joint content tiger team meeting
DESCRIPTION
Joint Content Tiger Team Meeting. December 10, 2012. Agenda. Roll – Catlin Timeline Review – John and Eric Content Working Session – Eric/All Scope – Eric/All. The Deliverables. TBD by the Joint Content Tiger Team Implementation content specification Samples Test cases - PowerPoint PPT PresentationTRANSCRIPT
Joint Content Tiger Team Meeting
December 10, 2012
Agenda
• Roll – Catlin• Timeline Review – John and Eric• Content Working Session – Eric/All• Scope – Eric/All
The Deliverables
• TBD by the Joint Content Tiger Team• Implementation content specification• Samples• Test cases• Executable test cases if needed• Implementation guide• Longer term: Content roadmap + C-CDA content implementation specification
DRAFT HARMONIZED CONTENT SPEC REVIEW
CURRENT SCOPE
Next Steps/Timeline
• 12/3/12: Review first draft and provide feedback by email prior to next call next week.
• 12/10/12: Review feedback; detailed working session to revised draft if/as needed. Identify any deltas prior to ratification.
• 12/17/12: Straw poll: Is the harmonized specification ready for ratification?
• Rest of Dec 12: Ratification (email vote perhaps).
Q&A