kitchen remodel - susan grantsusangrant.net/sgd_interiors.pdf · kitchen remodel, lagrange pk, il...

3
KITCHEN PLAN Wall Oven Cooktop & Hood DW Refrig Eating Rear Exit BEFORE KITCHEN - AFTER Kitchen Remodel, LaGrange Pk, IL (2003) Susan GRANT Post Office Box 5097 Chicago, Illinois 773.548-3322 60680-5097 www.susangrant.net ARCHITECT GREEN DESIGN Part of a larger general remodeling, this Kitchen Remodel for a Family originally from a more dense & active Chicago neighborhood, provided some much needed respite from the bustle of urban living. Improvements to the home included: - Installation of Insulated, High- Efficiency Alum clad windows - Installing new Heavier-duty Roofing Shingles - Installation & Upgrade of the Roof Insulation system - Installation of Heavier-Duty Exterior doors (which added some security and insulation value) - Installation of ADA friendly bathroom fixtures & Door Hardware; - Remodeling of the Family’s outdated Kitchen (pictured) Project completion, 2003-2005 Kitchen Remodel Private Residence LaGrange Park, Illinois Completed 2003

Upload: others

Post on 19-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Kitchen Remodel - Susan Grantsusangrant.net/sgd_Interiors.pdf · Kitchen Remodel, LaGrange Pk, IL (2003) KITCHEN - AFTER Susan GRANT Post Office Box 5097 Chicago, Illinois 773.548-3322

KITCHEN PLAN

Wall Oven

Cooktop &Hood

DW

Refrig

Eating

RearExit

BEFORE

KITCHEN - AFTERKitchen Remodel, LaGrange Pk, IL (2003)

S u s a nGRANT

Post Office Box 5097

C h i c a g o , I l l i n o i s

7 7 3 . 5 4 8 - 3 3 2 2

6 0 6 8 0 - 5 0 9 7

w w w . s u s a n g r a n t . n e t

A R C H I T E C TG R E E N D E S I G N

Part of a larger general remodeling,this Kitchen Remodel for a Familyoriginally from a more dense & activeChicago neighborhood, providedsome much needed respite from thebustle of urban living.

Improvements to the homeincluded:

- Installation of Insulated, High-Efficiency Alum clad windows

- Installing new Heavier-dutyRoofing Shingles

- Installation & Upgrade of the RoofInsulation system

- Installation of Heavier-Duty Exteriordoors (which added some securityand insulation value)

- Installation of ADA friendlybathroom fixtures & Door Hardware;

- Remodeling of the Family’soutdated Kitchen (pictured)

Project completion, 2003-2005

Kitchen Remodel

Private ResidenceLaGrange Park, IllinoisCompleted 2003

Page 2: Kitchen Remodel - Susan Grantsusangrant.net/sgd_Interiors.pdf · Kitchen Remodel, LaGrange Pk, IL (2003) KITCHEN - AFTER Susan GRANT Post Office Box 5097 Chicago, Illinois 773.548-3322

KITCHEN RemodelPrivate ResidenceChicago, IllinoisCompleted 2007

This Existing Split-Level Single familyHouse is undergoing a GeneralRenovation. New systems, windows,roofing, electrical, interior finishes are apart of project.

Improvements to the home included:

- Installation of a EnvironmentallyFriendly sprayed-in insulation. NewLow-E Insulated Windows throughout.

- Installation of a low-maintenance,water / flood resistant environmentallyfriendly Porcelain Floor Tile.

- Installation of Locally SourcedProducts, including a new GraniteCounter.

- Dimmable Lighting that can utilizecompact Fluorescent Lights.

Project Cost to HomeOwner(including Appliances & GraniteCounters) was about $12,750, foreverything you see in the photo(including demolition, new sub-floor,new drywall & insulation.)

KITCHEN - Before

KITCHEN - After

KITCHEN - After

KITCHEN - AfterKITCHEN - After

Post Office Box 5097

C h i c a g o , I l l i n o i s

7 7 3 . 5 4 8 - 3 3 2 2

6 0 6 8 0 - 5 0 9 7

w w w . s u s a n g r a n t . n e t

A R C H I T E C TG R E E N D E S I G N

S u s a nGRANT

Page 3: Kitchen Remodel - Susan Grantsusangrant.net/sgd_Interiors.pdf · Kitchen Remodel, LaGrange Pk, IL (2003) KITCHEN - AFTER Susan GRANT Post Office Box 5097 Chicago, Illinois 773.548-3322

FLOOR PLAN

Seating

Home Theatre

BarMech

Bath

Kitchen

Wash/ Dry

Storage

Seating

Exit

R

u

KITCHEN - After

Kitchen/Laundry - Before

BOOKs / Seating Area

KITCHEN - After

Basement RemodelPrivate ResidenceChicago, IllinoisCompleted 2004

This new Single-Family Home wasoriginally designed and completed forthis Chicago family 18 months earlier.After settling into the home, the Ownersdecided to complete the (thenunfinished) Basement level.

Improvements to the homeincluded:

- Installation of a EnvironmentallyFriendly Soy-Based Sprayed-in-PlaceExterior wall Insulation System.

- Custom Millwork / Cabinet systemsand Furniture.

- Installation of a Home Theatre Systemw/ Acoustical Ceiling Tile (which alsoserves to baffle sound from the Livingareas above.)

- Installation of a low-maintenance,water / flood resistant “Wood-look” FloorTile that has the beauty of real woodwithout the maintenance requirements.

- Installation of ADA friendly BathroomFixtures & Door Hardware;

- For Entertaining Purposes: Installationof a Bar/ Eating area, 2nd Kitchen &Laundry areas (pictured)

Project completion, 2004

BAR AREA - After

BAR - Before

Post Office Box 5097

C h i c a g o , I l l i n o i s

7 7 3 . 5 4 8 - 3 3 2 2

6 0 6 8 0 - 5 0 9 7

w w w . s u s a n g r a n t . n e t

A R C H I T E C TG R E E N D E S I G N

S u s a nGRANT