MCCS INTERNATIONAL SERVICES SUMMARY 1- Project Engineering Phase MCCS Multi Disciplines Champions Include: Electrical, Instrument, Mechanical (Fix-rotary), Piping, etc.
Cost Effect Of Rework In Engineering Phase For Issuance Of New Revision Documents Is Way More Cheaper Than Rework In Project Execution Phase
Detailed Design
Documents Review
Provision of Technical Problems List with Related
Attachments
Assistant in issuance of New Revision
of Related Documents
CONSEQUENCE:
TIME SAVING IN
PROJECT
EXECUTION
PHASE
2- Project Procurement Engineering Phase MCCS Multi Disciplines Champions Include: Electrical, Instrument, Mechanical (Fix-rotary), Piping, etc.
Cost Effect Of MCCS Champions Support In Procurement Engineering Phase Is Significantly Less Than Delay Cost In Project Execution Phase
Material Requisition Technical
Documents Review
(MR Packs)
Provision of Check sheet, Test sheet And Maintenance Procedure as Per Each PO NO And Related Tag NO(s),
Under relevant System And Sub-System. No
CONSEQUENCE:
TIME SAVING IN
PROJECT
EXECUTION
PHASE
3- PROJECT COMMISSIONING ENGINEERING PHASE (PLANNING) MCCS Multi Disciplines Team Include: Electrical, Instrument, Mechanical (Fix-rotary), Piping, etc.
Increasing Of Budget Baseline For High Quality Of Pre-
commissioning, Commissioning & Start-up Will Be
Compensated With Early Production Bonus
Technical Preparation For Execution Phase of Pre-Commissioning, Commissioning,
Start-Up Assistant And Multi Discipline Maintenance As per Computerise Maintenance Management
System (CMMS) And Electronic Document Management System (EDMS) And Warehouse Management
System (WMS)
THIS IS INTEGRATION OF CMMS, EDMS & WMS AS PER CREATION OF RELATEDMASTER DATABASE
CONSEQUENCE: SAFE
COMMISSIONING AND
START-UP AND EARLY
PRODUCTION
4- PROJECT CONSTRUCTION PHASE
Flange Management (Software Basis): Flange Management Software Will Be Used For Related Planning.
Also Flange Management Service Is Applicable In Oil &
Gas Facilities During Black Shut Down / Overhaul
Joint Data Management
Manual Bolt Torquing
Hydraulic Bolt Torquing
Hydraulic Bolt Tensioning
Joint Breakout
Auditable Report Confirming System Safety & Integrity as per ISO 9001
CONSEQUENCE:
FAILURE
PREVENTION OF
SYSTEMS DUE TO
LEAKING JOINTS
5- PROJECT PRE-COMM. & COMMISSIONING PHASE
N2 He Leak Testing: Helium Leak Detection Is Known To Be The Most Accurate Method Of Locating And Quantifying System Leaks.
Also N2 He Leak Testing Service Is Applicable In Oil & Gas
Facilities During Black Shut Down / Overhaul
Pre-engineering of test packs
and test procedures
Consumables (N2/He gas),
equipment & manpower supply
Pressurisation of systems
Data compilation and handover
to the client
Handover of related
Test Package Dossier
to Company and Main
Contractor with
complete sign off.
CONSEQUENCE:
SAFE START-UP
AND SAFE
OPERATION
INTEGRATION OF CMMS, EDMS & WMS
DEFINITION CMMS: Computerize Maintenance Management System EDMS: Electronic Document Management System WMS: Warehouse Management System MCCS: Mechanical Completion And Commissioning Services SEQUENCE OF INTEGRATION STEP 1: Master Database Creation For Project Permanent Equipment As Per Following Breakdown:
MASTER DATABASE BREAKDOWN
PURCHASING ORDER NUMBER (PO No. – EACH DISCIPLINE)
RELEVANT TAG No.(s) OF EACH PO No. AS PER RELATED SYSTEM & SUB-SYSTEM NUMBER (s)
RELEVANT TECHNICAL DOCUMENTS TO EACH TAG No.(s) SUCH AS DATASHEET, SPECIFICATION, LIST, DRAWING, DIAGRAM, MANUAL, PROCEDURE, etc.
RELEVANT TECHNICAL INFORMATION FOR WAREHOUSE SUCH AS STOCK No., STOCK CATEGORY, MIN/MAX QTY., CERT No., VENDOR DATA, SUPPLIER NAME, ESTIMATED PRICE, etc.
STEP 2: Provision Of All Related Technical Documents And Highperlinks As Per Specified Breakdown Structure:
Considering the current oil & gas market purchasing a specialized software such as SAP, Zinator, ICAPS, Easy
Plant, Mainta and so on is not affordable. However, MCCS Integrated Method is a superior solution for time saving in project execution phase and increase
the plant reliability in operation & maintenance phase.
OIL & GAS PROJECT LIFE CYCLE