Grid Interconnection – Wind Turbine Penetration into KESCRequirements, Issues and Solutions
ABDUL HASEEB SIDDIQI EE-14
![Page 2: Grid Interconnection – Wind Turbine Penetration into KESC - Requirements, Issues and Solutions](https://reader035.vdocuments.us/reader035/viewer/2022062418/55640e94d8b42aa9518b5980/html5/thumbnails/2.jpg)
![Page 3: Grid Interconnection – Wind Turbine Penetration into KESC - Requirements, Issues and Solutions](https://reader035.vdocuments.us/reader035/viewer/2022062418/55640e94d8b42aa9518b5980/html5/thumbnails/3.jpg)
Profile-Abdul Haseeb• Graduation- Electrical 2008
• Electrical Engineer-Ipek Energi-2009
• Junior Design Engineer- S Mehboob 2009
• Assistant Manager-Grid Maintenance-KESC 2012
• Senior Project Engineer-Schneider Electric-XXXX
![Page 4: Grid Interconnection – Wind Turbine Penetration into KESC - Requirements, Issues and Solutions](https://reader035.vdocuments.us/reader035/viewer/2022062418/55640e94d8b42aa9518b5980/html5/thumbnails/4.jpg)
Alta Wind Energy Center, California Largest Wint Farm 1320MWEnercon-E126-7.5MW, Largest Wind turbine
![Page 5: Grid Interconnection – Wind Turbine Penetration into KESC - Requirements, Issues and Solutions](https://reader035.vdocuments.us/reader035/viewer/2022062418/55640e94d8b42aa9518b5980/html5/thumbnails/5.jpg)
![Page 6: Grid Interconnection – Wind Turbine Penetration into KESC - Requirements, Issues and Solutions](https://reader035.vdocuments.us/reader035/viewer/2022062418/55640e94d8b42aa9518b5980/html5/thumbnails/6.jpg)
![Page 7: Grid Interconnection – Wind Turbine Penetration into KESC - Requirements, Issues and Solutions](https://reader035.vdocuments.us/reader035/viewer/2022062418/55640e94d8b42aa9518b5980/html5/thumbnails/7.jpg)
![Page 8: Grid Interconnection – Wind Turbine Penetration into KESC - Requirements, Issues and Solutions](https://reader035.vdocuments.us/reader035/viewer/2022062418/55640e94d8b42aa9518b5980/html5/thumbnails/8.jpg)
PAKISTANI MARKET
Two projects out of 50-60GW potential; Zorlu Energi 56.4MW & Fauji Fertilizer Company Energy Limited 49.5MW - Jhampir, Sindh.
14.66cents/KWhr || to 2-3 cents/KWhr generation costs.
![Page 9: Grid Interconnection – Wind Turbine Penetration into KESC - Requirements, Issues and Solutions](https://reader035.vdocuments.us/reader035/viewer/2022062418/55640e94d8b42aa9518b5980/html5/thumbnails/9.jpg)
Minimum wind velocity (cutin speed) of 3-5 m/s Nameplate capacity at 12-14 m/s. Exceeding 25 m/s (cut-off speed) the turbine is blocked
![Page 10: Grid Interconnection – Wind Turbine Penetration into KESC - Requirements, Issues and Solutions](https://reader035.vdocuments.us/reader035/viewer/2022062418/55640e94d8b42aa9518b5980/html5/thumbnails/10.jpg)
1. Blade 2. blade support 3. Pitch angle actuator 4. hub 5. spinner6. main support 7. main shaft 8. aircraft warning lights 9. gearbox10. mechanical brakes 11. hydraulic cooling devices 12. generator13. power converter 14. Anemometers 15. transformer 16. frame of the nacelle 17. supporting tower 18. yaw driving device
![Page 11: Grid Interconnection – Wind Turbine Penetration into KESC - Requirements, Issues and Solutions](https://reader035.vdocuments.us/reader035/viewer/2022062418/55640e94d8b42aa9518b5980/html5/thumbnails/11.jpg)
• Number of blades (commonly two or three)
• Rotor orientation (upwind or downwind of tower)
• Blade material, construction method, and profile
• Hub design: rigid, teetering or hinged
• Power control via aerodynamic control (stall control) or variable-pitch blades (pitch control);
• Fixed or variable rotor speed
• Orientation by self-aligning action (free yaw) or direct control (active yaw)
• Synchronous or asynchronous generator (with squirrel-cage rotor or wound rotor -Doubly Fed Induction Generator (DFIG) with gearbox or direct drive generator.
DESIGN CONSIDERATIONS
![Page 12: Grid Interconnection – Wind Turbine Penetration into KESC - Requirements, Issues and Solutions](https://reader035.vdocuments.us/reader035/viewer/2022062418/55640e94d8b42aa9518b5980/html5/thumbnails/12.jpg)
INSTALLATION OPTIONS
• OFF SHORE - Sea bed for up to 40 m from sea floor while for 50m floating turbines are used.
• ON SHORE -
![Page 13: Grid Interconnection – Wind Turbine Penetration into KESC - Requirements, Issues and Solutions](https://reader035.vdocuments.us/reader035/viewer/2022062418/55640e94d8b42aa9518b5980/html5/thumbnails/13.jpg)
Country Name of Company Market share Delivery 2011 in MW Totally installed power in GW
Denmark Vestas 12.7% 5,217 50
China Sinovel 9.0% 3,700 13 [3]
China Goldwind 8.7% [4]
Spain Gamesa 8.0% 3,308 24
Germany Enercon 7.8% 3,203 24
United States GE Energy 7.7% 3,170
India Suzlon Group 7.6% 3,116 20
China Guodian United Power
7.4% 3,042
Germany Siemens Wind Power 6.3% 2,591 6.7
China Ming Yang 3.6% 1,500
WIND TURBINE MANUFACTURERS
![Page 14: Grid Interconnection – Wind Turbine Penetration into KESC - Requirements, Issues and Solutions](https://reader035.vdocuments.us/reader035/viewer/2022062418/55640e94d8b42aa9518b5980/html5/thumbnails/14.jpg)
INTERCONNECTION ISSUES AND REQUIREMENTS•Limitation of the generated disturbance•Gradual insertion of the power to be injected into the network•Immunity from voltage reductions•Control of the active/Reactive power
![Page 15: Grid Interconnection – Wind Turbine Penetration into KESC - Requirements, Issues and Solutions](https://reader035.vdocuments.us/reader035/viewer/2022062418/55640e94d8b42aa9518b5980/html5/thumbnails/15.jpg)
WHEN TURBINE CAN BE DISCONNECTED
![Page 16: Grid Interconnection – Wind Turbine Penetration into KESC - Requirements, Issues and Solutions](https://reader035.vdocuments.us/reader035/viewer/2022062418/55640e94d8b42aa9518b5980/html5/thumbnails/16.jpg)
SOLUTIONS- ABB STATCOM
![Page 17: Grid Interconnection – Wind Turbine Penetration into KESC - Requirements, Issues and Solutions](https://reader035.vdocuments.us/reader035/viewer/2022062418/55640e94d8b42aa9518b5980/html5/thumbnails/17.jpg)
KESC INTERCONNECTION-DHABEJI GRID
![Page 18: Grid Interconnection – Wind Turbine Penetration into KESC - Requirements, Issues and Solutions](https://reader035.vdocuments.us/reader035/viewer/2022062418/55640e94d8b42aa9518b5980/html5/thumbnails/18.jpg)
Kesc Network
![Page 19: Grid Interconnection – Wind Turbine Penetration into KESC - Requirements, Issues and Solutions](https://reader035.vdocuments.us/reader035/viewer/2022062418/55640e94d8b42aa9518b5980/html5/thumbnails/19.jpg)
KESC NETWORK
![Page 20: Grid Interconnection – Wind Turbine Penetration into KESC - Requirements, Issues and Solutions](https://reader035.vdocuments.us/reader035/viewer/2022062418/55640e94d8b42aa9518b5980/html5/thumbnails/20.jpg)
LOAD ON DHABEJI-03-05-13
BOC Gharo Pakland Amreli Trafo 1 Trafo 20
20
40
60
80
100
120
140
160
180
200
3/5/2013 2/5/20132
Source : KESC
![Page 21: Grid Interconnection – Wind Turbine Penetration into KESC - Requirements, Issues and Solutions](https://reader035.vdocuments.us/reader035/viewer/2022062418/55640e94d8b42aa9518b5980/html5/thumbnails/21.jpg)
FUTURE ?????
![Page 22: Grid Interconnection – Wind Turbine Penetration into KESC - Requirements, Issues and Solutions](https://reader035.vdocuments.us/reader035/viewer/2022062418/55640e94d8b42aa9518b5980/html5/thumbnails/22.jpg)
![Page 23: Grid Interconnection – Wind Turbine Penetration into KESC - Requirements, Issues and Solutions](https://reader035.vdocuments.us/reader035/viewer/2022062418/55640e94d8b42aa9518b5980/html5/thumbnails/23.jpg)
![Page 24: Grid Interconnection – Wind Turbine Penetration into KESC - Requirements, Issues and Solutions](https://reader035.vdocuments.us/reader035/viewer/2022062418/55640e94d8b42aa9518b5980/html5/thumbnails/24.jpg)
![Page 25: Grid Interconnection – Wind Turbine Penetration into KESC - Requirements, Issues and Solutions](https://reader035.vdocuments.us/reader035/viewer/2022062418/55640e94d8b42aa9518b5980/html5/thumbnails/25.jpg)
![Page 26: Grid Interconnection – Wind Turbine Penetration into KESC - Requirements, Issues and Solutions](https://reader035.vdocuments.us/reader035/viewer/2022062418/55640e94d8b42aa9518b5980/html5/thumbnails/26.jpg)
THANK YOU