IT Strategy 2017-18 Page 1 5/23/2017 9:54 AM
Table of Contents
1. EXECUTIVE SUMMARY......................................................................................................................... 3
2. CONTEXT OF THE ITS STRATEGY ..................................................................................................... 5
2.1. INTRODUCTION..................................................................................................................................... 5 2.2. KEY GECDSB STRATEGIES – STRATEGIC PLAN 2015-2020 ................................................................ 5
3. ITS VISION AND GUIDING PRINCIPLES ........................................................................................... 7
3.1. VISION ................................................................................................................................................. 7 3.2. GUIDING PRINCIPLES ............................................................................................................................ 7
4. STRENGTHS, WEAKNESSES, OPPORTUNITIES AND THREATS ................................................ 9
4.1. STRENGTHS .......................................................................................................................................... 9 4.2. WEAKNESSES ..................................................................................................................................... 10 4.3. OPPORTUNITIES .................................................................................................................................. 11 4.4. THREATS ............................................................................................................................................ 12
5. VIEW 2020-21 ........................................................................................................................................... 13
6. HIGH LEVEL TIMELINE ...................................................................................................................... 23
7. DEMAND PLAN 2017-18 ........................................................................................................................ 27
APPENDIX 1 – AMENDMENTS ..................................................................................................................... 29
IT Strategy 2017-18 Page 3 5/23/2017 9:54 AM
1. Executive Summary
This document defines a three-year strategy for ITS and is updated annually. Its analysis
and initiatives are guided by GECDSB’s strategic plan and by industry best practice.
Technology Council has agreed that our vision for the Information Technology Services
Department at the Greater Essex County District School Board is to “align its policies,
procedures, resources and partnerships with the vision of the GECDSB’s Strategic
Plan and Board Improvement Plan for Student Achievement and Well-Being through
innovation, service and support.” The key words guiding everything we do are:
IIInnnnnnooovvvaaattteee
EEEnnnaaabbbllleee
SSSeeerrrvvveee
The Guiding Principles set by Technology Council are used to develop the ITS Strategy
and fall into these categories:
The role of IT: Expectations for IT investments in the GECDSB.
Information and data: How information is gathered, stored, accessed and used.
IT architecture and standards: The level of enforcement of IT architectural guidelines
and the standards that flow from these.
Communications: The extent of communication capabilities and services.
IT assets: The nature of IT resources and how they are made available.
Based on these Guiding Principles and a detailed Strength-Weakness-Opportunity-Threat
(SWOT) analysis, the ITS Strategy describes initiatives that align with the Board’s
Strategic Goals as follows:
Confident Learners who:
CL1 Achieve individual success in the pathway of their choice.
CL2 Practice and promote positive and healthy behaviours.
CL3 Act responsibly to self and others through good citizenship.
Engaged Communities that:
EC1 Respond to the needs of our learners.
EC2 Partner to enhance outcomes.
EC3 Embrace the diversity of our region.
Ethical Stewardship through:
ES1 Budget alignment with strategic priorities.
ES2 Effective, responsible and sustainable use of resources.
ES3 Safe and welcoming schools and facilities.
Specific initiatives under these general descriptions are documented and plotted on a
high level timeline for delivery, followed by the Annual Demand Plan.
IT Strategy 2017-18 Page 5 5/23/2017 9:54 AM
2. Context of the ITS Strategy
2.1. Introduction
The ITS focus will be strategic with a long-term vision for the future.
The following document governs the activities of the ITS Department and has been
created by the members of the Technology Council. Technology Council includes
members from all the stakeholder groups in the Greater Essex County District School
Board (GECDSB) as follows:
This strategy discusses ITS activities for the next three years, is updated annually by
Technology Council and is approved by Director’s Council prior to publication. Its
analysis and initiatives are guided by the Greater Essex County District School Board’s
strategic plans and by industry best practice.
2.2. Key GECDSB Strategies – Strategic Plan 2015-2020
The Strategic Plan provides the details of the GECDSB’s direction based on its mission:
IT Strategy 2017-18 Page 6 5/23/2017 9:54 AM
“Excellence in public education – confident learners, engaged communities, ethical
stewardship.”
The Board’s Strategic Goals guide all ITS initiatives and are documented as follows:
Confident Learners who:
CL1 Achieve individual success in the pathway of their choice.
CL2 Practice and promote positive and healthy behaviours.
CL3 Act responsibly to self and others through good citizenship.
Engaged Communities that:
EC1 Respond to the needs of our learners.
EC2 Partner to enhance outcomes.
EC3 Embrace the diversity of our region.
Ethical Stewardship through:
ES1 Budget alignment with strategic priorities.
ES2 Effective, responsible and sustainable use of resources.
ES3 Safe and welcoming schools and facilities.
IT Strategy 2017-18 Page 7 5/23/2017 9:54 AM
3. ITS Vision and Guiding Principles
3.1. Vision
Our vision for the Information Technology Services Department at the Greater Essex
County District School Board is to “align its policies, procedures, resources and
partnerships with the vision of the GECDSB’s Strategic Plan and Board Improvement
Plan for Student Achievement and Well-Being through innovation, service and
support.”
The key words guiding everything we do are:
IIInnnnnnooovvvaaattteee
EEEnnnaaabbbllleee
SSSeeerrrvvveee
3.2. Guiding Principles
The Guiding Principles on the following page serve to define the IT vision in more detail.
They can be generally categorized with the following definitions, taken from The New
CIO Leader, Gartner, Inc. and Harvard Business School Press, 2005, Marianne Brodbent
and Ellen S. Kitzis.
The role of IT: Expectations for IT investments in <GECDSB>.
Information and data: How information is gathered, stored, accessed and used.
IT architecture and standards: The level of enforcement of IT architectural guidelines
and the standards that flow from these.
Communications: The extent of communication capabilities and services.
IT assets: The nature of hardware and software resources available and how they are
made available.
IT Strategy 2017-18 Page 8 5/23/2017 9:54 AM
Guiding Principles
Role of IT Information and Data
IT Architecture and Standards
Communications IT Assets
The IT department is a service provider, partner and supporter focused on
meeting student, staff, administrator,
parent, community partner and ITS end-user requirements.
We maximize the value to all
stakeholders of every IT dollar spent at
GECDSB.
Stakeholders are assembled to make recommendations for suitable
applications affecting their use of
information technology. Consultation means better decisions.
We ensure that every application that we run has an owner identified who is
responsible for coordinating support to
its users.
The design and implementation of
technology in new school construction adheres to ITS standards to ensure that
current and innovative technology can
be supported.
We improve IT staff knowledge and
service through regular training.
We provide appropriate software training and support to stakeholders
outside the IT department.
IT expenditures are prioritized within
the budget approved by the Board.
We follow relevant industry-standard IT
methodologies to guide and govern all aspects of IT processes.
We routinely seek feedback from our stakeholders e.g. Customer Satisfaction
Survey
We implement and integrate systems such that data is
entered accurately once and
once only at source and is validated with system edits.
We use IT applications to
reduce costs through
eliminating duplication of
effort.
We strive towards standard
data definitions and business
rules across all applications.
All applications, business
rules and processes are clearly documented.
All data is secured and shared according to
GECDSB’s privacy policies.
Third party providers/vendors must
adhere to the GECDSB
privacy policy.
All data is backed up and
secured as provided in the GECDSB Disaster Recovery
Plan.
Data is collected and used to improve services and
improve the instructional process resulting in
improved student
achievement.
We ensure that information
and data is available to the
appropriate roles.
We share the responsibility with the rest of GECDSB to
communicate the importance
of securing data.
We only purchase proven,
fully vendor-supported
software and hardware
products and services
following the procurement
guidelines that meet
GECDSB’s standards, can be
supported in the GECDSB
environment and are suitable
for the purpose for which they
are intended.
We enforce standards for
hardware, software and
connectivity technology
selection and implementation
to streamline resource
requirements, reduce
incompatibilities and costs and
maximize reliability.
We review and revise our
standards regularly based
upon need, available
technology and budget.
We provide technology
seamlessly and with
transparency to allow
customers to focus on their
tasks rather than the tools.
We implement Tier 1
hardware solutions and
processes that will strive for
100% availability of the
technology.
We choose on premise or
cloud implementations of
applications as appropriate.
We secure our network
against internal and
external threats, while
enhancing service
flexibility (e.g. allowing
outside devices to connect
to our network and share
GECDSB resources).
GECDSB students, staff,
parents and the
community must be able
to access the IT resources
that they need from any
internet-connected
location.
GECDSB employees who
travel must be able to
access the IT resources
that they need from any
location outside the
jurisdiction of GECDSB
with GECDSB-owned
equipment and personal
devices.
We provide the best
possible Wide and Local
Area Networks with the
resources that we have
available.
We provide access to the
internet to enhance and
support student learning
in a safe environment.
We purchase suitable
applications where
appropriate rather than
develop software in-
house. We implement
with minimum
customization (minimum
programming changes).
We ensure an IT Disaster
Recovery Plan is built,
regularly maintained,
tested and followed.
We foster innovation by
providing support and
evaluation of pilot
programs of technology-
enabled operational tools
and learning programs.
We review, revise and/or
replace our applications
and hardware at regular
intervals.
We continue to provide
flexibility in the Board’s
infrastructure solutions to
anticipate the
implementation of new
technologies in the
future.
IT Strategy 2017-18 Page 9 5/23/2017 9:54 AM
4. Strengths, Weaknesses, Opportunities and Threats
4.1. Strengths
Wireless access is available in all locations
Access to technology is available at the point of instruction
Compass 4 Success is readily available to Superintendents, their Administrative
Assistants, Principals, Vice Principals, Student Success and Guidance teachers
Abundant and relevant data is available and protected
School administrators and staff are using data to drive instruction
Standardized Tier 1 equipment
Improved access to student information through applications e.g. Compass 4 Success,
GeoQuery, student information system
A variety of software has been tested and approved
Standard images for the devices in the Elementary panel minimize teacher/ student
training and support
Fast network speeds
Internet filter permits granular control
The Board financially supports the need to maintain sufficient access to internet
bandwidth
Provide safe and secure computer access
Availability of loaner hardware for administration use
Have a Help Desk with extended service hours and set up to provide live responses to
telephone queries
Have call log tracking which permits problem trend analysis to facilitate continuous
service improvements
Respond to emergencies
Business process for SEA computers has been developed
Network up time is 99.7%, providing service to all students and staff
Board-sponsored web resources
Have a governance model for projects and selection of computing infrastructure,
which includes Senior Administration as participants
Team approach to problem resolution
Improved collaboration for all stakeholders through Technology Council and formal
governance
Computer ratio and lab sizes have been established
Evergreen plan exists
Scheduled backups in all schools
Centralized and standardized servers/services
Have optimized the management of data and the integrity of the data
Awareness of issues has been raised and steps are being taken to improve business
processes as systems are being upgraded
Foundation is now in place to build better business processes for the future
IT Strategy 2017-18 Page 10 5/23/2017 9:54 AM
Desire to improve business processes exists
Have a process for meeting timelines for reporting
Established process for securing data
Server standard has been established for applications i.e. client/ server, Intel or AMD
processors, Blades, SAN, SQL database
Disaster Recovery Plan has been written
Good virus protection has reduced the number of service interruptions due to viruses
to almost zero
Security access is documented
Permit access to GECDSB technology resources by users’ personal equipment
4.2. Weaknesses
Non-standard image in Secondary leads to increased support
Increased SEA claims affect setup and support
Availability of time for learning use of software
Lack of classroom supervision
Compass 4 Success is not used regularly
Inaccurate data is entered without understanding of impact to other staff and
applications
Documented processes are not followed, lack of accountability
Long call log resolution time in some cases
False sense of security with internet filtering
No Board-provided forum available for staff and students to publish work and
exchange ideas outside the Board
Lack of understanding across GECDSB of what systems are used and what data is
available already
Lack of backup/ job overlap in some cases
Some staff continue to use Board equipment slated for retirement
Lack of ITS resources to support system initiatives
Inconsistent standard for “drop” locations in older buildings
Lack of redundancy for essential infrastructure components
Insufficient funding to keep up with change
Regular network intrusion tests are not performed
Long hardware repair down time in schools
Instructional software selection list, including iPad applications, is large and
challenging to manage
Older hardware architecture cannot perform with updated software, and newer
hardware cannot run older software
Lack of appropriate system edits prevents data validation at point of entry
Processes are not always documented
ITS does not have a Systems Analyst to help design systems integration
Standards are not consistently documented
Occasionally the ITS process impedes flexibility e.g. software
IT Strategy 2017-18 Page 11 5/23/2017 9:54 AM
4.3. Opportunities
Work toward one to one computing device to student ratio by leveraging the ability
for students to bring their own devices (BYOD) to the classroom in addition to
providing Board-purchased devices
Improve student learning by changing instructional practice
Use data to plan and enhance professional learning
Broaden user access to Compass 4 Success
Research new and emerging technologies
Focus less on the device and more on the application in the classroom
Provide specific training as identified by school administrators on how to use data for
SIPSA, etc.
Leverage the ability to filter websites with granularity, such as by panel or division
Use by students/ staff of Web 2.0 tools
Quality control of responses to Help Desk requests
While greatly improved, more training needed to build capacity re: healthy data
culture
New tablet device technologies offer important opportunities for improved
instructional practice when used appropriately
Web- or intranet-based application use is increasing
Aligning information to allow for better decision-making
Provide access to information to facilitate better student and parent engagement
Provide a “doorway” to global educational opportunities (Pathways, career
opportunities based on strengths
Implementation and sharing/ communicating of Business Process Improvement
practices
Enterprise portal implementation will open up more opportunities for business
process automation and improved communication
To spend government funding when allocated outside the normal budget process
To improve any business system which would increase efficiency
Provide remote access to data e.g. staff access from home
Document and improve processes e.g. K212, IPPS.net
Increased automation would allow strategic deployment of staff and reduce costs
Single sign on would improve efficiency
The creation of the Disaster Recovery Plan (DRP) has generated several
infrastructure projects that will move GECDSB closer to IT industry standards
Develop offsite Disaster Recovery location
Opportunity to improve SEA computer support processes because of the increase in
the number of machines in recent times
Implement systems so that information is not entered by multiple people multiple
times for individualized purposes
IT Strategy 2017-18 Page 12 5/23/2017 9:54 AM
4.4. Threats
Insufficient funding hinders providing technology at the point of instruction
Insufficient Professional Development funds to train staff to integrate technology at
the point of instruction
Inaccurate data input
Reliance on data over personal experience and judgment
Uneven adoption of technology by staff
Fast pace of technological change forces moving on before leveraging what is already
implemented
Trying to make many changes with too few staff and other resource constraints
Use of internet bandwidth for non-educational purposes without consideration for its
conservation may restrict its availability for others who need it for educational
purposes
Release of private information without appropriate scrutiny
Breach of confidentiality
Automation can de-personalize service
Lack of staff adherence to published IT policies
Unauthorized software is being loaded on GECDSB workstations
Unauthorized workstations access the wired network
Users do not clearly understand the importance of securing their workstations when
away from them
System initiatives exceed IT capacity
Internal/external threats of hacking, viruses, etc.
Funding constraints which limit plan implementation
7-year old equipment
Lack of buy-in from staff to enter accurate data
GECDSB staff do not understand the risks associated with storing confidential data
on the hard drive of a computer
Controlling access to systems
Business processes conflict causing a “Catch 22” in service e.g. registration and
provision of bus service
Single sign on may allow unauthorized access to multiple systems
Increased risk of theft and vandalism to mobile equipment
License compliance not regularly audited
There is no policy allowing ITS staff to temporarily revoke access to the network in
case of emergency
Fast pace of hardware/software/Operating System change
IT Strategy 2017-18 Page 27 5/23/2017 9:54 AM
7. Demand Plan 2017-18 The Demand Plan as approved by Technology Council and Director’s Council lists the following projects:
Project number Project name
Project manager
One time cost
Annual ongoing
cost change Funding Source
Link to 2020-21
Additional notes
10224 STUC 2017 18 Denis Bester
619,527 0 Classroom Computer Budget 5.6 2016-17 fiscal
10222 ELL management system
Paul Farah
0 0 N/A 5.27 N/A
10223 ETUC 2017 18 Paul Pesce
TBD 0 Classroom Computer Budget 5.6 2016-17 and 2017-18
fiscal
10225 Admin machine purchases 2017 18
Paul Pesce
69,564 0 School Admin Evergreen Budget
5.7 2017-18 fiscal
10226 Lexia deployment Paul Pesce
197,340 0 Special Education (Ministry-funded)
5.28 2016-17 fiscal
10227 Incident tracking system
Paul Pesce
9,491 -2,788 ITS Operations Budget 5.29 2016-17 fiscal
Total 895,922 -2,788
Two projects have been moved to the 2017-18 demand plan. These are:
Document management review
Email archiving review
IT Strategy 2017-18 Page 28 5/23/2017 9:54 AM
In addition, several projects are under discussion that may be submitted as ad hoc during the next 14 months. These include:
Document management implementation
Email archiving implementation
K212 implementation
Workplace Violence Management Program
Power BI
Psych/Social Work Services process
Synrevoice conversion to SchoolMessenger
SEA equipment delivery process and reporting
WAN modernization
IT Strategy 2017-18 Page 29 5/23/2017 9:54 AM
Appendix 1 – Amendments
Version no.
Issue date Section affected
Nature of amendment Author
1.0 October, 2007 Initial Draft Tech Council
1.1 June, 2008 2.1 Para 1 Remove reference to KPMG report; replace with a generic statement regarding ITS focus
Para 2 Remove reference to KPMG report
Stakeholders diagram Add Superintendents
Tech Council
2.2 All Align with current version of the Continuous Growth Plan
3.2 Role of IT bullet 1 Insert “student, staff, administrator, parent, community partner and ITS” before “end user requirements”
Role of IT bullet 3 Replace “job functions” with “use of information technology”
Role of IT bullet 5 Rewrite to reference ITS standards in new school construction rather than a partnership including ITS
4.1 Technology in the Classroom bullet 1 Add “have been established” to clarify
Technology in the Classroom bullet 2 Add “exists” to clarify
Technology in the Classroom bullet 5 Rewrite to clarify
Technology in the Classroom bullet 6 Rewrite to clarify
Information and Data bullet 1 Replace “A lot of” with “Abundant and relevant”
4.2 Technology in the Classroom bullet 2 Replace “too large to be manageable” with “large and challenging to manage”
Information and Data bullet 1 Replace “Do not have a central department to manage” with “Have not optimized the management of”
Information and Data bullet 2 Rewrite to indicate lack of focus rather than lack of knowledge about data and information
Infrastructure Add bullet “Inconsistent standard for ‘drop’ locations”
IT Strategy 2017-18 Page 30 5/23/2017 9:54 AM
Version no.
Issue date Section affected
Nature of amendment Author
4.3 Technology in the Classroom Add bullet “Quality control of responses to Help Desk requests”
Infrastructure Add bullet “Permit access to GECDSB technology resources by users’ personal equipment”
4.4 ITS Processes Insert “Risk of” ahead of “security penetrations”
5.1.8 Replace “access to” with “use of”
5.1.10 Remove “Universal Design for all technological assistive devices”
Shift all following 5.1 subsections up
5.2.7 Remove “Data verification” – already included in Guiding Principles under Information and Data
Shift all following 5.2 subsections up
5.2.9 Remove “Data standardization” – already included in Guiding Principles under Information and Data
Shift all following 5.2 subsections up
5.2.11.3 Remove – completed
5.3.15 Remove – requires less than 5 days IT time
Shift all following 5.3 subsections up
5.4.2.5 Remove
5.5.2 Remove – completed
Shift all following 5.5 subsections up
5.5.5 Remove – completed
Shift all following 5.5 subsections up
6 Revise timeline for project completions in 2007-8 and extensions to 2011-12
7 Revise annual plan
2.0 June, 2009 2.2 All Align with current version of the Continuous Growth Plan
Tech Council
IT Strategy 2017-18 Page 31 5/23/2017 9:54 AM
Version no.
Issue date Section affected
Nature of amendment Author
3.2 Role of IT bullet 6 Insert “and service” after “IT staff knowledge”
Information and Data Add bullets:
“Third party providers/vendors must adhere to the GECDSB privacy policy.” “All data will be secured as provided in the GECDSB Disaster Recovery Plan.” “Data will be collected and used to improve services and improve the instructional process resulting in improved student achievement.”
Communications bullet 3 Replace “IT customers” with “employees” and add “with GECDSB-owned equipment” to the end
Communications Add a bullet “We will maintain the best possible Wide and Local Area Networks with the resources that we have available.”
4.1 Technology in the Classroom bullet 7 Add “in elementary” at the end
Information and Data bullet 3 Remove
Information and Data Add the following bullets:
“School administrators and staff are beginning to use data to drive instruction” “Administrative staff are using data to inform decision-making” “The Data Warehouse is accessible and is being used”
Business Processes and Systems Add the following bullet:
“Improved access through applications”
ITS Processes Add the following bullets:
“Have a process for meeting timelines for reporting” “Improved collaboration for all stakeholders” “Established process for securing data”
IT Strategy 2017-18 Page 32 5/23/2017 9:54 AM
Version no.
Issue date Section affected
Nature of amendment Author
4.2 Technology in the Classroom bullet 4 Add “scheduled” before backups and “in some schools” at the end
Technology in the Classroom bullet 5 Add “in some locations” at the end
Technology in the Classroom Add the following bullets:
“Non-standard image in secondary leads to increased support.” “Lack of consistent enforcement of rules for hardware repair.” “Allocation of computers to SERR, LST done inconsistently.” “Lack of network connection in portables.”
Information and Data bullets 2, 3 Remove
Information and Data Add the following bullet:
“Lack of access to equipment”
Business Processes and Systems bullets 2, 8 Remove
Business Processes and Systems bullet 7 Add “or Business” after “Systems”
ITS Processes bullet 1 Add “in some areas” at the end
ITS Processes bullet 2 Add “in some cases” at the end
ITS Processes bullet 3 Add “in some cases” at the end
ITS Processes bullet 4 Change “SST” to “IT”
ITS Processes Add the following bullet:
“Help Desk is not staffed continuously throughout the day with extended hours to cover school hours”
Infrastructure bullet 2 Remove “e.g. VAX”
IT Strategy 2017-18 Page 33 5/23/2017 9:54 AM
Version no.
Issue date Section affected
Nature of amendment Author
4.3 Technology in the Classroom bullet 1 Add “for admin use” at the end
Technology in the Classroom Add the following bullets:
“Inventory updates” “ITS and Spec Ed business process for SEA claims”
Information and Data bullets 1, 2 Remove
Information and Data Add the following bullets:
“Provide access to information to facilitate better student and parent engagement” “Provide a “doorway” to global educational opportunities (Pathways, career opportunities based on strengths)” “Use data to plan and enhance professional learning”
Business Processes and Systems bullets 1, 2 Remove
Business Processes and Systems Add the following bullets:
“Implementation of Business Process Improvement practices” “Increased automation would allow strategic deployment of staff and reduce costs” “Single sign on would improve efficiency”
ITS Processes bullet 3 Add “in schools that do not yet have a scheduled backup solution” at the end
ITS Processes Add the following bullets:
“Research new and emerging technologies” “Develop a business plan with the Spec Ed department” “With LANDesk we will have an opportunity to have a more accurate inventory for planning”
Infrastructure bullet 1 Revise to read WAN upgrade is being implemented
IT Strategy 2017-18 Page 34 5/23/2017 9:54 AM
Version no.
Issue date Section affected
Nature of amendment Author
4.4 Technology in the Classroom bullet 3 Add “/spyware/Trojans” after “Viruses” and remove “unauthorized”
Technology in the Classroom Add the following bullets:
“Spec Ed plan needed” “7-year old equipment” “Turnaround from identification to delivery” “More demand on shrinking budget”
Information and Data bullet 3 Remove
Information and Data Add the following bullet:
“Release of data without appropriate scrutiny”
Business Processes and Systems bullet 4 Remove
Business Processes and Systems Add the following bullets:
“Automation can de-personalize service” “Business processes conflict causing a ‘Catch 22’ in service e.g. registration and provision of bus service”
ITS Processes bullet 3 Add “and vandalism” after “theft”
5.1 Change 2011-12 to 2012-13
5.1.11 Universal access to the internet – remove – completed; re-number subsequent bullets
5.2 Change 2011-12 to 2012-13
5.2.9 MISA data warehouse enhancements – remove – completed
5.3 Change 2011-12 to 2012-13
5.3.6 Systems analyst position in ITS – remove – not feasible at this time; re-number subsequent bullets
5.3.8 Student information system – revise to reflect results of review
5.3.16 School fundraising accounting package – remove – not feasible at this time
5.4 Change 2011-12 to 2012-13
5.4.2.1 Change “Remote” to “Computer”
5.4.2.2 Equipment inventory – remove – completed
IT Strategy 2017-18 Page 35 5/23/2017 9:54 AM
Version no.
Issue date Section affected
Nature of amendment Author
5.4.2.3 Call logging – remove – completed
5.4.2.4 Knowledge base – remove – completed
5.5.3 Unified messaging – remove – base infrastructure completed; re-number subsequent bullets
5.5.4 Tighter, yet more flexible network security – remove – completed
5.5.5 Improved desktop security – remove – completed; re-number subsequent bullets
6.0 Revise high level timeline to reflect updated planning
7.0 Change “2008-9” to “2009-10”
Revise to reflect approved plan
2.1 October, 2009 1, 4.1, 5.1
Change “Technology in the Classroom” to “Technology for Learning” to correspond to the introduction to section 4.0
Tech Council
November, 2009 2.2 Change the latest version of the Continuous Growth Plan to September, 2009 from 2008
Tech Council
A.1.2 – Add Focus 2009-2010
A.3.4 – Add Status June 2009 and Focus 2009-2010
A.3.6 – Add Status June 2009 and Focus 2009-2010
A.3.7 – Add Status June 2009 and Focus 2009-2010
A.4.3 – Add Status June 2009 and Focus 2009-2010
B.1.4 – Add Status June 2009 and Focus 2009-2010
B.2.2 – Remove (completed from ITS perspective)
B.2.7 – Add Status June 2009 and Focus 2009-2010
B.2.9 – Add Status June 2009 and Focus 2009-2010
B.4 – Remove (completed)
3.1 Communications – Add “We will provide access to the internet to enhance and support student learning.”
IT Strategy 2017-18 Page 36 5/23/2017 9:54 AM
Version no.
Issue date Section affected
Nature of amendment Author
4.1 Technology for Learning
o Add “Fast network speeds”
ITS Processes
o Expand “Improved collaboration for all stakeholders through Technology Council and formal governance”
o Add “Business process for SEA computers has been developed”
Infrastructure
o Change Oracle to SQL
o Add “AMD” to Intel processors
o Add “Much better internet filter providing more flexibility”
4.2 Technology for Learning
o Remove “Slow network speeds in some locations”
o Remove “Lack of network connection in portables”
o Add “Increased SEA claims affecting support”
Information and Data
o Add “While greatly improved” to “Lack of training to build capacity re: healthy data culture”
Business Processes and Systems
o Remove “or Business” from “ITS does not have…”
ITS Processes
o Remove “Lack of ability to solve issues remotely in some cases”
o Remove “Lack of documented processes, roles and responsibilities for system implementation”
o Add “Occasionally, the IT process impedes flexibility e.g. software”
Infrastructure
o Remove “Too many users try to go through the same wireless access point simultaneously”
o Add “80MB of internet bandwidth is not enough”
o Add “False sense of security with internet filtering”
IT Strategy 2017-18 Page 37 5/23/2017 9:54 AM
Version no.
Issue date Section affected
Nature of amendment Author
4.3 Technology for Learning
o Add “Work toward one to one computer to student ratio
Information and Data
o Add “Broaden access to Data Warehouse”
Business Processes and Systems
o Change “Document and improve processes”
o Change “Implementation and sharing/ communicating of Business…”
o Add “Enterprise portal implementation will open up more opportunities for business process automation”
ITS Processes
o Opportunity to improve SEA computer support processes because of the increase in the number of machines in recent times”
4.4 Information and Data
o Add “MISA funding from the province is not guaranteed for the future”
Business Processes and Systems
o Add “resource constraints” to “Trying to make many changes with too few staff”
o Add “Funding constraints”
December, 2009 5.1.1 Change heading from “1:1 electronic textbooks to students” to “Electronic curriculum delivery”
Change “textbooks to students at a ratio of 1:1” to “curriculum resources to students”
Tech Council
January, 2010 2.1 Insert revised stakeholder chart Tech Council
2.3 Add Board Improvement Plan section
April, 2010 5.1.2 Computer ratios – Remove; review complete, ratios remain the same
Tech Council
5.1.8 Commonplace online use of textbooks/research materials – Remove; the change in language in 5.1.1 now covers this bullet
5.2.7 Privacy policy – Remove; policy implemented in 2009-10
IT Strategy 2017-18 Page 38 5/23/2017 9:54 AM
Version no.
Issue date Section affected
Nature of amendment Author
5.3.7 Student information system – Remove; after review the project team decided to leave Trevlac on Foxpro due to the increased workload for the DBA/Developer, but continue to implement District Office on SQL.
5.3.10 Tangible capital assets tracking – Remove wording referring to “less than 5 days ITS time” as the initiative is still under investigation.
5.3.15 Online training – Add.
7.0 Change “2009-10” to “2010-11”
Revise to reflect approved plan
3.0 October, 2010 Title page
Revise dates to reflect new year – “2010-11” to “2011-12” and “June, 2010” to “May, 2011”
Tech Council
1. Replace “Continuous Growth Plan” with “strategic plan”
2.1 Replace “Continuous Growth Plan” with “strategic plan”
3.2 Role of IT – Add
o We will utilize industry-standard IT methodologies to guide and govern all aspects of IT processes.
3.2 Information and Data – Add
o We will ensure that information and data is available to the appropriate roles.
o We will share the responsibility with the rest of GECDSB to communicate the importance of securing data.
4.1 Strengths, Technology for Learning – Revise
o “Expanding wireless access” to “Wireless access is available in all locations”
4.1 Strengths, Technology for Learning – Add
o Scheduled backups in all schools
o Availability of loaner hardware for admin use
o Centralize servers/services
IT Strategy 2017-18 Page 39 5/23/2017 9:54 AM
Version no.
Issue date Section affected
Nature of amendment Author
4.1 Strengths, Information and Data – Revise
o Abundant and relevant data is available and protected
o School administrators and staff are using data to drive instruction
o Compass 4 Success is readily accessible
o Have optimized the management of data and the integrity of the data
4.2 Weaknesses, Technology for Learning – Delete
o Lack of scheduled backups in some schools
o Allocation of computers to SERR, LST done inconsistently
4.2 Weaknesses, Technology for Learning – Add
o Limited internet bandwidth
o No standard process for implementing staff blogs and wikis
4.2 Weaknesses, Information and Data – Delete
o Have not optimized the management of data and the integrity of the data
o While greatly improved, lack of training to build capacity re: healthy data culture
o Lack of access to equipment
4.2 Weaknesses, Business Processes and Systems – Delete
o Information is entered by multiple people multiple times for individualized purposes
4.2 Weaknesses, Infrastructure – Add
o Production applications run on test servers
o Disaster Recovery Plan is not being tested regularly
4.3 Opportunities, Technology for Learning – Delete
o Availability of loaner hardware for admin use
o Centralize servers/services
IT Strategy 2017-18 Page 40 5/23/2017 9:54 AM
Version no.
Issue date Section affected
Nature of amendment Author
4.3 Opportunities, Technology for Learning – Add
o Web- or intranet- based software use is increasing
o Spec Ed Plan needed
4.3 Opportunities, Information and Data – Change
o Data Warehouse to Compass 4 Success
4.3 Opportunities, Information and Data – Add
o While greatly improved, more training needed to build capacity re: healthy data culture
o Provide remote access to data e.g. staff access from home
4.3 Opportunities, Business Processes and Systems – Revise
o “Enterprise portal implementation will open up more opportunities for business process automation and improved communication”
4.3 Opportunities, Business Processes and Systems – Add
o Implement systems so that information is not entered by multiple people multiple times for individualized purposes
4.3 Opportunities, ITS Processes - Delete
o Implementation of Tivoli will improve backup processes in schools that do not yet have a scheduled backup solution
o Improved software – Help Desk
4.3 Opportunities, Infrastructure – Delete
o WAN upgrade is being implemented
4.3 Opportunities, Infrastructure – Add
o Develop offsite Disaster Recovery location
4.4 Threats, Technology for Learning – Delete
o Vulnerability of data
o Spec Ed Plan needed
IT Strategy 2017-18 Page 41 5/23/2017 9:54 AM
Version no.
Issue date Section affected
Nature of amendment Author
4.4 Threats, Technology for Learning – Revise
o Internal threats (students/staff) “such as student work, student identity, etc.”
4.4 Threats, Technology for Learning – Add
o Use by students/staff of blogs and wiki’s using equipment outside the Board’s control
4.4 Threats, Information and Data - Add
o GECDSB staff do not understand the risks associated with storing confidential data on the hard drive of a computer
o Breach of confidentiality
4.4 Threats, Business Processes and Systems – Add
o Single sign on may allow unauthorized access to multiple systems
4.4 Threats, Infrastructure – Add
o “wired” to “Unauthorized workstations access the network”
o “There is no policy allowing ITS staff to temporarily revoke access to the network in case of emergency”
4.4 Threats, Infrastructure – Delete
o “Not all administration computers are secured with a workstation password”
March, 2011 5.1.2 Interactive white boards
o Change “interactive white board” to “interactive technology” to reflect recent changes in the types of interactive technologies that are available
Tech Council
5.1.3 Portables with ready access to technology
o Remove – completed, re-number subsequent sections
5.1.4 Access for personal alptops/electronic devices to the Board’s network
o Remove – completed, re-number subsequent sections
5.1.5 Standard wireless implementation in all buildings
o Remove – completed, re-number subsequent sections
IT Strategy 2017-18 Page 42 5/23/2017 9:54 AM
Version no.
Issue date Section affected
Nature of amendment Author
5.1.6 Panel-specific internet filtering
o Remove – completed, re-number subsequent sections
5.1.11 SoundField systems
o Remove – this issue will be addressed as the need arises, and the nature of it may change as technology changes, re-number subsequent sections
5.1.12 Teacher 1 to 1
Add, re-number based on deletions above
5.2.1 Integration of data
o Remove – included in Guiding Principles as this is not really an initiative, re-number subsequent sections
5.2.2 Secure data
o Remove – included in Guiding Principles as this is not really an initiative, re-number subsequent sections
5.2.3 Protocol for data access
o Change name to “Identity management”
5.2.4 24/7 access to data
o Remove – included in Guiding Principles as this is not really an initiative, re-number subsequent sections
5.2.6 Safe schools – School climate survey
o Add, re-number based on deletions above
5.3.2 Standardization of data processes
o Remove – included in Guiding Principles as this is not really an initiative, re-number subsequent sections
5.3.3 Continuous improvement processes
o Remove – included in Guiding Principles as this is not really an initiative, re-number subsequent sections
IT Strategy 2017-18 Page 43 5/23/2017 9:54 AM
Version no.
Issue date Section affected
Nature of amendment Author
5.3.9 Tangible capital assets tracking
o Remove – will require less than 5 days ITS time
5.3.15 BAS upgrade
o Add, re-number based on deletions above
5.3.16 BAS SQL conversion
o Add, re-number based on deletions above
5.3.17 IPPS upgrade
o Add, re-number based on deletions above
5.3.18 Absence requests
o Add, re-number based on deletions above
5.3.19 Business forms and processes
o Add, re-number based on deletions above
5.3.20 Internet presence
o Add, re-number based on deletions above
5.3.21 Email assessment
o Add, re-number based on deletions above
5.3.22 eCommerce
o Add, re-number based on deletions above
5.3.23 Employee Self Service (ESS)
o Add, re-number based on deletions above
5.3.24 Web T4s
o Add, re-number based on deletions above
5.3.25 Email archiving
o Add, re-number based on deletions above
5.3.26 Trevlac SQL conversion
o Add, re-number based on deletions above
IT Strategy 2017-18 Page 44 5/23/2017 9:54 AM
Version no.
Issue date Section affected
Nature of amendment Author
5.3.27 Benefits system
o Add, re-number based on deletions above
5.4.2.2 Enterprise Management Console (EMC)
o Add
5.4.3 Improved school server backups
o Remove – completed, re-number subsequent sections
5.5.1 Wide Area Network (WAN) upgrade
o Remove – completed, re-number subsequent sections
5.5.2 Improved school server backups
o Remove – completed, re-number subsequent sections
5.5.7 Documented and implemented access and security policies
o Remove – completed, re-number subsequent sections
6.0 High level timeline
o Replace with current
April, 2011 5.1.7 Teacher 1 to 1
o Remove per Director’s Council
Tech Council
5.3.2 Job function on-line help/documentation
o Remove – not considered an ITS project once Enterprise Portal is implemented; re-number subsequent sections
5.3.5 Teacher performance appraisals
o Remove – not considered an ITS project once Employee Self Service is implemented; re-number subsequent sections
5.3.14 IPPS upgrade
o Remove – less than 5 days ITS time; re-number subsequent sections
o Note that this is required prior to implementation of Employee Self Service
5.3.21 Web T4s
o Remove – less than 5 days ITS time; re-number subsequent sections
IT Strategy 2017-18 Page 45 5/23/2017 9:54 AM
Version no.
Issue date Section affected
Nature of amendment Author
5.4.3 Documented process to enforce ITS policies
o Remove – process exists to enforce all policies at GECDSB, including ITS; re-number subsequent sections
7. Annual plan
o Update to reflect new plan
May, 2011 Title page,
footers
Replace logo Scott Scantlebury
2.1 Stakeholders
o Update to reflect the change in name of the Parent Councils to GECPIC
Tech Council
2.2 Continuous Growth Plan
o Insert “heading” before “Key Priority of Teaching and Learning”
o Replace “focus on” with “utilization of”
4.4 Threats
o Technology for Learning
Revise “Decreased funding for providing technology at the point of instruction” to “Decreased funding hinders providing technology at the point of instruction”
o Business Processes and Systems
Replace “Lack of staff adoption of technology” with “Uneven adoption of technology by staff”
o Infrastructure
Replace “Some staff do not comply with licensing agreements” with “Lack of full compliance with licensing agreements”
5.3 Business Processes and Systems
o Opening paragraph – insert “less time on administrative classroom functions and” in front of “more staff time…”
4.0 October, 2011 Title Page
Change dates to 2012-13 Tech Council
3.2 Role of IT – change:
o Bullet 1 – add “partner and supporter” after service provider; change “satisfying” to “meeting”
IT Strategy 2017-18 Page 46 5/23/2017 9:54 AM
Version no.
Issue date Section affected
Nature of amendment Author
o Bullets 2,3,4,5,6,7,8,9 – Remove “will”
o Bullet 3 – Add “Consultation means better decisions.”
o Bullet 7 – Insert “appropriate” after “provide”
o Bullet 9 – Replace “utilize” with “follow relevant”
Role of IT – add:
o Bullet 10 – We routinely seek feedback from our stakeholders e.g. Customer Satisfaction Survey
Information and Data – change:
o Bullets 1,2,3,4,5,7,8,9,10 – Remove “will”
o Bullet 1 – Add “accurately” after “entered”
o Bullet 7 – Add “backed up and” before “secured”
IT Architecture and Standards – change
o Bullets 1,2,3,4,5 – Remove “will”
o Bullet 1 – Add “and hardware” after software; “following the procurement guidelines” after “services”
o Bullet 5 – Replace “provide” with “strive for”
Communications – change
o Bullets 1,4,5 – Remove “will”
o Bullet 1 – Replace “laptops” with “devices”; add “and share GECDSB resources” after network
o Bullet 2 – Remove “mobile”; replace “IT customers” with “students, staff, parents and the community”, replace GECDSB with any internet-connected”
o Bullet 3 – Add “and personal devices” after equipment
o Bullet 4 – Replace “maintain” with “provide”
o Bullet 5 – Add “in a safe environment” after “learning”
IT Assets – change:
o Bullets 1,2,3,4,5 – Remove “will”
o Bullet 1 – Move “where appropriate” to after packages
o Bullet 3 – Add “software and hardware” before experimentation
o Bullet 4 – Replace “and revise” with
IT Strategy 2017-18 Page 47 5/23/2017 9:54 AM
Version no.
Issue date Section affected
Nature of amendment Author
“revise and/or replace” after “review”; add “and hardware” after “applications”
o Bullet 5 – Remove “as much as possible”, insert “continue” in front of “provide”
4. Change opening paragraph to reflect GECDSB’s Strategic Plan Goals
Sort bullets based on Strategic Plan Goals
5. Change heading date to 2015-16
Sort initiatives based on Strategic Plan Goals
Remove completed and deleted initiatives
o BAS upgrade
o BAS SQL conversion
o Standard suite of office tools
o Trevlac SQL conversion
o Online training
o Benefits system
o Timesheets
o Access based on function
o Employee Self Service (ESS)
o Identity management
o Navigation system for data mapping / searching
o Restructure of support delivery model
o Digital document sharing in the classroom
o Centralized school servers
June, 2012 1. Revise Executive Summary to reflect the current Board Strategic Goals
M. Guthrie
2. Insert Section 2.2, Board Strategic Goals and re-number all subsequent sections
Revise new Section 2.3 to reflect the current Board Continuous Growth Plan
Revise new Section 2.4 to reflect the current Board Improvement Plan
5. 5.2.1 – revise heading to Enterprise Portal – internet presence
5.2.2 – 5.2.6 – add
o Enterprise Portal – intranet
o Enterprise Portal – team sites
o Enterprise Portal – MySites
IT Strategy 2017-18 Page 48 5/23/2017 9:54 AM
Version no.
Issue date Section affected
Nature of amendment Author
o Enterprise Portal – parent portal
o Office 365 implementation
and re-number all subsequent sub-sections
Remove
o 5.2.10 – Student email
o 5.2.11 – School wiring closet improvements
and re-number all subsequent sub-sections
5.3.1 – remove Safe schools – School climate survey and re-number all subsequent sub-sections
5.4.1 – revise heading to Enterprise Portal – document management, navigation, search
Remove
o 5.4.2 – Appropriate licensed instructional software available to all students
o 5.4.3 – documentation of ITS processes
Remove
o 5.5.6 – online recruitment
o 5.5.7 – BAS automated fax
and re-number subsequent sub-sections
5.5.8 – remove BAS invoice scanning and re-number subsequent sub-sections
5.5.8 – revise to Enterprise Portal – eCommerce
Remove
o 5.5.9 – email assessment
o 5.5.10 – more and better support tools
and re-number subsequent sub-sections
5.5.15 – revise to LSS server replacement
5.5.16 – insert Remote computer management tool assessment and re-number subsequent sub-section
6. Update High Level Timeline
7. Update annual plan
5.0 October, 2012 Title Page
Change dates to 2012-13 Tech Council
1. Revise vision statement
IT Strategy 2017-18 Page 49 5/23/2017 9:54 AM
Version no.
Issue date Section affected
Nature of amendment Author
2.1 Revise Stakeholder figure
2.2 Merge 2.2 and 2.3, removing reference to the Board Continuous Growth Plan and adding the Board’s Strategic Plan report bullets underpinned by ITS. Re-number subsequent sub-sections.
3.1 Revise vision statement
3.2 Guiding Principles – IT Assets
o Bullet 1 – Revise “software packages” to “applications”
4.1 Strengths
o Student Achievement – Add “to Superintendents, their Administrative Assistants, Principals, Vice Principals, Student Success and Guidance teachers” to Compass 4 Success bullet
o Culture of Learning – Add “student” ahead of “information” and examples “e.g. Compass 4 Success, GeoQuery, student information system” to the Improved access bullet
o Culture of Learning – Revise internet filter bullet to read “Internet filter gives granular control”
o Culture of Caring – Revise “Providing” to “Provide” in the first bullet
o Culture of Caring – Add “with extended service hours and set up to provide live responses to telephone queries” to “Have a Help Desk”
o Culture of Caring – Add “which permits problem trend analysis to facilitate continuous service improvements” to “Have call log tracking”
o Culture of Caring – Change network up time to 99.7% and replace numbers of students and staff with “all”
o Good Stewardship – Add “and standardized” to “Centralized servers”
o Good Stewardship – Change “Better” to “Good” for virus protection
o Good Stewardship – Add “Security access is documented” and “Permit access to GECDSB technology resources by users’ personal
IT Strategy 2017-18 Page 50 5/23/2017 9:54 AM
Version no.
Issue date Section affected
Nature of amendment Author
equipment”
4.2 Weaknesses
o Student Achievement – Add “setup and” to “Increased SEA claims”
o Culture of Learning – Add “Compass 4 Success is not used regularly”
o Culture of Caring – Add “and applications” to “Inaccurate data”
o Good Stewardship – Change 80MB to 248MB in “internet bandwidth
o Good Stewardship – Add “in older buildings” to “Inconsistent standard”
o Good Stewardship – Remove firewall from “Lack of redundancy”
o Good Stewardship – Add “in schools” to “Long hardware repair”
o Good Stewardship – Add “and newer hardware cannot run older software” to “Older hardware architecture”
o Good Stewardship – Add “I.T.” to “tracking assets”
o Good Stewardship – Change “assist with” to “support” in “Lack of ITS resources” and move to the top of the list
o Good Stewardship – Remove “Shortage of ITS staff”, “Lack of documented security access”, “Non-standard servers are still being used”, “Help Desk is not staffed continuously throughout the day with extended hours to cover school hours”
4.3 Opportunities
o Student Achievement – Change “computer” to “computing device” in “Work toward one to one”
o Student Achievement – Add “user” to “Broaden access”
o Student Achievement – Add “e.g. imaging, remote desktop support” to “Better support tools”
o Student Achievement – Add “Focus less on the device and more on the application in the classroom”, “Leverage the ability to BYOD (Bring Your Own Device) to the classroom”, “Provide specific training as identified by school administrators on how to
IT Strategy 2017-18 Page 51 5/23/2017 9:54 AM
Version no.
Issue date Section affected
Nature of amendment Author
use data for SIPSA, Visible Learning, etc.”
o Collaborative Partnerships – Change “software” to “application” in “Web- or intranet-based”
o Collaborative Partnerships – Remove “Develop a business plan with the Spec Ed Department” and “Centralize all servers to save hardware cost and provide higher level of security and greater efficiencies
o Good Stewardship – Change “Government funding” to “To spend government funding when allocated outside the normal budget process”
o Good Stewardship – Remove “Permit access to GECDSB technology resources by users’ personal equipment”
4.4 Threats
o Student Achievement – Add “Insufficient Professional Development funds to train staff to integrate technology at the point of instruction”, “Fast pace of technological change forces moving on before leveraging what is already implemented”
o Culture of Caring – Change “data” to “private information” in “Release of data”
o Culture of Caring – Remove “Unsecured access to network is too easy”
o Good Stewardship – Add “Fast pace of hardware/software/Operating System change”
5. Change dates to 2016-17
7. Change dates to 2013-14 and 2016-17
April, 2013 5.1.1 Electronic curriculum delivery – remove and replace with “No initiatives…”
5.2.12 Data fluency for all staff - remove
5.5.6 WebStock – BAS interface – remove and re-number subsequent initiatives
5.5.11 Administration Building generator – remove and re-number subsequent initiatives
IT Strategy 2017-18 Page 52 5/23/2017 9:54 AM
Version no.
Issue date Section affected
Nature of amendment Author
5.5.16 Remote computer management tool – remove and re-number subsequent sections
5.5.17 “Ask Jeeves” – remove
Add
o Data centre switch replacement
o SAN controller installation
o Router replacement (all locations)
o Backup system
o Laptop backup
o Employee Self Service (ESS)
o MS System Center implementation
o Accommodations/staffing software implementation
o Faxpress upgrade
o IPPS 3.0 upgrade
6. High Level Timeline – update
7. Demand Plan – replace with 2013-14 plan
6.0 October, 2013 Title Page,
headings and
footers
Change dates to 2014-15 and 2017-18 Tech Council
December, 2013 3.2 Guiding Principles – IT Assets
o Remove “will” from first bullet
4.1 Culture of Learning
o Change “Standard images in Elementary minimize teacher/ student training and support” to “Standard images for the desktops and laptops in the Elementary panel minimize teacher/ student training and support”
4.2 Student Achievement
o Add bullet “Automated enterprise-level management of iPads is not possible, which reduces efficiency and effectiveness of support”
Good Stewardship
o Remove “e.g. email server” from fourth bullet
o Add “including iPad applications” to
IT Strategy 2017-18 Page 53 5/23/2017 9:54 AM
Version no.
Issue date Section affected
Nature of amendment Author
eighth bullet
o Remove bullet “Lack of cohesive policies”
4.3 Student Achievement
o Remove “To” from third bullet
o Remove “imaging” from sixth bullet
Culture of Learning
o Add bullet “New tablet device technologies offer important opportunities for improved instructional practice when used appropriately”
April, 2014 5.0 Remove these sections and re-number
5.2.1 Enterprise Portal – internet presence
5.2.2 Enterprise Portal – intranet
5.2.3 Enterprise Portal – team sites
5.2.4 Enterprise Portal – MySites
5.2.9 Access to work related files and work products from home
5.5.6 Tendering process
5.5.9 School UPS replacement
5.5.11 Voice over IP (VoIP) telephony
5.5.13 LSS server replacement
5.5.14 Data centre switch replacement
5.5.15 SAN controller installation
5.5.18 Laptop backup
5.5.19 Employee Self Service (ESS)
5.5.21 Accommodations/staffing software implementation
5.5.22 Faxpress upgrade
5.5.23 IPPS 3.0 upgrade
Add “ON HOLD” to the following sections
5.2.5 Enterprise Portal – parent portal
5.5.7 Enterprise Portal - eCommerce
Remove “Enterprise Portal” from the following section
5.4.1
Add the following sections
5.2.7 Wireless modernization
5.5.13 Enterprise Portal – Intranet migration
5.5.14 ESS timesheets non-Facility Services
IT Strategy 2017-18 Page 54 5/23/2017 9:54 AM
Version no.
Issue date Section affected
Nature of amendment Author
5.5.15 WebStock BAS interface
5.5.16 BAS 3.0 implementation
5.5.17 Dowswell lab move
5.5.18 Legacy iPad VPP enrolment
5.5.19 Secondary iPad VPP implementation
5.5.20 IPPS 5.0 implementation
5.5.21 School LAN upgrade
5.5.22 Benefits
May, 2014 6. Replace High Level Timeline with chart updated for 2014-15
7.0 January, 2015 Title page,
headings and
footers
Change dates to 2015-16 and 2018-19 Tech Council
1. Add BIPSA to Vision
Remove reference to KPMG
3.1 Add BIPSA to Vision
3.2 IT Assets
o Revise third bullet to read “We foster innovation by providing support and evaluation of pilot programs of technology-enabled operational tools and learning programs.”
April, 2015 5.0 Change the following
5.2.1 Remove “Enterprise Portal”
5.5.20 Change “5.0” to “4.1”
Remove the following sections and re-number
5.2.7 Wireless modernization
5.3.1 Automated call out
5.5.6 Enterprise Portal – eCommerce
5.5.9 Implementation of single sign on
5.5.10 Router replacement
5.5.11 Backup system
5.5.12 MS System Center implementation
5.5.17 Dowswell lab move
5.5.18 Legacy iPad VPP enrolment
5.5.19 Secondary iPad VPP implementation
5.5.20 IPPS 5.0 implementation
Add the following sections
IT Strategy 2017-18 Page 55 5/23/2017 9:54 AM
Version no.
Issue date Section affected
Nature of amendment Author
5.5.14 Public website management tool
5.5.15 Legacy website conversion
5.5.16 Mobile Device Management (MDM) tool
5.5.17 Employee demographic changes – self service
5.5.18 Employee requests for transfer automation
5.5.19 Parklane interface to OSBIE
5.5.20 Expense reimbursements
6. Replace High Level Timeline with chart updated for 2015-16
7. Replace Annual Demand Plan with chart updated for 2015-16
8.0 January, 2016 Title page,
headings and
footers
Change dates to 2016-17 and 2019-20, add Annual Plan to title page
Tech Council
1. Replace Board Strategic Goals Tech Council
2.1 Replace Stakeholder chart
Change sentence tense to present
Tech Council
2.2 Replace Board Strategic Plan information including Board Strategic Goals
Remove detailed Key Priorities
Tech Council
4. Reorganize to list from sections
Revise to work sheet updated by Technology Council
Tech Council
April, 2016 5. Change section dates to 2019-20
Re-organize to work sheet updated by Technology Council to match Board Strategic Goals and include alignment
Tech Council
6. Revise timelines updated by Technology Council
Tech Council
7. Revise annual plan per Technology Council
Tech Council
9.0 September, 2016
Title page,
headings and
footers
Change dates to 2017-18 and 2020-21 Tech Council
IT Strategy 2017-18 Page 56 5/23/2017 9:54 AM
Version no.
Issue date Section affected
Nature of amendment Author
October, 2016 3.2 Add “support” to training bullet under IT Role
IT Architecture section – add
We choose on premise or cloud implementations of applications as appropriate.
Tech Council
April, 2017 5. Change section dates to 2020-21
Add initiatives including Board Strategic Goals and alignment
Tech Council
6. Revise timelines updated by Technology Council
Tech Council
7. Revise annual plan per Technology Council
Tech Council