Integrated Tools for Mining, Modelling, Estimation, Design, Optimisation and Scheduling

by Kayleigh Cooper, Snr Consultant MICROMINE Africa

Page 2: Integrated Tools for Mining, Modelling, Estimation, … › wp-content › uploads › 2019 › 07 › ...Modelling, Estimation, Design, Optimisation and Scheduling by Kayleigh Cooper,

• Founded in Western Australia in 1986, MICROMINE is an Australian-owned provider of intuitive software solutions to the mining and exploration industry.

• From capturing, managing, visualising and understanding data to controlling and reporting on mine production, MICROMINE has a solution.

• MICROMINE is the only provider of solutions that are relevant to every stage of the mining process. This means that our clients can source all of their software needs through the one local vendor.

MICROMINE Africa – Who are we?

Page 3: Integrated Tools for Mining, Modelling, Estimation, … › wp-content › uploads › 2019 › 07 › ...Modelling, Estimation, Design, Optimisation and Scheduling by Kayleigh Cooper,

With offices in 18 of the world’s mining capitals, MICROMINE’s specialists have the local knowledge to provide solutions that are relevant to your geographic location and operation, maximising the return on your investment.

Page 4: Integrated Tools for Mining, Modelling, Estimation, … › wp-content › uploads › 2019 › 07 › ...Modelling, Estimation, Design, Optimisation and Scheduling by Kayleigh Cooper,

Micromine Modules Exploration through to Exploitation

Page 5: Integrated Tools for Mining, Modelling, Estimation, … › wp-content › uploads › 2019 › 07 › ...Modelling, Estimation, Design, Optimisation and Scheduling by Kayleigh Cooper,

Micromine Modules

CoreResource

Estimation

ExplorationImplicit

Modelling

Mining Wireframing

Stratigraphic Modelling

Surveying

SchedulerPit

Optimisation

Micromine’s 10 Modules

Page 6: Integrated Tools for Mining, Modelling, Estimation, … › wp-content › uploads › 2019 › 07 › ...Modelling, Estimation, Design, Optimisation and Scheduling by Kayleigh Cooper,

Stratigraphic Modelling Module:

Simplifying the Geological Modelling Process

Page 7: Integrated Tools for Mining, Modelling, Estimation, … › wp-content › uploads › 2019 › 07 › ...Modelling, Estimation, Design, Optimisation and Scheduling by Kayleigh Cooper,

Where do we start?

The aim of most drilling programs is to locate and define a resource. This is achieved through a number

a number of key steps including:

• Data Preparation

• Data Processing

• Seam elevation modelling

• Seam thickness modelling

• Generating a Seam Block Model (SBM)

• Enhancing the SBM

• Reporting

How long does this take? Time is money.

Page 8: Integrated Tools for Mining, Modelling, Estimation, … › wp-content › uploads › 2019 › 07 › ...Modelling, Estimation, Design, Optimisation and Scheduling by Kayleigh Cooper,

We are currently investigating a Coal Project. The information we have so far:

• The project area spans 30km2

• 153 diamond drillholes consisting of 687 sample intervals (Including lithology and Assays)

• Database consists of historical and recent information

• 7 Faulted zones

Lets set up a scenario

Page 9: Integrated Tools for Mining, Modelling, Estimation, … › wp-content › uploads › 2019 › 07 › ...Modelling, Estimation, Design, Optimisation and Scheduling by Kayleigh Cooper,

Lets Prepare the Data

What problems are we facing when we are interpreting the drillholes?

Page 10: Integrated Tools for Mining, Modelling, Estimation, … › wp-content › uploads › 2019 › 07 › ...Modelling, Estimation, Design, Optimisation and Scheduling by Kayleigh Cooper,

Cross section through the modified data

Data Processing

Cross section through the data as is

Page 11: Integrated Tools for Mining, Modelling, Estimation, … › wp-content › uploads › 2019 › 07 › ...Modelling, Estimation, Design, Optimisation and Scheduling by Kayleigh Cooper,

What is happening in the Background?

Page 12: Integrated Tools for Mining, Modelling, Estimation, … › wp-content › uploads › 2019 › 07 › ...Modelling, Estimation, Design, Optimisation and Scheduling by Kayleigh Cooper,

Creating the SBM

Page 13: Integrated Tools for Mining, Modelling, Estimation, … › wp-content › uploads › 2019 › 07 › ...Modelling, Estimation, Design, Optimisation and Scheduling by Kayleigh Cooper,

Creating the SBM

Page 14: Integrated Tools for Mining, Modelling, Estimation, … › wp-content › uploads › 2019 › 07 › ...Modelling, Estimation, Design, Optimisation and Scheduling by Kayleigh Cooper,

Creating the SBM

Page 15: Integrated Tools for Mining, Modelling, Estimation, … › wp-content › uploads › 2019 › 07 › ...Modelling, Estimation, Design, Optimisation and Scheduling by Kayleigh Cooper,

Modifying the SBM

Page 16: Integrated Tools for Mining, Modelling, Estimation, … › wp-content › uploads › 2019 › 07 › ...Modelling, Estimation, Design, Optimisation and Scheduling by Kayleigh Cooper,

Modifying the SBM

Page 17: Integrated Tools for Mining, Modelling, Estimation, … › wp-content › uploads › 2019 › 07 › ...Modelling, Estimation, Design, Optimisation and Scheduling by Kayleigh Cooper,

Creating Wireframes

Page 18: Integrated Tools for Mining, Modelling, Estimation, … › wp-content › uploads › 2019 › 07 › ...Modelling, Estimation, Design, Optimisation and Scheduling by Kayleigh Cooper,

Modelling stratigraphic deposits, such as coal seams, laterites, oil and gas reservoirs, or aquifers, is a specialiseddiscipline requiring many techniques not used in the hard rock industry. The modelling needs to take into account instances such as seams eroded away, or lithology tend to “pinch-out” and rock partings.

MICROMINE has developed a suite of tools to model complex stratigraphic deposits. The SBM has become an efficient container for all information relating to the deposit. This module can cuts down on the time consuming and labor intensive work that a Geologist would have to do in order to generate an equivalent model using traditional methods such as explicit wireframing.

It doesn’t stop there. MICROMINES’s geological modelling toolkit also includes the Implicit Modelling and Resource Estimation modules. Workflow steps from each of the three modules are easily combined, helping geologists to efficiently model virtually any mineral deposit.

In Conclusion

Page 19: Integrated Tools for Mining, Modelling, Estimation, … › wp-content › uploads › 2019 › 07 › ...Modelling, Estimation, Design, Optimisation and Scheduling by Kayleigh Cooper,

Questions?