  • 5/23/2018 IIRMS Overview ERW Train Feb162004

    1/43

    30 June 2014 1

    OVERVIEW OF

    Indonesian Integrated Road Management

    Systems (IIRMS)

    Disampaikan pada

    Pelatihan IIRMS

    Depkimpraswil

    Jakarta

    16 Februari 2004

    ERW

  • 5/23/2018 IIRMS Overview ERW Train Feb162004

    2/43

    Executive Summary

    30 June 2014 2

    KERANGKA PRESENTASI (1)

    LATAR BELAKANG PENGEMBANGAN IRMS

    IIRMS

    SIKLUS PEMBINAAN / PENGELOLAAN

    JALAN

    STRUKTUR MODULE DALAM IIRMS/IRMS

    PRINSIP DASAR PERENCANAAN

    TRANSPORTASI

    PROSES PENGEMBANGAN IIRMS

  • 5/23/2018 IIRMS Overview ERW Train Feb162004

    3/43

    Executive Summary

    30 June 2014 3

    KERANGKA PRESENTASI (2)

    MODULE MODULE IIRMS:

    DATABASE & SISTEM MASUKAN DATA (SMD)

    MODULE SECTIONING / SEGMENTATION

    NETWORK ANALYSIS MODULE (NAM)

    STRATEGIC EXPENDITURE PLANNING MODULE (SEPM)

    PROGRAMMING MODULE (PGM)

    BUDGETING MODULE (BGM)

    ROAD DESIGN SYSTEM (RDS)

    ECONOMIC REVIEW MODULE (ERM)

    CONSTRUCTION IMPLEMENTATION MODULE (CIM)

    MONITORING AND REVIEW MODULE (MRM)

    STATISTIC ANALYSIS MODULE (SAM) ENHANCED HIGHWAY INFORMATION MODULE (EHIM)

    KESIMPULAN

    DISKUSI

  • 5/23/2018 IIRMS Overview ERW Train Feb162004

    4/43

    Executive Summary

    30 June 2014 4

    LATAR BELAKANG PENGEMBANGAN IRMSIIRMS (1)

    DIPERLUKAN ALAT BANTU YANG SISTEMATIS AGARPEMBINAAN JALAN DAPAT EFEKTIF DAN EFISIEN

    TAHUN 1986-1987 DANA PEMBINAAN JALAN TURUNDRASTIS SEBAGAI AKIBAT ANJLOKNYA HARGA

    MINYAK

    PERLU BANTUAN LUAR NEGERI YANG CUKUP BESAR

    BANK DUNIA BERSEDIA MEMBERIKAN BANTUANDALAM BENTUK SECTOR LOAN

    BANK DUNIA MENSYARATKAN PROGRAM JALANDISUSUN DENGAN SISTEM YANGMEMPERTIMBANGKAN KAIDAH TEKNIS DAN EKONOMISECARA OBYEKTIF

  • 5/23/2018 IIRMS Overview ERW Train Feb162004

    5/43

    Executive Summary

    30 June 2014 5

    LATAR BELAKANG PENGEMBANGAN IRMS IIRMS (2)

    TAHUN 1987 DIMULAI PENGUMPULAN DATAROUGHNESS DAN PENGEMBANGAN DATABASE -RMMS

    TAHUN 1992 IRMS TERBENTUK SELANJUTNYA BMS, KREEM DAN URMS

    DIKEMBANGKAN

    TAHUN 1995 PENYEMPURNAAN IRMS

    TAHUN 1997

    2001 PENGEMBANGAN IIRMS(Integrasi N, P, K, O, Jembatan & GIS)

  • 5/23/2018 IIRMS Overview ERW Train Feb162004

    6/43

    Executive Summary

    30 June 2014 6

    MAKRO INDIKATOR (NASIONAL)

    SEKTOR TRANSPORTASI JALAN

    1. ASSET (2000)

    JALAN = 292.444 KM ~ Rp.270 TRILLION

    JEMBATAN = 1.000.000 M ~ Rp. 30 TRILLION

    Rp. 300 TRILLION

    2. ROAD TRANSPORT SYSTEM COST (2000)

    INFRASTRUCTURE ~ Rp. 5 TRILLION

    ROAD USER COST ~ Rp. 220 TRILLION

    Rp. 225 TRILLION

    % PDB = Rp. 225 1012

    / Rp. 1.000 1012

    ~ 20%

    3. PANGSA TRANSPORTASI JALAN (1992)

    ANGKUTAN PENUMPANG = 93 %

    ANGKUTAN BARANG = 41 %

  • 5/23/2018 IIRMS Overview ERW Train Feb162004

    7/43

    Executive Summary

    30 June 2014 7

    PROPENASRENCANA

    TATA

    RUANG

    POLDAS PROPEDAPROGRAM

    PEMBANGUNAN

    JALAN

    PROGRAM

    PEMBINAAN

    JALAN

    JANGKAMENENGAHKEMAMPUAN

    PENDANAAN

    PROGRAM

    PEMELIHARAAN

    JALAN

    IIRMS

    KONDISI

    JARINGAN JALAN

    YANG ADA

    DATA

    LALU LINTAS

    GBHN

    STUDI

    TRANSPORTASI/

    JARINGAN

    JALAN

    PROGRAM

    PEMBINAAN

    JALAN

    TAHUNAN

    RENSTRADEP KIMPRASWIL

    Proses Penyusunan Program Pembinaan Jalan

  • 5/23/2018 IIRMS Overview ERW Train Feb162004

    8/43

    Executive Summary

    30 June 2014 8

    Program Pemeliharaan Disusun Berdasarkan AnalisaEkonomi Menurut Perhitungan Manfaat Bagi PenggunaJalan (Direct Benefit to Road User)

    Program Pembangunan (Jalan Baru) Disusun BerdasarkanDetail Feasibility Study dengan Mempertimbangkan:

    - Analisis Dampak Lingkungan- Manfaat Bagi Road User- Manfaat Bagi Masyarakat Umum (Indirect Benefit)

    - Pertumbuhan/Pengembangan Wilayah- Integrasi dengan Pembangunan Sektor Lain- Sinkronisasi dengan Rencana Tata Ruang

    PENDEKATAN SYSTEM

  • 5/23/2018 IIRMS Overview ERW Train Feb162004

    9/43

    Executive Summary

    30 June 2014 9

    ROAD SECTOR MANAGEMENT PROCESS & BINA MARGA M. I. S

    SUBDIT PDP SUBDIT ABLN KANWIL PU DINAS TK I

    SUBDIT PUM SUBDIT PAN SUBDIT JALANDIT BINLAK /

    BAG ADPER SUBDIT EPM

    DINAS TK II

    SUBDIT PUM

    DIT BINKOT

    Urban Road Management

    PT. JASA MARGA

    Toll Road Management

    Desa Road Management

    SUBDIT JEMBATAN

    Bridge Design

    * B M S

    RBO / P3T NAS/

    P3TPROP

    PBPJK

    * K P E* R D S / M* IRMS

    * BMS

    Road DesignYearly Programing +

    Budgeting

    Med (5)+ Long (10/25 Yrs)

    Planning

    Repelita

    Rd Network Study

    Rd Classification

    Feasibility Study

    * RIDPD

    * STPLM (IIRMS)

    So, S1, S2, S3

    DIP (APBN + BLN)

    SPABP (BPJP, BPJK)

    Design (Oyad, Simp Design,

    Full design)Tender Doc

    Specification

    Asst of Program +

    Tender PreparationMonitoring/ Supervision of

    Progress

    Evaluation

    Public Relation ( Humas)

    Evaluation of

    Projcect Implementation +

    Benefit

    Monitoring + Controll

    of Implementation

    Implementation

    of Ko/Kab Project

    Implemation of N/P ProjectCoordination of Planning

    for Public works Infrastructure

    Loan Negotiation

    Planning System

    DevelopmentMonitoring of Foreign

    Assisted ProjectMulti Sector Analysis

    Transport Planning

    Road Ledger

    Planning Asst

    Design

    Supervision

    Planning Asst

    Design / Review

    Supervision

    * C I M

    Design

    Tender Doc

    Specifiation

    Load Administration

    Kab RoadN/P Road

    Legend:Input

    Feed Back

    Coordination

    Kab. Road Management

    Dip / LK / PO

    As Built Drawing

    * KRMS

    * URMS

    * TRMS

  • 5/23/2018 IIRMS Overview ERW Train Feb162004

    10/43

    Executive Summary

    30 June 2014 10

    Planning

    Budgeting

    Road Design Module

    Programming

    Network Screening Sub-Module

    NSSM

    Segmentation

    Data Entry System

    SMD

    Statistical Analysis Module

    SAM

    Enhanced Highway Information Module

    EHIM

    Monitoring & Review Module

    MRM

    Construction Implementation Module

    CIM

    Budgeting

    Road Design System

    Programming Module

    Strategic Expenditure Planning

    SEPM

    Network Analysis Module

    NAM

    Data Entry System (SMD)

    Data Sectioning

    Perbandingan IRMS (1992) & IIRMS (2000)

  • 5/23/2018 IIRMS Overview ERW Train Feb162004

    11/43

    Executive Summary

    30 June 2014 11

    No. Module Description Platform Software

    Data

    base

    Multi

    User

    1 SMD Data Entry System Windows Powerbuilder Dbase Yes

    2 SECTION Sectioning system DOS Foxpro 2.6 Dbase No

    3 NAM Network Analysis Module DOS MicroSoft C Dbase No

    4 CIM Construction Implementation Module Windows Powerbuilder Sybase Yes

    5 MRM Monitoring & Reporting Module Windows Powerbuilder Sybase Yes

    6 SAM Statistical Analysis Module Windows Powerbuilder Sybase Yes

    7 TYPM Three Year Programming DOS Foxpro 2.6 Dbase No

    8 SEPM Strategic Expenditure Planning Module Windows Powerbuilder Dbase No9 SEPM optimisation modules DOS Clipper Dbase No

    10 BGM Budgeting Module (92 version) DOS Clipper Dbase No

    11 EHIM Enhanced Highway Information Module Windows Powerbuilder Sybase Yes

    12 RDS Road Design System Windows Vis. Bas/Form 1 EXCEL Yes

    Module & Platform IIRMS

  • 5/23/2018 IIRMS Overview ERW Train Feb162004

    12/43

    Executive Summary

    30 June 2014 12

    BIAYA TRANSPORT Vs STANDAR/KONDISI JALAN

    Biaya

    Transport

    Biaya Transport Total

    Biaya Pembina Jalan

    (Pembangunan dan

    Pemeliharaan Jalan)

    Biaya Pengguna Jalan(Operasi Kendaraan + Waktu)

    Rusak

    BeratSedang Baik

    Biaya Transport Minimum

    Rusak

    Ringan

  • 5/23/2018 IIRMS Overview ERW Train Feb162004

    13/43

    Executive Summary

    30 June 2014 13

    Integrasi pada dua sisi Pada Perencanaan Jangka Menengah - dengan

    Module SEPM

    Mengintegrasikan keluaran dari berbagai SistemManajemen yang ada (IRMS, URMS, KRMS, BMS)

    Pada Penampilan berbentuk grafis (GIS) dengan

    Module EHIM Mengintegrasikan data dasar masing-masing sistem

    untuk tujuan presentasi dan pelaporan dalam bentukgrafis

  • 5/23/2018 IIRMS Overview ERW Train Feb162004

    14/43

    Executive Summary

    30 June 2014 14

    STANDARDISASI KODE

    Lokasi

    Kota X

    Kota YSuffx 01 Suffx 02

    Kode RuasNoProp

    Ruas

    SuffixKode LokasiKpfrom

    Kpto Kode Program

    Kode Penanganan

    ( Treatment)Mulai

    Dari Planning -------- s/d -------------Implementasi (Monitoring)

  • 5/23/2018 IIRMS Overview ERW Train Feb162004

    15/43

    Executive Summary

    30 June 2014 15

    KERANGKA KONSEP & OPERASI

    INDONESIAN INTEGRATED ROAD MANAGEMENT SYSTEM

    ( IIRMS )

    SEPM

    EHIM

    Indikator Kinerja

    Kebijakan Pembinaan JalanR

    I

    D

    P

    D

    U

    R

    M

    S

    I

    R

    M

    S

    B

    M

    S

    IIRMS

    T

    R

    M

    S

    K

    R

    M

    S

  • 5/23/2018 IIRMS Overview ERW Train Feb162004

    16/43

    Executive Summary

    30 June 2014 16

    Database Sistem

    Data Jaringan Jalan

    Data Inventarisasi Jalan

    Data Kondisi Jalan Data Struktur Jalan

    Data Lalu Lintas

    Data Lingkungan Jalan

    Data Harga Satuan Penanganan

    Data Harga Satuan Biaya Pengguna Jalan

  • 5/23/2018 IIRMS Overview ERW Train Feb162004

    17/43

    Executive Summary

    30 June 2014 17

    CONDITION RATINGS from IRI and AADT

    IRI (International

    Roughness Index) =m/km

    AADT ( TWO WAY/LANE TRAFFIC )

    0 50 100 200 300 1,000 3,000

    From To 50 100 200 300 1,000 3,000 10,000 > 10,000

    0 IRI

  • 5/23/2018 IIRMS Overview ERW Train Feb162004

    18/43

    Executive Summary

    30 June 2014 18

    Sistem Masukan Data Sistem Masukan Data ditulis dalam

    platform Windows

    Struktur File diubah untuk menyesuaikan

    dengan sistem referensi yang baru

  • 5/23/2018 IIRMS Overview ERW Train Feb162004

    19/43

    Executive Summary

    30 June 2014 19

    Noprop Ruas Sffx Km ost Length IRI

    01 023 2 11200 1.005 R1

    01 023 2 11300 .996 R2

    Noprop Ruas Sffx Km ost Offsetfr Kmpostto Offsetto Length IRI

    01 023 2 11200 0 11200 400 .400 RA

    01 023 2 11200 400 11200 800 .400 RB

    01 023 2 11200 800 11300 0 .205 RC

    Old Format

    New Format

    Sistem Referensi Data

  • 5/23/2018 IIRMS Overview ERW Train Feb162004

    20/43

    Executive Summary

    30 June 2014 20

    Data Sectioning

    DRP

    ROUGH

    RCS

    RF

    650

    11200 11300 11400

    400300 600 700 900 100

    CF

    950

    RA RB RC RD RE

    CA CB

    0

    CC CD CE

    250 350 600

    SEGMENT SUBLINK REPLINK

    E i S

  • 5/23/2018 IIRMS Overview ERW Train Feb162004

    21/43

    Executive Summary

    30 June 2014 21

    Network Analysis Module

    Replink sebagai keluaran Sectioning proses

    Alternatif penanganan untuk tahun 1 s.d. 11

    Ada 23 strategi untuk setiap replink Perbaikan Road User Cost Model (IHCM)

    Perbaikan Pavement Deterioration Model

    (P4ST-HDM4) Dapat diproses dengan Alternatif masukan

    dan keluaran

    E ti S

  • 5/23/2018 IIRMS Overview ERW Train Feb162004

    22/43

    Executive Summary

    30 June 2014 22

    Pilihan Operasi NAM

    Analisa SUBLINK untuk menyusun

    MNPLAN

    Analisa REPLINK untuk menetapkan

    Strategi Penanganan

    REPLINK for IRMS or URMS

    E ti S

  • 5/23/2018 IIRMS Overview ERW Train Feb162004

    23/43

    Executive Summary

    30 June 2014 23

    Overview - SEPMKRMS

    Segmentation

    IRMS

    Segment

    Replink

    Replink

    NAM

    BMS

    Bmdata

    Repbridge

    Bmplan

    Krms

    Repkrms

    Planning

    URMS RIDPD

    RIDPD

    SEPM

    Repbridge Repkrms

    StrategiesBms

    Strategies

    Krms

    strategies

    Urms

    strategies

    E ti S

  • 5/23/2018 IIRMS Overview ERW Train Feb162004

    24/43

    Executive Summary

    30 June 2014 24

    Inter-urban

    Roads

    Rural

    Roads

    Urban

    Roads

    Bridges

    SEPM

    Budgets

    Investment

    Programme

    Network

    Condition

    Development

    Projects

    E ti S

  • 5/23/2018 IIRMS Overview ERW Train Feb162004

    25/43

    Executive Summary

    30 June 2014 25

    Alokasi Dana Hasil SEPM

    Status Jalan (N, P, Ka, Ko)

    Jenis Jalan (Antar-Kota, Kota, Rural, Desa) Jenis Program (R, P, B, dsb.)

    Sumber Dana (APBN, APBDI, dsb.)

    Wilayah

    E ti S

  • 5/23/2018 IIRMS Overview ERW Train Feb162004

    26/43

    Executive Summary

    30 June 2014 26

    Efficiency Frontier

    Agency Cost

    NetPresentValue

    Efficiency Frontier

    E ti S

  • 5/23/2018 IIRMS Overview ERW Train Feb162004

    27/43

    Executive Summary

    30 June 2014 27

    Prediksi Kinerja Hasil SEPM

    Kondisi Jalan (Baik, sedang, dsb., atau IRI)

    Kecepatan

    Index Biaya Pengguna Jalan

    Kondisi Jembatan

    E ti S

  • 5/23/2018 IIRMS Overview ERW Train Feb162004

    28/43

    Executive Summary

    30 June 2014 28

    0

    1

    2

    3

    4

    5

    6

    7

    2002 2003 2004 2005 2006 2007 2008 2009 2010 2011

    Budget Y ear

    1.25 T

    1.50 T

    2.00 T

    2.50 T

    3.00 T

    3.50 T

    4.00 T5.00 T

    MIN

    UNC

    INDONESIA NATIONAL ROAD - KPI: Roughness (IRI)

    Kinerja Jln Nas vs Skenario Pendanaan

    E ti S

  • 5/23/2018 IIRMS Overview ERW Train Feb162004

    29/43

    Executive Summary

    30 June 2014 29

    0%

    100%

    2002 2003 2004 2005 2006 2007 2008 2009 2010 2011

    Budget Year

    1 GOOD

    2 FAIR

    3 POOR

    4 BAD

    NDONESIA NATIONAL ROAD ( 3.00 T ) - Ten Year KPI: Network Roughness (Roads

    Kinerja Jln Nasional utk Skenario Pendanaan

    Rp. 3 trilyun/tahun

    E ec ti e S mmar

  • 5/23/2018 IIRMS Overview ERW Train Feb162004

    30/43

    Executive Summary

    30 June 2014 30

    Benefit vs Biaya

    0

    50

    100

    150

    200

    250

    300

    350

    400

    450

    500

    3.0 3.5 4.0 4.5 5.0 5.5 6.0 6.5 7.0 7.5 8.0

    Annual Expenditure 2000 - 2010 (Rp trillion)

    NPV

    (Rptrillio

    n)

    Executive Summary

  • 5/23/2018 IIRMS Overview ERW Train Feb162004

    31/43

    Executive Summary

    30 June 2014 31

    Programming Module

    SEPM mencari alternatif penanganan yang terbaik

    (optimal) sesuai dengan ketersediaan dana

    Penanganan terbaik untuk setiap segmen Penanganan diagregasi secara linear & menurut

    waktu

    Setiap Segmen akan mendapat rekomendasi jenis

    dan waktu penanganan

    Intervensi manual tidak diperkenankan

    Executive Summary

  • 5/23/2018 IIRMS Overview ERW Train Feb162004

    32/43

    Executive Summary

    30 June 2014 32

    Programming

    Year 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42

    1

    2

    3

    1 - 3

    1 - 3

    1

    2

    3

    Betterment Periodic Routine

    Allocate treatment len ths to ears 1 to 3

    Segment

    O timised out ut from SEPM b se ment

    A re ate betterment and eriodic treatments for ears 1 to 3

    Fill a s less than s ecified len th

    Executive Summary

  • 5/23/2018 IIRMS Overview ERW Train Feb162004

    33/43

    Executive Summary

    30 June 2014 33

    Budgeting Module

    Menterjemahkan hasil Programming dalam

    format dokumen administrasi (Satuan I, II,

    III dan DIP) Data berjenjang sesuai hirarki (Proyek,

    Bagpro, Paket, Ruas)

    Executive Summary

  • 5/23/2018 IIRMS Overview ERW Train Feb162004

    34/43

    Executive Summary

    30 June 2014 34

    Road Design System

    RDM yang telah dikembangkan tahun 1994

    tidak pernah dimanfaatkan

    RDS telah diperbaiki dan memiliki menu

    sistem dengan Visual Basic

    Menyediakan fasilitas eksport untuk ERM

    module

    Executive Summary

  • 5/23/2018 IIRMS Overview ERW Train Feb162004

    35/43

    Executive Summary

    30 June 2014 35

    Economic Review Module

    FSEEM yang baru

    Dapat menganalisa hasil input data sesuai

    dengan keinginan pemakai Menghitung NPV dan IRR

    Operasi tahun tunggal

    Standalone atau terintegrasi dengan IRMS Dapat menampilkan data input dan data

    disain dalam bentuk strip map

    Executive Summary

  • 5/23/2018 IIRMS Overview ERW Train Feb162004

    36/43

    Executive Summary

    30 June 2014 36

    Kemampuan Lain ERM

    Import/Export ke propinsi

    Versi tahun jamak ERM

    Program dapat dimanipulasi secara manual

    Dapat ber-interface dengan Budgeting Module

    Dapat menampung komentar pemakai

    Executive Summary

  • 5/23/2018 IIRMS Overview ERW Train Feb162004

    37/43

    Executive Summary

    30 June 2014 37

    Construction Implementation

    Module

    Mengimport data bulanan dari KPE/SIPP

    Data ruas harus dicek sesuai dengan nomor

    data di IRMS

    Membentuk file on going

    Executive Summary

  • 5/23/2018 IIRMS Overview ERW Train Feb162004

    38/43

    Executive Summary

    30 June 2014 38

    Monitoring & Review Module

    Merekam data masukan untuk design dan

    perkiraan biaya untuk setiap tahap dalam

    siklus manajemen jalan

    Diharapkan dapat menjadi masukan untuk

    mencari penyebab perbedaan biaya dari

    tahap desain awal sampai denganpelaksanaan (konstruksi)

    Executive Summary

  • 5/23/2018 IIRMS Overview ERW Train Feb162004

    39/43

    Executive Summary

    30 June 2014 39

    Statistic Analysis Module

    Alat analisa untuk memproses dan

    mengkompilasi data-data detail kedalam

    format yang standar dan menarik untukdisajikan secara grafis

    Executive Summary

  • 5/23/2018 IIRMS Overview ERW Train Feb162004

    40/43

    Executive Summary

    30 June 2014 40

    Executive Summary

  • 5/23/2018 IIRMS Overview ERW Train Feb162004

    41/43

    Executive Summary

    30 June 2014 41

    Kesimpulan (1)

    IRMS dan IIRMS dapat menjadi alat bantu

    yang efektif untuk perencanaan dan

    manajemen pembinaan jalan

    Data yang akurat merupakan syarat mutlak

    untuk pendaya-gunaan IRMS-IIRMS

    Diperlukan SDM yang berkompeten dan

    dalam jumlah yang mencukupi agar Sistem

    dapat dipelihara (dikembangkan)

    Executive Summary

  • 5/23/2018 IIRMS Overview ERW Train Feb162004

    42/43

    Executive Summary

    30 June 2014 42

    Kesimpulan (2)

    Saat ini dan kedepan merupakan perioda

    konsolidasi, penekanan pada aspek Institusi

    dan SDM (tidak hanya software) Pelembagaan Sistem di Pusat dan Daerah

    Peningkatan alokasi SDM utk pengoperasian

    dan pengembangan Sistem

    Executive Summary

  • 5/23/2018 IIRMS Overview ERW Train Feb162004

    43/43

    Executive Summary

    TERIMA KASIH

    ATAS PERHATIANNYA

    Mohon Saran dan Masukan

    Direktorat Bina Teknik

    Ditjen Prasarana Wilayah

    Jakarta

    16 Februari 2004