111f7e708231d41b2317/html5/thumbnails/22.jpg)
23
Powell Boulevard (Central Portion)(82nd Ave to 174th Ave)
2 of 3
Powell Blvd
82n
dA
ve
174
thA
ve
I-205
Powell Butte
Outer Powell Safety Project (99th – 174th)
State of Good Repair & HCT opportunity
Crossings
![Page 23: Local Investment Team (LIT) Corridor Tours: Powell Boulevard To… · Powell Boulevard (Central Portion) (82nd Ave to 174th Ave) 2 of 3 Powell Blvd 82 nd e 174 th e I-205 Powell Butte](https://reader034.vdocuments.us/reader034/viewer/2022042318/5f07111f7e708231d41b2317/html5/thumbnails/23.jpg)
24
Powell Boulevard – Eastern Portion(174th Ave to Burnside Blvd)
3 of 3
Powell Blvd174
thA
ve
Gresham
North-south dual lefts at 182nd/Highland Dr.
(opportunity)
Northbound lane at Hogan
(opportunity)
2-way bicycle lane (opportunity)
![Page 24: Local Investment Team (LIT) Corridor Tours: Powell Boulevard To… · Powell Boulevard (Central Portion) (82nd Ave to 174th Ave) 2 of 3 Powell Blvd 82 nd e 174 th e I-205 Powell Butte](https://reader034.vdocuments.us/reader034/viewer/2022042318/5f07111f7e708231d41b2317/html5/thumbnails/24.jpg)
25
• Safety issues throughout corridor
• Intersection projects at major intersections in Gresham, including signal enhancements and redesigns
• Ongoing multimodal project along Outer Powell including transit, pedestrian, and bicycle facilities
• Pedestrian crossing enhancements
• Major transit investment study opportunity
Identified Issues and Opportunities:
![Page 25: Local Investment Team (LIT) Corridor Tours: Powell Boulevard To… · Powell Boulevard (Central Portion) (82nd Ave to 174th Ave) 2 of 3 Powell Blvd 82 nd e 174 th e I-205 Powell Butte](https://reader034.vdocuments.us/reader034/viewer/2022042318/5f07111f7e708231d41b2317/html5/thumbnails/25.jpg)
26
Other Projects or Opportunities?
![Page 26: Local Investment Team (LIT) Corridor Tours: Powell Boulevard To… · Powell Boulevard (Central Portion) (82nd Ave to 174th Ave) 2 of 3 Powell Blvd 82 nd e 174 th e I-205 Powell Butte](https://reader034.vdocuments.us/reader034/viewer/2022042318/5f07111f7e708231d41b2317/html5/thumbnails/26.jpg)
27
Presentation Outline
• Corridor overview
• Regional, local, safety
• Projects/opportunities
• Tour follow-up
![Page 27: Local Investment Team (LIT) Corridor Tours: Powell Boulevard To… · Powell Boulevard (Central Portion) (82nd Ave to 174th Ave) 2 of 3 Powell Blvd 82 nd e 174 th e I-205 Powell Butte](https://reader034.vdocuments.us/reader034/viewer/2022042318/5f07111f7e708231d41b2317/html5/thumbnails/27.jpg)
28
What else did you notice on the tour?
I-84
Powell BlvdGresham
I-205
Downtown Portland
![Page 28: Local Investment Team (LIT) Corridor Tours: Powell Boulevard To… · Powell Boulevard (Central Portion) (82nd Ave to 174th Ave) 2 of 3 Powell Blvd 82 nd e 174 th e I-205 Powell Butte](https://reader034.vdocuments.us/reader034/viewer/2022042318/5f07111f7e708231d41b2317/html5/thumbnails/28.jpg)
29
• Should we focus on long-term planning or short-term needs?
• What investment needs are missing?
Key Questions and Considerations
![Page 29: Local Investment Team (LIT) Corridor Tours: Powell Boulevard To… · Powell Boulevard (Central Portion) (82nd Ave to 174th Ave) 2 of 3 Powell Blvd 82 nd e 174 th e I-205 Powell Butte](https://reader034.vdocuments.us/reader034/viewer/2022042318/5f07111f7e708231d41b2317/html5/thumbnails/29.jpg)