lo935 - flexible planning

Upload: kiran-jadhav

Post on 03-Jun-2018

221 views

Category:

Documents


1 download

TRANSCRIPT

  • 8/11/2019 LO935 - Flexible Planning

    1/217

    LO935 Flexible Planning

    LO935

    Release 640 04/06/2006

  • 8/11/2019 LO935 - Flexible Planning

    2/217

    SAP AG 2001

    LO935 Flexible Planning

    LO935LO935

    Flexible PlanningFlexible Planning SAP AG

    R/3 System

    Release 4.6C

    Mai 2001

    Material number 50047186

  • 8/11/2019 LO935 - Flexible Planning

    3/217

    SAP AG 2004

    Copyright 2004 SAP AG. All rights reserved.

    No part of this pub lication may be reproduced or transmitted inany form or for any purpose without the express permission ofSAP AG. The information contained herein may be changedwithout prior notice.

    Copyright

    Some software products marketed by SAP AG and its distributors contain proprietary software components of

    other software vendors.

    Microsoft, Windows, Outlook, and PowerPoint are registered trademarks of Microsoft Corporation.

    IBM, DB2, DB2 Universal Database, OS/2, Parallel Sysplex, MVS/ESA, AIX, S/390, AS/400, OS/390, OS/400,

    iSeries, pSeries, xSeries, zSeries, z/OS, AFP, Intelligent Miner, WebSphere, Netfinity, Tivoli, and Informix are

    trademarks or registered trademarks of IBM Corporation in the United States and/or other countries.

    Oracle is a registered trademark of Oracle Corporation.

    UNIX, X/Open, OSF/1, and Motif are registered trademarks of the Open Group. Citrix, ICA, Program Neighborhood, MetaFrame, WinFrame, VideoFrame, and MultiWin are trademarks or

    registered trademarks of Citrix Systems, Inc.

    HTML, XML, XHTML and W3C are trademarks or registered trademarks of W3C, World Wide Web

    Consortium, Massachusetts Institute of Technology.

    Java is a registered trademark of Sun Microsystems, Inc.

    JavaScript is a registered trademark of Sun Microsystems, Inc., used under license for technology invented and

    implemented by Netscape.

    MaxDB is a trademark of MySQL AB, Sweden.

    SAP, R/3, mySAP, mySAP.com, xApps, xApp, and other SAP products and services mentioned herein as well as

    their respective logos are trademarks or registered trademarks of SAP AG in Germany and in several other

    countries all over the world. All other product and service names mentioned are the trademarks of their respective

    companies. Data contained in this document serves informational purposes only. National product specifications

    may vary.

    These materials are subject to change without notice. These materials are provided by SAP AG and its affiliated

    companies ("SAP Group") for informational purposes only, without representation or warranty of any kind, and

    SAP Group shall not be liable for errors or omissions with respect to the materials. The only warranties for SAP

  • 8/11/2019 LO935 - Flexible Planning

    4/217

    Group products and services are those that are set forth in the express warranty statements accompanying such

    products and services, if any. Nothing herein should be construed as constituting an additional warranty.

  • 8/11/2019 LO935 - Flexible Planning

    5/217

    SAP AG 1999

    Information Systems

    Processes in Salesand Distribution

    LO150 5 days

    Logistics InformationSystem (LIS)Reporting

    LO930 2 days

    Level 2 Level 3

    Processes inProcurement

    LO020 5 days

    ManufacturingPlanning & Executionfor Discrete & Repetitive

    LO050 5 days

    Executive InformationSystem (EIS) 2 -Setting up the System

    AC620 2 days

    Advanced Functionsof the Report Writer

    CA710 3 days

    Advanced LISConfiguration

    LO940 2 days

    Technical Aspects inLIS with Special Focuson PURCHIS/INVCO

    LO555 2 days

    Technical Aspects inLIS with Special Focuson PPIS

    LO275 2 days

    Technical Aspects inLIS with Special Focuson SIS

    LO630 2 days

    Executive InformationSystem (EIS) 1 -Reporting

    AC615 2 days

    Basics of the ReportPainter/Report Writer

    CA705 2 days

    Flexible Planning

    LO935 2 days

  • 8/11/2019 LO935 - Flexible Planning

    6/217

    SAP AG 2002

    Prerequisites

    Essential:Knowledge of content of LO930 - Logistics InformationSystem (LIS) Reporting

    Recommended:LO050 - Manufacturing Planning & Execution for Discrete &Repetitive

  • 8/11/2019 LO935 - Flexible Planning

    7/217

    SAP AG 1999

    Target group

    Project team members responsible for planning inthe Logistics Information System

    Notes to the user

    - The training materials are not teach-yourself programs. They complement the courseinstructor's explanations. On the sheets, there is space for you to write down additional

    information.

  • 8/11/2019 LO935 - Flexible Planning

    8/217

    (C) SAP AG LO935 1-1

    SAP AG 2002

    Course Overview

    Course Goals

    Course Objectives

    Course Content

    Course Overview Diagram

    Main Business Scenario

    Contents:

  • 8/11/2019 LO935 - Flexible Planning

    9/217

    (C) SAP AG LO935 1-2

    SAP AG 2002

    This course will enable you to:

    Plan based on information structures Use the planning tools in the LIS system

    Summarize the uses of the planning methods anddif ferences between them

    Maintain master data for various planning methods

    Course Goals

  • 8/11/2019 LO935 - Flexible Planning

    10/217

    (C) SAP AG LO935 1-3

    SAP AG 2002

    On completing th is course, you will be able to:

    Outline the differences between Standard SOP andFlexible Planning

    Create sales and production plans

    Use the forecast too l

    Create planning types, macros and events

    Perform resource planning and rough-cut capacityanalysis

    Use mass processing

    Transfer planning resul ts to Demand Management

    Course Objectives

  • 8/11/2019 LO935 - Flexible Planning

    11/217

    (C) SAP AG LO935 1-4

    SAP AG 2002

    Unit 7 Events

    Unit 8 Production Planning

    Unit 9 Mass Processing

    Unit 10 Al locations

    Unit 11 Conclusion

    Unit 1 Introduction

    Unit 2 Planning Methods

    Unit 3 Master Data

    Unit 4 Planning Types and Macros

    Unit 5 General Planning Functions

    Unit 6 Statistical Forecast

    Preface

    Appendices

    Course Contents

  • 8/11/2019 LO935 - Flexible Planning

    12/217

    (C) SAP AG LO935 1-5

    SAP AG 2002

    Course Overview

    Planning Method

    Stat. Forecast

    MayMay

    Master Data

    Events

    Production Planning

    Al locations

    InfoStructure

    Mass Processing

    Job

    PlanningFunctions

    Planning Types

  • 8/11/2019 LO935 - Flexible Planning

    13/217

    (C) SAP AG LO935 1-6

    SAP AG 2002

    You are a member of your companys planningimplementation team. You must define your info

    structure, that means your planning levels(characteristi cs) and key figures you want to plan.

    Business Scenario

  • 8/11/2019 LO935 - Flexible Planning

    14/217

    (C) SAP AG LO935 1-7

    SAP AG 2002

    Quantities and dates...

    Order and rate proposals BOM explosion

    Scheduling at workcenters

    Production controlledby run scheduleheaders

    Production ordercontrol

    MPS/MRPMPS/MRP

    RepetitiveManufacturingRepetitiveManufacturing

    SFCSFC

    Statement ofdemand

    SKUs/configurable m aterials

    Demand

    Management

    Demand

    Management...

    Sales organizationDivisionSold-to partyMaterial

    Plant

    Sales plansProduction plans

    ...

    SOPSOP

    Logistics Planning Systems

    Sales & Operations Planning (SOP) is the planning tool of the Logistics Information System (LIS).

    Sales & Operations Planning (SOP) is a flexible forecasting and planning tool that you can use to set

    sales, production, and other supply chain and logistics targets. SOP uses historical, existing, and

    estimated future data to perform planning calculations. You would generally use SOP for medium- to

    long-term planning. You can also perform resource planning to determine the amounts of the work

    center capacities and other resources required to meet these targets. SOP supports both high-level

    planning of complex planning hierarchies and detailed planning of finished products, allowing for eithera top-down or a bottom-up approach to planning.

    SAP based the architecture of the logistics planning system on the MRP II concept.

  • 8/11/2019 LO935 - Flexible Planning

    15/217

    (C) SAP AG LO935 1-8

    SAP AG 2002

    Sales Planning

    Production Planning

    Purchasing

    Retail

    Business Applications of SOP

    SAP AG

    In SOP, you can plan future sales volumes based on historical data, as well as market intelligence and

    anticipated trends and changes at your company. You can also perform aggregate sales planning. With

    SOP, you can keep sales plans consistent at all levels of your organization.

    Sales planning provides the input for production planning. You typically carry out production planning

    at product group, finished product, or SKU level.

    With SOP, you can manage the allocation of scarce products to different customers or customer groups.

    You can also plan complex products, manufactured in a large number of variants. In purchasing, you can use SOP to plan quotas for multiple sources of supply or to track purchasing

    budgets.

    In retail, you can use the SOP system to plan purchasing budgets and monitor open-to-buy.

  • 8/11/2019 LO935 - Flexible Planning

    16/217

    (C) SAP AG LO935 1-9

    SAP AG 2002

    Period unit

    Characteristics

    157

    398

    Key figures

    Versions

    RegionSales organizationMaterialPlant

    Others

    Incoming ordersInvoiced salesOthers

    DayWeekMonthFiscal year variantFlexible time buckets

    X

    A00 Act ive000 Actual data001 Forecast based on trend model002 Sales incl . market intell igenceOthers

    A00 Act ive000 Actual data001 Forecast based on trend model

    002 Sales incl. market intell igenceOthers

    Info Structure Definition

    Sales & Operations Planning uses the same data infrastructure as the logistics information systems (for

    example, the Sales Information System). In other words, the system stores planning data, as well as

    actual data in information structures.

    An information structure holds three different types of information:

    Characteristics are criteria that the system uses to perform data reduction, and includes items such assales organization, distribution channel, customer, material, and plant.

    Periods are time units that give the information structures a time reference. The system displays andstores planning data per storage periodicity. This is not necessarily the same as the update period ofthe information structure.

    Key figures are values of particular business interest, for example, incoming sales and productionquantities. Historical key figure values give a measure of business performance.

    In addition, SOP allows you to maintain alternative planning scenarios in the same information structure.

    You do this using planning versions. Version A00 is the active planning version. Use it to maintain your

    definitive plan. Inactive versions are numerical and consist of three digits. Use them to maintain test

    plans.

    Remember that version 000 contains actual data. Do not plan version 000.

  • 8/11/2019 LO935 - Flexible Planning

    17/217

    (C) SAP AG LO935 1-10

    SAP AG 2002

    Info structure

    EUROPE

    Central

    Paris

    Characteristics

    USA

    North South

    New York Dallas

    RegionSales organizationSales offi ceMaterial

    (Product groupings or materials)

    North America

    Flexib le Planning: Master Data

    The objects you plan in SOP depend on the characteristics in the info structure, and on the sequence of

    the characteristics in the info structure.

    By defining the values of the planned characteristics, you create the master data for flexible planning.

    Some of you may know the structure illustrated in the graphic as the sales forecast hierarchy (SFH).

  • 8/11/2019 LO935 - Flexible Planning

    18/217

    (C) SAP AG LO935 1-11

    SAP AG 2002

    Multiple options for

    customized configuration

    Planning hierarchies

    Consistent, level-by-level,or delta planning

    Content and l ayout ofthe planning table isuser-defined

    Flexible Planning

    Largely preconfigured

    Product groups

    Level-by-level p lanning

    Standard planning table

    Standard SOP

    Flexib le Planning vs. Standard SOP

    Sales & Operations Planning consists of two elements: flexible planning and standard SOP.

    The graphic shows you the differences.

    To access flexible planning, select LogisticsLogistics Controlling Flexible planning.

    To access standard SOP, select Logistics ProductionSOP.

    You can copy the planning table of standard SOP and modify it to suit your company's needs.

  • 8/11/2019 LO935 - Flexible Planning

    19/217

    (C) SAP AG LO935 1-12

    SAP AG 2002

    Rules

    Aut omatic

    Periodic

    Flexible

    Update

    S001

    S730

    Copy datafrom oneinfo structureto another

    Info structures

    S140

    Use of Copy Management in Planning

    You use Copy Management as a tool for managing data in information structures.

    In Sales Operations Planning, you can use it to copy actual data from a standard information structure to

    the information structure you want to use for planning. You can therefore carry out comparisons of

    planned and actual data.

    Using Copy Management to populate your planned information structures with actual data has

    performance advantages. The primary benefit is the reduction in the operating system load that results

    from the decrease in the number of info structures the system must update. (You can also supply plannedinformation structures with actual data through LIS updating.)

    Another possible use of Copy Management would be to copy data you have planned in one information

    structure to information structure S140, where you then plan product allocations.

    You access Copy Management in Customizing for the Logistics Data Warehouse.

  • 8/11/2019 LO935 - Flexible Planning

    20/217

    (C) SAP AG LO935 1-13

    SAP AG 2002

    Addi tionalInformation

    Material master

    Customer master

    Documents

    .

    .

    .

    Sales organization: USSales office: US North

    CustomerIncomingorders

    Jones, Inc.Smith, Inc.

    25,00035,000

    20,00030,000

    Sales organization: US

    Sales officeIncomingorders

    Invoicedsales

    60,000

    40,000

    50,000

    40,000

    Anal ysis of S730

    Incomingorders

    Invoicedsales

    100,000 90,000Drill downto salesoffices

    Salesorganization

    US

    Drilldown tocustomers

    US North

    US South

    Invoicedsales

    Standard Analyses: Reporting Techniques

    You can run a standard analysis for any planning version based on consistent planning. Select

    EnvironmentReporting.

    You can store the standard analysis as a selection version. A selection version is not the same as a

    planning version.

  • 8/11/2019 LO935 - Flexible Planning

    21/217

    (C) SAP AG LO935 1-14

    SAP AG 2002

    Classification

    ABC Analysis

    AA B CCCustomers

    Sales orders

    Incoming orders

    Materials (%)

    Dual Classification

    Ordervalue

    No.orders

    Cumulative Curve

    12/95 1/96 2/96 3/96 4/96 5/96

    Invoiced sales

    Planned/ActualComparisons

    Previous/Current Year Comparison: InvoicedSalesCustomer Planned Actual Difference %

    Customer 1 $30,000 $40,000 $10,000 +33%Customer 2 $66,000 $70,000 $ 4,000 +6%Customer 3

    Customer SalesCustomer Sales OrdersOrders NoNo..ordersorders

    BaxterBaxter 5000 3000 1005000 3000 100TaylorTaylor 9000 15000 30009000 15000 3000CrowthCrowth 6000 9500 7506000 9500 750

    Standard Analyses: Analytical Techniques

    You can use a wide range of functions to examine the underlying key figures and characteristic values of

    an analysis from a business perspective. All the functions for statistical analyses present information in

    easy-to-use graphics.

  • 8/11/2019 LO935 - Flexible Planning

    22/217

    (C) SAP AG LO935 1-15

    SAP AG 2002

    Sales & Operations Planning (SOP) is the planningtool o f the Logistics Information System.

    SOP can be used to plan sales, production, andother supply chain and logistics activities.

    The Logistics Information System and Sales &Operations Planning have the same datainfrastructure.

    Sales & Operations Planning is made up of twoelements: Flexible planning and s tandard SOP.

    Introduct ion: Summary

  • 8/11/2019 LO935 - Flexible Planning

    23/217

    (C) SAP AG LO935 2-1

    SAP AG 2002

    Planning Methods

    Uses of the planning methods

    Consistent p lanning

    Level-by-level planning

    Contents:

  • 8/11/2019 LO935 - Flexible Planning

    24/217

    (C) SAP AG LO935 2-2

    SAP AG 2002

    On completing this uni t, you wil l be able to:

    Planning Methods: Unit Objectives

    Explain the differences between the planningmethods

    Outline the features and benefits of eachplanning method

    Maintain Customizing for Flexible Planning

    Summarize performance enhancements

  • 8/11/2019 LO935 - Flexible Planning

    25/217

    (C) SAP AG LO935 2-3

    SAP AG 2002

    Course Overview

    Planning Method

    Stat. Forecast

    MayMay

    Master Data

    PlanningFunctions

    Planning Types

    Events

    Al locations

    InfoStructure

    Mass Processing

    Job

    Production Planning

  • 8/11/2019 LO935 - Flexible Planning

    26/217

    (C) SAP AG LO935 2-4

    SAP AG 2002

    Planning Methods: Business Scenario

    You are a member of your companys planningimplementation team. You have already created the

    info structu re for the new SOP planning initiative.Now you must decide which planning method willmeet your companys requirements best.

  • 8/11/2019 LO935 - Flexible Planning

    27/217

    (C) SAP AG LO935 2-5

    SAP AG 2002

    Level-by-level Top-down

    Consistent Bottom-up& top-down

    Planning Methods

    Sales & Operations Planning (SOP) supports both top-down and bottom-up planning.

    The different planning methods support these two approaches in different ways by. It is important to

    consider your choice of planning method carefully.

    You cannot define more than one planning method for any information structure. However, you can

    always create a new information structure with another planning method and copy the original data using

    Copy Management.

  • 8/11/2019 LO935 - Flexible Planning

    28/217

    (C) SAP AG LO935 2-6

    SAP AG 2002

    Material AM001 is selected from planning hierarchy

    Autom atic disaggregation

    Reg ion Mater ial Pl an t Pl an ned q ty Pr op or ti on

    New Jersey AM001 0001 600 60 %New Jersey AM002 0001 -New Jer sey AM003 0001 -New Jer sey AM004 0001 -

    California AM001 1001 400 40%California AM002 1001 -California AM003 1001 -

    You enter an order quantit yof 1000 pc. for material AM001:

    Create Consistent Planning

    Consistent planning has two main advantages:

    Ease of use: you plan your data at one level and can rely on data consistency at all other levels. You can create planning data from any perspective you want.

    The system uses proportional factors to determine the value of the total in relation to the details.

    Similarly, the system also determines the value of one detail in relation to another detail using the

    proportional factors. For more information on the proportional factors, see the Master Data unit.

    In the example in the graphic, the system uses proportional factors to perform disaggregation.

  • 8/11/2019 LO935 - Flexible Planning

    29/217

    (C) SAP AG LO935 2-7

    SAP AG 2002

    Region Material Plant Order quantity

    New Jersey AM001 0001 600New Jersey AM002 0001 100New Jer sey A M003 0001 150New Jersey AM004 0001 50

    California AM001 1001 400California AM002 1001 200California AM003 1001 100

    Region Material Plant Order quantity

    New Jersey AM001 0001 1200New Jersey AM002 0001 100New Jer sey A M003 0001 150New Jersey AM004 0001 50

    California AM001 1001 800

    California AM002 1001 200California AM003 1001 100

    1000

    2000

    You change incoming orders from 1000 to 2000:

    Change Consistent Planning

    Planning data can be accessed from any level. You determine the combination, or set, of characteristic

    values that you want to plan by the values you enter in the initial dialog box when you call the planning

    screen; in consistent planning, you can specify any, all, or no characteristic values.

    The system aggregates data dynamically when you call the planning table.

    In the example in the graphic, a planner has selected material AM001 is selected. He or she is planning

    the order quantities of this material in all regions and plants. The planner changes the total order quantity

    from 1000 to 2000 units. The system performs disaggregation automatically based on previously planneddata.

  • 8/11/2019 LO935 - Flexible Planning

    30/217

    (C) SAP AG LO935 2-8

    SAP AG 2002

    Bulbs

    Consistent Planning Views

    With the consistent planning method, you have a consistent view on your planning data at all times -

    whatever level you decide to plan at. In technical terms, the sum of the key figures at the detailed level

    gives the key figure at the total level.

    The example in the graphic shows two possible views: the central planning of all light bulbs in the US

    and the decentralized planning of standard-sized light bulbs in New Jersey

    Planning levels are interdependent: changes you make at one planning level have an immediate effect on

    all the other planning levels. The system carries out aggregation and disaggregation automatically atruntime.

    Planning is based on a self-defined information structure.

    Your view on the planning table is non-hierarchical.

  • 8/11/2019 LO935 - Flexible Planning

    31/217

    (C) SAP AG LO935 2-9

    SAP AG 2002

    Characteristcs

    Sales organization

    Distri bution ch annel

    Material

    Order quantity stored

    10 pc 20 pc 5 pc 30 pc

    Order quantity visib le

    10 pc 20 pc 5 pc 30 pc

    30 pc 35 pc

    65 pc

    Key figure

    Save Consistent Planning

    In consistent planning, the system stores data at the detailed level. If you enter the planning table at

    aggregate level, the system aggregates the key figure values.

    This procedure has two advantages:

    You plan your data at one level and can rely on data consistency at all other levels. You can create planning data from any perspective you want.

  • 8/11/2019 LO935 - Flexible Planning

    32/217

    (C) SAP AG LO935 2-10

    SAP AG 2002

    Incoming orders quantityIncoming orders quantity Incoming orders quantityIncoming orders quantity

    100 0

    100 100

    40 40

    Original plan

    Sales organization

    Distribution ch annel

    Material

    Changed plan

    50

    20 10 15 5 20 10 15 5 20 10 15 5

    50

    Master dataMaster data

    75 40

    20 10 15 5

    75 40

    50

    30 20

    50

    Planned incoming order quanti ties are changed from 30 pc and20 pc to 75 pc and 40 pc at distribution channel level

    Foreground Saved Foreground Saved

    30 20

    Level-By-Level Planning

    In level-by-level planning, the planning hierarchy levels are independent of each other. The system

    stores data separately at each planned level.

    You have a hierarchical view of the data in the planning table.

    The system does not perform automatic aggregation or disaggregation. Plans at different levels are not

    necessarily consistent.

    In level-by-level planning, the system does not automatically fed changes you make at one level to other

    levels. It is possible to impose data consistency across several planning levels. To disaggregate data, you must

    use the Edit Disaggregate line function in the planning table. The system then bases disaggregation

    on the constant proportional factors from the planning hierarchy. To aggregate data, you must define an

    aggregation macro in the planning type.

    The advantage of level-by-level planning is that you get a chance to check your data before passing it on

    to other levels.

  • 8/11/2019 LO935 - Flexible Planning

    33/217

    (C) SAP AG LO935 2-11

    SAP AG 2002

    Consistent Planning Level-By-Level Planning

    Planned values saved at detailed level only.

    Entire planning hierarchy can be planned in

    one transaction (no characteristic valuesselection).

    Planning table can be called with gaps in listof selected characteristic values.

    Planning values are visible:(i) for the characteristic values

    combination you enter(ii) at the detailed level(iii) at all levels in between

    Identical key figures planned at total anddetailed level.

    Key figures are defined in the planning type

    once only.Macros can be calculated at any level.

    Planned values can be saved at all levels.

    At least one characteristic value must be specified.

    Each level must be planned and disaggregatedindividually

    Planning table must be called without gaps in list ofselected characteristic values.

    Planning values are visible:(i) for the characteristic values

    combination you enter(ii) at the level below that

    Key figures at owner and member levels can be different.

    Key figures must be defined at both owner and member

    levels in the planning type.Macros can be calculated at either owner or memberlevel, depending on how you have defined them.

    Consistent vs. Level-By-Level

    Standard SOP always uses the level-by-level planning method.

    Standard SOP is based on information structure S076.

  • 8/11/2019 LO935 - Flexible Planning

    34/217

    (C) SAP AG LO935 2-12

    SAP AG 2002

    Function

    Autom atic aggregat ion

    Autom atic d isaggregationbased on factors saved indatabase

    Autom atic time-d ependen tdisaggregation based onprevious planning data

    Create planning hierarchy

    Planning types/macros

    Set opening stockautomatically in background

    Forecast

    Events

    Resource leveling

    Background processing

    Fix key figure values in theplanning table

    Long texts for versions andperiods in the planning table

    Standard analysis for info structureTransfer to Demand Management

    Consistent

    Yes

    Yes

    Yes

    Yes

    Yes

    Yes

    Yes

    Yes

    Yes

    Yes

    Yes

    Yes

    YesYes

    Level-By-Level

    No

    No

    No

    Yes

    Yes

    Yes

    Yes

    Yes

    Yes

    Yes

    No

    Yes

    NoYes

    Comparison of the Different Planning Methods

  • 8/11/2019 LO935 - Flexible Planning

    35/217

    (C) SAP AG LO935 2-13

    SAP AG 2002

    Key figure

    parameters

    Planning

    method

    Field catalogs:characteristics

    Field catalogs:

    key figuresDefine

    informationstructure

    Definemacros

    Define planning typeDefine planning type

    Define screenlayout

    Planning

    units

    Customizing for Flexible Planning

    Before working with flexible planning, you must first make a number of settings in Customizing. For

    example, you must define the planning method of each information structure.

    You can use only one planning method to plan an information structure.

    To plan an information structure with a second planning method, create a second information structure

    based on the first one and then copy the actual data using Copy Management. Then define the planning

    method of this new information structure.

    You must define the planning units of each information structure: currency unitperiod unit (storage periodicity) unit of measure

    It may happen in either consistent planning or level-by-level planning that the base unit of a material is

    different than the base unit of the information structure. In this case, you maintain the base unit of the

    information structure as an alternative unit in the material master record, together with a conversion

    factor.

  • 8/11/2019 LO935 - Flexible Planning

    36/217

    (C) SAP AG LO935 2-14

    SAP AG 2002

    Performance Enhancements

    No user exits

    No zero column usage

    No event usage

    Do not save to fo recast DB

    Planning object check off

    Key-figure-restricted DB update off

    ALE permit ted

    Document key figure

    You access the settings listed above in the Customizing activity Set parameters of info structures and key

    figures. They are all designed to improve the performance of your information structures. The following

    explains two of them. For a description of the others read the F1 help.

    Planning object check off

    If you set this indicator, you improve performance. However, the system does not perform the following

    checks:

    Are the selected characteristic value combinations in the planning hierarchy? They might be in actualdata of the information structure, but not in the planning hierarchy. Has the planning hierarchy been revised? In the master data menu of Flexible Planning, you have an

    option for revising the planning hierarchy. This option allows you to exclude one or more

    characteristic value combinations (planning objects) from the planning process. When you call the

    planning table, the system checks to see which characteristic value combinations you are planning for

    this information structure.

    Key figure restricted DB update off

    You can improve performance if you set this indicator. However, the system cannot save two planning

    types of an information structure simultaneously because it reads all the key figures in the information

    structure when it saves a planning type based on the information structure.

    If you do not set this indicator, the system automatically locks and saves only those key figures

    contained in one planning type. This means that two or more planning types of an information structure

    can be saved at the same time.

  • 8/11/2019 LO935 - Flexible Planning

    37/217

    (C) SAP AG LO935 2-15

    SAP AG 2002

    Planning Methods: Unit Summary

    Explain the differences between the planningmethods

    Outline the features and benefits of eachplanning method

    Maintain Customizing for Flexible Planning

    Summarize performance enhancements

    You are now able to:

  • 8/11/2019 LO935 - Flexible Planning

    38/217

    (C) SAP AG LO935 2-16

    Data Used in the Exercises

    Data Data in Training System Data in IDES System

    Information

    Structure

    S630 to S650

    S140

    S630 to S650

    S140

    Sold-to Customers 1001, 1175

    1002,1012,1033,1174,

    1300, 1670, 1671, 1900,1901, 2004, 2140, 2200,

    2300, 2500, 14000, 99999

    1001, 1175

    1002,1012,1033,1174,

    1300, 1670, 1671, 1900,1901, 2004, 2140, 2200,

    2300, 2500, 14000, 99999

    Sales Organization 1000 1000

    Distribution

    Channel

    12 12

    Division 00 when ordering

    04 when planning

    00 when ordering

    04 when planning

    Materials L-40C, L-40F, L-40R,L-40Y

    L-60C, L-60F, L-60R,

    L-60Y

    L-80C, L-80F, L-80R,

    L-80Y

    L-40C, L-40F, L-40R,L-40Y

    L-60C, L-60F, L-60R,

    L-60Y

    L-80C, L-80F, L-80R,

    L-80Y

    Plant 1200 1200

    Storage Location 0001 0001

  • 8/11/2019 LO935 - Flexible Planning

    39/217

    (C) SAP AG LO935 2-17

    Planning Methods Exercises

    Unit: Planning Methods

    Topic: Planning Methods

    Explain the differences between the three planning methods.

    Your sales/forecasting department would like to see changes made toyour plan at all levels of the planning structure, at the time the plan is

    changed. Therefore, the consistent planning method best suits the

    planning requirements of your organization.

    1-1 Using the Implementation Guide (IMG), verify the planning parameters of your info

    structure S630 + ##. The parameters should haveat least

    the following:

    Field Name Input Data

    Planning Method K (consistent)

    Exchange rate type M

    Statistics currency UNI

    Base unit of measure CAR (carton)

    Planning periods M

    Capacity figure

    1-1-1 What is the menu path in the IMG for changing the planning parameters for aninfo structure?

    The information message The table is client-independentadvises you

    that each change you make will have an effect on all other clients in

    the system. PressEnter to continue.

    ______________________________________________________

    ______________________________________________________

  • 8/11/2019 LO935 - Flexible Planning

    40/217

    (C) SAP AG LO935 2-18

    Planning Methods Solutions

    Unit: Planning Methods

    Topic: Planning Methods

    1-1 Using the Implementation Guide (IMG), verify the planning parameters of your info

    structure S630 + ##. The parameters should have at leastthe following:

    Field Name Input Data

    Planning Method K (consistent)

    Exchange rate type M

    Statistics currency UNI

    Base unit of measure CAR (carton)

    Planning periods M

    Capacity figure

    1-1-1 What is the menu path in the IMG for changing the planning parameters for aninfo structure?

    The information message The table is client-independentadvises you

    that each change you make will have an effect on all other clients inthe system. PressEnter to continue.

    Tools AcceleratedSAP Customizing Edit Project SAP ReferenceIMG

    Logistics - General Logistics Information System (LIS) Planning

    Master data Set parameters for info structures and key figuresOr

    Production Sales and Operations Planning (SOP) Master data Setparameters for info structures and key figures

    Scroll down to your info structure S6## and then double-click on the table

  • 8/11/2019 LO935 - Flexible Planning

    41/217

    (C) SAP AG LO935 3-1

    SAP AG 2002

    Master Data

    Planning hierarchy

    Product group

    Proportional factors

    Version management

    Contents:

  • 8/11/2019 LO935 - Flexible Planning

    42/217

    (C) SAP AG LO935 3-2

    SAP AG 2002

    On completing this uni t, you wil l be able to:

    Master Data: Unit Objectives

    Name the di fferences between master data forFlexible Planning and Standard SOP

    Explain how to create master data

    Outline the role of the proport ional factors

  • 8/11/2019 LO935 - Flexible Planning

    43/217

    (C) SAP AG LO935 3-3

    SAP AG 2002

    Master Data: Course Overview

    Planning Method

    Stat. Forecast

    MayMay

    Master Data

    Events

    Al locations

    InfoStructure

    Mass Processing

    Job

    Production Planning

    PlanningFunctions

    Planning Types

  • 8/11/2019 LO935 - Flexible Planning

    44/217

    (C) SAP AG LO935 3-4

    SAP AG 2002

    Master Data: Business Scenario

    Your company buil ds its forecast based on thehistory of invoiced quantity for the same quarter of

    the previous year. You expect your product mix tobe consistent. Therefore, you can build yourplanning hierarchy and calculate your proportionalfactors based on this history.

  • 8/11/2019 LO935 - Flexible Planning

    45/217

    (C) SAP AG LO935 3-5

    SAP AG 2002

    CharacteristicsCharacteristics ValuesValues

    Sales

    organization

    Sales offi ce

    Customer

    Material

    USA

    Europe

    Paris Dallas Boston

    Jones, Inc. Smith, Inc.

    L - 40F L - 100FL - 60F L - 100CL - 60C

    Characteristic Values to be Planned

    You create the master data for Flexible Planning by specifying the values of the characteristics you want

    to plan. You do this in a planning hierarchy.

    For consistent planning and level-by-level planning, you need to create a planning hierarchy before you

    can plan.

    A planning hierarchy is based on an information structure. You can create only one planning hierarchy

    per information structure.

  • 8/11/2019 LO935 - Flexible Planning

    46/217

    (C) SAP AG LO935 3-6

    SAP AG 2002

    Info structure

    EUROPE

    Central

    Paris

    Characteristics

    USA

    North South

    New York Dallas

    RegionSales organizationSales officeMaterial

    (Product groupings or materials)

    North America

    Planning Hierarchies

    The objects you plan in SOP depend on the characteristics in the info structure, and their sequence.

    By defining the values of the planned characteristics, you create the master data for Flexible Planning.

    You do this in a planning hierarchy.

    You can only create one planning hierarchy per information structure.

    In a planning hierarchy, the characteristic values represent the organizational levels at which you want to

    plan.

    To create a planning hierarchy manually, choose Master dataPlanning hierarchyCreate from theFlexible Planning menu.

    You have already defined the default units of a planning hierarchy in the Customizing step Set

    parameters of info structures and key figures. These are period unit, base unit of measure, and currency.

  • 8/11/2019 LO935 - Flexible Planning

    47/217

    (C) SAP AG LO935 3-7

    SAP AG 2002

    1997 1998

    Characteristic v alue combinationsfound in version 000

    xxxxxxxx

    xx

    x

    xxx

    xxxxxxxx

    xEur Central Paris M1Eur Central Paris M2Eur Central Paris M3Eur Central Paris M4Eur Central Paris M5

    USA North NY M7USA North NY M8

    USA North NY M6

    x

    USA South Dal. M11USA North NY M10

    USA South Dal. M12USA South Dal. M13USA South Dal. M14USA South Dal. M15

    USA North NY M9Data is filteredusing method

    USA South Dal. M16 xxUSA South Dal. M17

    x

    x

    Automat ic Creat ion o f a Planning Hierarchy

    You can create a planning hierarchy automatically based on actual data (version 000) or existing planned

    data (versions A00-999).

    To create a planning hierarchy automatically based on actual data, choose Master dataGenerate

    master data.

    It is often not necessary, or even desirable, to plan all products sold to all customers, including materials

    rarely sold. SAP offers you two ways to filter out characteristic value combinations (that is, data records)

    for planning: Specify a time frame Define your own method in Customizing

    A method is a program or programs written by your company to perform a clearly defined, highly

    specific task when certain conditions are met. For example, a method allows you to perform complex

    transformations on statistical data.

    One possible method would be to select materials or customers by their ABC indicator. For example,

    you might want to plan A materials individually, and B and C materials in collective planning objects.

    You can simulate the results of this automatic creation function. This lets you see how many

    characteristic value combinations the system would find in the specified time frame and therefore helps

    you decide how best to create the planning hierarchy.

  • 8/11/2019 LO935 - Flexible Planning

    48/217

    (C) SAP AG LO935 3-8

    SAP AG 2002

    Info structure S624

    Paris

    L-40F

    Europe USA

    Dallas

    Smith, Inc.

    Boston

    40% 60%

    100% 50% 50%

    100% 100%

    30% 20% 50%

    12%12% 21%21%20%20%8%8% 24%24%

    Jones, Inc. Baker, Inc.

    70% 30% 20% 80%

    100%

    6%6%9%9%

    L-60F L-100F L-40F L-60F L-60F L-100F

    Proportional Factors for Consistent Planning

    In consistent planning, disaggregation is based on the proportional factors between the total level and the

    detailed level.

    You can store constant proportional factors in the planning hierarchy. These proportional factors are not

    specific to any one key figure, characteristic value, or period.

    You can calculate constant proportional factors for consistent planning one of two ways:

    Using actual data

    Using the proportions already maintained between adjacent levels in the planning hierarchy To calculate the proportional factors for consistent planning on the basis of actual data, choose Master

    dataCalculate proportionsUsing actual data from the flexible planning menu.

    To calculate the proportional factors for consistent planning on the basis of the level-to-level proportions

    in the planning hierarchy, choose Master dataCalculate proportionsUsing planning hierarchy

    from the flexible planning menu.

    You can override the constant proportional factors in the planning table at any time. If you do this,

    however, the system bases subsequent disaggregation on the new proportional factors, which the system

    derives from the detailed planning data, and not on the constant proportional factors. To re-apply the

    constant proportional factors to a specific key figure in the planning table, you must choose Edit

    Disaggregate line.

  • 8/11/2019 LO935 - Flexible Planning

    49/217

    (C) SAP AG LO935 3-9

    SAP AG 2002

    Info structure S625

    Paris

    L-40F

    Europe USA

    Dallas

    Smith, Inc.

    Boston

    40% 60%

    100% 50% 50%

    100% 100%

    30% 20% 50%

    Jones, Inc. Baker, Inc.

    70% 30% 20% 80%

    100%

    L-60F L-100F L-40F L-60F L-60F L-100F

    Proport ional Factors for Level-By-Level Planning

    Using proportional factors, you describe the dependencies of the individual nodes in a planning

    hierarchy or a product group hierarchy more closely. These factors allow you to disaggregate planning

    data through the planning hierarchy. The planning method determines whether or not this happens

    automatically (see the Planning Methods Unit).

    In level-by-level planning, the system performs disaggregation based on the proportional factors

    between adjacent planning levels. This applies both to Standard SOP and to information structures in

    Flexible Planning for which you have defined level-by-level planning. You can create these proportional factors manually or automatically.

    In most cases, you base this calculation on the actual data in version 000. However, you can also use any

    planning version.

    To create the proportional factors for level-by-level planning automatically, you have two choices:

    Create them for a single level in the planning hierarchy or product group with EditCalculateproportions or

    Create them for multiple levels of the planning hierarchy or product group with Master data Calculate proportionsUsing actual data or Product groupCalculate proportions

  • 8/11/2019 LO935 - Flexible Planning

    50/217

    (C) SAP AG LO935 3-10

    SAP AG 2002

    LightbulbsLightbulbsPlant 9999Plant 9999

    Line "frosted"Plant 0001

    40 wattPlant 0001

    60 wattPlant 0001

    40 wattPlant 0002

    60 wattPlant 0002

    100 wattPlant 0002

    Line "clear"Plant 0002

    Product Group Hierarchy

    You create the master data for standard SOP by maintaining one or more product groups.

    A product group can consist of either additional product groups or materials.

    In a product group, you can group together products according to any criteria (distribution, production

    method, and so on).

    For each product group, the system creates a material master record of material type PROD.

    Enter both product groups and materials with a plant reference.

    For each product group member, enter a description, a unit of measure, a units of measure conversionfactor (if the unit of the member is different than the owner unit), and an aggregation factor.

    You can perform cross-plant planning.

    You can perform planning out at the material or product group level

    Use level-by-level planning with product groups.

    Standard SOP always uses the level-by-level planning method.

    Standard SOP is based on information structure S076.

  • 8/11/2019 LO935 - Flexible Planning

    51/217

    (C) SAP AG LO935 3-11

    SAP AG 2002

    InfoStructure

    A00Active Ver sion

    000Actual Data

    001Simulation 1

    002Simulation 2

    UpdatingDemand Mgt .

    Copy

    Version Management

  • 8/11/2019 LO935 - Flexible Planning

    52/217

  • 8/11/2019 LO935 - Flexible Planning

    53/217

    (C) SAP AG LO935 3-13

    Master DataExercises

    Unit: Master Data

    Topic: Planning Hierarchy

    Explain the two ways of creating master data for flexible planning.

    Outline the role of the proportional factors.

    Your company builds its forecast based on the history of invoiced

    quantity for the same quarter of the previous year. You expect your

    product mix to be consistent. Therefore, you can build your planning

    hierarchy and calculate your proportional factors based on this history.

    1-1 The following is the forecast input sheet your organization has been using to load

    forecasts into your legacy system. It shows actual data collected for the prior year,allowing space for your sales force to enter the sales forecast in currency values. Yourinfo structure S630 + ## already supports this format. Create a planning hierarchy for

    your info structure that supports the data on the following sheet:

    Sales Organization 1000 Germany Frankfurt Division 04 Lighting,Customer 1000 Becker Berlin Plant1200

    Material L-80F 80 Watt Frosted Light bulbs

    Month+1 Month+2 Month+3 Month+4 Month+5

    Last Years Invoiced Sales 10000 11000 12000 13000 14000

    Last Years Invoiced Qty 1000 1100 1200 1300 1400

    Sales Forecast QtyMaterial L-40C 40 Watt Clear Light bulbs

    Month+1 Month+2 Month+3 Month+4 Month+5

    Last Years Invoiced Sales 5000 6000 7000 8000 9000

    Last Years Invoiced Qty 500 600 700 800 900

    Sales Forecast Qty

  • 8/11/2019 LO935 - Flexible Planning

    54/217

    (C) SAP AG LO935 3-14

    Sales Organization 1000 Germany Frankfurt Division 04 Lighting,Customer 1175 Elektromarkt Bamby Plant1200

    Material L-60C 60 Watt Clear Light bulbs

    Month+1 Month+2 Month+3 Month+4 Month+5

    Last Years Invoiced Sales 10000 11000 12000 13000 14000

    Last Years Invoiced Qty 1000 1100 1200 1300 1400Sales Forecast Qty

    Material L-80F 80 Watt Frosted Light bulbs

    Month+1 Month+2 Month+3 Month+4 Month+5

    Last Years Invoiced Sales 5000 6000 7000 8000 9000

    Last Years Invoiced Qty 500 600 700 800 900

    Sales Forecast Qty

    Material L-40C 40 Watt Clear Light bulbs

    Month+1 Month+2 Month+3 Month+4 Month+5

    Last Years Invoiced Sales 2500 3000 3500 4000 4500

    Last Years Invoiced Qty 250 300 350 400 450

    Sales Forecast Qty

    1-1-1 Based on this input sheet, what are the planning levels you will enter into yourplanning hierarchy?

    1

    0.2.13

    0.2.14

    0.2.10

    0.2.11

    0.2.7

    0.2.8

    0.2.50.2.2

    0.2.3

    0.2.27

    0.2.28

    0.2.24

    0.2.25

    0.2.21

    0.2.22

    0.2.190.2.16

    0.2.17

    Formatted: Bullets and Numb

    Formatted: Bullets and Numb

    Formatted: Bullets and Numb

    Formatted: Bullets and Numb

    Formatted: Bullets and Numb

    Formatted: Bullets and Numb

    Formatted: Bullets and Numb

    Formatted: Bullets and Numb

    Formatted: Bullets and Numb

  • 8/11/2019 LO935 - Flexible Planning

    55/217

    (C) SAP AG LO935 3-15

    1-1-2 Based on the above structure, begin entering your planning hierarchy.

    When creating the planning hierarchy for the first time, leave thecharacteristics blank.

    A message will be displayed about the proportional factors. Because

    we are not entering proportional factors, selectAll maintnceto

    bypass this message.

    Dont forget to enter the data for both Sold-to Parties.

    Leave all the aggregation and proportion factors blank for now, because wewill let the system calculate the proportions based on actual data.

    1-1-3 What is the menu path for this function?

    1-1-4 Display the hierarchy graphic for your planning hierarchy thus far. How many

    boxes (nodes) does it have?

    _________________________________________________________

    _________________________________________________________

    1-2 You have decided entering the planning hierarchy is a tedious task. Since you forecast

    based on your history of invoiced quantity, automatically build your planning hierarchy

    based on last 12 month (including the current month).

    When you perform this function for the first time, select the simulation indicator. For

    the second run, turn off the simulation indicator.

    1-2-1 What version will you use to base your planning hierarchy?

    _________________________________________________________

    1-2-2 When you have rerun this step with the simulation indicator turned off, display

    your planning hierarchy, including the hierarchy graphic.

    1-2-3 What additional sold-to partner(s) were created?

    _________________________________________________________

    1-2-4 What materials were created for this partner?

    _________________________________________________________

    1-2-5 What is the difference between your manual entries and the automaticallycreated entries?

  • 8/11/2019 LO935 - Flexible Planning

    56/217

    (C) SAP AG LO935 3-16

    _________________________________________________________

    _________________________________________________________

    _________________________________________________________

    1-3 Automatically create proportional factors for your planning hierarchy.

    Base this calculation on actual values of the key figure invoiced qty.

    Make sure that the proportions are adjusted in the planning hierarchy.

    Use the last six month for the calculation

    1-3-1 What version will you use to calculate your proportional factors?

    _________________________________________________________

    1-3-2 Display your planning hierarchy. Where do you see the proportional factors?

    _________________________________________________________

    _________________________________________________________

    1-3-3 Why is a proportional factor of zero calculated for sold-to partner 1000?

    _________________________________________________________

    _________________________________________________________

  • 8/11/2019 LO935 - Flexible Planning

    57/217

    (C) SAP AG LO935 3-17

    Master DataSolutions

    Unit: Master Data

    Topic: Planning Hierarchy

    1-1 The following is the forecast input sheet your organization has been using to load

    forecasts into your legacy system. It shows actual data collected for the prior year,

    allowing space for your sales force to enter the sales forecast in currency values. Yourinfo structure S630 + ## already supports this format. Create a planning hierarchy for

    your info structure that supports the data on the following sheet:

    Sales Organization 1000 Germany Frankfurt Division 04 Lighting,Customer 1000 Becker Berlin Plant1200

    Material L-80F 80 Watt Frosted Light bulbs

    Month+1 Month+2 Month+3 Month+4 Month+5

    Last Years Invoiced Sales 10000 11000 12000 13000 14000Last Years Invoiced Qty 1000 1100 1200 1300 1400

    Sales Forecast Qty

    Material L-40C 40 Watt Clear Light bulbs

    Month+1 Month+2 Month+3 Month+4 Month+5

    Last Years Invoiced Sales 5000 6000 7000 8000 9000

    Last Years Invoiced Qty 500 600 700 800 900

    Sales Forecast Qty

    Sales Organization 1000 Germany Frankfurt Division 04 Lighting,Customer 1175 Elektromarkt Bamby Plant1200

    Material L-60C 60 Watt Clear Light bulbsMonth+1 Month+2 Month+3 Month+4 Month+5

    Last Years Invoiced Sales 10000 11000 12000 13000 14000

    Last Years Invoiced Qty 1000 1100 1200 1300 1400

    Sales Forecast Qty

    Material L-80F 80 Watt Frosted Light bulbs

    Month+1 Month+2 Month+3 Month+4 Month+5

    Last Years Invoiced Sales 5000 6000 7000 8000 9000

    Last Years Invoiced Qty 500 600 700 800 900

    Sales Forecast Qty

    Material L-40C 40 Watt Clear Light bulbs

    Month+1 Month+2 Month+3 Month+4 Month+5

    Last Years Invoiced Sales 2500 3000 3500 4000 4500

  • 8/11/2019 LO935 - Flexible Planning

    58/217

    (C) SAP AG LO935 3-18

    Last Years Invoiced Qty 250 300 350 400 450

    Sales Forecast Qty

    1-1-1 Based on this input sheet, what are the planning levels you will enter into your

    planning hierarchy?

    1-1-2

    Based on the above structure, begin entering your planning hierarchy

    When creating the planning hierarchy for the first time, leave thecharacteristics blank.

    A message will be displayed about the proportional factors. Becausewe are not entering proportional factors, selectAll maintnceto

    bypass this message.

    Dont forget to enter the data for both Sold-to Parties.

    Leave all the aggregation and proportion factors blank for now, because we

    will let the system calculate the proportions based on actual data.

    Sales Org

    1000

    Material

    L-80F

    Material

    L-40C

    Material

    L-80F

    Material

    L-40C

    Sold-to Party

    1175

    Division

    04

    Sold-to Party

    1000

    Material

    L-60C

    Plant

    1200

    Plant

    1200

    Plant

    1200

    Plant

    1200

    Plant

    1200

    Formatted: Bullets and Numb

    Formatted: Bullets and Numb

    Formatted: Bullets and Numb

    Formatted: Bullets and Numb

    Formatted: Bullets and Numb

    Formatted: Bullets and Numb

    Formatted: Bullets and Numb

    Formatted: Bullets and Numb

    Formatted: Bullets and Numb

    Formatted: Bullets and Numb

    Formatted: Bullets and Numb

    Formatted: Bullets and Numb

  • 8/11/2019 LO935 - Flexible Planning

    59/217

    (C) SAP AG LO935 3-19

    Logistics Logistics controlling Flexible planning Master data

    Planning hierarchy Create

    Enter your info structure S630 + ##. Click the green check button twice.

    On the Create Planning Hierarchy screen, enter sales organization 1000.

    Choose [Next level]. Enter division 04.

    Choose [Next level]. Enter Sold-to 1000 and 1175.

    Choose [Next level].

    Continue entering data using the input sheet above. When you are

    finished, choose [Save].

    1-1-3 What is the menu path for this function?

    Logistics Logistics controlling Flexible planning Master data

    Planning hierarchy Create

    1-1-4 Display the hierarchy graphic for your planning hierarchy thus far. How many

    boxes (nodes) does it have?

    Planning hierarchy Graphics

    Enter Info Structure S-##, choose Enter.

    Leave the characteristics blank.

    The number of nodes is 14 + 1 for the planning hierarchy S##.

    1-2 You have decided entering the planning hierarchy is a tedious task. Since you forecastbased on your history of invoiced quantity, automatically build your planning hierarchy

    based on the last 12 month (including the current month).

    When you perform this function for the first time, select the simulation indicator. Forthe second run, turn off the simulation indicator.

    From the Flexible Planning menu:

    Master data Generate master data

    Enter your info structure S630 + ##.

    Enter version 000.

    Enter the date range specified above.

    Be sure the simulation indicator is selected for the first time you run this step.

    [Execute]

    Green-arrow back.

    Turn the simulation indicator off.

    [Execute]

    1-2-1 What version will you use to base your planning hierarchy?

    Version 000 Actual data

  • 8/11/2019 LO935 - Flexible Planning

    60/217

  • 8/11/2019 LO935 - Flexible Planning

    61/217

    (C) SAP AG LO935 3-21

    The proportional factors are displayed at each level of the planning

    hierarchy, relative to the level above.

    1-3-3 Why is a proportional factor of zero calculated for sold-to partner 1000?

    Because there are no actual data for sold-to partner 1000

  • 8/11/2019 LO935 - Flexible Planning

    62/217

    (C) SAP AG LO935 4-1

    SAP AG 2002

    Planning Types and Macros

    Planning types

    Include actual data

    Performance enhancements

    Drill down functionality

    Variable time buckets

    Macros

    Contents:

  • 8/11/2019 LO935 - Flexible Planning

    63/217

    (C) SAP AG LO935 4-2

    SAP AG 2002

    On completing this uni t, you wil l be able to:

    Planning Types and Macros: Objectives

    Create your own planning type

    Outline the use of planning type info

    Create your own macros

    Explain different ways to execute macros

  • 8/11/2019 LO935 - Flexible Planning

    64/217

    (C) SAP AG LO935 4-3

    SAP AG 2002

    Planning Method

    Stat. Forecast

    MayMay

    Master Data

    Events

    Al locations

    InfoStructure

    Mass Processing

    Job

    Production Planning

    PlanningFunctions

    Planning Types

    Planning Types and Macros: Course Overview

  • 8/11/2019 LO935 - Flexible Planning

    65/217

    (C) SAP AG LO935 4-4

    SAP AG 2002

    Management would l ike to sto re all planning data,both sales and production, in the same structure.

    Different departments would l ike to have differentviews of their relevant data.

    Addit ionaly, certain user groups should be allowedto display but not change certain key figures.

    Planning Types and Macros: Business Scenario

  • 8/11/2019 LO935 - Flexible Planning

    66/217

    (C) SAP AG LO935 4-5

    SAP AG 2002

    InfoStructure

    Incoming orders qty.

    Incoming ordersInvoiced quantityInvoiced salesProduction qty .Stock levelTarget sto ck levelDays supplyTarget days supply

    Incoming ord. qty.Incoming orders

    Invoiced quantity

    Invoiced sales

    Sales

    Production qty.

    Stock level

    Target stock level

    VersionA00

    Version001

    Planning type: SALES

    Planning type: PRODUCTION

    Planning Types

    In Flexible planning, you can create your own customized planning screens, referred to as planning

    types.

    A planning type is a self-defined view on the planning data in an information structure. You can create

    as many planning types as you need for an information structure.

    To create a planning type, choose ToolsPlanning type/macro Create in Flexible planning or carry

    out the Customizing step Maintain planning types.

    In level-by-level planning, you define each level of the planning type separately.

  • 8/11/2019 LO935 - Flexible Planning

    67/217

    (C) SAP AG LO935 4-6

    SAP AG 2002

    The planning typedetermines whichkey figures are displayedin the planning table

    The planning typedetermines whichkey figures are displayed

    in the planning table

    You can create macrosin the planning typeto calculate key figures

    You can create macrosin the planning typeto calculate key figures

    Include actual datafrom Version 000in the planning table

    Include actual datafrom Version 000in the planning table

    The planning typedetermines the horizonand the time grid of

    planning

    The planning typedetermines the horizonand the time grid of

    planning

    Planning

    Table:

    Create a Planning Type 1

    A planning type is a customized view on the planning table; for example, you might have one view for

    the sales planner and another view for the production planner. A planning type defines the content and

    layout of the lines in the planning table, as well as the mathematical operations, in the form of macros,

    which the system can perform on these lines.

    A planning type is based on any information structure of your choice (either a standard information

    structure or a self-defined information structure). You therefore have almost unlimited possibilities with

    regard to the information you can plan. The actions you perform to create a planning type are:

    Creating planning type info Assigning a key figure to a line Creating lines in the planning table Defining line attributes Defining macros Using special operators to define macros for stock balance, production, days' supply, and historical

    totals

    Translating planning type, freely defined line, and macro texts

  • 8/11/2019 LO935 - Flexible Planning

    68/217

    (C) SAP AG LO935 4-7

    SAP AG 2002

    Insert event linesInsert event lines

    Define line type: output line planning line aggregation averaging

    Define line type: output line planning line aggregation averaging

    Define: drilling down performance extended selection

    screen

    Define: drilling down performance

    extended selectionscreen

    Planning type

    Info structure

    Invoiced sales

    Actua l sal es

    Proport. Event

    Correct. sales

    Create a Planning Type 2

    The aggregate planning indicator in the planning type info enables:

    Drilldown in the planning table Variable time buckets Saving of fixed values Performance enhancements

    If you set the indicator, the system aggregates the key figure values by the database server, and transfers

    only the totals to the application server. If you do not set this indicator, the system transfers the details tothe application server, which aggregates them. The system automatically sets the indicators for planning

    types that you created in Release 3.0 or 3.1 when you upgrade.

  • 8/11/2019 LO935 - Flexible Planning

    69/217

    (C) SAP AG LO935 4-8

    SAP AG 2002

    PlanningPlanningtypetype

    Select key fi guresfrom info structure

    Select key fi guresfrom info structure

    - Order value

    - Confirmed quantity- Open order quantity

    - Open order value

    - Delivery quantity

    - Sales

    Define additional

    lines

    Define additional

    lines

    - Event

    - Corrected sales

    - Actual datafrom previous year

    MacroMacro

    Event/orig. sales * 100

    = Deviation in %

    + - * / etc.

    Planning t ablePlanning table

    - Consistent

    - Level-by-level

    - Delta

    Orig. sales

    Event

    Corr. sales

    Deviation i n %

    Defining a Planning Table

    A planning type typically contains a subset of the key figures in the underlying information structure.

    You can also define additional lines whose contents the system obtains, for example, by the execution of

    macros.

    You define macros in a planning type. A macro performs a mathematical operation on an existing field

    or fields, and returns a new calculated value. You can set up a macro so that the system automatically

    executes it when the planner enters or leaves the planning screen, or when he presses Enter.

    In a planning type, you can also insert lines for this year's actual data, last year's actual data, events, andexternal data.

    To define which data the system reads into the external data line, you must use the MCP20001

    functional enhancement in a Customizing project (transaction CMOD).

    You set attributes for each line in a planning type.

  • 8/11/2019 LO935 - Flexible Planning

    70/217

    (C) SAP AG LO935 4-9

    SAP AG 2002

    Definemacros

    Define Planning TypeDefine Planning TypeDefine Info StructureDefine Info Structure

    Planningmethod

    Planningunits

    Setaggregation type

    Define screenlayout

    Key figureparameters

    Aggregation and Disaggregation:Determine by Aggregation Type

    The aggregation type of a key figure specifies how the system aggregates and disaggregates that key

    figure. You set the aggregation type in Customizing (either in Set planning parameters for info structures

    and key figures or in Maintain planning types).

    The three aggregation types are:

    The system calculates an average The system calculates a total; the system performs disaggregation based on the proportional factors

    The system does not perform any aggregation Total calculated is the default aggregation type for planned key figures. The default aggregation type for

    a freely defined line is no aggregation. For more information, see the IMG.

  • 8/11/2019 LO935 - Flexible Planning

    71/217

    (C) SAP AG LO935 4-10

    SAP AG 2002

    SOPKAPA

    SOPKAPAM

    SOPDIS

    Standard Planning Types

    Standard SOP comes with three planning types:

    SOPKAPA: the system uses this for the single-level planning of a product group SOPKAPAM: the system uses this for the planning of an individual material SOPDIS: the system uses this for dual-level planning of a product group

    You can copy any one of these planning types and then modify it to suit your needs.

  • 8/11/2019 LO935 - Flexible Planning

    72/217

    (C) SAP AG LO935 4-11

    SAP AG 2002

    DatabaseDatabaseserverserver

    Appli cat ionAppli cat ionserverserver

    Aggregat ed

    Detailed

    Aggregate Plann ing

    Improved performance

    Drill down functionality

    Aggregate planning indicator

    You set this indicator in the planning type by selecting Maintain planning types in Customizing. The

    database server aggregates key figures in this planning type, and it transports only these totals to the

    application server. If you do not set this indicator, the database server transports details to the application

    server, which then aggregates them. The system automatically sets the indicators for planning types that

    you created in Release 3.0 or 3.1 when you upgrade.

    This indicator enables the following: Improved performance Drill down functionality Flexible time buckets Permanent fixing

  • 8/11/2019 LO935 - Flexible Planning

    73/217

    (C) SAP AG LO935 4-12

    SAP AG 2002

    3.0 Database ... W17 W18 W19 ...

    Disp lay ... W17 W18 W19 ...

    4.0 Database ... W17 W18.4 W18.5 W19 ...

    Display ... W17 W18 W19 ...

    or ... 04/97 05/97

    Data entry in d ifferent time buckets possible

    Aggregat ion and d isaggregation based on predefined timebucket grid

    Variable Time Buckets

    You can plan using more than one period indicator. For these indicators, you let the system generate a

    technical period that it saves as a fiscal year variant. You must set the planning method of the

    information structure to consistent planning. The following example explains how to plan in weeks and

    months.

    Example: Set the information structure parameters for this function in Set parameters of info structures

    and key figures as follows:

    1.Press F4 on the Planning periods field. (The Storage periodicity field is not ready for input.) 2.In the Planning periods box on the next screen, enter W and M in the PI column. 3.Enter a name for your technical fiscal year variant. This name should consist of two letters. 4.Enter a generation horizon. This horizon should encompass the planning horizon both past and

    future periods that you wish to plan with this information structure.

    5.Save these settings. The system automatically generates a technical fiscal year variant. Return to the Information Structure

    Parameters screen. The name of your technical fiscal year variant (see step 3) appears as the fiscal year

    variant. A G appears in the Planning periods field. This G stands for generated.

    Define the sequence of the periods in the planning type info.

  • 8/11/2019 LO935 - Flexible Planning

    74/217

    (C) SAP AG LO935 4-13

    SAP AG 2002

    Macros

    Record function: standard operators

    Record function: special macros for production, stockbalance, days' supply, and historical totals

    Create function

    Functional enhancement MCP20002 (macro "User...")

    You define very simple macros with the Record function. Follow the instructions at the bottom of the

    screen.

    You define more complicated macros with the Create function.

    To calculate production, stock balance, days' supply, or a historical total, you can use one of the special

    macros provided by SAP.

    To write your own, highly complex macro, use functional enhancement MCP20002 in a Customizing

    project (transaction CMOD). The macro name must begin with the string USER.

  • 8/11/2019 LO935 - Flexible Planning

    75/217

    (C) SAP AG LO935 4-14

    SAP AG 2002

    Operand 1(mandatory)

    Operator Operand 2(optional)

    Result

    Key figuremember

    Key figureowner

    Key figureowner

    DM

    AM

    Key figure = V

    Key figuremember

    Key figure

    Key figureornumerical

    value

    +

    *

    /

    >