CITY OF TERRACE
FINANCE, PERSONNEL AND ADMINISTRA T/ON COMPONENT
OF THE COMMITTEE OF THE WHOLE REPORT
MEMO:
FROM:
DATE:
SUBJ:
Kris Boland, CAO, for Mayor & Council
Lori Greenlaw, Director of Finance
September 23, 2021
List of Unfunded Capital Projects
RECOMMENDATION:
That the recommended items from the unfunded capital projects list be added to the Draft General, Sewer, and Water Capital Plans 2022-2026 and proceed to the community budget consultation phase of the budget process.
BACKGROUND:
Attached for information: Appendix A: Unfunded Capital Projects - Recommended Appendix B: Unfunded Capital Projects - Remaining
As part of our financial planning process staff have compiled a list of unfunded capital projects; these are projects that are required but a funding source has not yet been identified, primarily due to a lack of funding availability. As we are not able to undertake every possible capital project due to limited funding and reserve balances, careful consideration has been given to each project before identifying ones to put forward for Council's consideration. Staff prioritizes the unfunded capital projects in the following order:
1. Legal or legislated 2. Health and safety 3. Protect existing infrastructure 4. Maintain existing services 5. Efficiency gain 6. Other (new items or initiatives)
Staff have reviewed this list and taking the existing projects in the capital plan into consideration, are recommending the projects itemized in Appendix A for inclusion in the Draft General, Sewer, and Water Capital Plans 2022-2026. The recommendation includes all items that fall into the category of Legal or legislated, Health and safety, and Protect existing infrastructure, as these items are deemed to be of the highest importance and take into consideration the City's limited financial resources. The projects contained in years 2022-2024 in the category of Maintain existing services are
List of Unfunded Capital Projects - 2 - 9/23/2021
also being recommended as they are considered essential to maintaining our services in the near term. One new item in 2022 is also included in this list as it is a prior recommendation from Council to install CCTV Systems for security purposes in City buildings.
The total of all projects being recommended to move from the unfunded capital projects list to the Draft General, Sewer, and Water Capital Plans 2022-2026 is $5,392,015. Staff have spent considerable time reviewing the existing projects in the five-year plans and the projects on the unfunded capital list from an engineering, asset management, and financial planning perspective; the recommendations to move forward or defer projects are due to this analysis.
Table 1 - Totals by priority ranking from Appendix A Unfunded Capital Projects -Recommended
2022 2023 2024 2025 2026
1. Legal or legislated 25,000
Total
25,000
2. Health and safety 21,573 200,000 1,361,017 150,000 1,732,590
3. Protect existing infrastructure 25,000 25,000
4. Maintain existing services 627,350 2,634,575 322,500 3,584,425
5. Efficiency gain
6. Other (new items) 25,000 25,000
Recommended $723,923 $ 2,834,575 $ 1,683,517 $ 150,000 $ $ 5,392,015
Table 2 - Funding source for recommendations
2022 2023 2024 2025 2026 Total
Gas Tax Reserve (bonus 2021 payment) 586,525 586,525
NCPG Reserve 137,398 2,834,575 1,683,517 150,000 4,805,490
$ 723,923 $ 2,834,575 $ 1,683,517 $ 150,000 $ 5,392,015
An item of note in Appendix A is the Arena Refrigeration Plant. This project is included in 2023 of the Draft General Capital Plan with a budget of $500, 000. This original budget was based on a high-level estimate based on work done in other communities in past years and no longer reflects current costing or safety requirements. This budget is increasing from $500,000 to $1,800,000 over a three-year period and the shortfall of $1 ,300,000 is included in Appendix A: Unfunded Capital Projects - Recommended list. This new budget is based on an April 2021 Site Review and System Upgrade Recommendation report that was completed by an independent refrigeration engineer and considers current costing and safety requirements.
List of Unfunded Capital Projects - 3 - 9/23/2021
There are over $58,000,000 in various projects that remain on the unfunded capital list that have been identified based on staff's immediate knowledge, reports and studies, and master plans. Many of the items on the unfunded list need additional planning and discussion and are very conceptual and not yet well refined. There is still a lot of asset management work to be done which will expand on and improve the unfunded capital projects list. Staff are taking continual steps forward with asset management planning and will be providing Council with an update.
A summary of the City's reserves is included on this agenda to give context for funding decisions related to the Capital Plan.
Recommendations related to this report will come back to the October 14, 2021 Committee of the Whole Council Meeting if further discussion is required prior to community budget consultation.
BUDGETARY IMPACT OF RECOMMENDATION (if applicable):
Budgeted Amount: Unbudgeted Amount:
COUNCIL STRATEGIC FOCUS AREA(S):
D Increase City Revenues X Responsible Asset Management X Value our Natural Assets & Lifestyle D Enhance Civic Pride D Advocate for Community, Social & Environmental Issues X Manage the Impacts of Growth
Submitted by: L Greenlaw, -Director of Finance Approved for Submission to Council
Treas.
CAPITAL & PROJECTS 2022 2023 2024 2025 2026 Notes
Transportation (incl roads, paving, etc)
PW 4800 Davis Reconstruction 750,000
WAT 4800 Davis Reconstruction 185,000
PW Birch Hill Gabions 25,000 Priority to install prior to road failure
PW Kalum Hill Storm Pipe Replacement 100,000
Big "0" pipe running from the top of Kalum Hill to
the Howe Creek trail needs to be replaced with
fused pipe. Current piping is being pulled apart
as the material beneath it slides. Constant
maintenance issue with vandalism.
PW Eby Storm Inspection 25,000
Hire a specialized contractor to walk through Eby
storm
PW Cooper/Lanfear/Mcconnell Roundabout Design 75,000
PW Cooper/Lanfear/Mcconnell Roundabout 750,000
Sewer
SEW STP Road Upsize Gravity Main 450,000
South of Graham, 500mm to 750mm. Identified in
Sewer Master Plan
Sportsplex
LS Main Arena Roof Phase I and II 188,000 188,000
Identified as a requireemnt, AJ Roof quoted for
full roof
LS Exterior Doors Main Arena 50,000 Lower priority than front doors but long overdue
LS Banquet Room Front Doors: Glass & Accessible 25,000 Bring down to two doors
LS Arena Refrigeration Plant Replacement 200,000 950,000 150,000
Addit'l portion in 2023 cap plan - but the budget is
insufficient
Other Facilities
PW Mechanic Shop Vehicle Hoist Upgrade 35,000
PW Mechanic Shop Doors 2022 To 2025 16,000 16,000 Two per year for two years
PW RCMP Boiler 100,000
End of life due for replac, efficiencies to be
realized with updates
PW Rcmp Genset (Backup Generator) 60,000 End of life, parts unavailable for repairs
PW Library Boiler 100,000End of life due for replac, efficiencies to be
realized with updates
PW Public Works Salt Shed Roofing 10,000 Remove and replace rusted tin roofing
PW Public Works Boiler 75,000
End of life due for replac, efficiencies to be
realized with updates
LS Aquatic Centre Main Filter Tank 37,350
LS Aquatic Centre Water Tanks x3 32,375
Parks
LS Tennis Net Replacements 10,000 6,700 3 in 2022, 2 in 2023
Cemetery
Appendix A
City of TerraceUnfunded Capital Projects - Recommended
CAPITAL & PROJECTS 2022 2023 2024 2025 2026 Notes
Appendix A
City of TerraceUnfunded Capital Projects - Recommended
LS Columbarium/Slab 45,000 45,000 45,000 Should be an annual project each year
Development Services
DS Building Regulations Bylaw 25,000
FD Fire Department
FD NH3 Gas Detector Replacement 7,000
FD Wireless Head Set Intercom 14,573
FD Self-Contained Breathing Apparatus SCBA 411,017 Replacement
FIN Administration, Finance, and IT
IT Phone System Replacement 40,000
End of Life - system is having issues and needs a
full replacement
IT Website Security Update 55,000
Version website is running on will be unsupported
late 2022, will be exposed to security threats
IT CCTV Systems for: PW/CH/AS 25,000 For security purposes
IT Waste Collection Database Upgrade 5,000
Supply a scanner to waste collection staff to input
data on the go
IT Sportsplex Schedule Display Replacement 5,000
Replace and add a second screen upstairs to
incld info re: room bookings and classes etc
IT Firewall Replacement 5,000
Replace aging firewall to protect network from
attacks
IT Windows 10 IOS License Upgrade 7,500 Windows 10 end of life 2025
IT Networking Switching Replacement 12,000
IT Wireless Access Point Networking Replacement 10,500
IT Printer Replacement: Fire Hall 9,000 Past end of lifecycle but not heavily used
IT Printer Replacement: Sportsplex 9,000 Past end of life and unable to get parts
IT Upgrade Speakers: Pool 7,000
Currently underpowered, this would allow for a
2nd amp and speaker upgrade
723,923$ 2,834,575$ 1,683,517$ 150,000$ -$
2022 2023 2024 2025 2026
1. Legal or legislated 25,000 - - - - 25,000
2. Health and safety 21,573 200,000 1,361,017 150,000 - 1,732,590
3. Protect existing infrastructure 25,000 - - - - 25,000
4. Maintain existing services 627,350 2,634,575 322,500 3,584,425
5. Efficiency gain - -
6. Other (new items) 25,000 25,000
Recommended 723,923$ 2,834,575$ 1,683,517$ 150,000$ -$ 5,392,015$
CAPITAL & PROJECTS Priority 2022 2023 2024 2025 2026 2027+ Notes
Transportation (incl roads, paving, etc)
PW Kenney Street Mill And Fill 4. Maintain existing services 200,000 Was originally proposed to be in 2022
PW Keith: Kenny To Sande Reconstruction 4. Maintain existing services 2,000,000 Pending build-out of subdivision
WAT Keith: Kenny To Sande Reconstruction 4. Maintain existing services 300,000
PW Graham: Eby to Kenney Resonctruction 4. Maintain existing services 1,800,000
REMOVED from 2023 in 5yr plan given
satisfactory condition, reconsider if problems
increase
WAT Graham: Eby to Kenney AC Replacement 4. Maintain existing services 510,000 Removed from 2023 in 5yr plan
SEW Graham: Eby to Kenney Sewer Upgrades 4. Maintain existing services 750,000 Removed from 2023 in 5yr plan
PW Lakelse: Emerson to Kalum Reconstruction 4. Maintain existing services 1,300,000
WAT Lakelse: Emerson to Kalum Reconstruction 4. Maintain existing services 90,000
PW Lanfear Hill Reconstruction or Pedestrian Walkway 4. Maintain existing services 1,000,000 7,000,000
Possiby reimagine this project and reduce to a
raised pedestrian walkway approx $1m. Raised
walkway concept could be develop in 2022.
Apply for grants and construct in 2024.
PW Frank Street Erosion Protection 4. Maintain existing services 300,000
Pursue grant and/or monitor and repair after
damage as a result of flooding
PW Kenney/Keith Intersection Upgrades 4. Maintain existing services 200,000
PW Keith: Molitor To Kenney Reconstruction 4. Maintain existing services 2,400,000
WAT Keith: Molitor To Kenney Reconstruction 4. Maintain existing services 400,000
PW Floyd Reconstruction 4. Maintain existing services 600,000 Removed from 2019
WAT Floyd Water Extension 4. Maintain existing services 90,000
PW 4700 Park Reconstruction 4. Maintain existing services TBD
PW 4500 Lazelle Reconstruction 4. Maintain existing services TBD
PW 2200 Evergreen Reconstruction 4. Maintain existing services TBD
PW North Thomas Paving 4. Maintain existing services 670,000
WAT North Thomas AC Replacement 4. Maintain existing services 110,000
SEW North Thomas Sewer Extension 4. Maintain existing services 300,000
PW Lanfear Pedestrian Staircase 6. Other (new items) 750,000
PW Pedestrian Crossing W/ Island: Safeway/Greig Ave 6. Other (new items) 50,000
PW Pedestrian Mid-Block Crossing - Safeway/Lakelse Ave 6. Other (new items) 20,000
PW Pedestrian Overpass - Kalum/CN 6. Other (new items) 12,000,000
PW Pedestrian Bulb-Outs/Crosswalk Skeena Mall/Mcds/Lakelse6. Other (new items) 40,000
PW Emerson: Grieg To Park Reconstruction 4. Maintain existing services 1,000,000
PW Lakelse Blvd Enhancement - East Of Kalum 6. Other (new items) 300,000
PW Market Street Completion - Farmer's Market Improvements6. Other (new items) 650,000
Comp Market St w/concrete curb, sidewalk,
lighting, design feature to enhance market
activity along east side and into GLP
DS Downtown Wayfinding & Signage 6. Other (new items) 30,000
DS
Slope Hazard Assessment and Development Permit
Guidelines 4. Maintain existing services 100,000
Comp assessment and refine existing DPA
boundaries; update and adopt clear DP
guidelines for this DPA
DS Active Transportation Plan Update 4. Maintain existing services 70,000 Update to the 2009 AT Plan
Appendix B
Unfunded Capital Projects - RemainingCity of Terrace
Removed from 2024 in 5yr plan. Downtown-
combine with canopy rework
CAPITAL & PROJECTS Priority 2022 2023 2024 2025 2026 2027+ Notes
Appendix B
Unfunded Capital Projects - RemainingCity of Terrace
Water Projects
WAT River Intake - Construction 4. Maintain existing services 1,000,000
River Pump House currently draws water from
the Skeenar, change to shallow drilled well to
remove most of Turbidity.Seal existing below
ground tank from river infiltration piping and add
baffle to create Chorine contact time. UV
system installed as well.
WAT Reservoir Upgrades 4. Maintain existing services 250,000
WAT Park Booster Buiding Upgrade 4. Maintain existing services 100,000
WAT 2ND Upper Grid Reservoir 4. Maintain existing services 2,000,000
Cascade valve solved problem for lower grid
but not for upper grid
Sportsplex
LS Public Access Water Fountain 6. Other (new items) 6,000
LS Banquet Room Kitchen Redesign And Upgrade 4. Maintain existing services 50,000
LS Concession Upgrades 4. Maintain existing services TBD
Including commercial exhaust and rangehood
for deep fryer. Design work is estimated at 5k.
Other Facilities
PW Mechanic Tire Storage 4. Maintain existing services 25,000 Install will free up shop space
PW Public Works Outdoor Parking Shelter 6. Other (new items) 150,000
Class D cost estimate for additional 20' bay,
extend outdoor shelter for vehicle parking
PW Firehall Alarm Upgrades 4. Maintain existing services 25,000
PW RCMP Parking Expansion 6. Other (new items) 15,000
Grub out grass section at west side of the
RCMP building to pave for additional parking
space. Est. 6 additional spaces. Costs, sub ex,
crush, asphalt, line marking.
PW Library Accessible Parking Upgrade 6. Other (new items) 30,000
30k estimate to grade and pave, additional
costs of electrical, curbing, line marking
undetermined. Potential grant funding.
PW City Hall Training Room Flooring 6. Other (new items) 15,000
Remove carpet and install vinyl plank flooring
into the training room and entrance to the
training room at City Hall
PW City Hall Staff Entrance Canopy 6. Other (new items) 8,000
Install canopy with lighting at back staff
entrance of City Hall. Not the same project as
2020 carry forward.
Parks
LS Riverside Parklands: Master Planning Process 4. Maintain existing services 20,000 Design for the complete revamping of this site
LS Buday Park Wooden Structure Replacement 4. Maintain existing services 50,000
The posts on the bottom wooden structure are
showing signs of rot. Slide has been removed.
LS Christie Park Pitch Reconstruction (200K/Year 1 Of 4) 4. Maintain existing services 800,000 Review options
LS
Riverside Ball Park: Concession And Washroom
Facility 6. Other (new items) TBD Following master planning process
LS Squash Courts, Gymnasium Construction 6. Other (new items) TBD
LS Elks Park Fields Irrigation 6. Other (new items) TBD
LS Indoor Soccer Field (Soccer Dome) 6. Other (new items) TBD Identified in community survey and PMP
CAPITAL & PROJECTS Priority 2022 2023 2024 2025 2026 2027+ Notes
Appendix B
Unfunded Capital Projects - RemainingCity of Terrace
LS Disc Golf Course Completion 6. Other (new items) TBD
LS Tetrault Resurrection 4. Maintain existing services TBD
LS Kin Hut Building 4. Maintain existing services TBD
LS Track Dumper Equipment 6. Other (new items) 20,000 Trail work
LS Bobcat And Trailer 6. Other (new items) 75,000
DS Parkland Acquisition Nw Bench (Dcc Program) 6. Other (new items) 500,000
Cemetery
LS Columbarium/Slab 4. Maintain existing services 2022-2024 on recommended list 45,000 45,000 Should be an annual project each year
FD Fire Department
FD Rescue Chisel Replacement 4. Maintain existing services 6,000
FD Modular Training Props 4. Maintain existing services 50,000 Replace Older Props
FD Bullex Training System 4. Maintain existing services 15,000 Replacement Of (For Fire Extinguishers)
FD New Fire Hall/Emergency Services Building 6. Other (new items) 15,000,000
FD New Ladder Truck 6. Other (new items) 1,500,000
FIN Administration, Finance, and IT
ADM Records Management Assessment 6. Other (new items) 20,000
FIN PSD Salary Module 6. Other (new items) 20,000
To add to existing operating and capital
modules
IT Backup Server Replacement 4. Maintain existing services 30,000
IT Server Room UPS Replacement 4. Maintain existing services 20,000
IT Hardware Server Upgrade 4. Maintain existing services 90,000
IT Windows Server OS License Upgrade 4. Maintain existing services 22,000
Skeena Industrial Development Park
SIDP East Subdivision - Light Industrial Lots 6. Other (new items) 1,000,000
SIDP Signage 6. Other (new items) 20,000
-$ 6,000$ 150,000$ 1,596,000$ 1,120,000$ 55,180,000$
2022 2023 2024 2025 2026 2027+
1. Legal or legislated - - - - - - -
2. Health and safety - - - - - - -
3. Protect existing infrastructrue - - - - - - -
4. Maintain existing services - - - 1,461,000 1,120,000 23,252,000 25,833,000
5. Efficiency gain - - - - - - -
6. Other (new items) - 6,000 150,000 135,000 - 31,928,000 32,219,000
Unfunded List - 6,000 150,000 1,596,000 1,120,000 55,180,000 58,052,000
Identified in Fire Dept Inspection and Audit from
2013, and Fire Underwriters Survey from 2016