Page 1: Innovative Well Completion Design- The Goldilocks Completion · well completion is built from library of components Fully coupled and properly connected Reservoir-Well model Connection

Michael Byrne

Dr Lesmana Djayapertapa

Ken Watson

Innovative Well Completion Design-The Goldilocks Completion

Lloyd’s Register

2019

Page 2: Innovative Well Completion Design- The Goldilocks Completion · well completion is built from library of components Fully coupled and properly connected Reservoir-Well model Connection

Presentation Outline

2

• How do we currently model wells?

• What is so different about using CFD?

• Some strange results?

• Goldilocks and the three completions

• Does this really work?

• Implications for future wells

Page 3: Innovative Well Completion Design- The Goldilocks Completion · well completion is built from library of components Fully coupled and properly connected Reservoir-Well model Connection

Why Bother?Conventional Well Inflow Modelling Software Computational Fluid Dynamics (CFD)

LR - WellscopeConventional Reservoir Simulator

Numerical Method Nodal analysis 3D Numerical Method – Capturing Porous, Non-Porous, Turbulence

Darcy equation in reservoir, nodal analysis in well

Well Model Actual well completion geometry is NOT captured

Actual well completion geometry is captured

Actual well completion geometry is NOT captured

Reservoir-to-well connection Reservoir grid is imported to simulate inflow, well completion is built from library of components

Fully coupled and properly connected Reservoir-Well model

Connection factors are used to connect reservoir to well

Pressure drop / flow rate calculation

Pressure drop or flow rate is prescribed. Equations are used to determine flow rate or pressure drop

Pressure drop inside the well are the result of the actual completion geometry and flow rate from reservoir

Pressure drop between reservoir and well and the pressure within the well are determined using equation

Modelling near wellbore formation damage

Near wellbore formation damage is manifested as “skin” factor

Near wellbore formation damage can be simulated using Formation Damage lab. test results

Near wellbore formation damage is manifested as “skin” factor

Run time Fast run time Long run time, high memoryNot any more!

Moderate run time

Steady State / Transient Steady State Steady State or Transient Transient

Single Phase / Multiphase Multiphase Single Phase or Multiphase Multiphase

3

Page 4: Innovative Well Completion Design- The Goldilocks Completion · well completion is built from library of components Fully coupled and properly connected Reservoir-Well model Connection

3D Modelling – what is Wellscope?

● Wellscope is a patented modelling workflow to estimate well inflow and well component performance

● Based on Computational Fluid Dynamics (CFD)– Model wells and near wellbore

– Considers fluids and well geometry

● More accurate prediction of productivity benefit of different drilling and completion strategies– No “fudge” or skin factors

● Other applications– Sands and fines transport in wells– Flow into and through sand control and ICDs

– Component erosion modelling & prediction

Near wellbore pressure variation Reservoir pressure variation

VB0SQ8

Page 5: Innovative Well Completion Design- The Goldilocks Completion · well completion is built from library of components Fully coupled and properly connected Reservoir-Well model Connection

• Some Strange Results!

(Restrictive ICD)

(“Goldilocks” ICD)

• Not too much restriction, not too little restriction, but just the right amount for this reservoir and this well

• The Goldilocks completion

No. Completion ICDs Nozzles PISM3/d/bar

Drawdown RateM3/d

1 SAS 0 0 30 90 2700

2 ICD 1 77 1 27 90 2430

3 ICD 2 154 4 60 90 5400

Page 6: Innovative Well Completion Design- The Goldilocks Completion · well completion is built from library of components Fully coupled and properly connected Reservoir-Well model Connection

Reservoir Pressure Profile Comparison

Pressure (bar)

HeelStand Alone Screen PI: 30 (sm3/D)/bar

“Goldilocks” ICD PI: 60 (sm3/D)/bar

Restrictive ICD PI: 27 (sm3/D)/bar

Page 7: Innovative Well Completion Design- The Goldilocks Completion · well completion is built from library of components Fully coupled and properly connected Reservoir-Well model Connection

Horizontal Well

Open Hole:Preferential flow at the Heel

Balanced Inflowwith Restrictions

Outlet

Outlet

Heel

Toe

Heel

Toe

Page 8: Innovative Well Completion Design- The Goldilocks Completion · well completion is built from library of components Fully coupled and properly connected Reservoir-Well model Connection

Zoom in on the toe of the last Screen (nearest to the heel)

8

A portion of the toe of the screen experiences “outflow”oil flows outwards from the basepipe to the annulus via the sand screen

Strong annular flowThis part of the well shows oilflows outwards towards the formation→ Inefficient completion

Some of the flow in the annulusgoes out to the formation,some goes into the basepipe, and some continues to flow along the annulus→ Inefficient completion

sandface

This part of the well is undergoing “outflow” oil flows outwards towards the formation→ Inefficient completion

Reservoir pressure contour plot is used as the background colour

Page 9: Innovative Well Completion Design- The Goldilocks Completion · well completion is built from library of components Fully coupled and properly connected Reservoir-Well model Connection

Zoom in on the heel of the last Screen (nearest to the heel)

9

“end of the road” for the annular flow – everything dives into the base pipe

This part of the well is experiencing “inflow”

Page 10: Innovative Well Completion Design- The Goldilocks Completion · well completion is built from library of components Fully coupled and properly connected Reservoir-Well model Connection

Zoom in on the toe of ICD joint

10

Annular flow is not as strong as Stand Alone Screen completionAll part of the well is flowing “inwards” from reservoir to annulus

Page 11: Innovative Well Completion Design- The Goldilocks Completion · well completion is built from library of components Fully coupled and properly connected Reservoir-Well model Connection

Zoom in on the ICD

11

Annular flow is not as strong as Stand Alone Screen completionAll part of the well is flowing “inwards” from reservoir to annulus

High turbulence intensity for flow through the ICD nozzles

Page 12: Innovative Well Completion Design- The Goldilocks Completion · well completion is built from library of components Fully coupled and properly connected Reservoir-Well model Connection

Zoom in on the ICD

12

High oil velocity through the ICD nozzles

Page 13: Innovative Well Completion Design- The Goldilocks Completion · well completion is built from library of components Fully coupled and properly connected Reservoir-Well model Connection

The “Goldilocks” Completion

13

Page 14: Innovative Well Completion Design- The Goldilocks Completion · well completion is built from library of components Fully coupled and properly connected Reservoir-Well model Connection

Does this really work?

● Model indicated: High PI despite poor reservoir quality

● Well showed: “Best in class” PI

● Model Indicated: Flow from all sections of 2.5km horizontal well

● Well Showed: Tracers indicated clean-up from all parts of well

● Model Indicated: Well productivity more than twice best case

● Well Showed: Is the gauge broken? – “exceptional rates”

14

Model versus reality

Page 15: Innovative Well Completion Design- The Goldilocks Completion · well completion is built from library of components Fully coupled and properly connected Reservoir-Well model Connection

15

“Grant me the serenity to accept the things I

cannot change, the courage to change the

things I can, and the wisdom to know the

difference.”

Reinhold Niebuhr

Page 16: Innovative Well Completion Design- The Goldilocks Completion · well completion is built from library of components Fully coupled and properly connected Reservoir-Well model Connection

●Grant me the Serenity to accept the reservoirsI cannot change, the courage to change the wells I can and the wisdom to know the difference

16

Page 17: Innovative Well Completion Design- The Goldilocks Completion · well completion is built from library of components Fully coupled and properly connected Reservoir-Well model Connection

Implications for future wells

● Simple assumptions should be challenged

● Tradition and heresay are not necessarily good reasons for believing something!

● Well value will be realised

● And we’ll all live happily ever after…….

17

We think…

Page 18: Innovative Well Completion Design- The Goldilocks Completion · well completion is built from library of components Fully coupled and properly connected Reservoir-Well model Connection

Questions?