![Page 1: KGP Integrity Assessment - · PDF filetechnology for PETRONAS ... » Defect assessment » Free span ... • Structured implementation of PIMS is the key to](https://reader036.vdocuments.us/reader036/viewer/2022062600/5a789b6a7f8b9a1f128d824f/html5/thumbnails/1.jpg)
Presentation to PETRONAS-PETRAD-INTSOK-CCOP
Deepwater Subsea Tie-back Workshop
25th January 2011 Presented by:
Naila Rusma Idris, GTS
Co-author: M Hisham A Bakar, Nur Jasmin A Hakim, A Sirwan M Tuselim
© 2011 PETROLIAM NASIONAL BERHAD (PETRONAS) All rights reserved. No part of this document may be reproduced, stored in a retrieval system or
transmitted in any form or by any means (electronic, mechanical, photocopying, recording or otherwise) without the permission of the copyright owner.
©2011 PETROLIAM NASIONAL BERHAD (PETRONAS)
CONFIDENTIAL
Deepwater Pipeline Integrity Assessment
![Page 2: KGP Integrity Assessment - · PDF filetechnology for PETRONAS ... » Defect assessment » Free span ... • Structured implementation of PIMS is the key to](https://reader036.vdocuments.us/reader036/viewer/2022062600/5a789b6a7f8b9a1f128d824f/html5/thumbnails/2.jpg)
Group Technical Solutions (GTS)
PETRONAS
HOLDING COMPANY UNIT (HCU)
TECHNOLOGY & ENGINEERING
GTS
![Page 3: KGP Integrity Assessment - · PDF filetechnology for PETRONAS ... » Defect assessment » Free span ... • Structured implementation of PIMS is the key to](https://reader036.vdocuments.us/reader036/viewer/2022062600/5a789b6a7f8b9a1f128d824f/html5/thumbnails/3.jpg)
Group Technical Solutions (GTS)
Leaders with passion in technology innovation, entrepreneurship and people development
Technically competent workforce in developing and delivering technology, project and engineering solutions
Commitment towards HSE, Quality and Service Excellence
Leadership in delivering
innovative technology solutions and projects
We develop and deploy
technology for PETRONAS
growth and future positioning
We commercialize
technology solutions for value
and competitive advantage
We provide value adding
technical solutions and institute
technical governance for
operational excellence
We provide stewardship for
groupwide technical capability
development and knowledge
assets
We deliver projects at
competitive cost, schedule
and assured operability
We provide effective project
procurement management for
cost and delivery advantage
3
Technology &
Engineering
![Page 4: KGP Integrity Assessment - · PDF filetechnology for PETRONAS ... » Defect assessment » Free span ... • Structured implementation of PIMS is the key to](https://reader036.vdocuments.us/reader036/viewer/2022062600/5a789b6a7f8b9a1f128d824f/html5/thumbnails/4.jpg)
Presentation Outline
1. Presentation Objectives 2. Background
• PIMS: The big picture • Pipeline Integrity Assessment • Reference codes & standards
3. GTS Methodology and related case study
4. Conclusions 5. Challenges 6. Lesson Learnt
![Page 5: KGP Integrity Assessment - · PDF filetechnology for PETRONAS ... » Defect assessment » Free span ... • Structured implementation of PIMS is the key to](https://reader036.vdocuments.us/reader036/viewer/2022062600/5a789b6a7f8b9a1f128d824f/html5/thumbnails/5.jpg)
Objectives
![Page 6: KGP Integrity Assessment - · PDF filetechnology for PETRONAS ... » Defect assessment » Free span ... • Structured implementation of PIMS is the key to](https://reader036.vdocuments.us/reader036/viewer/2022062600/5a789b6a7f8b9a1f128d824f/html5/thumbnails/6.jpg)
Presentation Objectives
• To share the importance of pipeline integrity management. • To highlight GTS methodology for deepwater pipeline integrity assessment.
![Page 7: KGP Integrity Assessment - · PDF filetechnology for PETRONAS ... » Defect assessment » Free span ... • Structured implementation of PIMS is the key to](https://reader036.vdocuments.us/reader036/viewer/2022062600/5a789b6a7f8b9a1f128d824f/html5/thumbnails/7.jpg)
Background
![Page 8: KGP Integrity Assessment - · PDF filetechnology for PETRONAS ... » Defect assessment » Free span ... • Structured implementation of PIMS is the key to](https://reader036.vdocuments.us/reader036/viewer/2022062600/5a789b6a7f8b9a1f128d824f/html5/thumbnails/8.jpg)
8
Leak due to accelerated wall thinning? Damage caused by third party?
Leak due to cracking? Severe coating damage?
Have you experienced this?
![Page 9: KGP Integrity Assessment - · PDF filetechnology for PETRONAS ... » Defect assessment » Free span ... • Structured implementation of PIMS is the key to](https://reader036.vdocuments.us/reader036/viewer/2022062600/5a789b6a7f8b9a1f128d824f/html5/thumbnails/9.jpg)
Why is it happened?
• Pipeline failures are usually related to a breakdown in a ‘system’.
![Page 10: KGP Integrity Assessment - · PDF filetechnology for PETRONAS ... » Defect assessment » Free span ... • Structured implementation of PIMS is the key to](https://reader036.vdocuments.us/reader036/viewer/2022062600/5a789b6a7f8b9a1f128d824f/html5/thumbnails/10.jpg)
PIMS Fitness
for Service
Engineering&
Design
Audit & Baseline Assessment
Training I & M
Operation Control & Monitoring
Repair &
Rehab
Reference: A. Cosham, P. Hopkins; The Pipeline Defect Assessment Manual (PDAM) ; Penspen Ltd. 2003
Risk and Reliability Assessment
PIPELINE INTEGRITY
MANAGEMENT
SYSTEMS
PHILOSOPHY:
“ENSURING A
PIPELINE IS SAFE AND
SECURE FOR
EFFICIENT
TRANSPORTATION OF
HYDROCARBONS”
Pipeline Integrity Management
![Page 11: KGP Integrity Assessment - · PDF filetechnology for PETRONAS ... » Defect assessment » Free span ... • Structured implementation of PIMS is the key to](https://reader036.vdocuments.us/reader036/viewer/2022062600/5a789b6a7f8b9a1f128d824f/html5/thumbnails/11.jpg)
Pipeline Integrity Assessment
PIMS INTEGRITY ASSESSMENT
BASELINE ASSESSMENT
INSPECTION
RISK ASSESSMENT
FITNESS FOR SERVICE
• What is pipeline integrity assessment?
• Defined as thorough evaluation of a potentially unacceptable anomaly.
• When should we perform pipeline integrity assessment?
• When an anomaly is observed or detected OR upon availability of inspection results for projection of future integrity.
![Page 12: KGP Integrity Assessment - · PDF filetechnology for PETRONAS ... » Defect assessment » Free span ... • Structured implementation of PIMS is the key to](https://reader036.vdocuments.us/reader036/viewer/2022062600/5a789b6a7f8b9a1f128d824f/html5/thumbnails/12.jpg)
Pipeline Integrity Assessment
• For typical subsea pipeline system, the integrity assessment may be split into:
• Corrosion assessment • Mechanical assessment e.g. fatigue in free span, displacement causing overstress or damage by third party.
• What is the outcome of integrity assessment? • Pipeline integrity/ risk status • I&M planning • Repair & rehab option.
![Page 13: KGP Integrity Assessment - · PDF filetechnology for PETRONAS ... » Defect assessment » Free span ... • Structured implementation of PIMS is the key to](https://reader036.vdocuments.us/reader036/viewer/2022062600/5a789b6a7f8b9a1f128d824f/html5/thumbnails/13.jpg)
Reference Codes & Standard
• DNV-RP-F116 Integrity Management of Submarine Pipeline
Systems, Oct 2009. • ASME/ ANSI B31.8S: Supplement to B31.8 on Managing System
Integrity of Gas Pipelines, 2009. • PCSB RBI Manual for Offshore Pipelines, 2000. • DNV-RP-F105 Free Spanning Pipelines, March 2002. • DNV RP F101- Parts A & B: Corroded Pipelines, 2004 (updated
2006). • ASME B31.G: Manual for Determining the Remaining Strength of
Corroded Pipelines, 2009. • API 1160 Managing System Integrity for Hazardous Liquid
Pipelines, Nov 2001.
![Page 14: KGP Integrity Assessment - · PDF filetechnology for PETRONAS ... » Defect assessment » Free span ... • Structured implementation of PIMS is the key to](https://reader036.vdocuments.us/reader036/viewer/2022062600/5a789b6a7f8b9a1f128d824f/html5/thumbnails/14.jpg)
GTS Methodology
![Page 15: KGP Integrity Assessment - · PDF filetechnology for PETRONAS ... » Defect assessment » Free span ... • Structured implementation of PIMS is the key to](https://reader036.vdocuments.us/reader036/viewer/2022062600/5a789b6a7f8b9a1f128d824f/html5/thumbnails/15.jpg)
Case study
• Integrity assessment for a deepwater pipeline in Malaysia.
• High dense phase with high pressure pipeline system.
• Rigid pipeline running from subsea PLET to onshore gas terminal.
• High wall thickness and deepwater subsea pig launcher which posed challenge for normal in-line inspection.
![Page 16: KGP Integrity Assessment - · PDF filetechnology for PETRONAS ... » Defect assessment » Free span ... • Structured implementation of PIMS is the key to](https://reader036.vdocuments.us/reader036/viewer/2022062600/5a789b6a7f8b9a1f128d824f/html5/thumbnails/16.jpg)
GTS Integrity Assessment Methodology
Engagement Session with Client
Site Visit Interview Session with Operation Personnel
Identify Gaps
Identify Facilities Limitation
Threats Identification
System Compliance Review
Data Verification
Data Gathering & QA/QC
Inspection Reference Plan (IRP) Development
Risk Assessment Alternative Inspection Technology
Assessment
Mechanical Assessment
Corrosion Assessment Internal Inspection
External Inspection
Revision 0 Year: 2010
![Page 17: KGP Integrity Assessment - · PDF filetechnology for PETRONAS ... » Defect assessment » Free span ... • Structured implementation of PIMS is the key to](https://reader036.vdocuments.us/reader036/viewer/2022062600/5a789b6a7f8b9a1f128d824f/html5/thumbnails/17.jpg)
Threat Identification
No Threat Group Findings
1 Design, fabrication and installation (DFI)
No significant threat been introduced during this stage. The only concern is on the functionality of subsea launcher which are yet to be executed.
2 Corrosion – internal/ external/ erosion
CMP is not specific and tailored to actual operating condition and requirement. Pipeline never been inspected internally, actual condition not known.
3 Third party / external impact
No history of third party interference or external impact but there is probability at shallow water section.
4 Structural On-bottom stability is within design acceptable limit except for free span.
5 Natural hazard No history of extreme weather or natural hazard recorded within the area.
6 Operation related Pipeline O&M manual not available.
![Page 18: KGP Integrity Assessment - · PDF filetechnology for PETRONAS ... » Defect assessment » Free span ... • Structured implementation of PIMS is the key to](https://reader036.vdocuments.us/reader036/viewer/2022062600/5a789b6a7f8b9a1f128d824f/html5/thumbnails/18.jpg)
Risk Assessment
• Corrosion assessment
» Internal corrosion
» External corrosion
• Mechanical assessment
» On-bottom stability
» External impact
» Defect assessment
» Free span
• Risk assessment exercise identified risk level status for the pipeline system.
![Page 19: KGP Integrity Assessment - · PDF filetechnology for PETRONAS ... » Defect assessment » Free span ... • Structured implementation of PIMS is the key to](https://reader036.vdocuments.us/reader036/viewer/2022062600/5a789b6a7f8b9a1f128d824f/html5/thumbnails/19.jpg)
Corrosion Risk Assessment
• Internal and External Corrosion: High risk category
5 M H H VH VH
4 L M H H VH
3 L L M H H
2 VL L L M H
1 VL VL L L M
A B C D E
Pro
bab
ility
of
Failu
re (
PO
F)
Consequence of Failure (COF)
![Page 20: KGP Integrity Assessment - · PDF filetechnology for PETRONAS ... » Defect assessment » Free span ... • Structured implementation of PIMS is the key to](https://reader036.vdocuments.us/reader036/viewer/2022062600/5a789b6a7f8b9a1f128d824f/html5/thumbnails/20.jpg)
On-bottom Stability
• On bottom stability: Medium risk category
5 M H H VH VH
4 L M H H VH
3 L L M H H
2 VL L L M H
1 VL VL L L M
A B C D E
Pro
bab
ility
of
Failu
re (
PO
F)
Consequence of Failure (COF)
![Page 21: KGP Integrity Assessment - · PDF filetechnology for PETRONAS ... » Defect assessment » Free span ... • Structured implementation of PIMS is the key to](https://reader036.vdocuments.us/reader036/viewer/2022062600/5a789b6a7f8b9a1f128d824f/html5/thumbnails/21.jpg)
External Impact P
rob
abili
ty o
f Fa
ilure
(P
OF)
Consequence of Failure (COF)
• External impact: Medium risk category
>10-2 M H H VH VH
10-3 to 10-2 L M H H VH
10-4 to 10-3 L L M H H
10-5 to 10-4 VL L L M H
<10-5 VL VL L L M
A B C D E
![Page 22: KGP Integrity Assessment - · PDF filetechnology for PETRONAS ... » Defect assessment » Free span ... • Structured implementation of PIMS is the key to](https://reader036.vdocuments.us/reader036/viewer/2022062600/5a789b6a7f8b9a1f128d824f/html5/thumbnails/22.jpg)
Free span Detailed Assessment
• Free span: Very High risk category
![Page 23: KGP Integrity Assessment - · PDF filetechnology for PETRONAS ... » Defect assessment » Free span ... • Structured implementation of PIMS is the key to](https://reader036.vdocuments.us/reader036/viewer/2022062600/5a789b6a7f8b9a1f128d824f/html5/thumbnails/23.jpg)
Defect Assessment
• Defect assessment not performed due to no inspection data.
![Page 24: KGP Integrity Assessment - · PDF filetechnology for PETRONAS ... » Defect assessment » Free span ... • Structured implementation of PIMS is the key to](https://reader036.vdocuments.us/reader036/viewer/2022062600/5a789b6a7f8b9a1f128d824f/html5/thumbnails/24.jpg)
Overall Pipeline System Risk
![Page 25: KGP Integrity Assessment - · PDF filetechnology for PETRONAS ... » Defect assessment » Free span ... • Structured implementation of PIMS is the key to](https://reader036.vdocuments.us/reader036/viewer/2022062600/5a789b6a7f8b9a1f128d824f/html5/thumbnails/25.jpg)
Inspection Reference Plan (IRP)
• Based on the findings and assessment results, the Inspection Reference Plan (IRP) is then developed to detail out the inspection plan and risk management activity for the pipeline system.
![Page 26: KGP Integrity Assessment - · PDF filetechnology for PETRONAS ... » Defect assessment » Free span ... • Structured implementation of PIMS is the key to](https://reader036.vdocuments.us/reader036/viewer/2022062600/5a789b6a7f8b9a1f128d824f/html5/thumbnails/26.jpg)
Conclusions
![Page 27: KGP Integrity Assessment - · PDF filetechnology for PETRONAS ... » Defect assessment » Free span ... • Structured implementation of PIMS is the key to](https://reader036.vdocuments.us/reader036/viewer/2022062600/5a789b6a7f8b9a1f128d824f/html5/thumbnails/27.jpg)
Conclusions
• Structured implementation of PIMS is the key to successful pipeline integrity management.
• GTS deepwater pipeline integrity assessment methodology combined more than two elements in PIMS.
• Deliverables of the study:
(i) pipeline risk status, and
(ii) inspection reference plan.
• All identified gaps and threats should be resolved by pipeline operator in a timely manner to ensure pipeline system is within operating risk limit.
![Page 28: KGP Integrity Assessment - · PDF filetechnology for PETRONAS ... » Defect assessment » Free span ... • Structured implementation of PIMS is the key to](https://reader036.vdocuments.us/reader036/viewer/2022062600/5a789b6a7f8b9a1f128d824f/html5/thumbnails/28.jpg)
Challenges
![Page 29: KGP Integrity Assessment - · PDF filetechnology for PETRONAS ... » Defect assessment » Free span ... • Structured implementation of PIMS is the key to](https://reader036.vdocuments.us/reader036/viewer/2022062600/5a789b6a7f8b9a1f128d824f/html5/thumbnails/29.jpg)
Challenges
• Data unavailability due to inspection challenges has lead to some assumptions during study.
• High pressure system limits corrosion modeling.
• No specific code and standard for deepwater pipeline integrity management and assessment.
![Page 30: KGP Integrity Assessment - · PDF filetechnology for PETRONAS ... » Defect assessment » Free span ... • Structured implementation of PIMS is the key to](https://reader036.vdocuments.us/reader036/viewer/2022062600/5a789b6a7f8b9a1f128d824f/html5/thumbnails/30.jpg)
Lesson Learnt
![Page 31: KGP Integrity Assessment - · PDF filetechnology for PETRONAS ... » Defect assessment » Free span ... • Structured implementation of PIMS is the key to](https://reader036.vdocuments.us/reader036/viewer/2022062600/5a789b6a7f8b9a1f128d824f/html5/thumbnails/31.jpg)
• Realistic design for future deepwater pipeline system: to consider operational challenges, integrity management and I&M requirements i.e. practicality of subsea launcher for inspection, subsea tie-ins etc.
• The industry to develop recommended practice specific to deepwater pipeline integrity management and assessment.
Lesson Learnt