iec 61850 · 2007. 1. 9. · communication networks and systems in substations m a d r i d ( s p a...

93
© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 1 IEC 61850 SCC Schwarz Consulting Company, SCC Dipl.-Ing. Karlheinz Schwarz Im Eichbaeumle 108 76139 Karlsruhe / Germany Tel +49-721-684844 Fax +49-721-679387 Email [email protected] URL www.scc-online.de IEC 61850 - Communication networks and systems in Substations Ma d rid ( Sp a i n) N ovembe r 2 0 02 Ma d rid ( Sp a i n) N ovembe r 2 0 02

Upload: others

Post on 17-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 1

IEC 61850SCC

Schwarz Consulting Company, SCC Dipl.-Ing. Karlheinz SchwarzIm Eichbaeumle 10876139 Karlsruhe / Germany

Tel +49-721-684844Fax +49-721-679387Email [email protected] www.scc-online.de

IEC 61850 -Communication networks and

systems in Substations

Madrid (Spain)

November 2002Madrid (Spain)

November 2002

Page 2: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 2

IEC 61850SCCCurrent activities

• IEC 61850 (editor of part 7-1/7-2)

• IEC 61850 (project leaderconformance testing - part 10)

• Seamless CommunicationArchitecture within IEC

• IEC 61400-25 Wind Power /Decentralised Power Systems

Page 3: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 3

IEC 61850SCC

Past activities

• IEC 60870-6 TASE.2 (ICCP)

• IEC Fieldbus, Profibus, ...

• ISO 9506 MMS (Convenor ISO TC184SC5 WG2)

• ...

Page 4: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 4

IEC 61850SCC

15 min15 min

Content

• Scope and objectives of IEC 61850

• Approach of IEC 61850

• Content and structure of IEC 61850

• Introduction to IEC 61850-7-2 (ACSI)

• Communication mappings 8-x, 9-x

• Conformance testing

45 min45 min

30 min30 min

30 min30 min

Page 5: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 5

IEC 61850SCC

Scope of IEC 61850

Page 6: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 6

IEC 61850SCC

Scope

Systems in substations

Communication networks in substations

Page 7: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 7

IEC 61850SCC

Technical Services

Remote control (NCC)

CONTR. PROT.

FCT. A FCT. B

PROT. CONTR.

Sensors Actuators

Remoteprotection

BAY/UNIT LEVEL

STATION LEVEL

PROCESS LEVEL

HV Equipment

Remoteprotection

Process Interface

1,6

3 3

9

8

1,6

2 24,54,5

710 61850Interfaces

Page 8: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 8

IEC 61850SCC

IF1 protection-data exchange between bay and station level

IF2 protection-data exchange between bay level and remote protection(outside the scope of this standard)

IF3 data exchange within bay level

IF4 CT and VT instantaneous data exchange (especially samples) betweenprocess and bay level

IF5 control-data exchange between process and bay level

IF6 control-data exchange between bay and station level

IF7 data exchange between substation (level) and a remote engineer'sworkplace

IF8 direct data exchange between the bays especially for fast functions likeinterlocking

IF9 data exchange within station level

IF10 control-data exchange between substation (devices) and a remotecontrol center (outside the scope of this standard)

61850 Interfaces

Page 9: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 9

IEC 61850SCCSubstation system

Monitoring, Eng., ...

Control

Protection

Measurements

Page 10: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 10

IEC 61850SCC

Substation communication

Services (abstract)

Services (concrete)

Transport of messages(TCP/IP, ..., Ethernet, ...)

Page 11: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 11

IEC 61850SCC

Most definitions of IEC 61850

are applicable

in many other application areas.

Most definitions of IEC 61850

are applicable

in many other application areas.

BUT ...

Page 12: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 12

IEC 61850SCCApplication areas

Electric PowerDistributed Energy (Wind,Water, Fuel Cell, Solar, ...)GasWaterWaste Waterother industries

Report on the use of 61850 outside utilities: http://www.nettedautomation.com/news/n_45.html

Page 13: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 13

IEC 61850SCC

Objectives of IEC 61850

Page 14: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 14

IEC 61850SCCCurrent sampled value architecture

SensorsCT/VT

hardwiredsignals

otherdevices

Protectiondevices

Page 15: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 15

IEC 61850SCCIEC 61850 sampled value architecture

SensorsCT/VT

otherdevices

Protectiondevices

EthernetSwitch

networkedsignals

1

Page 16: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 16

IEC 61850SCC

Protectiondevice

hardwiredsignals

Current protection architecture

Page 17: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 17

IEC 61850SCC

Protectiondevice

networkedsignals

IEC 61850 protection architecture

EthernetSwitch

2

Page 18: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 18

IEC 61850SCCOther applications

3 4

6

5

EthernetSwitch

IEC 61850

Monitoring ControlEngineering

Monitoring ControlEngineering

Controlcenters

Controlcenters

Current

Page 19: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 19

IEC 61850SCC

BUT ...

... we have alreadyreplaced wires by

COMMUNICATION SYSTEMS !YES, BUT ...

Page 20: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 20

IEC 61850SCC

ControlProt. 1 Prot. 1Prot. 2 Prot. 2

Station Gateway

centralFunctions

HM I

Process interface Process interface Process interface

MVB,CAN other

Source: RWE, ABB, Alstom, Siemens

60870-5-103 FIELDBUSDNPMODBUS LON 60870-5

-101/4PROFIBUS

... You may have to many

Page 21: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 21

IEC 61850SCC

• Wind power control centre supervises 39wind turbines from 9 different suppliers.

• With the delivery of the turbine each supplierprovides a disk or CD for his own proprietary(hidden) communication solution.

• 9 different programs on different machines(DOS, Windows 98 or NT, Unix) must bestarted to communicate with all turbines.

• Integration require costly custom data-translation and data-mapping components.

• Wind power control centre supervises 39wind turbines from 9 different suppliers.

• With the delivery of the turbine each supplierprovides a disk or CD for his own proprietary(hidden) communication solution.

• 9 different programs on different machines(DOS, Windows 98 or NT, Unix) must bestarted to communicate with all turbines.

• Integration require costly custom data-translation and data-mapping components.

Vattenfall(Sweden)

Situation in Wind Power

Page 22: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 22

IEC 61850SCC

Objectives

Simplify Engineering

Reduce # of protocols

Use mainstream Technology

Common Objects for reuse

ONE Std for all apps/dev in a SS

Page 23: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 23

IEC 61850SCC

otherdevicsother

devicsotherdevics

EthernetSwitch

RelayA

BayController

ModernSwitchgear

ModernCT / VT

RelayB

RelayA

BayController

ModernSwitchgear

ModernCT / VT

RelayB

13

2

HMI

5 3

Engineering

453

ControlCenter

Router

6

sampled value exchange (1),fast exchange of I/O data (2),control and trip signals (3),engineering and configuration (4),monitoring and supervision (5),control-center communication (6)

sampled value exchange (1),fast exchange of I/O data (2),control and trip signals (3),engineering and configuration (4),monitoring and supervision (5),control-center communication (6)

“IEC 61850 Substation”

Page 24: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 24

IEC 61850SCC

IEC 61850

meets substation requirements

scalable

easy to add information models

uses standard communication

Page 25: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 25

IEC 61850SCCIEC 61850 is ...

Multi-

part (14)

multidisciplinary

multifarious

purpose

application

layered

Page 26: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 26

IEC 61850SCC

Approach of IEC 61850

Page 27: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 27

IEC 61850SCC

A new standard: For what?

To enable devices from differentmanufacturers to easily communicatewith any other device, at any location,at any time for monitoring, control, ...

to easily re-use software (devicemodels, APIs, ...),

to easily integrate, engineer andconfigure devices and applications, ...

Page 28: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 28

IEC 61850SCC

Change in design rules

today:bandwidth

cost

today:integration

cost

... and today:

simplify device (information)engineering and integration

Design rule in the past:

save transmission bandwidth

Page 29: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 29

IEC 61850SCC

Design rule for IEC 61850

Shift from the simple "wire-replacing"

I/O data (point lists) exchange to:

Application information models

Advanced information exchange methods

Internet-based communication suites

Page 30: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 30

IEC 61850SCC

IEC 60870-5-103IEC 60870-5-101IEC 60870-5-104

IEC 60870-6TASE.2/ICCP

UCA® 2.0

UCA ® trademark of EPRI (Palo Alto, USA)

IEC 61850

Experience taken into account

Domain experts Domain experts

Domain expertsDomain experts

Page 31: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 31

IEC 61850SCCConfiguration knowledge

MeasurementsStatus

VA

Status

substatio

n

documenta

tion

“Application”

<2673> <240.04>

Id 2673 is Phase A to

ground voltagein kV of ...

What is2673?

Page 32: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 32

IEC 61850SCCConfiguration info in the device

VA

Status

Named Information:PhV.phsA.cValPhV.phsA.rangePhV.phsA.q...PhV.phsA.unitsPhV.phsA.dbPhV.phsA.smpRate

Exchange:GetReportLog

some 30some 30

IEC 61850-7-3IEC 61850-7-3

IEC 61850-7-2IEC 61850-7-2

Container:SubMD/MMXU

IEC 61850-7-4IEC 61850-7-4

Report <PhV.phsA.cVal> <240.04>Get.response <PhV.phsA.units> <V><1000>

Page 33: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 33

IEC 61850SCC

therealthing

... is a Switch made of ...

Semantic/Meaning

Name „XCBR“ Circuit Breaker

IEC 61850IEC 61850

Page 34: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 34

IEC 61850SCC

90 Standard LN Models (PDIS, XCBR, ...)

500 Standard Data (Pos, ...)

100 Standard Data Attribute (stVal, q, ...)

10 Standard Comm.-Service Models

90 Standard LN Models (PDIS, XCBR, ...)

500 Standard Data (Pos, ...)

100 Standard Data Attribute (stVal, q, ...)

10 Standard Comm.-Service Models

Models

Page 35: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 35

IEC 61850SCC

Logical node groups Number oflogical nodes

System logical nodes 2

Protection functions 28

Protection related functions 10

Supervisory control 5

Generic references 3

Interfacing and archiving 4

Automatic control 4

Metering and measurement 7

Sensors and monitoring 3

Switchgear 2

Instrument transformer 2

Power transformer 4

Further power system equipment 14

88

Logical Node Models (LN)

Page 36: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 36

IEC 61850SCCWind Power Plant (IEC 61400-25)

Drawing developed by the U.S. Department of Energy - Wind Energy Program

Wind power plantcomponents:(focus)

- Wind turbine- Wind generator- Nacelle- Rotor- Gear- Brake- Yaw- ...

- Wind turbine- Wind generator- Nacelle- Rotor- Gear- Brake- Yaw- ...

Information Models

Page 37: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 37

IEC 61850SCC

Generator: MeasurandsGenerator speedDuty factor sent to generatorSlipGenerator current (Weier)Generator bearing temperatureGenerator temperatureGenerator 2 temperature

Generator: MeasurandsGenerator speedDuty factor sent to generatorSlipGenerator current (Weier)Generator bearing temperatureGenerator temperatureGenerator 2 temperature

Status informationThyristor openingGenerator connectedHeat generator (order)Status word from Weier

Status informationThyristor openingGenerator connectedHeat generator (order)Status word from Weier

What to define and exchange?

Real Wind GeneratorReal Wind GeneratorModelModel

Page 38: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 38

IEC 61850SCC

Common logical node information

Logical nodeLogical nodeinformation

information independent from the dedicated functionrepresented by the LN, e.g., mode, health, name plate,...

information representing either the status of the processor of the function allocated to the LN, e.g., switch type,switch operating capability, ...

Status information

information needed for the function of a logical node,e.g., first, second, and third reclose time, close pulsetime, and reclaim time of an autoreclosing function.

Settings

are analogue data measured from the process orcalculated in the functions like currents, voltages, power,etc., e.g., total active power, total reactive power,frequency, net real energy since last reset, ...

Measured values

are data, which are changed by commands likeswitchgear state (ON/OFF), tap changer position orresetable counters, e.g., position, block opening, ...

Controls

Logical Node

Page 39: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 39

IEC 61850SCC

substitution

status

PosControl value “ctlVal”Operate timeOriginatorControl numberStatus value “stVal”QualityTime stamp...Substit. enableSubstit. value...

Pulse configurationControl modelSBO timeoutSBO class...

XCBR

control

configuration,description, and extension

Logical node

Data-Attributes

Data

BlkOpn

Controls

controllable

status value

Data

Page 40: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 40

IEC 61850SCC

Real devicesin anysubstation

Map

ping

TCP/IPNetwork

MMS

SCSM, e.g.61850-8-1

61850-7-2Services

logical device (Bay)

Hid

es/e

ncap

sula

tes

real

Wor

ld

...

(Virtual World)

LNLNLNLN

Position

Mode

XCBR1

61850-7-4 logicalnode (circuit breaker)

61850-7-4 data(Position)

61850-6configuration file

virtualisation

CompleteModel

Page 41: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 41

IEC 61850SCC

Network

Protection BayController

ProprietaryLink

UnitMerging

Sampledvalues

(multicast)

Sampled values (example)

Page 42: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 42

IEC 61850SCC

Current

LN TCTRAmpsARtg

LN TVTRVolts VRtg

LN PhsATCTRAmpARtg

LN NeutTCTRAmpARtg

LN PhsATVTRVolVRtg

LN NeutTVTRVol VRtg

LN BusBTVTRVolVRtg

LN PhsBTCTRAmpARtg

LN PhsBTVTRVolVRtg

LN PhsCTCTRAmpARtg

LN PhsCTVTRVolVRtg

Instantiate to „Neutral“ TCTR

61850-7-4LN

classes

Voltage

SMVControlDatSetRefSmvIDSmpRate

61850-7-2class

LN LLN0

DS1PhsATCTR.ARtgNeutTCTR.ARtgPhsATVTR.VRtgPhsATCTR.AmpPhsBTCTR.AmpPhsCTCTR.AmpNeutTCTR.AmpPhsATVTR.VolPhsBTVTR.VolPhsCTVTR.VolNeutTVTR.VolBusBTVTR.Vol...

SMVControl 1DatSetRef = 1SmvID = 1SmpRate = 8

SMVControl 2DatSetRef = 1SmvID = 2SmpRate = 16

...

Logical Device “MergingUnit”

Samples

Samples

8/period

16/period

Page 43: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 43

IEC 61850SCC

engineering and configuration (4)

IEC 61850 Approach

- measurements- status- protection- control- engineering- ...

ONE Data Model

... many services

control-center communication (6)

control and trip signals (3)

monitoring and supervision (5)

fast exchangeof I/O data (2)

sampled valueexchange (1)

Page 44: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 44

IEC 61850SCC

Content and structure of IEC 61850

Page 45: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 45

IEC 61850SCC

TCP/IPNetwork

DataValues

DataValues

Configuration file

according to 61850-6Communication

profiles

Mapping to e.g.MMS andTCP/IP/Ethernet(IEC 61850-8-1,-9-1, 9-2)

Ethernet,TCP/IP, ...

Ethernet,TCP/IP, ...

Logical Nodes &Data

InformationModels(61850-7-4 / -7-3)

2000+ items(name taggedinformation)

2000+ items(name taggedinformation)

Service “Interface”

InformationExchange(61850-7-2)

publ./subscr., get,set, control, ...

reporting, logging

publ./subscr., get,set, control, ...

reporting, logging

IEC 61850 “Layering”

Page 46: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 46

IEC 61850SCCSystem AspectsPart 1: Introduction and OverviewPart 2: GlossaryPart 3: General RequirementsPart 4: System and Project ManagementPart 5: Communication Requirements for Functions and Device Models

ConfigurationPart 6: Configuration Language for electrical Substation IEDs

Modelling IntroductionPart 7-1: Principles and Models

Information ModelsPart 7-4: Compatible Logical Node Classes and Data ClassesPart 7-3: Common Data Classes

Information Exchange MethodsPart 7-2: Abstract Communication Service Interface (ACSI)

Mapping to real specific Communication Networks (SCSM)Part 8-1: Mapping to MMS and ISO/IEC 8802-3 (Ethernet)Part 9-1: Sampled values over serial unidir. multidrop point to point link (802.3)Part 9-2: Sampled values over ISO/IEC 8802-3 (Ethernet)

TestingPart 10: Conformance Testing

Parts of IEC 61850

Page 47: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 47

IEC 61850SCCReuse of (and additions to) IEC 61850

additionalLNs and Data

additionalCDCs

Substations andFeeder Applications

Logical Nodes &Data Classes(current 7-4)

CommonData Classes (current 7-3) *1WD IEC 61400-25

XYZXYZ

Wind Power Plants(IEC TC 88*)

reuse

reuse

Page 48: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 48

IEC 61850SCC

Introduction to IEC 61850-7-2(ACSI)

Abstract Communication ServiceInterface

Page 49: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 49

IEC 61850SCC

ClientClient ServerServer ServerServer

IF IF IF IF

Peer-to-peerPeer-to-peer

IF

IEC 61850IEC 61850

Client/ServerClient/Server

IF

IF = interfcace

Local and external Interfaces

Page 50: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 50

IEC 61850SCCDLL Interface

MMS/IEC61850/UCAServer DLL

closeDLL

openDLL

storeDLLpk01

serviceDLL

VB or CApplication(real time data)

Packet 2(array of Int)

Packet 3(array of Int)

Packet x(array of Int)

CommunicationServices

values (Int32)

Simulator orApplication

add TSscaleunit

add TSscaleunit

add TSscaleunit

processvalues

+deadband

check+

reportif changes

require reportor

log data forlater retrieval

meas.

storeDLLpk02status

storeDLLpknstatus

values (Int32)

values (Int32)

Packet 1(array of Int)

Vp01

Vp02

Vp03

Vpx

values WTur......

VB Test Server

map datato models

(e.g., WTur)

report e.g. every 100 ms

wind powerplant

“Sigvards“

Details about the DLLs: http://www.nettedautomation.com/solutions/uca/products/dll/demo/

Page 51: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 51

IEC 61850SCC

ACSI Server

AC

SI S

erv

ice

s(m

ap

pe

d t

o M

MS

)61850-7-2 ACSI (Abstract

communication service interface)

DataData

Data SetData SetGet, Set, Def., Del., SubstituteGet, Set, Def., Del., Substitute

Management, Browse, Selfdescr.Management, Browse, Selfdescr.

Report ControlReport ControlSubscribe, Report, ...Subscribe, Report, ...

Log, Log ControlLog, Log ControlQuery Log, Empty LogQuery Log, Empty Log

Control ObjectControl ObjectControl, SBO, ...Control, SBO, ...

GSE ControlGSE ControlGen. Subst. Event (GOOSE, ...)Gen. Subst. Event (GOOSE, ...)

SMV ControlSMV ControlTransm. of sampled valuesTransm. of sampled values

Setting GroupSetting GroupSelectActiveSG, SetSGValues,...SelectActiveSG, SetSGValues,...

Page 52: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 52

IEC 61850SCC

IEDIED

Output (Signal)to process

Online Management

Online Selfdescription

GOOSE / SMV

Input (Signal)from process

various control services

DATADATA

DATADATA

ReportingReportingReporting/Logging

GOOSE/SMVcontrol

GOOSE/SMVcontrol

various services

GOOSE / GSSE locallocal

Control response

Inpu

t mod

elO

uput

mod

elInput and Output models

Page 53: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 53

IEC 61850SCCService model Description Services

Server Represents the external visible behaviour of a device.All other ACSI models are part of the server.

ServerDirectory

Applicationassociation

Provision of how two or more devices can be con-nected. Provides different views to a device: restrictedaccess to the server's information and functions.

AssociateAbortRelease

Logical device Represents a group of functions; each function is de-fined as a logical node.

LogicalDeviceDirectoryGetAllDataValues

Logical node Represents a specific function of the substation sys-tem, e.g., overvoltage protection.

LogicalNodeDirectory

Data Provides a means to specify typed information, e.g.,position of a switch with quality information, and time-stamp.

GetDataValuesSetDataValuesGetDataDefinitionGetDataDirectory

Data set Allow to group various data together. GetDataSetValueSetDataSetValueCreateDataSetDeleteDataSetGetDataSetDirectory

Substitution Supports to replace a process value by a remotelyset value.

SetDataValues

Setting groupcontrol

Defines how to switch from one set of setting valuesto another one and how to edit setting groups.

SelectActiveSGSelectEditSGSetSGValuesConfirmEditSGValuesGetSGValuesGetSGCBValues

ACSI models (1)

Page 54: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 54

IEC 61850SCC

Service model Description Services

Reporting and log-ging

Describes the conditions for generating reportsand logs based on parameters set by the client.Reports may be triggered by changes of processdata values (e.g., state change or deadband) orby quality changes. Logs can be queried for laterretrieval.

Reports may be send immediately or deferred(buffered). Reports provide change-of-state andsequence-of-events information exchange.

Buffered RCB:ReportGetBRCBValuesSetBRCBValues

Unbuffered RCB:ReportGetURCBValuesSetURCBValues

Log CB:GetLCBValuesSetLCBValues

Log:QueryLogByTimeQueryLogByEntryGetLogStatusValues

ACSI models (2)

Page 55: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 55

IEC 61850SCCService model Description Services

Generic substationevents(GSE)

Provides fast and reliable system-wide distribu-tion of data; peer-to-peer exchange of IED binarystatus information.

GOOSE means Generic Object Oriented Substa-tion Event and supports the exchange of a widerange of possible common data organised by aDATA-SET

GSSE means Generic Substation State Eventand provides the capability to convey statechange information (bit pairs).

GOOSE CB:SendGOOSEMessageGetReferenceGetGOOSEElementNum-berGetGoCBValuesSetGoCBValues

GSSE CB:SendGSSEMessageGetReferenceGetGSSEElementNumberGetGsCBValuesSetGsCBValues

Transmission ofsampled values

Fast and cyclic transfer of samples, e.g., of in-strument transformers.

Multicast SVC:SendMSVMessageGetMSVCBValuesSetMSVCBValues

Unicast SVC:SendUSVMessageGetUSVCBValuesSetUSVCBValues

Control Describes the services to control, e.g., devices orparameter setting groups.

SelectSelectWithValueCancelOperateCommandTerminationTimeActivatedOperate

Time andtime synchronisa-tion

Provides the time base for the device and sys-tem.

services in SCSM

File transfer defines the exchange of huge data blocks likeprograms.

GetFileSetFileDeleteFileGetFileAttributeValues

ACSI models (3)

Page 56: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 56

IEC 61850SCC

controlservicerequest

local

remote

local

remote

LLN0.Loc (local / remote)(for complete LD)

XCBR.Loc

OFF,BLOCKED,TEST/BL.

ON, TEST

XCBR.ModXCBR.Beh

ServiceRequest

testblocked...

Output model (1)

Page 57: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 57

IEC 61850SCC

ServiceRequest

testblocked

State Machine

Che

ckco

nditi

ons

SignalConditioning

value

Output (Signal)to process

Input (Signal)from process

Control/Setpoint resp.

Command termination

ON

OFF

XCBR.Pos.ctlVal

Controlattrib.

Set control attributes

status

XCBR.Pos.stVal

Output model (2)

Page 58: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 58

IEC 61850SCC

1113

124355646534743

9

2883

124355646534548

9

2003

124355646534543

9

2993

124355646534743

9

3003

124355646534548

9

1333

124355646534543

9

Operating Curve Type (volt.)Operating Curve Type (amp)Time MultiplierMinimum Operate TimeMax Operate TimeOperate Delay TimeType of Reset CurveReset Delay Time

LN PVOC

SettingsAVCrvTmACrvTmMultMinOpTmmsMaxOpTmmsOpDlTmmsTypRsCrvRsDlTmms

1223

124355646534543

LN PDIF

Restraint Mode RstMod 9Settings

Status information... Settings

data

active buffer(active setting

group)

logical node

settin

g gro

ups

each setting groupcontains a

consistent set ofvalues

each DATA, e.g.,„RsDlTmms“ ismore complex

than the depictedvalue (43). The

CDC of this data is„ING“ = Integerstatus setting:

- setVal- minVal- maxVal- stepSize- d

Setting group model

Page 59: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 59

IEC 61850SCC

retrievalmethod

time-criticalinformationexchange

can losechanges (ofsequence)

multipleclients to re-

ceive informa-tion

last changeof data

stored by

typical clientbut not

exclusive

Polling (Get-DataValues)

NO YES YES - Browser

UnbufferedReporting

YES YES NO - Real-time GUI

BufferedReporting*

YES NO NO Server Data Concen-trator

Log (used forSOE logging)

NO NO YES Client EngineeringStations

Input model - Overview

Page 60: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 60

IEC 61850SCCPolling versus logging (1)

Reg 00

Reg 01

Reg 02

Reg 03

Reg 04

Process

Reg 00 <240.1>Reg 00 <240.1>Reg 00 <240.1>Reg 00 <240.1>

Get Reg 00Get Reg 00Get Reg 00Get Reg 00

Get Reg 00Get Reg 00

Reg 00 <240.1>Reg 00 <240.1>

LogObject

Query

Var 00Var 01Var 02Var 03Var 04

Sequence-of-Events

Monitor

Changein value

Reg00„Phs_A_Volt“

Analogx1000Volt

Programming

Data Maintenance

!?ProgrammingData Maintenance

!?

Page 61: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 61

IEC 61850SCCPolling versus logging (2)

PhV.phsA

Process

...

IEC 61850IED

LogObjectQueryQuery

Sequence-of-Events

ReportingChangein value

Changein value

Monitor

configureconfigure

db=5

mag(AV)

Volt

1000

ProgrammingData Maintenance

!

QueryQuery

Page 62: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 62

IEC 61850SCC

Functionality in IED

IED online configurable

Polling versus logging (3)

“Documentation” in IED

Page 63: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 63

IEC 61850SCC

Input (Signal)from process/

application

SignalConditioner

SubstitutionValue

SetDataValueService „subEna“

Value(local issue)

Block/Unblock(local issue)

oper.block

oper. unblocked

subst.

unsubst.

Qualitychange(qchg)

Inter-mediate Value

operatorBlockedsubstituted

SmpR

ate

(FC

=CF)

61850-7-3

Quality

Input model (1)

Page 64: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 64

IEC 61850SCC

GetDataValue Response

data attributevaluesinstantaneou

smeasured

value

rangeof value

deadbandedvalue

qualityof value

timestamp

rangeof value

deadbandedvalue

qualityof value

timestamp

data change(dchg)

data change(dchg)

quality change(qchg)

data value andinternal event

61850-7-4/361850-7-2

instantaneousmeasured

value

Report

Log

instMag(FC=MX)

range (FC=MX,TrgOp=dchg)

mag (FC=MX,TrgOp=dchg)

hhll

quality (FC=MX,TrgOp=qchg)

good, ...invalid

db (FC=CF)

hhLim, ... llLim (FC=CF)

t (FC=MX)

dchg

dchg

qchgQuality change(qchg)

operBl., subst.

timestamp fromsample process

Intermediate Value

monitoring processdata attributesInput

model (2)

Page 65: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 65

IEC 61850SCC

Reporting

Buffered ReportBuffer

Unbuff. Report

BRCNameRptEnaDiscBuf

DataSetRefBufTimIntgPd

TrgOps (dchg, qchg, dupd, integrity, gi)

URCNameRptEna DataSetRefIntgPd

TrgOps (dchg, qchg, dupd, integrity, gi)

ReportformattingReportformatting

Logging

Logformatting

LogObject

Query

LogEntry

LCNameLogEna

DataSetRef

TrgOps (dchg,qchg, dupd)

61850-7-2

Grouped by DataSet

rangeof value

deadbandedvalue

qualityof value

timestamp

data change(dchg)

data change(dchg)

quality change(qchg)

instantaneousmeasured

value

internal events

rangeof value

deadbandedvalue

qualityof value

timestamp

data change(dchg)

data change(dchg)

quality change(qchg)

instantaneousmeasured

value

rangeof value

deadbandedvalue

qualityof value

timestamp

data change(dchg)

data change(dchg)

quality change(qchg)

instantaneousmeasured

value

Input model (3)Reporting and Logging

Page 66: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 66

IEC 61850SCC

Grouped by DataSet

instantaneousmeasured

valuestatusvalue

any data value

statusvalue

multicast

GOOSE

GOOSE

GCRef DataSetRef

GOOSEformatting

Application

publisher

GoEnaConfRevNdsCom

samples of measured values

Grouped by DataSet

instantaneousmeasured

valueinstantaneousmeasured

valueinstantaneousmeasured

valueunicast or multicast

Sampled MV

SMV

SvcNam DataSetRefSvEnaConfRevSmpRate

SMVformatting

Application

61850-7-2

publisher

Input model (3)GOOSE - Sampled Value

Page 67: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 67

IEC 61850SCC

substitution

status

PosControl valueOperate timeOriginatorControl number

Status value “stVal”QualityTime stamp...Substit. enableSubstit. value...

Pulse configurationControl modelSBO timeoutSBO class...

XCBR

control

configuration,description, and extension

BlkOpn

ControlsOperate <ON>

Report <ON>

Log

Configurate

Substitute

Selfdescription...

Trip <OFF>

1

2

3

4

5

6

7

LN, Data and Services

Page 68: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 68

IEC 61850SCC

Communication mappings 8-x, 9-x

Page 69: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 69

IEC 61850SCCIEC 61850 Profiles

Presentation

Session

Transport

Network

Data Link

Physical

Application

InformationIEC 61850

Information exchangeIEC 61850sampled

values GOOSE

Ethertype

9-1 9-2

TCP

IPEthernet, ...

Physical

ASN.1

IEC 61850/ISO 9506

RFC 1006

Session

IETF

IEC 61850-8-1

Page 70: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 70

IEC 61850SCC

Communication mapping 8-1

Page 71: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 71

IEC 61850SCC

IEC 61850-7-2

Logical Node Data Data Set GOOSE Transmission of Sampled Value...

SCSM 9-xSampled values over ...

9-1...

serialunidirectional

multidroppoint to point link

9-2...

ISO/IEC 8802-3

SCSM 8-1

Mapping to MMS (ISO/IEC 9506 Part 1 and Part 2)

and to ISO/IEC 8802-3

...

Mappings of IEC 61850

Page 72: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 72

IEC 61850SCC

Domain

map

IEC 61850-8-1MMS message*

MMS NamedVariable

* GOOSE/GSSE/SMV messages map directly to ISO/IEC 8802-3

GetDataValues -> ReadSetDataValues -> Write

LOGICAL DEVICELOGICAL NODE

DATA-SET

ControlBlock

Attributes

IEC61850-7-2

DATA

LOGControl Blocks(BRCB, URCB, GoCB,... LCB)

use

MMS NamedVariableList

map

InformationModels

IEC 61850-7-4

IEC 61850-7-3Common DATAClasses

Control Blocks

map

MMS NamedVariable

ControlBlockBehavior

map

MMSJournal

Mapping 8-1

Page 73: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 73

IEC 61850SCCK03/Q0CSWIK03/Q0CSWI$STK03/Q0CSWI$ST$PosK03/Q0CSWI$ST$Pos$stValK03/Q0CSWI$ST$Pos$qK03/Q0CSWI$ST$Pos$tK03/Q0CSWI$ST$Pos$origin$orCatK03/Q0CSWI$ST$Pos$origin$orIdentK03/Q0CSWI$SVK03/Q0CSWI$SV$PosK03/Q0CSWI$SV$Pos$subEnaK03/Q0CSWI$SV$Pos$subValK03/Q0CSWI$SV$Pos$subQK03/Q0CSWI$SV$Pos$subIDK03/Q0CSWI$COK03/Q0CSWI$CO$PosK03/Q0CSWI$CO$Pos$ctlValK03/Q0CSWI$CO$Pos$origin$orCatK03/Q0CSWI$CO$Pos$origin$orIdentK03/Q0CSWI$CO$Pos$TK03/Q0CSWI$CO$Pos$TestK03/Q0CSWI$CO$Pos$CheckK03/Q0CSWI$CO$Pos$SIDK03/Q0CSWI$CFK03/Q0CSWI$CF$PosK03/Q0CSWI$CF$Pos$ctlModel

MMS Named Variable

4 structuredcomponents of the MMSNamed Variable

Based on a document prepared by Jochen Haude (RWE).

Mapping 8-1(to MMS)

Page 74: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 74

IEC 61850SCC

Report[DatNam=FALSE](K03/Q0CSWI.Pos)

MMSpdu ::= CHOICE { .... unconfirmed-PDU [3] IMPLICIT SEQUENCE { .... . CHOICE { .... . . informationReport [0] IMPLICIT SEQUENCE { .... . . . variableAccessSpecification CHOICE { .... . . . . variableListName [1] CHOICE { .... . . . . . vmdSpecific [0] IMPLICIT VisibleSting </RPT>}. . . . . }, -- end of variableAccessSpecification. . . . listOfAccessResult [0] INPLICIT SEQUENCE OF CHOICE { .... . . . . success CHOICE { ... structure [2] IMPLICIT SEQUENCE OF -- „Data“. . . . . . CHOICE {... visible-string [10] IMPLICIT VisibleString <LLN0$RP$AllRptsCo>}, -- RptID

. . . . . . CHOICE {... bit-string [4] IMPLICIT BIT STRING <0001 000x>}, -- OptFlds

. . . . . . CHOICE {... bit-string [4] IMPLICIT BIT STRING <0100 0000 0000 0000 0000 xxxx>}, -- InclBS

. . . . . . CHOICE {... structure [2] IMPLICIT SEQUENCE OF -- Value(s) - here only one

. . . . . . . CHOICE {... structure [2] IMPLICIT SEQUENCE OF -- Value

. . . . . . . . CHOICE {... integer [5] IMPLICIT INTEGER <1> }, -- stVal

. . . . . . . . CHOICE {... bit-string [4] IMPLICIT BIT STRING <0000 0000 0000 0xxx>}, -- q

. . . . . . . . CHOICE {... utc-time [17] IMPLICIT UtcTime<SS SS SS SS QQ MM MM MM>}, -- t

. . . . . . . . CHOICE {... structure [2] IMPLICIT SEQUENCE OF -- origin

. . . . . . . . . CHOICE {... integer [5] IMPLICIT INTEGER <3> }, -- origin.orCat

. . . . . . . . . CHOICE {... visible-string [10] IMPLICIT VisibleString <???> }} -- origin.orIdent

. . . . . . . . } -- end of „Value“

. . . . . . . }, -- end of „Value(s)“

. . . . . . CHOICE {... integer [5] IMPLICIT INTEGER <1>} -- reasonCode

. . . . . . } -- end of „Data“

. . . . . } -- end of ListOfAccessResult

. . . . } -- end of informationReport

. . . }

. . } -- end of unconfirmedPDU

. } -- end of MMSpdu

A3 4E

A0 4C

01 0680 04 XX XX XX XX

A0 42A2 408A 11 XX XX XX XX XX XX XX XX XX XX

XX XX XX XX XX XX XX84 02 01 1084 04 04 80 00 00A2 1EA2 1C85 01 0184 03 03 00 0090 08 XX XX XX XX XX XX XX XXA2 0885 01 038A 03 XX XX XX

85 01 01

Σ 80 Byte(44 Byte pay load)

Identi

fier (T

ag)

Length

Content

MMS Syntax (written in ASN.1) defined in ISO 9506-2

Interpretation of received message(Tag values -> ASN.1 syntax (Schema))

1 octet for the tag;1 octet for length;1 octet for value

Based on a document prepared by Jochen Haude (RWE).

Page 75: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 75

IEC 61850SCCMappings

ImplementedServiceModels:LD, LN,DATA,DATA-SET,Control Blocks,LOG, ...

RealData

Mapped to MMSModels and Services

Serialization applying ASN.1BER encoded MMS messages

Serialization applyingXML encoded „MMS

messages“

development effort (estimated)

~1/10 ~3/10~6/10 given

Page 76: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 76

IEC 61850SCC

Communication mapping 9-1

Page 77: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 77

IEC 61850SCC

Merging Unit

Line Protection Bay ControllerEthernet

Controller

MultiplePorts

EthernetController

EthernetController

ProprietaryLink

ProprietaryLink

Serial unidirectionalMultidrop point to point link

Synchronisation, monitoring, testand configuration interfaces

Binary Inputs

Architecture

Page 78: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 78

IEC 61850SCC

Empty

MAC - SublayerISO/IEC 8802-3

andPriority tagging/VLAN acc. to

IEEE 802.1Q

Link Layer

Physical Layer

Empty

Empty

Empty

SCSM for ISO/IEC 8802-3:Definition of ASDU's

Network Layer

Transport Layer

Session Layer

Presentation Layer

Application Layer

100Base-FXIEEE 802.3

10Base-TIEEE 802.3

10Base-FLIEEE 802.3

AUI-InterfaceIEEE 802.3

Communication Stack

Page 79: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 79

IEC 61850SCC27 26 25 24 23 22 21 20

Byte 1 msb Length of ASDU ( = 44)

Byte 2 ASDU

Header lsb

Byte 3 msb LNName ( =02) lsb

Byte 4 msb DataSetName (=01) lsb

Byte 5 msb

Byte 6 LDName

lsb

Byte 7 msb Rated Phase Current

Byte 8 lsb

Byte 9 msb Rated Neutral Current

Byte 10 lsb

Byte 11 msb Rated Phase Voltage

Byte 12 lsb

Byte 13 msb Rated Delay Time

Byte 14 lsb

Byte 15 msb Current Phase A, prot.

Byte 16 lsb

Byte 17

ASDU(universaldata set )

msb Current Phase B, prot.

Byte 18 lsb

Byte 19 msb Current Phase C, prot.

Byte 20 lsb

Byte 21 msb Current Neutral

Content universal data set based on IEC 60044-8

... ...

Page 80: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 80

IEC 61850SCC

Conformance testing

Page 81: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 81

IEC 61850SCC

Scope

This part of IEC 61850 specifies methods for

conformance testing of devices

of substation automation systems.

In addition it gives guidelines for setting up testenvironments and specifies levels ofinteroperability. Thus it enables the

investigation of conformance claims and toestablish their validity.

Part 10: Conformance Testing

Page 82: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 82

IEC 61850SCCStart

Static Confor-mance review

SelectionParameterisation

Dynamic Tests________________________

Basic Interconnection testing

Capability Testing

Behaviour Testing

Analysis of Results

Final Conformance ReviewSynthesis and Conclusion

Test Report Production

End

PICS

PIXIT

Static Confor-mance Requirm.

Dynamic Confor-mance Requirm.

ConformanceTest Suite

MICS

Conceptual conformance assessment process

Page 83: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 83

IEC 61850SCCTest system configuration

Page 84: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 84

IEC 61850SCC

Comm.Processorf1

Physical device #1Sender

Comm.Processor f2

Physical device #2Receiver

Time Requirement

a b c

Performance

Page 85: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 85

IEC 61850SCC

Additional issues

Page 86: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 86

IEC 61850SCC

IEC 61850IEC 61850 Standard: 2002/3

UCA UCA

IEEE TR: 1999

UCA, TASE.2 and IEC 61850

TASE.2TASE.2

Standard: 1997

Page 87: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 87

IEC 61850SCCComparison of Modelling

(Virtual World)

Hid

es/

en

ca

psu

late

s re

al W

orl

d

Logical Device

Ma

pp

ing

MMS

LNLNLNLN

XSWI PosSTXSWI VMXXSWI PosRPXSWI ALG

...

?

61850Services

Ma

pp

ing

61850(2003)

„Points“

„DeviceModel“

„DeviceModel“

1

2

3

(Virtual World)

Hid

es/

en

ca

psu

late

s re

al W

orl

d

PointsM

ap

pin

g

MMS

TypeTypeTypeTypeTypeTypeTASE.2

Services

TASE.2(1997)

„Points“

UserConvention„Xyz“ Type

Page 88: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 88

IEC 61850SCC

7-2

7-3

7-4 Compatible Logical Nodeand Data Classes

Common Data Classes

Abstract CommunicationService Interface (ACSI)

Mapping to MMS and Ethernet8-x Common ApplicationService Model (CASM)

Standard Data Types andCommon Components

Common Class Definitions

GOMSFE

Device Models

UCA 261850-x-y

GOOSE Communication

Building Blocks (Bricks)

SV Mapping to Ethernet9-xConformance Testing10

Configuration DescriptionLanguage6

Communicationrequirements5

System andProjectmanangement4

General requirements3

IEC 61850 - UCA

Page 89: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 89

IEC 61850SCC

Application dataand encoding

Basic data modelsand services

common and specific datastructures and services

Data structures fordevice models

Information models

TASE2

No No No many

Features

very flexible,can add new

Limited and fixed

few few manysome

870-5 TASE.1 61850

No No No many

Comparison

Comprehensive comparison 101, 103, 104, TASE.2, 61850: http://www.nettedautomation.com/news/n_44.html

Yes Yes YesYes

Page 90: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 90

IEC 61850SCC

UCA™compatible

UCA™compatible

...

IEC 61850 - UCA

Page 91: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 91

IEC 61850SCC

WIND TURBINE GENERATOR SYSTEMSIEC 61400 Part 25 - Communications for

monitoring and control of wind power plants

Example of Decentraliced Power System andOpen Communication Systems based on IEC 61850

Details and first Working Draft: http://www.scc-online.de/std/61400

Page 92: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 92

IEC 61850SCC

Page 93: IEC 61850 · 2007. 1. 9. · Communication networks and systems in Substations M a d r i d ( S p a i n ) N o ve m b e M a r r 2 0 0 2 i d ... SCC IEC 61850 Current activities •

© SCC, Nov 2002; Madrid, Karlheinz Schwarz Page 93

IEC 61850SCC

[email protected]/news/

Demo-Software:www.nettedautomation.com/solutions/demo/20020114/index.html