large shaft sling type - couplings - morris · pdf fileyear 2 –install a shredder to...

15
LARGE SHAFT SLING TYPE - COUPLINGS

Upload: truongthuan

Post on 18-Mar-2018

235 views

Category:

Documents


3 download

TRANSCRIPT

LARGE SHAFT – SLING TYPE - COUPLINGS

• Up to 13% reduction in energy consumption

• Significant reduction in shaft fractures

• Significant increase the life of transmissions and gear reducers

• Does not require lubrication

• Free of mechanical maintenance

• Reduction of cane mill bearing wear • Noise is reduced

• Reduction of transmission bearing wear

• Isolates vibration between mill and drive

• Isolates and absorbes axial load between mill and drive

• Isolates missalignment between mill and drive

• Very compact – minimal space needed

• Each coupling is custom made according to customer’s characteristics

LARGE SHAFT – SLING TYPE - COUPLINGS

Morris Sallick Industrial Supplies, Inc.Mechanical, Electrical, Control/Automation & Instrumentation Process Engineering

CHUTE HEIGHT SENSOR

Morris Sallick Industrial Supplies, Inc.Mechanical, Electrical, Control/Automation & Instrumentation Process Engineering

SHORT RETENTION TIME DIFFUSER

Morris Sallick Industrial Supplies, Inc.Mechanical, Electrical, Control/Automation & Instrumentation Process Engineering

SHORT RETENTION TIME DIFFUSER

Morris Sallick Industrial Supplies, Inc.Mechanical, Electrical, Control/Automation & Instrumentation Process Engineering

SHORT RETENTION TIME DIFFUSER

Morris Sallick Industrial Supplies, Inc.Mechanical, Electrical, Control/Automation & Instrumentation Process Engineering

SHORT RETENTION TIME DIFFUSER

Morris Sallick Industrial Supplies, Inc.Mechanical, Electrical, Control/Automation & Instrumentation Process Engineering

SHORT RETENTION TIME DIFFUSER

Morris Sallick Industrial Supplies, Inc.Mechanical, Electrical, Control/Automation & Instrumentation Process Engineering

SHORT RETENTION TIME DIFFUSER

Mill # 5

Mill #1

Mill # 2

Mill # 3

Mill # 4

Shredder6000 TCD

INITIAL CONDITION

6000 TCD

Morris Sallick Industrial Supplies, Inc.Mechanical, Electrical, Control/Automation & Instrumentation Process Engineering

SHORT RETENTION TIME DIFFUSER

YEAR 1 – INSTALL 1 SHORT-RETENTION-TIME –DIFFUSER OPERATING AS A BAGASE DIFFUSER AND KEEP MILLING AT 6000 TCD.MILLS 2, 3 & 4 SLOW DOWN TO OPERATE AT 3000 TCD THROUGHPUT, THERE SHOULD BE NO LOSS IN OVERALL

EXTRACTION.

Mill #1

Mill # 2

Mill # 3

Mill # 4

Mill # 5

Shredder6000 TCD

3000 TCD

3000 TCD

SRTD # 1

3000 TCD

3000 TCD

3000 TCD

Morris Sallick Industrial Supplies, Inc.Mechanical, Electrical, Control/Automation & Instrumentation Process Engineering

SHORT RETENTION TIME DIFFUSER

Mill #1

Mill # 2

Mill # 3

Mill # 4

Mill # 5

Shredder9000 TCD

3000 TCD

3000 TCD

6000 TCD

6000 TCD

3000 TCD

SRTD # 1

YEAR 2 – INSTALL A SHREDDER TO IMPROVE PI TO 90+% AND CONVERT THE DIFFUSER TO CANE-DIFFUSION BY FEEDINGFROM THE CANE-PREPARATION LINE. INCREASE CAPACITY BY ANYTHING UP TO 9000 TCD THROUGHPUT.

Morris Sallick Industrial Supplies, Inc.Mechanical, Electrical, Control/Automation & Instrumentation Process Engineering

SHORT RETENTION TIME DIFFUSER

Mill #1

Mill # 2

Mill # 3

Mill # 4

Mill # 5

Shredder

3000 TCD

SRTD # 1

3000 TCD

3000 TCD

SRTD # 2

3000 TCD

SRTD # 3

3000 TCD 3000 TCD 3000 TCD

9000 TCD

YEAR 3 – ADD 2 ADDITIONAL 3000 TCD SRT DIFFUSERS TO DISCHARGE TO MILLS # 1 & 3 AND OPERATE THE 3 MILLS FOR DRYING PURPOSES, ALL RUNNING SLOWLY (+- 3 RPM). EXTRACTION SHOULD INCREASE SIGNIFICANTLY. NOTE: IF ANY MILLS BREAKS DOWN THE DIFFUSER SHOULD BE ABLE TO DISCHARGE INTO OTHER MILLS.