introduction to ecc pt1 january 2016. some history erc established erc tg1 on umts/imt-2000 (the...

22
INTRODUCTION TO ECC PT1 January 2016

Upload: victoria-fields

Post on 19-Jan-2018

219 views

Category:

Documents


0 download

DESCRIPTION

2 Mr. Pasi Toivonen FICORA ERC TG1: August 1997 – October 2000 Mr. Didier Chauveau ANFR ECC PT1: October 2009 – present time Mr. Peter Scheele BNetzA ECC PT1: October 2003 – October 2009 Mr. Jim Connolly ComReg ERC/ECC PT1: October 2000 – October ECC PT1 Chairmen 2

TRANSCRIPT

Page 1: INTRODUCTION TO ECC PT1 January 2016. Some History ERC established ERC TG1 on UMTS/IMT-2000 (the group has held 17 meetings) 1997 TG1 produced first ERC

INTRODUCTION TO ECC PT1

January 2016

Page 2: INTRODUCTION TO ECC PT1 January 2016. Some History ERC established ERC TG1 on UMTS/IMT-2000 (the group has held 17 meetings) 1997 TG1 produced first ERC

Some History

ERC established ERC TG1 on UMTS/IMT-2000(the group has held 17 meetings)

1997

TG1 produced first ERC Decisions and developed responses to the first EC Mandates on UMTS

ECC PT1 developed major UMTS/IMT-2000 ECC deliverables implemented by most CEPT countries

ERC PT1 held its 1st meeting in Mainz, Germany

ECC PT1 has held over 50 meetings and continues addressing IMT and MFCN matters

2000 2015

ECC PT1 has been an active contributor to ITU-R (WP5D, JTG 4-5-6-7)

2

Page 3: INTRODUCTION TO ECC PT1 January 2016. Some History ERC established ERC TG1 on UMTS/IMT-2000 (the group has held 17 meetings) 1997 TG1 produced first ERC

2

Mr. Pasi ToivonenFICORAERC TG1:August 1997 – October 2000

Mr. Didier ChauveauANFRECC PT1:October 2009 – present time

Mr. Peter ScheeleBNetzAECC PT1:October 2003 –October 2009

Mr. Jim ConnollyComRegERC/ECC PT1:October 2000 – October 2003

1997 2000 2015

ECC PT1 Chairmen

3

Page 4: INTRODUCTION TO ECC PT1 January 2016. Some History ERC established ERC TG1 on UMTS/IMT-2000 (the group has held 17 meetings) 1997 TG1 produced first ERC

GSM, DECT IMT-2000/UMTS, IMT,

MFCN,Mobile on board Aircraft,

Mobile on board Vessels, M2M 700MHz

Contributions – Deliverables

ECC PT1

CEPTadministrations

Industry

Internationalorganisations

In an average meeting:• 78 participants with ~60

% representing industry• 50 input documents

20+ECC deliverables

10+CEPT Reports

4

Page 5: INTRODUCTION TO ECC PT1 January 2016. Some History ERC established ERC TG1 on UMTS/IMT-2000 (the group has held 17 meetings) 1997 TG1 produced first ERC

2

Participants

5

Mai

nz #

1Pa

ris #

2Bu

dape

st #

3Br

ight

on #

4He

lsin

ki #

5Br

usse

ls #

6Li

sbon

#7

Berli

n #8

Gro

ning

en #

9Du

blin

#10

St. P

eter

sbur

g #1

1He

lsin

ki #

12

Cope

nhag

en #

13M

ainz

#14

Cam

brid

ge #

15Up

psal

a #1

6

Biel

/Bie

nne

#17

Mai

sons

-Alfo

rt #1

8He

lsin

ki #

19Vi

areg

gio

#20

Osl

o #2

1Vi

lniu

s #2

2

Mai

nz #

23 (X

O)

Mai

nz #

24Ta

vira

#25

Buda

pest

#26

Athe

ns #

27He

lsin

ki #

28Du

blin

#29

Paris

#30

Mai

nz #

31

Stoc

khol

m #

32Se

ville

#33

Soph

ia A

ntip

olis

#34

Cope

nhag

en #

35Ta

llinn

#36

Vien

na #

37

Biel

/Bie

nne

#38

Reyk

javi

k #3

9W

rocl

aw #

40

Kris

tians

and

#41

Mar

seill

e #4

2Be

rlin

#43

Ljub

ljana

#44

Rom

e #4

5

Luxe

mbo

urg

#46

Zagr

eb #

47

Edin

burg

h #4

8Vi

lniu

s #4

9M

ontre

ux #

50He

lsin

ki #

51

0

20

40

60

80

100

120

70

78

62

75 7479

68

80

53 54

68

79 80

67 6976

7974

8491

85

70

36

96 9487

70 7279

8275

8279

53

7770

7672

75

86

76

68

78

92

8186 87

9791

8791

Page 6: INTRODUCTION TO ECC PT1 January 2016. Some History ERC established ERC TG1 on UMTS/IMT-2000 (the group has held 17 meetings) 1997 TG1 produced first ERC

Documents

6

Mai

nz #

1Pa

ris #

2Bu

dape

st #

3Br

ight

on #

4He

lsin

ki #

5Br

usse

ls #

6Li

sbon

#7

Berli

n #8

Gro

ning

en #

9Du

blin

#10

St. P

eter

sbur

g #1

1He

lsin

ki #

12

Cope

nhag

en #

13M

ainz

#14

Cam

brid

ge #

15Up

psal

a #1

6

Biel

/Bie

nne

#17

Mai

sons

-Alfo

rt #1

8He

lsin

ki #

19Vi

areg

gio

#20

Osl

o #2

1Vi

lniu

s #2

2

Mai

nz #

23 (X

O)

Mai

nz #

24Ta

vira

#25

Buda

pest

#26

Athe

ns #

27He

lsin

ki #

28Du

blin

#29

Paris

#30

Mai

nz #

31

Stoc

khol

m #

32Se

ville

#33

Soph

ia A

ntip

olis

#34

Cope

nhag

en #

35Ta

llinn

#36

Vien

na #

37

Biel

/Bie

nne

#38

Reyk

javi

k #3

9W

rocl

aw #

40

Kris

tians

and#

41M

arse

ille

#42

Berli

n #4

3Lj

ublja

na #

44Ro

me

#45

Luxe

mbo

urg

#46

Zagr

eb #

47

Edin

burg

h #4

8Vi

lniu

s #4

9M

ontre

ux #

50He

lsin

ki #

51

0

10

20

30

40

50

60

70

80

56

32 31

48

40

61

74

52

43

59

44

55

43 45 47

54

75

50

60 6259

3227

54 55

39

14

35

57

38

47

70

63 65

55 55 55

74

33

48 46

31

37

2833

45

3741

31 30 31

Page 7: INTRODUCTION TO ECC PT1 January 2016. Some History ERC established ERC TG1 on UMTS/IMT-2000 (the group has held 17 meetings) 1997 TG1 produced first ERC

CEPT Members

7

Mai

nz #

1Pa

ris #

2Bu

dape

st #

3Br

ight

on #

4He

lsin

ki #

5Br

usse

ls #

6Li

sbon

#7

Berli

n #8

Gro

ning

en #

9Du

blin

#10

Pete

rsbu

rg #

11He

lsin

ki #

12

Cope

nhag

en #

13M

ainz

#14

Cam

brid

ge #

15Up

psal

a #1

6

Biel

/Bie

nne

#17

Mai

sons

-Alfo

rt #1

8He

lsin

ki #

19Vi

areg

gio

#20

Osl

o #2

1Vi

lniu

s #2

2

Mai

nz #

23 (X

O)

Mai

nz #

24Ta

vira

#25

Buda

pest

#26

Athe

ns #

27He

lsin

ki #

28Du

blin

#29

Paris

#30

Mai

nz #

31

Stoc

khol

m #

32Se

ville

#33

Soph

ia A

ntip

olis

#34

Cope

nhag

en #

35Ta

llinn

#36

Vien

na #

37

Biel

/Bie

nne

#38

Reyk

javi

k #3

9W

rocl

aw #

40

Kris

tians

and#

41M

arse

ille

#42

Berli

n #4

3Lj

ublja

na #

44Ro

me

#45

Luxe

mbo

urg

#46

Zagr

eb #

47

Edin

burg

h #4

8Vi

lniu

s #4

9M

ontre

ux #

50He

lsin

ki #

51

0

5

10

15

20

25

30

15 1514

1618

1716

18

1413 13

14 14 1415

1614

1517

1819

18

12

1920

2119

15

1918

1517

20

15

18 1817

2022 22

21 2122

2321

2426

25

2119

21

Page 8: INTRODUCTION TO ECC PT1 January 2016. Some History ERC established ERC TG1 on UMTS/IMT-2000 (the group has held 17 meetings) 1997 TG1 produced first ERC

ECC PT1 Terms of Reference

The Project Team shall be responsible for implementing the WAPECS concept as appropriate in the context of MFCN and in frequency bands identified by ECC, including collaborating with WG FM on frequency management issues (e.g. cross-border coordination issues, sharing of bands with applications other than MFCN).  

______________________________________________________________1 In recent ECC Decisions, spectrum has been designated to MFCN (mobile/fixed communications networks) which includes IMT and other communications networks in the mobile and fixed services" which would include fixed wireless access but not point-to-point links.

1

 

8

See full ECC PT1 Terms of Reference on the ECC PT1 webpage

Page 9: INTRODUCTION TO ECC PT1 January 2016. Some History ERC established ERC TG1 on UMTS/IMT-2000 (the group has held 17 meetings) 1997 TG1 produced first ERC

ECC PT1 Officials

ChairmanMr. Didier Chauveau,ANFR, DPSAITel: +33 1 45 18 77 04E-mail: [email protected]

Vice-chairmanMr. Pasi ToivonenFICORATel: +358 9 6966 853E-mail:[email protected]

9

SecretaryMr. Antone Borissov,ANFRTel: +33 68 09 38 856E-mail:[email protected]

Vice-chairmanMr. Steve GreenOFCOMTel: +44 207 7834384E-mail: [email protected]

Page 10: INTRODUCTION TO ECC PT1 January 2016. Some History ERC established ERC TG1 on UMTS/IMT-2000 (the group has held 17 meetings) 1997 TG1 produced first ERC

Place of ECC PT1 within ECC

ECC

WG FMFrequency

Management

WG SESpectrum

Engeneering

WG NaNNumbering and

Networks

CPGConference

Preparatory Group

ECO

ECC PT1IMT

Matters

Steering Group

ETSI

SRDoc

FM49, FM51, FM54,

FM55, EFIS/MG

SE7, SE40, STG

3GPP WiMAX Forum

GSMA

Industry

UMTS Forum

10

GTI

Page 11: INTRODUCTION TO ECC PT1 January 2016. Some History ERC established ERC TG1 on UMTS/IMT-2000 (the group has held 17 meetings) 1997 TG1 produced first ERC

ECC PT1 co-operation with external entities

ECC PT1

ECCAPT Wireless Group

(AWG)

CITEL

11

European Commission

Page 12: INTRODUCTION TO ECC PT1 January 2016. Some History ERC established ERC TG1 on UMTS/IMT-2000 (the group has held 17 meetings) 1997 TG1 produced first ERC

ECC PT1 input to the CEPT preparation to the WRCs (pre WRC -2015)

ECC PT1 has contributed to the preparation of the European Common Proposals (ECPs) for the World Radiocommunication Conferences (WRCs) on the following Agenda Items:

WRC-2000:• 1.6.1• 1.6.2

WRC-2003:• 1.22• 1.33 • 1.34

WRC-2007:• 1.4• 1.9

review of spectrum and regulatory issues for advanced mobile applications in the context of IMT‑2000, noting that there is an urgent need to provide more spectrum for the terrestrial component of such applications, and priority should be given to terrestrial mobile spectrum needs, and adjustments to the Table of Frequency Allocations as necessary

identification of a global radio control channel to facilitate multimode terminal operation and worldwide roaming of IMT‑2000to consider progress of ITU‑R studies concerning future development of IMT‑2000 and systems beyond IMT‑2000, in accordance with Resolution 228 (WRC‑2000)to review the results of studies in response to Resolution 539 (WRC‑2000) concerning threshold values for non‑GSO BSS (sound) in the band 2 630‑2 655 MHz, and to take actions as required

to review and revise technical, operational and regulatory provisions, including provisional limits in relation to the operation of high altitude platform stations within IMT‑2000 in the bands referred to in No. 5.388, in response to Resolution 221 (WRC‑2000)

to consider frequency-related matters for the future development of IMT‑2000 and systems beyond IMT‑2000 taking into account the results of ITU‑R studies in accordance with Resolution 228 (Rev.WRC‑03)

to review the technical, operational and regulatory provisions applicable to the use of the band 2 500-2 690 MHz by space services in order to facilitate sharing with current and future terrestrial services without placing undue constraint on the services to which the band is allocated

12

Page 13: INTRODUCTION TO ECC PT1 January 2016. Some History ERC established ERC TG1 on UMTS/IMT-2000 (the group has held 17 meetings) 1997 TG1 produced first ERC

WRC-2015: AI 1.1 and AI 1.2

WRC-2015:• Support CPG_PTD on AI 1.1:to consider additional spectrum allocations to the mobile service on a primary basis and identification of additional frequency bands for International Mobile Telecommunications (IMT) and related regulatory provisions, to facilitate the development of terrestrial mobile broadband applications, in accordance with Resolution 233 (WRC 12); • Support CPG_PTD on AI 1.2to examine the results of ITU R studies, in accordance with Resolution 232 (WRC 12), on the use of the frequency band 694-790 MHz by the mobile, except aeronautical mobile, service in Region 1 and take the appropriate measures;

ECC PT1 is paving the way for the future of mobile

ECC PT1/CPG PTD meetings were co-located ensuring efficient organisation and cooperation for drafting CEPT position on AI 1.1 and AI 1.2 in synergy with harmonisation measures under development in ECC 13

Page 14: INTRODUCTION TO ECC PT1 January 2016. Some History ERC established ERC TG1 on UMTS/IMT-2000 (the group has held 17 meetings) 1997 TG1 produced first ERC

ECC PT1 input to the WRC-2015

WRC-2015:• Support CPG_PTA on AI 4 and 10

to further develop the working document on “Proposed action on Resolutions relating to Mobile Service” and the ECP elements

When developing its response to CPG PTA, ECC PT1 addressed contributions from industry on future needs from mobile sectors on frequency ranges above 6 GHz, specific frequency bands to be considered for future IMT-systems , Initial characteristics of systems operating in the bands above 6 GHz, provide initial estimations for spectrum requirements for systems above 6 GHz

14

Page 15: INTRODUCTION TO ECC PT1 January 2016. Some History ERC established ERC TG1 on UMTS/IMT-2000 (the group has held 17 meetings) 1997 TG1 produced first ERC

ECC PT1 is the CEPT entity contributing to ITU-R WP5D

15

Since the establishment of the ITU-R WP5D “IMT Systems” (successor of ITU-R WP8F) in January 2008, ECC PT1 has been contributing to its work by presenting the CEPT positions on the issues on the agenda of WP5D, including:

• Development and update of ITU-R Recommendations and Reports on IMT

• Digital Dividend (790-862 MHz for Region 1) • IMT-Advanced submission and evaluation process• Cognitive Radio Systems (CRS)• Femtocells (home base stations)• 3.5 GHz• 700 MHz • IMT 2020

ECC PT1 is brand recognised at the international level and in the industry

Page 16: INTRODUCTION TO ECC PT1 January 2016. Some History ERC established ERC TG1 on UMTS/IMT-2000 (the group has held 17 meetings) 1997 TG1 produced first ERC

How is ECC PT1 organised?

Sub Working Groups (SWGs) are active during the ECC PT1 plenary meetings

Correspondence Groups (CGs) are active between ECC PT1 plenary meetings

Openingplenary

Closingplenary

Sub working group A

Sub working group C

Plenarymeeting

n

Plenarymeeting

n+1

Correspondence group X

Correspondence group Y

Correspondence group Z

The number of CGs may vary

16

Sub working group E

Page 17: INTRODUCTION TO ECC PT1 January 2016. Some History ERC established ERC TG1 on UMTS/IMT-2000 (the group has held 17 meetings) 1997 TG1 produced first ERC

Presentation of ECC PT1 SWGs

SWG-A – “Spectrum Issues”Chairman: Mr. Michael Kraemer (E-Plus Mobilfunk GmbH)

michael.kraemer @ eplus-gruppe.de

SWG-C – “Compatibility and Sharing Issues”Chairman: Mr. Sverker Magnusson, (Ericsson)

sverker.magnusson @ ericsson.com

SWG-E – “Coordination of CEPT activities in relation to the ITU-R process for the development of IMT-2020”

Chairman: M. Eiman Mohyeldin, (Nokia) eiman.mohyeldin @ nokia.com

17

Page 18: INTRODUCTION TO ECC PT1 January 2016. Some History ERC established ERC TG1 on UMTS/IMT-2000 (the group has held 17 meetings) 1997 TG1 produced first ERC

ECC PT1 current and recent activityThe following presents a list of current and recent activity within ECC PT1:

• ECC DEC (15)01 on 700 MHz MFCN • EC mandate 700 MHz: CEPT Report 53 (tasks 1&2) and current activity (draft CEPT

Report 60 - task 3) • Recommendations on MFCN cross border coordination

• ECC REC(15)01 : 700 MHz, 1452-1492 MHz, 3,4-3,8 GHz• Update of ERC REC(01)01: 1920-1980 MHz and 2110-2170 MHz’

• Update of ECC/DEC(05)05 to improve the harmonised band plan 2.6 GHz and to add relevant technical conditions (BEM)

• “Coverage obligations” : ECC Report 231• “Broadband Mobile Communication On-board Vessels ” : ECC Report 237, revision of

ECC DEC (08)08 • “Machine 2 Machine” 700 MHz 2 X 3 MHz : Draft ECC Report 242 on compatibility

studies with other possible applications in 700 MHz• Mobile Communications on board Aircraft (MCA) : Analysis of usage of MCA without

Network Control Unit and relevant follow up actions • Support to ECO on ECO Report 03: information on “licensing of mobile bands” now

available from EFIS • Possible contributions on IMT 2020 in ITU-R

18

Page 19: INTRODUCTION TO ECC PT1 January 2016. Some History ERC established ERC TG1 on UMTS/IMT-2000 (the group has held 17 meetings) 1997 TG1 produced first ERC

Response to EC mandatesECC PT1 drafted CEPT Reports in response to EC mandates

(example of the last 3 years)

These CEPT reports are the basis either for the update of EC framework or the development of EC framework

MFCN 3.4-3.8 GHz: CEPT Report 049 • Harmonised band plan• New BEM suitable for MFCN with large bandwidthEC Decision 2014/276/EU

Mobile Communications onboard Aircraft (MCA): CEPT Report 048• MCA LTE1800 : 1710-1785 MHz and 1805-1880 MHz• MCA UMTS2100 (FDD): 1920-1980 MHz and 2110-2170 MHzEC Decision 2013/654/EU

MFCN 700 MHz: CEPT Report 53 and an additional draft CEPT Report 60 under development

• MFCN in 700 MHz : 2 X 30 MHz and “zero to 4 blocks of 5 MHz” SDL EC Decision expected in Q1 2016 19

Page 20: INTRODUCTION TO ECC PT1 January 2016. Some History ERC established ERC TG1 on UMTS/IMT-2000 (the group has held 17 meetings) 1997 TG1 produced first ERC

IMT 2020

• ECC PT1 (SWG E) has started work on IMT 2020 to develop CEPT contributions to ITU-R WP 5D on the following topics:1. Technical requirements & Evaluations2. Process and circular letter

• Frequency bands for IMT 2020 will be considered for WRC-19 under Agenda Item 1.13 by ITU-R Task Group 5/1

• ECC PT1 has agreed on an Input to the February 2016 WP 5D meeting inviting WP 5D to send TG 5/1 stable technical and operational characteristics as early as possible, in order for the studies to progress

• ECC PT1 is awaiting guidance from ECC and CPG on how the CEPT work on AI 1.13 should be addressed

• Evaluation methods for IMT 2020 will be considered in more detail at the ECC PT1#52 meeting in April 2016

20

Page 21: INTRODUCTION TO ECC PT1 January 2016. Some History ERC established ERC TG1 on UMTS/IMT-2000 (the group has held 17 meetings) 1997 TG1 produced first ERC

ECC PT1 webpage

The most recent information:http://www.cept.org/ecc/groups/ecc/ecc-pt1

21

Page 22: INTRODUCTION TO ECC PT1 January 2016. Some History ERC established ERC TG1 on UMTS/IMT-2000 (the group has held 17 meetings) 1997 TG1 produced first ERC

For further information on ECC PT1

22

Please refer to the ECC PT1 contacts