KESC BQPS II Reported By: Rao Muhammad Shahbaz Manager Condition Monitoring Date: 17-Jan-2013 Steam Turbine Vibration Status Report Activity Performed: Dynamic Balancing Description: At bearing #4, shaft vibration reading from X-probe was observed 114 microns. After considering the dynamic balancing as root cause elimination activity, it was performed by HE Engineer with the aid of ADRE system. Balancing Activity: Balancing activity was performed on LP rotor. Selected planes were near bearing no. 3 & 4. Given below was the status: Speed= 3000 r/min Reference Run (On which Dynamic Balancing was decided): After addition of correction weight, there was not much change in vibration. So additional weight was removed and now on these two bearings, 1X status is as follows: On the next page, unfiltered orbits, polar plots, shaft center line plot & bar graphs of all 6 bearings are attached. Bearing 3 (1X) X-probe= 21µm @ 113˚ Y-probe= 35µm @ 254˚ Bearing 4 (1X) X-probe= 88µm @ 141˚ Y-probe= 37µm @ 271˚ Bearing 3 (1X) X-probe= 45μm @ 161˚ Y-probe= 53μm @ 270˚ Bearing 4 (1X) X-probe= 100μm @ 118˚ Y-probe= 46μm @ 237˚

Upload: others

Post on 27-May-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: KESC BQPS II - Maintenance · KESC BQPS II Reported By: Rao Muhammad Shahbaz Manager Condition Monitoring Date: 17-Jan-2013 Steam Turbine Vibration Status Report Activity Performed:

KESC BQPS II

Reported By: Rao Muhammad Shahbaz

Manager Condition Monitoring

Date: 17-Jan-2013

Steam Turbine Vibration Status Report

Activity Performed: Dynamic Balancing

Description:

At bearing #4, shaft vibration reading from X-probe was observed 114 microns. After considering the

dynamic balancing as root cause elimination activity, it was performed by HE Engineer with the aid of

ADRE system.

Balancing Activity:

Balancing activity was performed on LP rotor. Selected planes were near bearing no. 3 & 4. Given

below was the status:

Speed= 3000 r/min

Reference Run (On which Dynamic Balancing was decided):

After addition of correction weight, there was not much change in vibration. So additional weight was

removed and now on these two bearings, 1X status is as follows:

On the next page, unfiltered orbits, polar plots, shaft center line plot & bar graphs of all 6 bearings are

attached.

Bearing 3 (1X)

X-probe= 21µm @ 113˚

Y-probe= 35µm @ 254˚

Bearing 4 (1X)

X-probe= 88µm @ 141˚

Y-probe= 37µm @ 271˚

Bearing 3 (1X)

X-probe= 45µm @ 161˚

Y-probe= 53µm @ 270˚

Bearing 4 (1X)

X-probe= 100µm @ 118˚

Y-probe= 46µm @ 237˚

Page 2: KESC BQPS II - Maintenance · KESC BQPS II Reported By: Rao Muhammad Shahbaz Manager Condition Monitoring Date: 17-Jan-2013 Steam Turbine Vibration Status Report Activity Performed:

KESC BQPS II

Reported By: Rao Muhammad Shahbaz

Manager Condition Monitoring

Current Bar Graph of all 6 Bearings:

Page 3: KESC BQPS II - Maintenance · KESC BQPS II Reported By: Rao Muhammad Shahbaz Manager Condition Monitoring Date: 17-Jan-2013 Steam Turbine Vibration Status Report Activity Performed:

KESC BQPS II

Reported By: Rao Muhammad Shahbaz

Manager Condition Monitoring

Run Up of Steam Turbine:

Bearing #1:

Polar Plot

Shaft Center Line

Page 4: KESC BQPS II - Maintenance · KESC BQPS II Reported By: Rao Muhammad Shahbaz Manager Condition Monitoring Date: 17-Jan-2013 Steam Turbine Vibration Status Report Activity Performed:

KESC BQPS II

Reported By: Rao Muhammad Shahbaz

Manager Condition Monitoring

Waterfall

Bearing #2:

Polar Plot

Page 5: KESC BQPS II - Maintenance · KESC BQPS II Reported By: Rao Muhammad Shahbaz Manager Condition Monitoring Date: 17-Jan-2013 Steam Turbine Vibration Status Report Activity Performed:

KESC BQPS II

Reported By: Rao Muhammad Shahbaz

Manager Condition Monitoring

Shaft center line

Waterfall

Page 6: KESC BQPS II - Maintenance · KESC BQPS II Reported By: Rao Muhammad Shahbaz Manager Condition Monitoring Date: 17-Jan-2013 Steam Turbine Vibration Status Report Activity Performed:

KESC BQPS II

Reported By: Rao Muhammad Shahbaz

Manager Condition Monitoring

Bearing #3:

Polar Plot

Shaft Center line

Page 7: KESC BQPS II - Maintenance · KESC BQPS II Reported By: Rao Muhammad Shahbaz Manager Condition Monitoring Date: 17-Jan-2013 Steam Turbine Vibration Status Report Activity Performed:

KESC BQPS II

Reported By: Rao Muhammad Shahbaz

Manager Condition Monitoring

Waterfall

Bearing #4:

Polar Plot

Page 8: KESC BQPS II - Maintenance · KESC BQPS II Reported By: Rao Muhammad Shahbaz Manager Condition Monitoring Date: 17-Jan-2013 Steam Turbine Vibration Status Report Activity Performed:

KESC BQPS II

Reported By: Rao Muhammad Shahbaz

Manager Condition Monitoring

Shaft Center Line

Waterfall

Page 9: KESC BQPS II - Maintenance · KESC BQPS II Reported By: Rao Muhammad Shahbaz Manager Condition Monitoring Date: 17-Jan-2013 Steam Turbine Vibration Status Report Activity Performed:

KESC BQPS II

Reported By: Rao Muhammad Shahbaz

Manager Condition Monitoring

Bearing # 5:

Polar Plot

Shaft Center Line

Page 10: KESC BQPS II - Maintenance · KESC BQPS II Reported By: Rao Muhammad Shahbaz Manager Condition Monitoring Date: 17-Jan-2013 Steam Turbine Vibration Status Report Activity Performed:

KESC BQPS II

Reported By: Rao Muhammad Shahbaz

Manager Condition Monitoring

Waterfall

Bearing #6:

Polar Plot

Page 11: KESC BQPS II - Maintenance · KESC BQPS II Reported By: Rao Muhammad Shahbaz Manager Condition Monitoring Date: 17-Jan-2013 Steam Turbine Vibration Status Report Activity Performed:

KESC BQPS II

Reported By: Rao Muhammad Shahbaz

Manager Condition Monitoring

Shaft Center Line

Waterfall